2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFICS EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) - MINNA

LOT 1
CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:AVALON AND PARTNERS Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SHUAIBU SANI GENERAL BUSINESS CONCEPT LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:BARUCH-ARIS WORKS LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 90
Six months bank statement  3
CUMULATIVE SCORE 100 90
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:CACHET BUSINESS RESOURCES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:BASNA LINK NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 74.5
Six months bank statement 3
CUMULATIVE SCORE 100 74.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:AL-TINARCH ARCHITEC SERVICES Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 62
Six months bank statement  3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:GIGAPLUS PLC Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5 17.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 49.5
Six months bank statement 3
CUMULATIVE SCORE 100 49.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:AUTO BEAUTY SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5 20
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15 6
Evidence of financial capacity 3 46
Six months bank statement 3
CUMULATIVE SCORE 100 46
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SONITE COMMUNICATION LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 74
Six months bank statement 3
CUMULATIVE SCORE 100 74
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SAUKI GROUP OF COMPANY NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 97
Six months bank statement 3
CUMULATIVE SCORE 100 97
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:EL-SUNNIC INTEGRATED RESOURCES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON  3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 16
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 63.5
Six months bank statement  3
CUMULATIVE SCORE 100 63.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:CROWN AND MINE EXPERT SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs  2.5 25 12.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON  3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 16
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 63.5
Six months bank statement  3
CUMULATIVE SCORE 100 63.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:LAVORO INTERNATIONAL LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 100
Six months bank statement  3
CUMULATIVE SCORE 100 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:COMPLEX ENGINEERING SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON  3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 16
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 68
Six months bank statement 3
CUMULATIVE SCORE 100 68
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:GODONNA PETROLEUM AND ENERGY SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5 40
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 100
Six months bank statement  3
CUMULATIVE SCORE 100 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:KISHALOM NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 84
Six months bank statement 3
CUMULATIVE SCORE 100 84
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:ADCOL SYNERGY INTERNATIONAL LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 10
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 77
Six months bank statement 3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:CHANDHIS NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs  2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 66.5
Six months bank statement 3
CUMULATIVE SCORE 100 66.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SWAY ENGINEERING LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 14
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 83.5
Six months bank statement 3
CUMULATIVE SCORE 100 83.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:BAKONBAGI ENGINEERING LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15 9
Evidence of financial capacity  3 88.5
Six months bank statement 3
CUMULATIVE SCORE 100 88.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SK ENGINEERING OPTIONS LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON  3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 13
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 77.5
Six months bank statement 3
CUMULATIVE SCORE 100 77.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:ALL WORKS COMMERCIAL COMPANY LIMITED Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 67
Six months bank statement  3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SHELLENS B.V COMPANY Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 95
Six months bank statement  3
CUMULATIVE SCORE 100 95
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:SODEOSA GLOBAL RESOURCES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15 85
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 85
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:IMTAZ NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 10
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15 6
Evidence of financial capacity 3 48.5
Six months bank statement 3
CUMULATIVE SCORE 100 48.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:UPPER LEVEL LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 70
Six months bank statement  3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:REINFORCED GLOBAL RESOURCES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 44
Six months bank statement 3
CUMULATIVE SCORE 100 44
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:ONICON RESOURCES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 72
Six months bank statement 3
CUMULATIVE SCORE 100 72
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:ARCHISULTS LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15 70
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:DANZINGER NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:BIENVULA NIGERIA LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 82.5
Six months bank statement  3
CUMULATIVE SCORE 100 82.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:M.I KUTIRIKO MULT SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 41
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF YOUTH EMPOWERMENT CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:KILOBYTES SERVICES LTD Lot:__1

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 22.5
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 20
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 94.5
Six months bank statement 3
CUMULATIVE SCORE 100 94.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___10/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFICS EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) - MINNA

LOT 2
CONSTRUCTION AND EQUIPPING OF ICT BASED CENTRE

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION AND EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI- MINNA___

BIDDERS’S NAME:PRAXIS AND NEXUS LIMITED Lot:__2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-7 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account 6 15 6
Evidence of financial capacity  3 41
Six months bank statement 3
CUMULATIVE SCORE 100 41
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:IMTAZ NIGERIA LIMITED Lot:__2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15 6
Evidence of financial capacity 3 48.5
Six months bank statement 3
CUMULATIVE SCORE 100 48.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:BARUCH- ARIS WORKS LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 90
Six months bank statement  3
CUMULATIVE SCORE 100 90
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA______ _Signature/ Date__05/10/2018____ Supervisor’s Signature __________________

Project Manager Signature ___________________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ONICON RESOURCES LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 72
Six months bank statement 3
CUMULATIVE SCORE 100 72
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Project Manager Signature ___________________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:UMAWA VENTURES NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 74.5
Six months bank statement  3
CUMULATIVE SCORE 100 74.5

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:BIENVULA NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 82.5
Six months bank statement  3
CUMULATIVE SCORE 100 82.5

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:YS PLATFORM NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ARCHISULTS LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 70
Six months bank statement  3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:BASMAN PROJECTS LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 10
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 30
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 62
Six months bank statement  3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:AL- TINARCH ARCHITEC SERVICES Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 62
Six months bank statement  3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:SWAY ENGINEERING LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 14
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 83.5
Six months bank statement 3
CUMULATIVE SCORE 100 83.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:LASAFA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:DANZINGER NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-7 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 59.5
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:FUGA-T ENGINEERING COMPANY LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 12.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-8 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 57.5
Six months bank statement  3
CUMULATIVE SCORE 100 57.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:COMPLEX AUTOMATION SYSTEMS LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-9 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 35
Six months bank statement  3
CUMULATIVE SCORE 100 35
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:SALEM A&B NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 17.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-10 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 20
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 69.5
Six months bank statement 3
CUMULATIVE SCORE 100 69.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:SMIDA INTEGRATED SERVICES LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory X
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No.  5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-11 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN 7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:AMBAS ENGINEER & CONSULTING SERVICES LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 22.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-12 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON  3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 13
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account  6 15 9
Evidence of financial capacity  3 54.5
Six months bank statement 3
CUMULATIVE SCORE 100 54.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____03/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ALL WORKS COMMERCIAL COMPANY LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 17
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 77
Six months bank statement  3
CUMULATIVE SCORE 100 77
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:SHELLENS B.V. COMPANY Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 20
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-13 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 20
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 95
Six months bank statement  3
CUMULATIVE SCORE 100 95
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:IGS INNOVATIVE GLOBAL SOLUTION LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-14 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3 7
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 57
Six months bank statement  3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ALHARAMAIN TECHNOLOGIES LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-15 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15 15
Evidence of financial capacity 3 60
Six months bank statement 3
CUMULATIVE SCORE 100 60
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:KISHALOM NIGERIA LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-16 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 84
Six months bank statement 3
CUMULATIVE SCORE 100 84
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____05/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:UPPER LEVEL LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-17 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 10
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3 70
Six months bank statement  3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:CACHET BUSINESS RESOURCES LIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs 2.5 25 15
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-18 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 7
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor 3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 54
Six months bank statement 3
CUMULATIVE SCORE 100 54
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME: NEW COMPLEX NIGERIALIMITED Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
Relevant Experience of Project 1-5yrs 2.5 25 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-19 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON 7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20 13
3. Mechanical / Electrical Engineer  3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 70
Six months bank statement 3
CUMULATIVE SCORE 100 70
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CONSTRUCTION EQUIPPING OF ICT BASED CENTRE INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:AVALON & PARTNERS Lot:__ 2__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory X
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory X
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory X
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
Relevant Experience of Project 1-5yrs  2.5 25
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40
Evidence with completion certificates 3-20 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Architect Without ARCON 3
competence for the assignment With ARCON  7
(COREN /ARCON Certificate 2. Civil Engineer Without COREN 3
compulsory) With COREN  7 20
3. Mechanical / Electrical Engineer 3
4. Quantity Surveyor  3
10 Supporting Financial and Legal Company’s Sworn affidavit 3
documents Last 3years Audited account 6 15
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA_______________ Signature/ Date _____04/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFICS EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) - MINNA

LOT 3
PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ALHARAMAIN TECHNOLOGIES LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 75

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:ELM ENGINEERING SERVICES LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 25 22.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 9
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 91.5

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:SLOBA & COMPANY INT’L LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-6 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 59.5
Six months bank statement 3
CUMULATIVE SCORE 100 59.5

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:BIENVULA NIGERIA LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-7 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 15
Engineer
2. Technicians 1-5No.  5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 87.5

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:UGOLANSON NIGERIA LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-8 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without  5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No.  5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 90

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF INDUSTRIAL MACHINES WITH INSTALLATION AND TRAINING INSTITUTE:__ SEDI - MINNA___

BIDDERS’S NAME:GENTECH POWER SUPPLY NIGERIA LTDLot:__3__

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-9 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
0 Supporting Financial and Legal Company’s Sworn affidavit  3 12 97
documents Last 3years Audited account  6 15
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 97

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. Signature/ Date ___________________09/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFICS EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) - MINNA

LOT 4
EXTENSION OF 33KV POWER LINE TO THE INSTITUTE

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE. INSTITUTE: SEDI .

BIDDER'S NAME: AFRIC RESOURCES LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No.  5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 5
certificates 20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON  7
2. Civil Engineer Without
9 3 20 20
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor  3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 65
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be attached.

Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: AMBAS ENGINEERING CONSULTING SERVICES LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
 3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 16
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor  3
Supporting Financial and Legal documents Company’s Sworn affidavit 3
Last 3years Audited account  6
10 15 6
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 67

Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be attached.

Name of EVALUATOR SADIQ A. BAK Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: BADIK INTER GLOBAL LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 15
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 40
certificates 20
Evidence with completion 6 and above
certificates  40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 13
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor  3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 83
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: FUGA-T ENGINEERING COMPANY LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 20
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 65
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: PRAXIS & NEXUS LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs  2.5
6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10
8 Evidence with completion 3-5 No. 40 10
certificates 20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 42
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: SODEOSA GLOBAL RESOURCES LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 20
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 65
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: IGS INNOVATION GLOBAL SOLUTION LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 7.5
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs  2.5
6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10
8 Evidence with completion 3-5 No. 40 10
certificates 20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 39.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Dat 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: OMEK CONCEPT LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 70
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: HICAD NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 40
certificates 20
Evidence with completion 6 and above
certificates  40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON  7
2. Civil Engineer Without
9 3 20 17
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 94
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: SLOBA & COMPANY INT'L LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 22.5
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON  7
2. Civil Engineer Without
9 3 20 17
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 71.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: MUBAFIZ NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 15
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9  3 20 13
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 57
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: SHEDUKO ASSOCIATES NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 15
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 40
certificates 20
Evidence with completion 6 and above
certificates  40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 10
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 80
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: NEW COMPLEX NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 7
COREN
With COREN  7
3. Mechanical/Electrical Engineer 3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 61
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: TAGBAS TECHNICAL NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 20
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 20
certificates  20
Evidence with completion 6 and above
certificates 40
Professional Staff qualification and competence for the assignment 1. Architect Without
3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9  3 20 3
COREN
With COREN 7
3. Mechanical/Electrical Engineer 3
4. Quantity Surveyor 3
Supporting Financial and Legal documents Company’s Sworn affidavit 3
Last 3years Audited account  6
10 15 6
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 49
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: EXTENSION OF 33KV POWER LINE TO THE INSTITUTE INSTITUTE: SEDI .

BIDDER'S NAME: A.A MAHAMOUD ENGINEERING NIG. LTD LOT: 4 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRITERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project Manager 1-5yrs 2.5
6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Last 5years Listed with no evidence 0
Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10
8 Evidence with completion 3-5 No. 40 40
certificates 20
Evidence with completion 6 and above
certificates  40
Professional Staff qualification and competence for the assignment 1. Architect Without
 3
(COREN /ARCON Certificate compulsory) ARCON
With ARCON 7
2. Civil Engineer Without
9 3 20 16
COREN
With COREN  7
3. Mechanical/Electrical Engineer  3
4. Quantity Surveyor  3
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 96
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature: .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) MINNA

LOT 5
CAPACITY BUILDING AND YOUTH EMPOWERMENT PROGRAMS IN SOME

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: RAPHA GLOBAL LINKS ENTERPRISES LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 1. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 57
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA Signature/ Date ___________________08/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: VIRGRISS RESOURCES LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 2. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 57
Six months bank statement 3
CUMULATIVE SCORE 100 57
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA Signature/ Date _______08/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: YGD & SONS NIGERIA LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 3. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 59.5
Six months bank statement 3
CUMULATIVE SCORE 100
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E.A. BABALOLA Signature/ Date _______08/10/2018____ Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: KINLEY GLOBAL VENTURES LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 4. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: SURE DELIVERY NIGERIA LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 95
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: AL- TINARCH GLOBAL INVESTMENT LIMITED Lot:__ 5


S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20
Engineer
2. Technicians 1-5No. 6. 5
6 and 10
abov
e
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 72.5
PREQUALIFICATION REQUIREMENTS
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.Name of the
EVALUATOR___E. A. BABALOLA. ____ Signature/ Date __08/10/2018 Supervisor’s Signature _________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: SAL- SAK INTEGRATED SERVICES LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 7. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 9
Evidence of financial capacity 3
Six months bank statement 3
CUMULATIVE SCORE 100 59

Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Project Manager Signature ___________________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: FUSENIC PROFESSIONALS Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 12.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No.  5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 42.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: HAMASONS NIGERIA LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10 25 25
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 8. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 80
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: ROCKBOROUGH XL PRIME LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 12.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No.  5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 9. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 49.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: PLYMOUTH BLAKE RESOURCES LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 10. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: JYC INTER- VENTURES RESOURCES LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No.  5
Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 52
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: CIRCLES AND FRAMES LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without  5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 15
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______05/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: SHOLLY FRONTLINK IMPEC LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 59.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: SHAZUMAMI NIGERIA LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 15
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 11. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 57
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: REVIVAL RESOURCES GLOBAL INVESTMENT LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 12. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: EMKADY LOGISTICS LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 12
Evidence of financial capacity  3 62
Six months bank statement 3
CUMULATIVE SCORE 100 62
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: BIENVULA NIGERIA LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10 25 20
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above  40
9 Professional Staff qualification and 1. Business Manager/ System Without  5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN 10 20 10
Engineer
2. Technicians 1-5No.  5
6 and above 10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 85
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: CAPACITY BUILDING AND YIUTH EMPOWERMENT PROGRAMS IN SOME STATE INSTITUTE:__ SEDI -MINNA___

BIDDERS’S NAME: HIS PORTION VENTURES & SYNERGY LIMITED Lot:__ 5

PREQUALIFICATION REQUIREMENTS
S/N CRITERIA UNIT SCORE MAXIMUM SCORES REMARK
(%) SCORE (%) OBTAINED
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
7 Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10 25 17.5
Adequacy of Experience of Project 1-5yrs 2.5
Manager /Business Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
8 Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 5 and above 40
9 Professional Staff qualification and 1. Business Manager/ System Without 5
competence for the assignment Engineer/ Civil Engineer COREN
(COREN Certificate compulsory) /Mechanical / Electrical With COREN  10 20 20
Engineer
2. Technicians 1-5No. 5
6 and above  10
10 Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6 15 15
Evidence of financial capacity  3
Six months bank statement  3
CUMULATIVE SCORE 100 62.5
Note: 1. Cognate Staff are exclusive of Managing Directors.2. Minimum of 70% score is required for selection.3.For J.V a Registered MOU must be attached.

Name of the EVALUATOR___E. A. BABALOLA. _______________ Signature/ Date ______08/10/2018 Supervisor’s Signature __________________

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

SCIENTIFICS EQUIPMENT DEVELOPMENT INSTITUTE (SEDI) - MINNA

LOT 6
PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME:NEXAMOOR MULTI RESOURCES LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS
UNIT MAXIMUM SCORE
S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 12.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Last Listed with no evidence 0
5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Civil Without
assignment (COREN /ARCON Certificate compulsory) Engineer /Mechanical / Electrical Engineer COREN
5

With COREN
9 20 20

 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 46.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SCHEINDER WORLDWIDE LINKS. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs
 2.5
6-10yrs 5
11-15yrs 7.5
7 Above 15yrs 10 25 5
Adequacy of Experience of Principal Partner/Project 1-5yrs  2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 15
 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit 3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 34
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: AYYG & SONS. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 17.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 20
 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 72.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: VENUS CONSTRUCTION CO. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 12.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 15
 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 44.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SODEOSA GLOBAL RESOURCES LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory X
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 0
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 0
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Civil Without
assignment (COREN /ARCON Certificate compulsory) Engineer /Mechanical / Electrical Engineer COREN
5

With COREN
9 20 0
10

2. Technicians 1-5No Staff 5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit 3
Last 3years Audited account 6
10 15 0
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 0
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: ELM ENGINEERING SERVICES LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 22.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 20
 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 77.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SETIK DESIGNS NIG. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 22.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 20
 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 97.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: NATION WIDE DRILLERS LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 20
 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 47
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: DANZINGER NIG. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 12.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 20
 10

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 84.5
Note: 1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR: SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: TAGBAS TECHNICAL NIG. LTD LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 20
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5

With COREN
9 20 15
 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 87
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Dat 4/10/2018 Supervisor's Signature .

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: HEEZEEM GLOBAL VENTURES LTD. LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Without COREN
assignment (COREN /ARCON Certificate compulsory) Engineer/ Civil Engineer /Mechanical
/ Electrical Engineer 5

With COREN
9 20 15
 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 47

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

Note: 1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: ROLAN CONCEPTS LTD. LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 25
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Without COREN
assignment (COREN /ARCON Certificate compulsory) Engineer/ Civil Engineer /Mechanical
/ Electrical Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 74
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: NASAMU ULTIMATE CONCERNS LTD. LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 5
Adequacy of Experience of Principal Partner/Project 1-5yrs  2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 15

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 34
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: DAN MARKE TRADING CO. LTD. LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

MAXIMUM SCORE
S/N CRETERIA UNIT SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 20
Adequacy of Experience of Principal 1-5yrs 2.5
Partner/Project Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works Listed with no evidence 0
carried out in the Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and 1. Business Manager/ System Engineer/ Civil Without COREN
competence for the assignment (COREN Engineer /Mechanical / Electrical Engineer
/ARCON Certificate compulsory) 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal Company’s Sworn affidavit  3
documents Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 72
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: PRAXIS & NEXUS. LTD. LOT: 6 .

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 7.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 15

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 41.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: EL-SUNNIC INTERGRATED RESOURCES LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 65
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: HORSEPOWER ASSOCIATES TRADING LTD LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 20
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 75
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached.Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: TRIPLE ICON LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs  2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 62
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: MUSBRO INNOVATIVE SOLUTION LTD LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 5
Adequacy of Experience of Principal Partner/Project 1-5yrs  2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence  0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 0
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 15

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account 6
10 15 3
Evidence of financial capacity 3
Six month bank statement 3
CUMULATIVE SCORE 100 23
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: INTEGRATED YACK & SONS LTD LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 10
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 52
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: ALIPH TECHNOLOGIES LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 15
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 15

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 85
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: UGALASONS NIG. LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 15
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 15

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 85
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SCHEINDER PRIME INNOVATIVE LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 7.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 44.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SLOBA & COMPANY INT'L LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 17.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above  10 40 10
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
Engineer 5
9 20 20

With COREN
 10

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

2. Technicians 1-5No Staff 5


6 and above  10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 12
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 59.5

Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: PRODIGY INVESTMENT NIG. LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs  5
11-15yrs 7.5
Above 15yrs 10
7 25 20
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 20
Evidence with completion certificates 3-5 No.  20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
9 Engineer 5 20 15

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

With COREN

 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 70
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: AL-TINARCH GLOBAL INVESTMENT NIG. LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 22.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above  15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
9 Engineer 5 20 15

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

With COREN

 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 92.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: DANBABA UNIVERSAL SOLUTION LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs  2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs 10
7 25 7.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs  5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No.  5
8 Listed with award letters 5 and above 10 40 5
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above 40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
9 Engineer 5 20 15

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

With COREN

 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit 3
Last 3years Audited account  6
10 15 9
Evidence of financial capacity  3
Six month bank statement 3
CUMULATIVE SCORE 100 36.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: SURE DELIVERY NIG. LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs 7.5
Above 15yrs  10
7 25 12.5
Adequacy of Experience of Principal Partner/Project 1-5yrs  2.5
Manager 6-10yrs 5
11-15yrs 10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
9 Engineer 5 20 15

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

With COREN

 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 82.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

PROJECT: PROCUREMENT OF MATERIALS FOR PRODUCTION OF SCIENCE KITS/EQUIPMENT. INSTITUTE: SEDI .

BIDDER'S NAME: BIENVULA NIG. LTD. LOT: 6

PREQUALIFICATIONS REQUIREMENTS

UNIT MAXIMUM SCORE


S/N CRETERIA SCORE(%) SCORE(%) OBTAINED REMARK
1 Evidence of company registration with CAC 0 0 Mandatory 
2 Tax clearance for the last three (3) years 0 0 Mandatory 
3 Evidence of registration with PENCOM 0 0 Mandatory 
4 Evidence ITF Compliance Certificate 0 0 Mandatory 
5 Evidence of NSITF Clearance Certificate 0 0 Mandatory 
6 Evidence of Registration (IRR) with Bureau of Public Procurement 0 0 Mandatory 
Company’s Active Experience 1-5yrs 2.5
6-10yrs 5
11-15yrs  7.5
Above 15yrs 10
7 25 17.5
Adequacy of Experience of Principal Partner/Project 1-5yrs 2.5
Manager 6-10yrs 5
11-15yrs  10
16yrs and Above 15
Evidence of Similar previous works carried out in the Listed with no evidence 0
Last 5years Listed with award letters 1-5No. 5
8 Listed with award letters 5 and above 10 40 40
Evidence with completion certificates 3-5 No. 20
Evidence with completion certificates 6 and above  40
Professional Staff qualification and competence for the 1. Business Manager/ System Engineer/ Without
assignment (COREN /ARCON Certificate compulsory) Civil Engineer /Mechanical / Electrical COREN
9 Engineer 5 20 15

Canonic Associates
2018 CAPITAL PROJECTS SCIENTIFIC EQUIPMENT DEVELOPMENT INSTITUTE (SEDI)

With COREN

 10

2. Technicians 1-5No Staff  5


6 and above 10
Supporting Financial and Legal documents Company’s Sworn affidavit  3
Last 3years Audited account  6
10 15 15
Evidence of financial capacity  3
Six month bank statement  3
CUMULATIVE SCORE 100 87.5
Note:1.Cognate staff are exclusive of managing directors. 2. Minimum of 70% score is required for selection. 3. For J.V registered MOU must be
attached. Name of EVALUATOR SADIQ A. BAKO Signature/Date 4/10/2018 Supervisor's Signature .

Canonic Associates

Вам также может понравиться