Вы находитесь на странице: 1из 452
INSTRUCTION MANUAL 1 : TC-215 TC-225 INCH SPECIAL NOTES 4 (1) Copying of this document either wholly or in part is prohibited. (2) the contents of this document are subject to change without notice. (3) This document has been complied very carefully. If any questions arises, please contact the shop where you bought the product. ‘Thank you for purchasing Brother ONC tapping centers model TC-215 and 10-225. ‘The compactly designed model provides excellent performance, reliability, operation ease and economy. Please read the manuals carefully so that you can operate and maintain the machine in the correct manner, guaranteeing prolonged machine service Life at its top performance level. 1 IL wv Contents , Cautions for handling the machine Outline a 1. Each part name of machine and axis direction 2, Features and configuration of machine 21. Machining capacity 2-2, Spindle motor characteristics (16-215) Installation 1. Service conditions 2, Installation area 3. Machine movement 4, Machine installation 5. Power supply connection Maintenance 1, Routine inspection 2. Lubrication 2-1. Lubrication for ball screw and IM guide 2-2. Other lubrication OPERATION 1, OPERATION PROCEDURE 2. POWER ON AND OFF 3. CAUTIONS FOR SETTING WORKPIECES 4, SETTING AND REMOVAL OF TOOLS 5. OPERATION PANEL S-1, CRT Screen 5-2, Operation panel 5-2-1, Function of the switch 5-2-2, Function of Keys el. 6-2. 6-3, MANUAL RUN Zero Position Return RT) Working Zero Position Return (W.2 Rapid Feed Jog Feedrate (JOG) Step Length Spindle Revolve Tool Replacement Single Action 7. KEY-IN RUN rh 7-2. 7-2- Tae | 12 Block Run Parameter 1. Parameter (Switch) 2. Parameter 2 (System) 3, Parameter 3 (Pitch Error. Compensation) 7-2-4, Parameter 4 (RS-232¢) 7-2-5, Parameter 5 (Schedule Program) 7-3. Th, 15. Tool Menu Magazine Tools Cutting Tool Condition 7-5-1. Tool Pattern 7-5-2, Cutting Tool /Condition 7-5-3. Hole Sizes before Tapping J-5-4. Change of Cutting Tool in Memory Run. (Do not changecutting tool during cutting operation.) 7-5-5. Collective Deletion of Cutting Tool Conditions 7-6. 1/0 Display 7-6-1. External Input 7-6-2, Description of external output 8 Program Edit &1. 8-2, 83, Before Program Edit Insertion/Deletion/Cancellation of Data Program Edit Contents 8-3-1. Input of machining data IsL. Setting of machine zero position 1-2, Setting of inter-work return height 1-3. Setting the number of workpieces 1-4, Work material setting 1-5, Job 8-31-51. Center hole work ¢ "1-5-2. Hole boring work "1-5-3, Tap work "1-5-4. Reamer "145-5, Counter bore hole work "1-5-6. Counter bore tap work 1-5-7, The counter bore reamer work " 1-5-8, Top face cutting "1-5-9, Pattern, Z axis position, XY position, peripheral feed "15-10, Coolant " L-5-11. XY Movement " 1-5-12, Signal output : " 1-5=13. Subprogram " 1-5-14, Program stop 8-3-2, Setting of Machining Order Setting of Tool Pattern Setting of Cutting Tool/Condition Tool Assign Information necessary for tool assignment Assign operation Forced tool assign Sampled display of assign Tool check Tool Reassign 8-3-6. Program and Memory Display: Order ( 8-3-7. External Program Input and Output | "7-1, External memory display | "7-2, Program output to the external unit | "7-3, Program input from the external unit "7-4, External program delete “7-5, External data output "7-6, Data input from the external unit 8-3-8. Setting of Working Zero Position 8-3-9, Setting in the Magazine vn VEL VILE 8-4. Program Edit Examples 8-4-1, Examples of Linear Pattern Drilling 8-4-2, Drilling and Tapping using patterns 8-4-3. Example of Tapping for Multiple Workpiece 8-4-4, Examples of Tapping on Subprogram 8-4-5, Example of Surface Cutting with End Mill (Straight Line) 8-4-6, Examples of Surface Cutting With End Mill (R Cutting) B-4-7. Examples of Schedule Machining 9. Memory Run 9-1. Contents of Memory Run 9-2. Operation of Memory Run 9-3. Halt and Restart 9-4. Program Edit in Memory Run 10. Position Display Optional accessories and relevant components 1. Coolant equipment and solenoid valve 2, Installation of apindle-taper airblast equipment 3, Tool breakdown detector 4, Bubble cassette and bubble memory unit 5, R8~232C interface 6. Layout of components in control case Action for different cases Error code After Service 1 Cautions for handling the machine Cautions for handling the machine © Installation and service location (See Chapter III Installation 1. "Service conditions".) 1. Install the machine at the flat and stable place. 2. Do not install the machine at the place near fire or heating element, or where temperature steeply changes. 3. Do not install the machine at the place under sunlight, near a vent hole, or with a high temperature. 4. Use dry clean air for the air blast equipment. © Operation 1. Confirm the following before turning on the power: * No obstacle is left near the machine. % The CNC controller door is close. 2, Wear the uniform suitable for the operation. (Safety shoes, protectors, goggles, etc.) Confirm the following before starting the operation: % No dirt or dust is found on the taper portion at the end of the spindle. * No dirt or dust is found on the taper portion of the tool held by the magazine, or no chipping or abrasion is found on each section of the machine. * The tool is securely held and no pull-stud is loosened. Do not touch the rotational or moving element during operation: 5. Use components specified by us for the electrical equipment in the CNC controller. 6, Turn off the power before leaving the machine. 7. Be sure to warn up the machine before restarting it after shutdown for 3 days or more. (For spindle rotation, table movement, and ATC) © Adjustment and component installation 1, Turn off the power before starting adjustment and checking. 2. Do not use compressed air to clean the machine body, CNC controller, and operation panel, or to eliminate chips. Pay special attention to protecting the machine from water. = 10 - II Outline Sea 1. Bach part name of machine and axis direction ' Part No. Part name spindle head Columa a Table = [Control case L i 3 4 Intermediate table wo 5 Base cree ae 6 | Magazine na 7 8 Operation panel -w- Outline drawing 2. 0.79 3.93. 5.7 (20) oo) (145) 68.89 (1750) 74.84 (1901) TC-215 mer ans 228 erates 3S oa ae 3 BI a} 3} Pe 3 1 1 tener sarah a 2.65 6 RENT 65.92 (4700) 68.89 (1750) ri a | | 2 F| SS Si 2 -b- 29.72 (755) -14- Dimensions of table top 19.69 (500) 0.78 18.11#0.012 (4600.3) | [0.78 (co | [QE IOI 3080.0) 9.0680-008 BTA Py 11,8105" G080.9) 50.08 (25080, 2) (5080.2) a8 | f goy8 g\, cate / a8 | E18 HH

Вам также может понравиться