THOERY
High voltage (not primary) line emf is placed at 12 o’clock position and corresponding low
voltage line emf position is noted. Low voltage line emf position denotes Hour hand of the clock
and accordingly nomenclature is given (vector group is denoted). HV connection is denoted by
capital letter, LV connection is denoted by small letter and corresponding LV line emf position
is termed as HOUR hand of the clock and is denoted by suffix. For HV delta connected and LV
star connected, and LV line emf 300 leading is written as Dy11.
Connect neutral point of star connected winding with earth. Join 1U of HV and 2W of
LV together. Apply 415 V, three phase supply to HV terminals.
Measure voltages between terminals 2U-1N, 2V-1N, 2W-1N, that means voltages
between each LV terminal and HV neutral.
Also measure voltages between terminals 2V-1V, 2W-1W and 2V-1W.
Department of Electrical Engineering--GCET
G.H.PATEL COLLEGE OF ENGINEERING AND TECHNOLOGY V.V.NAGAR
2180901-TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENT
Department of Electrical Engineering
Date: / /20
Circuit Diagram:
Circuit Diagram:
Observation Table
Dy1
Dy11
Calculation:
Conclusion:
Questions: