6" THK. CHB 6" THK. CHB 4" THK.

CHB
EXTERNAL WALL EXTERNAL WALL INTERIOR WALL
1 2 2' 3
FFL FFL FFL
5600

300

300
3000 2650 900 2050
10mmØ VERT. BARS 10mmØ VERT. BARS 10mmØ VERT. BARS
NGL SPACED @ 0.60m. O.C. NGL SPACED @ 0.60m. O.C. NGL SPACED @ 0.60m. O.C.
1850 1100 W/ 10mmØ HOR. BARS W/ 10mmØ HOR. BARS W/ 10mmØ HOR. BARS
@ EVERY THIRD LAYER @ EVERY THIRD LAYER @ EVERY THIRD LAYER

400

400
OF CHB OF CHB OF CHB
LAUNDRY
1600

ELEV. +0.15M 3-10mmØ LONG. BARS 3-10mmØ LONG. BARS 3-10mmØ LONG. BARS
C1F1 C2F2 C1F1 W/ 10mmØ TRANSVERSE W/ 10mmØ TRANSVERSE W/ 10mmØ TRANSVERSE

200

200
WF-1 WF-1
BARS
BARS SPACED
SPACED @ 0.30m.
@ 0.30m. O.C.O.C. BARS SPACED @ 0.30m. O.C. BARS SPACED @ 0.30m. O.C.
A
ELEV.
450
2100

2100
STAIRWELL +0.10M 450 400

WF-3
KITCHEN
ELEV. +0.20M
C3F3 WF-1 WF-2
WF-1

A' SLAB ON WF-3


WF-3

5500
FILL
ELEV. +0.30M
2200

WF-2

2900
C1F1
DINING

LIVING
2 WALL FOOTING DETAIL
B C1F1
700

WF-1 S-1 SCALE 1:20MTS.


1200

SLAB ON PORCH
B'

500
FILL ELEV. +0.15M
5000

C CARPORT WF-1
ELEV. +0.00M C2F2 C1F1
10MM DIA SPACED
C O L U M N S C H E D U L E WHICHEVER DIMENSION IS GREATER GOVERNS
2500

@0.50M O.C B.W STIRRUPS


DIMENSION REINFORCING BARS
TOP BARS TOP BARS
MARK b (mm) h (mm) LATERAL TIES USING 10mmØ REBAR

3000 2200 2650 750 COL-1 150 400 6-16mmØ VERTICAL BARS 2@0.05M, 6@0.15M, REST @ 0.25M O.C
COL-2 150 400 6-16mmØ & 2- 12mmØ VERTICAL BARS 2 TIES - 2@0.05M, 6@0.15M, REST @ 0.25M O.C
COL-3 150 300 6-12mmØ VERTICAL BARS 2@0.05M, 6@0.15M, REST @ 0.25M O.C BOTTOM BARS BOTTOM BARS

DISCONTINUOUS ( MID-SPAN ) CONTINUOUS END 'A' ( MID-SPAN ) CONTINUOUS END 'B'


1 FOUNDATION PLAN END
A-2 S-1 SCALE 1:100MTS.

TYPICAL GIRDER / BEAM DETAILS


F O O T I N G S C H E D U L E
DIMENSION DEPTH OF REINFORCEMENTS
MARK WIDTH (mm) LENGTH (mm) THK (mm) EXCAVATION SHORT (S) LONG (L)
( mm )

FTG-1 1000 1200 300 1200 7-16mmØ 10-16mmØ


FTG-2 1000 1200 350 1200 7-16mmØ 10-16mmØ
S L A B S C H E D U L E
FTG-3 800 1000 250 1000 5-16mmØ 7-16mmØ REINFORCING BARS
THK SHORT SPAN LONG SPAN
MARK TYPE
1 2 2' 3 mm SUPPORT MID SPAN SUPPORT MID SPAN
S TOP BAR BOT. BAR BOT. BAR TOP BAR BOT BAR BOT. BAR
5600
50mm DROP 2F
N.G.L.
2650 900 2050 S1, S2,S3 100 10@125mm 10@250mm 10@125mm 10@125mm 10@250mm 10@125mm Two way
S5 100 10@125mm 10@250mm 10@125mm 10@125mm 10@250mm 10@125mm Two way
2B-3 2B-3
A S6 100 10@125mm 10@250mm 10@125mm 10@125mm 10@250mm 10@125mm Two way
2B-1
1450

S-3
L
2100

2100

ELEV. +3.05M STAIRWELL


2CBM-1

2B-1

CS 100 12@125mm 10@250mm 10@250mm 10@250mm 10@250mm 10@250mm Cantilever


S-5
650
4300

2B-3
A'
2B-1

THK
2B-2
5500

5500
2200

2B-4

2B-1

S-2
2900

ELEV. +3.10M
S-1
PLAN ELEVATION
2B-3 ELEV. +3.10M
B B E A M S C H E D U L E
700

S-4 CB-1
TYPICAL COLUMN -FOOTING DETAIL
1200

ELEV. +3.00M
B'
500

DIMENSION REINFORCING BARS


C 2B-3 2B-3 MARK b (mm) h (mm) LEFT SUPPORT MID SPAN RIGHT SUPPORT STIRRUPS USING 10mmØ REBAR

100mm DROP
TOP BAR BOT. BAR TOP BAR BOT. BAR TOP BAR BOT. BAR
2250 2650 750 2B-1 200 350 4-16mmØ 2-16mmØ 2-16mmØ 4-16mmØ 4-16mmØ 2-16mmØ 2@0.05M, 6@0.15M, REST @ 0.25M O.C
2B-2 200 350 2-16mmØ 2-16mmØ 2-16mmØ 4-16mmØ 2-16mmØ 2-16mmØ 2@0.05M, 4@0.15M, REST @ 0.25M O.C
NOTES:
2B-3 150 300 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2-16mmØ 2@0.05M, 4@0.15M, REST @ 0.25M O.C
1. NO FOOTING SHOULD REST ON BACKFILLED MATERIALS. 4. ALL PLANTED COLUMNS MUST BE SUPPORTED BY BEAMS. 2B-4 250 6-16mmØ 3-16mmØ 2-16mmØ 6-16mmØ 6-16mmØ 3-16mmØ 2@0.05M, 6@0.15M, REST @ 0.25M O.C
400
2. IN CASE THE SOIL CONDITION AT THE FOUNDING LEVEL 5. EARTH FILLING SHALL BE OF GOOD QUALITY SOIL
FOOTING CAN'T BE AS CERTAINED, THE CONTRACTOR MUST NON-PLASTIC TO AVOID SETTLEMENT. 2CBM-1 150 350 6-16mmØ 3-16mmØ 6-16mmØ 3-16mmØ 6-16mmØ 3-16mmØ 2@0.05M, REST @ 0.15M O.C
CONSULT A SOIL EXPERT OR A GEOTECHNICAL ENGINEER 6. FILL SHALL BE COMPACTED IN LAYERS OF 200MM TO
SECOND AND EXPLORE THE SURFACE CONDITION. A RELATIVE DENSITY OF 95%.
3. NO PIPE SHALL BE EMBEDDED INSIDE ANY COLUMN. 7. REMOVE / REPLACE TOP SOIL WHICH ARE HIGHLY PLASTIC
3 FLOOR FRAMING PLAN TO AVOID CRACKING OF SLAB ON FILL.
RB-1 150 300 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2-12mmØ 2@0.05M, 4@0.15M, REST @ 0.25M O.C

A-2 S-1 SCALE 1:100MTS. RB-2 150 350 3-12mmØ 2-12mmØ 2-12mmØ 3-12mmØ 3-12mmØ 2-12mmØ 2@0.05M, 4@0.15M, REST @ 0.25M O.C
RB-3 200 350 3-12mmØ 2-12mmØ 2-12mmØ 6-12mmØ 3-12mmØ 2-12mmØ 2@0.05M, 6@0.15M, REST @ 0.25M O.C
RB-4 250 400 4-16mmØ 2-16mmØ 2-16mmØ 4-16mmØ 4-16mmØ 2-16mmØ 2@0.05M, 6@0.15M, REST @ 0.25M O.C

STRUCTURAL ENGINEER PROJECT / LOCATION SHEET CONTENTS CAD BY SHEET NO.

Manalang MANALANG TAYAG ILANO PROPOSED MEDITERRANEAN HOUSE FOUNDATION PLAN


WALL FOOTING DETAILS
drr

Tayag ARCHITECTS REYNALDO PAZ


50 SQ. MTS. SINGLE ATTACHED UNIT COLUMN SCHEDULE DESIGNED BY
S-1
BASIC UNIT FOOTING SCHEDULE
Ilano 7H Strata 100 Bldg., Emerald Avenue, Ortigas Center TYPICAL COLUMN FOOTING DETAIL

Architects
Pasig City, Metro Manila, Philippines 1605
REG. NO.
PTR. NO.
TIN.
DATE:
OWNER:

---
TYPICAL GIRDER/BEAM DETAIL
SLAB SCHEDULE
BEAM SCHEDULE
NOTES
CHECKED BY