Вы находитесь на странице: 1из 3

Six Laning of Kishangarh-Udaipur-Ahemdabad Section of NH-79A, NH-79, NH-76 & NH-8 (Package-5)

BILL NO. 16 : Retaining & RE Wall

Item No. Description of Item Unit Quantity Rates Amount Remarks

16.10 Construction of RE wall

Construction of reinforced earth structures using metal strips as


a) Sqm 4,000 0
reinforcement as per Technical Specifications clause 3100.

Construction of reinforced earth structures using Geosynthetics as


b) Sqm 0
reinforcement as per Technical Specifications clause 3100.

Providing and laying of Filter media with granular materials/stone


crushed aggregates satisfying the requirements laid down in clause
2504.2.2. of MoRTH specifications to a thickness of not less than 600
c) mm with smaller size towards the soil and bigger size towards the wall Cum 542 0
and provided over the entire surface behind Reinforced Earth retaining
wall to the full height compacted to a firm condition complete as per
drawing and technical specification.

Construction of backfill in RE wall portion including providing, grading


d) and compaction with selected backfill soil in layers as per Technical Cum 420 0
Specifications clause 3100.

Construction of PCC/RCC cast-in-situ friction slab in M30 grade


e) Lm 7,743 0
including expansion joints as per Tenchnical Specifications and drawings

Providing and laying in position Reinforced Cement Concrete grade M


40 in crash barriers with caping beam, including reinforcement, providing
f) Lm 3,604 0
bituminous fiber board and Polysulphide joint filler at expansion
joints/gap locations complete as per drawings

g) Drain cum Reataining wall Lm 10,284 0

h) W-Beam Crash Barrier Lm 2,919 0

16.20 Construction of RCC retaining


Earthwork in excavation for Ret wall including all lifts and leads and
a) backfilling in layer with proper compaction complete as per drawings and 0
Technical Specifications Clause No.304.
i ordinary soil Cum 45 0
ii soft rock Cum 0

Plain/Reinforced cement concrete in open foundation complete as per


b) 0
drawing and technical specifications Section 1500, 1700, & 2100

i PCC Grade M15 Cum 3,538 0


ii RCC Grade M30 Cum 4,301 0

Supplying, fitting and placing un-coated HYSD bar reinforcement in


c) foundation complete as per drawing and technical specifications and as Mt 65,221 0
relevant clauses of sections 1600

Plain/Reinforced cement concrete in sub-structure complete as per


d) 0
drawing and technical specifications 1500, 1700 & 2200

RCC Grade M30 Cum 4,569 0


Supplying, fitting and placing HYSD bar reinforcement in sub-structure
e) Mt 65,275 0
complete as per drawing and technical specifications

Providing and fixing weep holes 100mm dia PVC pipe in wing walls,
f) head walls, return walls and retaining walls complete as per drawings Nos. 189 0
and Technical Specifications Clause 2706.

Construction of backfill in retaining wall portion including providing,


g grading and compaction with selected backfill soil in layers as per Cum 420 0
Technical Specifications clause 3100.

Providing and laying filter media with granular materials/stone crushed


aggregates satisfying the requirements laid down in clause 2504.2.2. of
h) Cum 542 0
MoRTH specifications to a thickness of not less than 600 mm with
smaller size towards the soil and bigger size

Providing and laying in position Reinforced Cement Concrete grade M


40 in crash barriers including reinforcement, two numbers of 100mm dia
i) RM 3,604 0
PVC pipes, providing bituminous fiber board and Polysulphide joint filler
at expansion joints/gap locations complet

Providing & fixing 80mm NB GI pipe rail on crash barrier complete with
j) RM 600 0
fixtures as per drawings and Technical Specifications Section 1900

k) Toe wall RM 0
Sheet pile cost for slope protection during construction of retaining wall
l) 2,134,485
(10%of the cost or retaining wall at existing structures)

Sub-Total 2,134,485

Total 2,134,485

0.213 Cr