Вы находитесь на странице: 1из 10

DE-

CARBONIZER
Definition
Used in conjunction with TRD and/or BlackHOLE plant. The de-carbonizer
is a electromagnetic impulse/signal that changes the material at a
molecular level and can be adjusted to garner a single carbon atom up
to a string of 37 atoms.
Off-gases that can be produced are, but not limited to, jet fuel, bunker
fuel, bio-diesel, gasoline and natural gas.
Output can be alternated to suit capacity needs.
Capabilities
Feed(tires) & biomass is chopped up and shredded into ¼” pieces at a
specific mix.
Metal is removed, recycled.
Use low-grade carbon black to augment bio-diesel production.
Bio-fuel is produced.
Uses a combination of a bio-fuel/hydrogen generator for fuel for self-
sustainment.
Can be-relocated to location of refuse to reduce the cost of transport
and increase savings.
By The Numbers
• Cost per 200 ton unit; $10’000’000 installed
• Yearly Operational cost for 1 units; PER MONTH per Year
Maintenance $10,000 $120,000
• Build Time; 6 months Labour $102,750 $1,233,000
• Transport; 1 month Production Costs $20,416 $244,992

Per unit
• Assembly; 2 months
• Testing; 1 month
• Total Time from drawing to delivery; 10 Months
• Size; 17Mx11Mx7M (L,W,H), extremely small footprint
• Use of local labour to assemble with assistance from imported
supervisors for final construction and training.
Revenue opportunities generated for total of Two units
with added bio-mass and oil from TRD.
• Bio-Diesel; 298’782 liters/day (84’164 Gallons/day), 1530 Barrels/day. Will be
augmented by Carbon black and Bunker Fuel from TRD unit.
• Carbon Black; 15 metric tons/day, high grade carbon black for export.
Based on current market values & estimated over a 1 year yield
Bio-Diesel: will yield 30’298’860 Gallons per year.
At a market rate of $3.55 Gallon (average of last year),
will yield $107’560’953 / year in gross revenue.
Carbon Black(highest quality): 5’400 tons/year.
At an average market rate of $1433 per ton
will yield $7’738’200/year
Less costs: Net revenue of $111’458’424 / year
Revenue generated for TIRES only plant
Job Creation
For the needed 1 units installed a minimum of 37/day will be employed.
Supervisor 1 1 1 3 $16,250 $195,000
Engenieer 2 2 2 6 $32,500 $390,000
Technicians 0 0 0 0 $0 $0
Loaders 2 2 2 6 $18,000 $216,000
sorters 0 0 0 0 $0 $0
general labour 2 2 2 6 $18,000 $216,000
transport 1 1 1 3 $9,000 $108,000
recovery 0 0 0 0 $0 $0
lab technicians 1 1 1 3 $9,000 $108,000
9 9 9 27 $102,750 $1,233,000

For 3 shifts daily

PER MONTH per Year


Maintenance $10,000 $120,000
Labour $102,750 $1,233,000
Production Costs $20,416 $244,992
Comparison

Class Efficiency on Average % Length of process to convert

De-Carbonizer 100 Consistent flow

No Comparison Unique
White Papers

• Tested and verified in Calgary, alpha unit for test purposes


operational
• Final Beta unit under lease and being installed in Fort
McMurray, Alberta, Canada for Oil/Gas Company
CONTACT
Steve Foster
Mob. UAE: +971 52 795 1548
Mob. UK: +44 7515 316516
E: steve@hvwwg.com E: info@hvwwg.com

Вам также может понравиться