Вы находитесь на странице: 1из 3

METHOD STATEMENT / HAZARD ANALYSIS / STANDARD OPERATING PROCEDURE (SOP) FOR ERECTION OF

TOWER CRANE

ACTIVITY : Installation Of Tower Crane

ITEMS JOB STEPS POTENTIAL HAZARDS CONTROL/PREVENTLY PERSON


MEASURES
1 Hirer to prepare temporary Falling from the height slip and Conduct tools box meeting. Hire Approval person
support ‘I’ beamsfor securing falls Use of lifting gear check lifting before
of slewing table / mount start work

Installation of slewing table Lifting gear failure injury to Lifting Supervisor and main Safety Supervisor
2 assembly Secure and lift the workers damage to the site Contractor Site Supervisor to check Lifting Supervisor
slewing table assembly into and confirm that physical condition of
position connect to the LG is good with s/no tag
foundation I beam tag line to
be fixed weight:3.2 tons
3 Installation of Machine Deck Tower crane boom collide with Signalmen to give proper hand and Safety supervisor
assembly c/w Power pack other working cranes or structure voice signal to tower crane operator Lifting Supervisor
connect to the slewing table on site while slewing and hoisting and ensure that he can hear and
assembly with 4nos 32m X up load for installation visualize your command
100m pins weight:2.8 tons
4 Installation of the ‘A’ Tools and accessories dropping Supervisor to check and confirm that Safety Supervisor
all tools to be put in proper container
frame(2.1 tons) assembly and from height injury to site workers Lifting Supervisor
and small items to be carry in tools
operator cabin platform bag , no tools or parts shall be allowed
(1.5tons) weight:3.6 tons to pleaced in open space

5 Installation of luffing Winch Worker slip and falling from Lifting Supervisor confirm that all Safety Supervisor
and Hoisting Drum height injury to workers on top of workers working at height must put on Lifting Supervisor
crane full body safety hardness with shock
absorber and double lanyard anchored
to static point of slewing frame
6 Erectors of the 31.08m main Jib section may hit overhead Lifting Supervisor to ensure that there Safety Supervisor
jib section by two (2) hoisting structure or service cable is clearance before hoisting up the jib Lifting supervisor
operation
a)Secure and tension the first
15m jib section and connect it
to the brackets of the slewing
table with 2 nos 32mm X
100mm pin and temporary
rope weight:1.2 ton
b)Secure the second (2) 15.5m
jib section and connect it to
the first 15m jib with 4 nos
weight:1.3 ton
7 Installation of Counter weight Load dropping from height Lifting Supervisor ensure all Safety Supervisor
secure and lift the counter serious injury to site workers unauthorized workers are dearer from Lifting Supervisor
weight into position and install affected work area and Erectors shall
to counter weight bracket be at tower crane mast area Hirer to
barricaded work area
8 Operation under warm Heat Reminder workers to drink more Safety Supervisor
weather water inform supervisor if not feeling Lifting Supervisor
well wear loose clothing for well
ventilation avoid dark color clothing

9 Operation under lighting Lightning strike Stop all opening field work and Safety Supervisor
period proceed to the protected area Lifting Supervisor