Вы находитесь на странице: 1из 14

PT.

Global Process Systems


Sekupang Logistics Base, Block F, No.6,
JI. R.E. Martadinata, Sekupang
Batam -29422 Indonesia
Tel. No. + 62 778 322696, Fax No. +62 778 322695

Project : EAST FORTUNE FUEL GAS PACKAGE BERANTAI – OFFSHORE MALAYSIA

Activity ID Activity Name Dur Start Finish March April

KEYDATES/MILESTONE 172 28-Feb-11 16-Sep-11


ENGINEERING 66 3-Mar-11 19-May-11 6 6 6 6 6 6 6
PROCUREMENT 117 9-Mar-11 24-Jul-11 6.1579 6.1579 6.1579 6.1579 6.1579 6.1579
MECHANICAL 117 9-Mar-11 24-Jul-11 6.1579 6.1579 6.1579 6.1579 6.1579 6.1579
PIPING 91 21-Mar-11 5-Jul-11 6.0667 6.0667 6.0667 6.0667 6.0667
Valves 82 21-Mar-11 24-Jun-11
PROC260 Sourcing/TBE/PO of Valves 10 21-Mar-11 1-Apr-11
PROC270 Lead time of Valves 74 2-Apr-11 24-Jun-11 6.2 6.2
Bulks 33 4-Apr-11 13-May-11 5.5 5.5
PROC150 Sourcing/TBE/PO of Pipe, Fittings & Flanges 10 4-Apr-11 16-Apr-11 5.0 5.0
PROC160 Lead time of Pipe, Fittings & Flanges 24 16-Apr-11 13-May-11
Delivery 45 13-May-11 5-Jul-11
PROC220 Delivery of Pipe, Fittings & Flanges 5 13-May-11 18-May-11
PROC230 Delivery of Valves 10 24-Jun-11 5-Jul-11
ELECTRICAL 39 25-Apr-11 9-Jun-11 4.875
Electrical Bulks 39 25-Apr-11 9-Jun-11
PROC330 Sourcing/TBE/PO of Electrical Bulks 10 25-Apr-11 6-May-11
PROC340 Lead time / Delivery of Electrical Bulks 30 6-May-11 9-Jun-11
INSTRUMENT 62 18-Apr-11 29-Jun-11 6.2
Instrument Items (Field Instrument) 56 25-Apr-11 29-Jun-11
PROC170 Sourcing/TBE/PO of Field Instuments 28 25-Apr-11 26-May-11
PROC200 Lead time/ Delivery of Field Instuments 40 15-May-11 29-Jun-11
Instrument Bulks 39 18-Apr-11 2-Jun-11
PROC310 Sourcing/TBE/PO of Instrument Bulks 10 18-Apr-11 29-Apr-11
PROC320 Lead time/ Delivery of Instrument Bulks 30 29-Apr-11 2-Jun-11
STRUCTURAL 45 12-Apr-11 3-Jun-11 5.625 5.625
Bulks 31 12-Apr-11 18-May-11 5.2
PROC350 Sourcing/TBE/PO for Primary Steel 10 12-Apr-11 23-Apr-11 5.0
PROC360 Sourcing/TBE/PO for Secondary Steel 10 19-Apr-11 30-Apr-11
PROC370 Sourcing/TBE/PO for Tertiary Steel 8 9-May-11 18-May-11
Delivery 34 23-Apr-11 3-Jun-11
PROC280 Leadtime/Delivery of Primary Steel 14 23-Apr-11 9-May-11
PROC290 Leadtime/Delivery of Secondary Steel 14 30-Apr-11 16-May-11
PROC300 Leadtime/Delivery of Tertiary Steel 14 18-May-11 3-Jun-11
CONSTRUCTION 141 3-Mar-11 13-Aug-11 6.4091 6.4091 6.4091 6.4091 6.4091 6.4091 6.4091
GEN030 WPS/ WQT 12 3-Mar-11 18-Mar-11
GEN010 Site Preparation 15 26-Mar-11 15-Apr-11
GEN040 Primary Steel Shop Drawings 17 29-Mar-11 26-Apr-11
GEN050 Secondary Steel Shop Drawings 18 8-Apr-11 10-May-11 3 3
GEN060 Tertiary Steel Shop Drawings 16 27-Apr-11 25-May-11
GEN070 Piping Shop Drawings 10 28-Apr-11 16-May-11
GEN020 Blasting/ Priming Steel 3 11-May-11 16-May-11
Structural 63 16-May-11 28-Jul-11
ST010 Prefab of Beams 12 16-May-11 31-May-11
ST060 Assembly of Lower Deck Frame 15 19-May-11 8-Jun-11
ST070 Assembly of Upper Deck Frame (w/ hold on some seconda... 14 21-May-11 9-Jun-11
ST020 Prefab of Miscl Plate (Stiffener, Gussets, etc) 14 26-May-11 13-Jun-11
ST030 Prefab of Access Patform 13 27-May-11 13-Jun-11
ST040 Prefab of Handrails 8 8-Jun-11 18-Jun-11
ST090 Installation of Column @ Lower Deck 5 8-Jun-11 14-Jun-11
ST180 Install Access Platform 5 14-Jun-11 20-Jun-11
ST050 Prefab of Gratings 12 18-Jun-11 4-Jul-11
ST080 Installation of Equipment Foundation/Plating @ Lower Deck 5 21-Jun-11 27-Jun-11
ST120 Lift & Install Upper Level Deck onto Lower Level Deck 5 21-Jun-11 27-Jun-11
ST100 Painting of Module frame 4 27-Jun-11 2-Jul-11
ST130 Installation of Access Platform 6 27-Jun-11 5-Jul-11
ST140 Installation of Handrails 8 5-Jul-11 15-Jul-11
ST160 Installation of Ladders & Stairways 6 5-Jul-11 13-Jul-11
ST150 Installation of Gratings 8 12-Jul-11 21-Jul-11
ST170 Module Cleaning & Final Touch-up Paint 6 20-Jul-11 28-Jul-11
Mechanical 23 2-Jul-11 29-Jul-11
MEC040 Install Dummy Heaters & Filters 2 2-Jul-11 5-Jul-11
MEC020 Installation of Pressure Vessel 2 25-Jul-11 27-Jul-11
MEC010 Installation of FG Heater A/B (Incl Control Panels) 2 27-Jul-11 29-Jul-11
MEC030 Installation of FG Filter A/B 2 27-Jul-11 29-Jul-11
Piping 70 18-May-11 8-Aug-11
PIP010 Fabrication of Pipe Spool 26 18-May-11 21-Jun-11
PIP020 Fabrication of Standard Pipe Support 12 28-May-11 14-Jun-11
PIP080 Painting of Pipe Spool/ Supports 16 7-Jun-11 28-Jun-11
PIP030 Installation of Standard Pipe Support @ Lower & Upper De... 8 14-Jun-11 24-Jun-11
PIP090 Erect/ Rig Pipe 15 20-Jun-11 9-Jul-11
PIP040 Installation of Pipe Spool 20 6-Jul-11 1-Aug-11
PIP050 Flushing & Hydrotest 18 11-Jul-11 3-Aug-11
PIP060 Re-instatement 10 25-Jul-11 6-Aug-11
PIP070 Insulation works 5 1-Aug-11 8-Aug-11
E&I 34 27-Jun-11 5-Aug-11
ENI010 Fabrication of E&I Support 7 27-Jun-11 5-Jul-11
ENI020 Installation of E&I Support 5 5-Jul-11 12-Jul-11
ENI040 Installation of Electrical Items 5 12-Jul-11 19-Jul-11
ENI030 Installation E&I Cable Tray 5 19-Jul-11 26-Jul-11
ENI050 Installation of Field Instruments 6 20-Jul-11 28-Jul-11
ENI060 E&I Cabling works 5 22-Jul-11 29-Jul-11
ENI070 Instrumentation In-line Items Re-instatement 4 30-Jul-11 5-Aug-11
Testing/Precomm 19 22-Jul-1113-Aug-11
PRE001 Mechanical Completion 12 22-Jul-11 8-Aug-11
PRE002 E&I Precommissioning 12 25-Jul-11 9-Aug-11
PRE003 Punchlisting 12 29-Jul-1113-Aug-11
DELIVERY EX-WORKS 5 14-Aug-11 19-Aug-11
DEL001 Preparation & Loadout to Quayside 2 14-Aug-11 16-Aug-11
DEL002 Ready at Quayside for Loadout & Sea Fastening 0 16-Aug-11
DEL003 Loadout & Sea Fastening (By others) 2 16-Aug-11 18-Aug-11
DEL004 Sailaway (By others) 0 19-Aug-11
May June July August Sept %

33.47
63.64
31.58
31.58
33.33

12.50

10.00
25.00

31.82

0.00
0.00

0.00

0.00

0.00

0.00
PT. Global Process Systems
Sekupang Logistics Base, Block F, No.6,
JI. R.E. Martadinata, Sekupang
Batam -29422 Indonesia
Tel. No. + 62 778 322696, Fax No. +62 778 322695

Project : EAST FORTUNE FUEL GAS PACKAGE BER -1.62

Activity ID Activity Name Dur Start Finish March April May June July

KEY CONSTRUCTION 141 3-Mar-11 13-Aug-11


CONSTRUCTION 141 3-Mar-11 13-Aug-11 6.4 6.4 6.4 6.4 6.4 6.4 6.4 6.4
GEN030 WPS/ WQT 12 3-Mar-11 18-Mar-11 4.0 4.0 4.0
GEN010 Site Preparation 15 26-Mar-11 15-Apr-11 3.8 3.8 3.8 0.0
GEN040 Primary Steel Shop Drawings 17 29-Mar-11 26-Apr-11 0.0 0.0 0.0 0.0 0.0
GEN050 Secondary Steel Shop Drawings 18 8-Apr-11 10-May-11 0.0 0.0 0.0 0.0
GEN060 Tertiary Steel Shop Drawings 16 27-Apr-11 25-May-11 0.0
GEN070 Piping Shop Drawings 10 28-Apr-11 16-May-11 0.0
GEN020 Blasting/ Priming Steel 3 11-May-11 16-May-11
Structural 63 16-May-11 28-Jul-11
Mechanical 23 2-Jul-11 29-Jul-11
Piping 70 18-May-11 8-Aug-11
E&I 34 27-Jun-11 5-Aug-11
Testing/Precomm 19 22-Jul-11 13-Aug-11
DELIVERY EX-WORKS 5 14-Aug-11 19-Aug-11
July August Plan % Actual %

5.19 3.57
36.36 25.00
100.00
75.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
KEYDATES/MILESTONE
MILE010
MILE020
MILE050
MILE120
MILE100
MILE080
MILE030
MILE070
MILE040
MILE090
MILE110
MILE060
PAYMENT MILESTONE
PMIL10
PMIL00
PMIL20
PMIL30
PMIL50
PMIL40
ENGINEERING
PROCESS
General
DEPR021
DEPR005
DEPR011
DEPR003
DEPR016
DEPR009
DEPR010
DEPR006
DEPR004
DEPR008
MECHANICAL
General
DEME010
DEME040
Specifications
DEME030
DEME032
DEME042
Datasheets
DEME054
DEME056
DEME066
DEME076
PIPING/LAYOUT
Equipment Layout
DEPL000
Specifications
DEPL007
DEPL009
DEPL013
DEPL015
DEPL017
DEPL019
RFQ's/ MTO
DEPL028
DEPL026
Drawings
DEPL034
DEPL040
DEPL036
DEPL038
ELECTRICAL
Drawings
DEEL044
DEEL064
DEEL134
DEEL074
DEEL054
DEEL094
DEEL104
DEEL114
DEEL124
MTO/General
DEEL084
DEEL040
DEEL076
INSTRUMENTATION
Specifications
DEIN032
Datasheets
DEIN048
DEIN058
DEIN056
DEIN046
DEIN040
DEIN052
RFQ's / MTO
DEIN090
DEIN096
DEIN102
DEIN092
DEIN086
DEIN082
DEIN088
Drawings
DEIN024
DEIN014
DEIN006
DEIN016
DEIN124
DEIN134
DEIN114
DEIN018
DEIN064
DEIN020
STRUCTURAL
Analysis & Design Calculation Reports
DEST052
DEST010
DEST022
Specifications
DEST024
DEST026
Drawings
DEST030
DEST032
DEST034
DEST054
DEST036
DEST040
DEST056
DEST042
DEST058
PROCUREMENT
MECHANICAL
Pressure Vessels
PROC001
PROC002
PROC003
PROC004
Electric Heaters
PROC005
PROC006
PROC007
PROC008
Filters
PROC009
PROC010
PROC011
PROC012
Delivery
PROC120
PROC100
PROC110
PIPING
Valves
PROC260
PROC270
Bulks
PROC150
PROC160
Delivery
PROC220
PROC230
ELECTRICAL
Electrical Bulks
PROC330
PROC340
INSTRUMENT
Instrument Items (Field Instrument)
PROC170
PROC200
Instrument Bulks
PROC310
PROC320
STRUCTURAL
Bulks
PROC350
PROC360
PROC370
Delivery
PROC280
PROC290
PROC300
CONSTRUCTION
GEN030
GEN010
GEN040
GEN050
GEN060
GEN070
GEN020
Structural
ST010
ST060
ST070
ST020
ST030
ST040
ST090
ST180
ST050
ST080
ST120
ST100
ST130
ST140
ST160
ST150
ST170
Mechanical
MEC040
MEC020
MEC010
MEC030
Piping
PIP010
PIP020
PIP080
PIP030
PIP090
PIP040
PIP050
PIP060
PIP070
E&I
ENI010
ENI020
ENI040
ENI030
ENI050
ENI060
ENI070
Testing/Precomm
PRE001
PRE002
PRE003
DELIVERY EX-WORKS
DEL001
DEL002
DEL003
DEL004