LOT 1
CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 90
Six months bank statement 3
CUMULATIVE SCORE 100 90
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 74.5
Six months bank statement 3
CUMULATIVE SCORE 100 74.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5 17.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 49.5
Six months bank statement 3
CUMULATIVE SCORE 100 49.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5 20
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 6
Evidence of financial capacity 3 46
Six months bank statement 3
CUMULATIVE SCORE 100 46
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 74
Six months bank statement 3
CUMULATIVE SCORE 100 74
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 97
Six months bank statement 3
CUMULATIVE SCORE 100 97
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 16
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 63.5
Six months bank statement 3
CUMULATIVE SCORE 100 63.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 16
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 63.5
Six months bank statement 3
CUMULATIVE SCORE 100 63.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 100
Six months bank statement 3
CUMULATIVE SCORE 100 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 16
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 68
Six months bank statement 3
CUMULATIVE SCORE 100 68
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5 40
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 100
Six months bank statement 3
CUMULATIVE SCORE 100 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 84
Six months bank statement 3
CUMULATIVE SCORE 100 84
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 10
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 77
Six months bank statement 3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 66.5
Six months bank statement 3
CUMULATIVE SCORE 100 66.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 14
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 83.5
Six months bank statement 3
CUMULATIVE SCORE 100 83.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 9
Evidence of financial capacity 3 88.5
Six months bank statement 3
CUMULATIVE SCORE 100 88.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 13
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 77.5
Six months bank statement 3
CUMULATIVE SCORE 100 77.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 67
Six months bank statement 3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 95
Six months bank statement 3
CUMULATIVE SCORE 100 95
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15 85
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 85
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 10
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 6
Evidence of financial capacity 3 48.5
Six months bank statement 3
CUMULATIVE SCORE 100 48.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 70
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 44
Six months bank statement 3
CUMULATIVE SCORE 100 44
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 72
Six months bank statement 3
CUMULATIVE SCORE 100 72
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15 70
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 82.5
Six months bank statement 3
CUMULATIVE SCORE 100 82.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 41
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 22.5
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 20
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 94.5
Six months bank statement 3
CUMULATIVE SCORE 100 94.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
LOT 2
CONSTRUCTION AND EQUIPPING OF ICT BASED CENTRE
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CONSTRUCTION AND EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI- MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-7 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 6
Evidence of financial capacity 3 41
Six months bank statement 3
CUMULATIVE SCORE 100 41
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 6
Evidence of financial capacity 3 48.5
Six months bank statement 3
CUMULATIVE SCORE 100 48.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 90
Six months bank statement 3
CUMULATIVE SCORE 100 90
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 72
Six months bank statement 3
CUMULATIVE SCORE 100 72
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 74.5
Six months bank statement 3
CUMULATIVE SCORE 100 74.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 82.5
Six months bank statement 3
CUMULATIVE SCORE 100 82.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 70
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 10
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 30
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 14
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 83.5
Six months bank statement 3
CUMULATIVE SCORE 100 83.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-7 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 59.5
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-8 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 57.5
Six months bank statement 3
CUMULATIVE SCORE 100 57.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-9 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 35
Six months bank statement 3
CUMULATIVE SCORE 100 35
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-10 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 20
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 69.5
Six months bank statement 3
CUMULATIVE SCORE 100 69.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-11 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-12 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 13
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 9
Evidence of financial capacity 3 54.5
Six months bank statement 3
CUMULATIVE SCORE 100 54.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 17
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 77
Six months bank statement 3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-13 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 95
Six months bank statement 3
CUMULATIVE SCORE 100 95
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-14 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 7
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 57
Six months bank statement 3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-15 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 60
Six months bank statement 3
CUMULATIVE SCORE 100 60
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-16 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 84
Six months bank statement 3
CUMULATIVE SCORE 100 84
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-17 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 10
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 70
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-18 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 54
Six months bank statement 3
CUMULATIVE SCORE 100 54
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-19 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 13
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 70
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-20 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
LOT 3
PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 75
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 22.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 9
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 91.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 59.5
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-7 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 15
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 87.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-8 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 90
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-9 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
0 Supporting Financial and Legal Company’s Sworn affidavit 3 12 97
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 97
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
LOT 4
EXTENSION OF 33KV POWER LINE TO THE INSTITUTE
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be attached.
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
LOT 5
CAPACITY BUILDING AND YOUTH EMPOWERMENT PROGRAMS IN SOME
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Name of the EVALUATOR___E. A. BABALOLA Signature/ Date ___________________08/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Name of the EVALUATOR___E. A. BABALOLA Signature/ Date _______08/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Name of the EVALUATOR___E.A. BABALOLA Signature/ Date _______08/10/2018____ Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 7. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 9
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 59
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 12.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 42.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 8. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 80
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 12.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 9. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 49.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 10. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 52
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 15
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 11. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 12. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 12
Evidence of financial capacity 3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 85
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___
PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 62.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.
Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
LOT 6
PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
UNIT MAXIMUM SCORE
S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 12.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last Listed with no evidence 0
5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Civil Without
assignment (COREN /ARCON Certificate compulsory) Engineer /Mechanical / Electrical Engineer COREN
5
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 15
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 15
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 0
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 20
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
9 20 15
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Without COREN
assignment (COREN /ARCON Certificate compulsory) Engineer/ Civil Engineer /Mechanical
/ Electrical Engineer 5
With COREN
9 20 15
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
Note: 1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .
PREQUALIFICATIONS REQUIREMENTS
MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 25
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Without COREN
assignment (COREN /ARCON Certificate compulsory) Engineer/ Civil Engineer /Mechanical
/ Electrical Engineer 5
9 20 20
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory
2 Tax clearance for the last three (3) years 0 0 Mandatory
3 Evidence of registration with PENCOM 0 0 Mandatory
4 Evidence ITF Compliance Certificate 0 0 Mandatory
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 20
Adequacy of Experience of Principal 1-5yrs 2.5
Partner/Project Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and 1. Business Manager/ System Engineer/ Civil Without COREN
competence for the assignment (COREN Engineer /Mechanical / Electrical Engineer
/ARCON Certificate compulsory) 5
9 20 20
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
PREQUALIFICATIONS REQUIREMENTS
With COREN
10
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
With COREN
10
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
With COREN
10
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
With COREN
10
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
With COREN
10
PREQUALIFICATIONS REQUIREMENTS
Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)
With COREN
10
Canonic Associates