Вы находитесь на странице: 1из 1

SAUDI ARABIAN OIL COMPANY

THIS REVISION IS NOT TO BE

UNTIL CERTIFIED AND DATED


USED FOR CONSTRUCTION
COMPLETELY REDRAWN & ADDED INDEX "O".

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
GENERAL: INCLUDING PLOT PLANS, AREA MAPS, DIAGRAMS (PROCESS FLOW/
PIPING & INSTRUMENT/VALVE OPERATING/HYDROSTATIC TEST), EQUIPMENT
A
ARRANGEMENTS, LINE DESIGNATION TABLES, DRAWING CONTROLS, SCOPE OF WORK,
SAFETY INSTRUCTION SHEETS, EQUIPMENT INSPECTION SCHEDULES AND SIGNAGE.

B LOSS PREVENTION: INCLUDING FIRE PROTECTION, FIREPROOFING & AREA CLASSIFICATION.

COLUMNS: INCLUDING FRACTIONATING, VACUUM, RERUN, CATALYTIC REACTORS,


C
REVISION DESCRIPTION

PLUS APPURTENANCES AS APPROPRIATE.

VESSELS: INCLUDING DRUMS, PRESSURE VESSELS, PRESSURE TANKS, ATMOSPHERIC


D
TANKS AND SPHEROIDS PLUS APPURTENANCES AND INTERNALS.

HEAT EXCHANGERS: INCLUDING SHELL/TUBE, AIR COOLED, PLATE


E
03-00644

EXCHANGER, ETC., PLUS APPURTENANCES AND EXTERNALS AS APPROPRIATE.


JOB ORDER/EWO NO.

F FURNACES: INCLUDING BOILERS, HEATERS, INCINERATORS, ETC., PLUS ASSOCIATED STACKS.


JUN08
DATE

LIQUID HANDLING EQUIPMENT: INCLUDING CENTRIFUGAL PUMPS


G
RECIPROCATING PUMPS, ROTARY PUMPS, GEAR PUMPS AND EJECTORS.
REV. NO.

15

H PAINTS/COATINGS: FOR INDUSTRIAL FACILITIES AND PIPELINES.

J INSTRUMENTATION: INCLUDING ROTATING EQUIP. INSTRUMENTATION AND INSTALL. DETAILS.


OTHER

GAS HANDLING/HVAC EQUIPMENT:


BY/DATE

GAS HANDLING-INCLUDING COMPRESSORS, FANS, VACUUM PUMPS, TURBINES & AIR DRYERS.
K
HVAC- INCLUDING CHILLERS, AIR HANDLING UNITS, HVAC FANS, REFRIGERANT
COMPRESSORS AND DUCTING.
REVIEW FOR KEY DRAWINGS

OPERATIONS/DATE
(SAUDI ARAMCO)

L PIPING: INCLUDING PIPING LAYOUTS AND PIPING ISOMETRICS.

STEEL/STEEL STRUCTURES: INCLUDING PREFABRICATED METAL BUILDINGS


M
(W/CLADDING), PIPEWAYS, PIPE ANCHORS/SUPPORTS, STEEL PILING AND FENCING.
CONST. AGENCY/DATE
REQUIRED

N INSULATION: INCLUDING BUILDING, PIPING AND EQUIPMENT INSULATION.

SECURITY DRAWINGS: SECURITY-AREA MAP, OVERALL PLAN, FACILITY LAYOUT,


O
FENCE, PATROL ROAD, GATE, GATEHOUSE, NETWORK/SYSTEMS, EQUIPMENT & ETC.

ELECTRICAL POWER SYSTEMS: INCLUDING OVERHEAD & UNDERGROUND


CERTIFIED/DATE

P
6/24/08
DESIGN CERTIFICATION

DISTRIBUTION, GROUNDING, LIGHTING, BATTERY, UPS SYSTEM, MOTORS & GENERATORS.


KHK
(DESIGN AGENCY)

CONCRETE: INCLUDING POURED-IN-PLACE CONCRETE FOUNDATIONS, PRECAST


Q CONCRETE STRUCTURES, CONCRETE BLOCK, CONCRETE PILES/PILE CAPS, PLUS
FORMING/REINFORCING MATERIAL AS APPROPRIATE.
6/24/08

BUILDING ARCHITECTURE: INCLUDING MISC. WOOD/STEEL/CONCRETE/MASONRY


ENGG./DATE

R
JDS

STRUCTURES, BUILT-UP ROOFING, FINISHED CARPENTRY AND BUILDING FURNISHINGS.

UTILITY SERVICES/CIVIL WORKS:


UTILITY-INCLUDING PLUMBING, SEWER AND SEWAGE SYSTEMS, WATER TREATMENT SYSTEMS
S AND FIRE PROTECTION/WATER SUPPLY/AC PIPING.
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
IS COVERED, FOR ALL APPROVAL

CIVIL-INCLUDING ROADS, GRADING, PAVING, BERMS AND LANDSCAPING. (FOR FENCING SEE "M")

COMMUNICATIONS: INCLUDING TELEPHONE, RADIO, MICROWAVE, MICROWAVE


T
WITH MULTIPLEX, DATA-COMM AND INTER-COMM.

SPECIAL EQUIPMENT: INCLUDING HOSPITAL, LABORATORY, KITCHEN, OFFICE,


U
REVISION VALIDATION

765220-0608-001
DRAWING COMPLETION CERTIFICATE NO:

CRANES AND SPECIAL SAFETY.

V RAILROAD AND MARINE: EQUIPMENT ONLY.

W WELDING: INCLUDING EQUIPMENT AND SUPPLIES.

X CATHODIC PROTECTION: INCLUDING EQUIPMENT AND SUPPLIES.


15

Y ROYALTY AND CUSTODY MEASUREMENT: STANDARD DRAWINGS.


THIS REVISION NO.

Z PROCESS CONTROL SYSTEMS: INCLUDING EQUIPMENT AND CABLING.


DRAWING AND EQUIPMENT INDEX KEY DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.

STD 001
990 A AE-036411 OF 15
STD. DWG. SAUDI ARABIA 003
Saudi Aramco 2616 ENG. (09/03)

VECTOR CADD-04

Copyright©Saudi Aramco 2009. All rights reserved.

Вам также может понравиться