Br no 299

SCOUR DEPTH CALCULATION


Proposed Linear water way : L = 1 x 13.91 = 13.91 m
Design flood discharge : Q = 111.41 Cumecs
Designed HFL : HFL = 86.990
Bed Level : BL = 83.540
Foundation design discharge for
: Qf = Q + 30 % of Q
catchment less than 500sqkm
= 111.41 + 33.420 = 144.83 Cumecs
2 1/3
Depth of scour for sandy bed : D = 1.338 x Qf
f
Where Qf is the discharge intensity : Qf = Qf / L
in cubic metre per second per metre = 144.83 / 13.91 = 10.41 Cumec / m
Silt factor for medium sand : f = 1.2
2 1/3
Then, Depth of Scour D = 1.338 x 10.41 = 6.000 m
: 1.2
Maximum depth of scour 1.25 x D
: 1.25 x 6.00 = 7.500 m
Level upto which Scour may happen Designed HFL - Max Scour Depth
: 86.99 - 7.5 = 79.490 m AMSL
Scour below bed level Bed Level - Scour Level
: 83.54 - 79.49 = 4.050 m
Br no 242
SCOUR DEPTH CALCULATION
Proposed Linear water way : L = 3 x 6.10 = 18.30 m
Design flood discharge : Q = 47.32 Cumecs
Designed HFL : HFL = 91.906
Bed Level : BL = 90.801
Foundation design discharge for
: Qf = Q + 30 % of Q
catchment less than 500sqkm
= 47.32 + 14.200 = 61.52 Cumecs
2 1/3
Depth of scour for sandy bed : D = 1.338 x Qf
f
Where Qf is the discharge intensity : Qf = Qf / L
in cubic metre per second per metre = 61.52 / 18.3 = 3.36 Cumec / m
Silt factor for medium sand : f = 1.769
2 1/3
Then, Depth of Scour D = 1.338 x 3.36 = 2.480 m
: 1.769
Maximum depth of scour 1.25 x D
: 1.25 x 2.48 = 3.100 m
Level upto which Scour may happen Designed HFL - Max Scour Depth
: 91.906 - 3.1 = 88.806 m AMSL
Scour below bed level Bed Level - Scour Level
: 90.801 - 88.806 = 1.995 m
Br no 194A
SCOUR DEPTH CALCULATION
Proposed Linear water way : L = 1 x 30.50 = 30.50 m
Design flood discharge : Q = 56.26 Cumecs
Designed HFL : HFL = 88.937
Bed Level : BL = 87.677
Foundation design discharge for
: Qf = Q + 30 % of Q
catchment less than 500sqkm
= 56.26 + 16.880 = 73.14 Cumecs
2 1/3
Depth of scour for sandy bed : D = 1.338 x Qf
f
Where Qf is the discharge intensity : Qf = Qf / L
in cubic metre per second per metre = 73.14 / 30.5 = 2.40 Cumec / m
Silt factor for medium sand : f = 2.842
2 1/3
Then, Depth of Scour D = 1.338 x 2.40 = 1.690 m
: 2.842
Maximum depth of scour for
: 1.25 x D
abutment
: 1.25 x 1.69 = 2.110 m
Maximum depth of scour for pier : 2 x 1.69 = 3.380

Level upto which Scour may happen Designed HFL - Max Scour Depth
: 88.937 - 2.11 = 86.827 m AMSL
Scour below bed level abutment Bed Level - Scour Level
: 87.677 - 86.827 = 0.850 m
Level upto which Scour may happen Designed HFL - Max Scour Depth
:
88.937 - 3.380 = 85.557 m AMSL
Scour below bed level pier : Bed Level - Scour Level
87.677 - 85.557 = 2.120 m