Assessors Name: Assessors signature: Location of Date of Review date:

Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

08 Falling of High Yes Yes Yes Prior to the  Provide toe board. Project Site Engineer
Materials commencement Manager
Scaffolding of the activity Supervisor
Erection  Stop working under Construction
Dismantling scaffolding. Manager Foreman

 Provide fully boarded Site Manager Charge hand


platform.
Scaffolders

 Provide barrication Project Helpers


Fall of High Yes Yes Yes
with proper signage, Engineer
Person
posters.
HSE Manager
 All the tools are
secured with rope to
prevent falling down.

 Steel stacked
materials should be
secured.

 Don’t stack
unnecessary materials
on scaffolding.

 Frequent cleaning of
platforms.

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Collapse of High Yes Yes Yes  Provide mid-rails and


scaffolding top-rails.
Scaffolding Medium
Erection  Employees working on
Dismantling the scaffold should be
trained for working at
height.

 Out riggers to be
provided to prevent
toppling of mobile
scaffold.

RISK RATING MATRIX 2 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

 Fall arrest, safety


Yes Yes Yes harness should be used
Manual
Handling High  Ladder over 3m
heights should be tied
or footed.

 Provide secure access.

 Scaffolding should be
on solid base.

 Adequate bracing and


ties should be
provided.

 Planks should be tied.

Low
 Loads on platform
should be evenly
distributed.

 Frequent inspection of
scaffold by
competent person.

RISK RATING MATRIX 3 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Assessors Name: Assessors signature: Location of Date of Review date:
Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

RISK RATING MATRIX 4 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09