Вы находитесь на странице: 1из 7

Bhadani Quantity Surveyors and Training Pvt. Ltd.

About us
We provide Professional Training and Job Oriented Courses to Civil Engineers(Freshers or
Experienced) and Company Staff for the various positions for working in INDIA and GULF
Countries in the Areas of Quantity Surveying, Billing Engineer, Tendering and Procurement
Management Civil, Construction Management and Contract Management

The courses we provide are in great demand in INDIA and GULF Countries and these courses
will provide better job opportunities in Big MNCs and Major Construction Companies in
INDIA and Abroad.

We have trained more than 500+ Professionals and Freshers(Beginners) working in India
and Abroad. Also we provides Pre-Placement Training in Major Engineering Colleges in India.
Website

http://www.billingengineer.com/training-division.html

Headquarters

New Delhi, Delhi

Company Type

Educational Institution

Specialties

Quantity Surveying Training For Civil Engineers, Construction Contract Management,


Tendering and Procurement Management, Billing Engineering, Mechanical Electrical And
Plumbing, AutoCAD and Revit. Building Information Modeling.

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.

Level 1 - Duration: - 45 Days


Quantity Surveying
1. Understanding the Role of BHADANI'S Quantity Surveying in the Construction
Industry
2. Checklist of All Kinds of Civil Works at Site.
3. Construction Methodologies of Civil Works and How it works in Construction
Industry
4. Construction Activities Identification Analysis and Report Generation
5. Making Project Chartered and Feasible Reports
6. Project Risk Analysis and Action Reports
7. Understanding and Reading the Structural and Architectural Drawings
8. Quantity Take off from the Drawings Like PCC, RCC, Reinforcement, Shuttering Etc.
9. Quantity Take off from the Architectural Drawings (Like Brickwork, Plaster Painting
Putty Work Etc.)
10. Faster Take off Methodologies from Drawings of Civil
11. Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
12. Management Information System (MIS) Generation and Preparation in Proper
Formats as per IS Standards
13. Estimation of All Kinds of Civil Works
14. Estimation Technique During Design Phase
15. Estimation Technique During Pre-Construction Phase
16. Estimation Technique During Post-Construction Phase
17. Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
18. Pre-Engineered Building (PEB) Estimation
19. Costing Techniques of All Kinds of Civil Works (Concrete, Brickwork, Earthwork,
Finishing Work, Wood Work, Steel Work, Demolishing Works Etc.)
20. Costing Techniques- Risk Based Costing
21. Costing Techniques - Parametric Costing
22. Costing Techniques - Machinery Transport Management and Costing
23. Costing Techniques - Scope Estimation and Cost Analysis
24. S-Curve Reporting
25. Labour Deployment Planning As per Budget
26. Labour Economics and Productivity Analysis
27. Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S
New Technique
28. Economic Order Quantity (EOQ) and Management
29. Machinery Output Analysis as per Market Standards
30. Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
31. Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
32. Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs,
Columns, Raft, Footing, Staircase Etc.
33. Bill of Quantity (BOQ) Take off (Material and Preparation)
34. Rate Analysis of All Kinds of Civil Works
35. Material Reconciliation Techniques from Contractor and Client's Side
36. Material Procurement Strategies as per the techniques used in Quantity Surveying
37.

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.

Level 2 Duration: - 25 Days


Billing Engineering
1. Understanding the Role of BHADANI'S Billing Engineer / Invoice Engineering
in the Construction Industry of India and World
2. Billing Engineering Tasks at Site Office and Understanding the Role in Head office
with the Client Coordination
3. Account Basics requirement for Billing Engineer
4. Construction Billing Procedures from Client Side as well as Contractor Side
5. Interim Payment Certification (IPC) from Client Sides as well as Contractor Side
6. RA Bill Making - Client Billing - Subcontracting
7. Billing with GST and Without GST - hands of Expertise
8. CPWD and Corporations and PSU's Techniques of Billing
9. Invoice Generation Through ERP
10. Claim and Dispute Settlement Procedures and all required techniques in Billing and
MIS Generation for the same
11. Material Engineering Bills for Both Client Side as well as Contractor's Side
12. Third Party Contractor Billing
13. Joint Venture Companies / Contractor Billing
14. Petty/ Vendor Billing
15. Preliminary Billing - Post Construction Billing
16. Inter Alia Billing, International Billing Challan Generation
17. Claim Management Procedures used by Invoice Engineers
18. Claim of Price Variations as per Norms of Govt. of INDIA
19. Claim of Quantity Variations as per the Norms of Govt. of INDIA
20. Mode of Measurement as per IS Codes with Nomenclatures
21. Claim of Extra Item Analysis of All Kinds of Civil Works During the Site Execution
as well as Post Contracting Period
22. Vendor Vs. Client Bill Reconciliation

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.
LEVEL 3 & 4: - DURATION: - 30 DAYS
TENDERING & CONSTRUCTION CONTRACT
MANAGEMENT
( NATIONAL ANDINTERNATIONALCONTRACTINGAND COMPETITIVE BIDDING)

1. Tendering Documents Preparation


2. Tendering Documents Submission Guidelines
3. Tender Review Reports Generation (T.R.R) for the Contractors as well as
Consultants
4. Technical Bidding as per Government Laws and as per BHADANI'S Technique
5. Financial Bidding as per Government Laws and as per BHADANI'S Technique
6. Statutory Documents Preparation Techniques for the Tender
7. Purchasing and Negotiation Techniques used by Clients and as well as Contractor's
Side
8. Pre-Bid Meeting Strategy Building and Coordination with Client
9. Finding Deviations and Clarify with the Client
10. Tender Hunting
11. Reverse Auctioning Strategy Building and Pressurizing client for the tender
12. Pooling Technique to use effectively for the Tender to get Maximize Benefits
13. Evaluation Strategy - Bidding Strategy - Relationship Building
14. Indemnify the Tender with the Use of Effective Monitoring of the Tender
15. Entering into Contracts - Strategy Building Approach - Scientific Approach
16. Construction Contracts Documents Formulation and Preparation
17. Procedures in Contract Management - Pre - Construction and Post Construction Phase
18. Clearing, Forwarding and Transport
19. Transport Management
20. Interpretation of Contracts and Contract Terms
21. Cost Overrun and Time Overrun - Strategy Building Approach
22. Indian Laws for Construction Contract Management
23. FIDIC International Laws (EPC Turnkey Projects)

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.

Level 5 Duration: - 25 Days


Construction Project Planning & Management
(CPM)
1. Critical Thinking and Problem Solving Approach
2. Strategically Thinking and Risk Analysis
3. Project Planning - Master Plan Generation
4. Project Management Procedures Used for Construction Industry by Big
MNC's and Construction Companies of India and World
5. Role of Project Manager in Construction Industry
6. Project Budget Preparation with all factors analysis in Hand
7. Actual Situation Comparison with Budget Amount
8. Progress Monitoring with the Key Indicators Strategy
9. MS Project Basics - Scheduling
10. Project Coordination Techniques with Accounts, HR , Purchase and
Procurement Departments with easy solutions
11. Management Information Generation
12. Modern Building Construction Trends Execution Plan & Strategy Building
13. Resettlement and Rehabilitation (R&R) for speedy progress of work
14. Quality Assurance with Total Quality Control Planning
15. Site (Field) Management Techniques used by Project Managers at Site
16. Management of Emergencies in High Rise Buildings
17. Self Inspection for Quality Construction at Site
18. Cost and Time Controlling Strategies used for Construction Projects
19. Cash Flow Monitoring - Budget Vs Actual Comparison
20. Green Sheet Report - Profit and Loss Determination for Construction
Projects
21. SWOT Analysis for Construction Project
22. JIT Implementation in any Construction Project
23. Earned Value Management (EVM) in Construction Project

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.

Plumbing Designing Duration 45 Days (30 Days + 15 Days


Project)
1. Plumbing Systems
a. Fundamentals of Plumbing System
b. Introduction, Definitions & Concepts
c. List of codes & Standards
d. Fixtures, Faucets and Fixture fittings
i. Washbasin
ii. Water Closet
iii. Bidet
iv. Bathtub
v. Shower
vi. Urinals
vii. Kitchen sink
viii. Floor Drain

2. Design of Domestic Water Supply and Distribution


System
a. Requirements of Water Supply system
b. Water Demand Calculations Water
c. Storage Calculations Underground Sump(UGS)sizing
Elevated storage Reservoir(ESR)sizing Internal Water
Supply System
d. Direct Pumping System
e. Hydro-pneumatic system
f. Over Head tank distribution system
g. Design Procedure for Internal Water Supply System
h. Flow rate (q) & Loading Unit (z)-From probability equation
i. Hazen Williams Formula for Head loss Calculation
Internal Water Supply Pipe sizing calculations
Pumping Calculations- HP/Watts
j. Number of tapping to be connected Heavier Size Pipes.
k. Material used in internal water supply system
l. . External. Water Supply System
m. Number of Population served
n. Number of Fixtures served by Each Pipe
o. Design Procedure for External Water supply System External
Water Supply Pipe Sizing Calculations Material used
in External water supply system
p. Water Supply Schematic Layout

Phone No - +918095672383
Bhadani Quantity Surveyors and Training Pvt. Ltd.
3. Design of Sanitary Drainage System
a. Requirements of Sanitary Drainage System
b. Types of Sanitary Drainage Systems
c. Single stack system
d. Single stack (partially ventilated ) system
e. One Pipe System
f. Two Pipe System
g. System requirement for Internal Sanitary Drainage System
h. Internal Sanitary Drainage Pipe Sizing Calculations
i. Design Procedure for External Sanitary Drainage System
j. External Sanitary Drainage Pipe Sizing Calculations
k. Calculation of Slope by Manning’s formula
l. Calculating Depth of Inspection Chamber/Manholes
m. Sanitary Drainage Schematic Layout
n. Design of Storm Water Drainage System
o. Design of Basement Drainage System
p. Using Manning’s Formula and Rational formula
q. Storm Water Drainage Pipe Sizing Calculations
r. Material used in Sanitary Drainage system

4. Drawings – Plumbing Layouts


a. Legends used in Plumbing
b. Legends used in Plumbing
c. Typical Floor Plan-Plumbing Layout
d. Enlarged Kitchen & Utility-Plumbing Layout
e. Riser Diagram for multi storied buildings.

5. The Other aspects


a. Life Cycle of the Project
b. Different stages in Design and Drafting
c. Communication between the different teams,
d. Mode of communication using standard formats
and templates
e. Project Management Tools
f. Maintaining Safe and healthy working environment

6. Employability Skills Improving


a. Resume Writing Skills Improving
b. Interview Skills En powering
c. En Powering of Interpersonal Relationships.
d. Stress Management.
e. Positive Attitude Development.
f. Self-Motivation.

Phone No - +918095672383

Вам также может понравиться