DESIGN VALIDIFICATION PLAN

Procedure description Acceptance criteria Responsible persons Test resource conclusion

Roll cage pipe testing Pipe penetration Material should not • Santosh kumar MIG welding Material melted on
test melt less then 1540˚c
1500˚c

Load impact test on design is tested •Relatively Strain • Dewang sheth Ansys 14.5 • max stress
chassis design applying virtual Free Chassis • Shubham chouhan generated is 162
loads using software •Max. F.O.S. Under • Chirag Rathod Mpa
all test conditions • max fos is 2.47

Steering geometry Move of Vehicle Vehicle should move • Shubham Prasad Visual Vehicle remains in
with Steering in in a straight line • Aahan gupta inspections straight lane
straight ahead with minimal lateral • Anoop dharkar
position deviation

Brakes Stopping distance Vehicle should stop • Prakhar sarwate Visual Stopping distance of
before 10M • Chandrapal Singh inspections vehicle 9.67m
parmar

Engine & Transmission Proper Working at • No loose • Yash Dixit Speedometers Max speed 47 km/h
various rpm connections • Vineet Joseph Sound
• Provide max • Samir Patel measuring
speed and max devices
rpm

Safety Inspection Of Driver ergonomics & • Shubham Mishra Quality & All assemblies are
Padding, Bumpers Rulebook • Ramashankar Sharma Rules check same as in rule book
,Seatbelt & Safety
Mounts