Вы находитесь на странице: 1из 6

1/16/2019 Life Cycle Planning in SAP APO.

Business Process Part-2

COURSES APO DP TRAINING APO SNP TRAINING

APO GATP TRAINING APO PPDS TRAINING BLOG CONTACT

Shares

Life Cycle Planning in SAP APO. Part-2


 DECEMBER 23, 2014  ADMIN

Life Cycle Planning in SAP APO DP

Setup Lifecycle Planning – like Pro le setup / Assignment Part -2

Please go through Previous post  Part -1.  this is continues of Part-1.

Creating Phase in and Phase out

We de ne phase in and phase out pro le to model the life cycle of Old and New
Products.

If the phase out pro le period is within the history horizon speci ed in the
master forecast pro le. the system adjusts the corrected history. If the phase in
pro le period is within the future horizon speci ed in the master forecast pro le,
the system directly adjusts the Forecast Key Figure. We must set the Lifecycle
planning Active indicator in the Master Forecast pro le

Phase-In pro le

Using phase-in pro le in Demand Planning, we can simulate the launch phase of
any product life cycle. A phase-in pro le changes the demand history or demand
forecast of a product by given percentages during a speci ed period or periods.

http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 1/6
1/16/2019 Life Cycle Planning in SAP APO. Business Process Part-2

In Demand Planning, we can also use Like pro le to generate forecast for a new
product based on existing product. In this kind of scenarios we can adjust the
historical data of the “like” product upwards to correct the downward trend in
Shares demand during the “like” product’s discontinuation phase.

Step 1

Execute the transaction /SAPAPO/MSDP_FCST1- you will reach the following


screen.

After clicking on the Phase In/out button, you will reach the “Time Series
Maintenance” screen.

Step 2 – Create Time Series Maintenance

1. Create the Time Series ID (Phase In) ZDEPH_IN_001 and Description.

2. Give the Phase in Start date and End date and the Period Indicator

If we are launching a new product from 1st Aug, 2011 and that will end by 31st
Dec, 2011 and the period Indicator is “M”

3.Select the ag “Before Start date, apply constant factor” –  “0” (its not showing
the above screen shot.) you use a constant factor before the start date with a
value of 0 in a phase-in pro le. You can also enter other values.

And  “After end date, apply constant factor” – 100%

 

http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 2/6
1/16/2019 Life Cycle Planning in SAP APO. Business Process Part-2

4. For newly launching products, it takes a ramp up time to reach the targeted
sales. So we give an increasing % values to attain the targeted sales by the phase
in end date.

 
Shares
Here, Phase in Start date is 1st Aug, 2011 and End Date is 31st Dec, 2011. so there
are 5 months of time to reach the targeted (100%) sales.

5. Click on “Save Time Series”

6. Click on Adopt Values.

After clicking the Adopt button, you will reach the main screen. With this you
have completed the creating Phase in Pro le.

LIFE CYCLE PLANNING IN SAP APO DP. PART-


1
LIFE CYCLE PLANNING IN SAP APO DP. PART
-3

Leave a Reply

http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 3/6
1/16/2019 Life Cycle Planning in SAP APO. Business Process Part-2

Comment

Shares

Name *

Email *

Website

Save my name, email, and website in this browser for the next time I comment.

POST COMMENT

Quick Enquiry

Name

Email Id

Contact No

Text Here....

http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 4/6
1/16/2019 Life Cycle Planning in SAP APO. Business Process Part-2

SEND

Shares

CALL NOW FOR REGISTRATION

 + 91 9611912764

 sapapoonlinetraining.in@gmail.com

OUR RECENT POSTS

CIF (Core InterFace) Monitoring

SAP APO Training Classroom Notes

SAP APO Alert Monitor Con guration

Life Cycle Planning in SAP APO DP. Part -3

Life Cycle Planning in SAP APO. Part-2

Life Cycle Planning in SAP APO DP. Part-1

Data Flow options for APO Demand Planning

SAP APO GATP Basic Methods of Availability Checks

What is GATP in SAP APO

Capable to Promise (CTP)

SAP APO Sample Resume

SAP APO Resume Sample

SAP APO Resume Sample

SAP APO GATP Con garation Guide

SAP APO GATP Con guration Document


http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 5/6
1/16/2019 Life Cycle Planning in SAP APO. Business Process Part-2

Rating of     
Average of 4.7 on a total of 1989 Ratings

TESTIMONIALS

Shares

If we talk about the success of my Proper training and the right This institute has
 career, it is only SAP APO Online
Training. Thank you guys!!

placement assistance have made my
life. Thank you team SAP APO Online

shaping up my
thankful to the tea

― Priyanka Tiwari ― Devitha Shetty

Proudly powered by WordPress | Theme: Rocked by aThemes.

http://www.sapapoonlinetraining.in/life-cycle-planning-in-sap-apo 6/6

Вам также может понравиться