1 S. No: 2-Noted. However,


2 S. No: 10-To be depicted a
3 S. No: 13-Open. Check arr
4 S. No: 14-Open. Don’t del
5 S. No: 18-Noted. However
6 S. No: 19-Noted. But even
7 S. No: 20-Reply not accep
8 S. No: 24-Open.
9 S. No: 28-Response to be

10 S. No: 29-To be addressed

11 S. No: 33-Review this actio


12 S. No: 34-Review this actio
13 S. No: 35-Open. Ofshore
14 S. No: 38-To be provided d
15 S. No: 41-Cover by note a
16 S. No: 44-Not accepted. A
17 S. No: 53-Noted. Open
18 S. No: 55-Refer note 24 an
19 S. No: 56-To be reviewed w
20 S. No: 57-To be reviewed w
21 S. No: 58-Refer action 66

22 S. No: 60-Sampling conne

23 S. No: 64-Pump protection


24 S. No: 68-Noted. Open du
25 S. No: 70-Noted but proofi
26 S. No: 71-Noted. All TQ ha
27 S. No: 72-Its not only for f
28 S. No: 73-Noted but proofi
29 S. No: 74-Noted but proofi
30 S. No: 75-Noted but proofi
31 S. No: 77-Noted. Open act

32 S. No: 78-All process relat


33 S. No: 91-Noted. Open.
34 S. No: 94-Noted. However
35 S. No: 95-Noted. P&ID ma
36 S. No: 98-Check P&IDs no
37 S. No: 105-Noted. Open
38 S. No: 110-Noted. Open
39 S. No: 113-Response not a
40 S. No: 114-Noted. Open
41 S. No: 115-Noted. Open
42 S. No: 117-Noted. Open
43 S. No: 120-Noted. Open
44 S. No: 121-Not accepted.
45 S. No: 123-Noted. Open
46 S. No: 124-Noted. Open
47 S. No: 125-Noted. Open
48 S. No: 130-Noted, adding
49 S. No: 131-Noted. Open
50 S. No: 132-Noted. To be de
51 S. No: 137-Noted. Open
52 S. No: 143-Not accepted.
53 S. No: 146-Noted. Open
. No: 2-Noted. However, to be rechecked with vendor documents received after award of PO in OLGA Software.
. No: 10-To be depicted at all PSV locations. E.G. In P&ID 9686-8110-25-110-1001, u/s, d/s FB valve is not shown
. No: 13-Open. Check arrangement with valve pit for depicted valve and flushing connection with valve. Also co
. No: 14-Open. Don’t delete the note. Incorporation of comments doesn’t mean. Modify previous note 22. Discus
. No: 18-Noted. However, cover by note "Warehouse spare of T type strainer screens shall be available" Open
. No: 19-Noted. But eventually civil should able to cope up with subject forces. Open
. No: 20-Reply not accepted. To be checked for all PSV and TSVs, List and segregate them as per philosophy and
. No: 24-Open.
. No: 28-Response to be checked w.r.t above comment in action 27. Discuss. Open

. No: 29-To be addressed with latest information w.r.t DCA. Open

. No: 33-Review this action w.r.t TQ/DCA and update. Open


. No: 34-Review this action w.r.t TQ/DCA and update. Open
. No: 35-Open. Ofshore P&ID to be attached showing this note.
. No: 38-To be provided downstream of pit also for isolation of equipment/pit. Open
. No: 41-Cover by note and provide arrangement in all P&IDs. Attachment not provided. Open.
. No: 44-Not accepted. All EPC 1.1.3 action close out by EPC 1.1.2 to be submitted for Company review. Open
. No: 53-Noted. Open
. No: 55-Refer note 24 and update it. Discuss.Open
. No: 56-To be reviewed w.r.t above action no 55. Open.
. No: 57-To be reviewed w.r.t above action no 55. Open.
. No: 58-Refer action 66 below for motor details as M2 for Auto Start. Open.

. No: 60-Sampling connection pump flow, nozzle elevation, and sampling philosophy is not clear. To be clarified

. No: 64-Pump protection is required irrespective of continuous/intermittent operation. Refer HAZOP action 35.
. No: 68-Noted. Open due to vendor information
. No: 70-Noted but proofing document is not attached. Open
. No: 71-Noted. All TQ have been replied. However, provide TQ no. Open
. No: 72-Its not only for future valves but all valves. Refer reply above for Sr. No. 66. Open
. No: 73-Noted but proofing document is not attached. Open
. No: 74-Noted but proofing document is not attached. Open
. No: 75-Noted but proofing document is not attached. Open
. No: 77-Noted. Open actions to be closed before issuing of IFA revision P&IDs. Typically, applicable to all P&IDs.

. No: 78-All process related documents to be updated with revised rainfall intensity as per Civil TQ. Proofing doc
. No: 91-Noted. Open.
. No: 94-Noted. However, note is incomplete. Discuss. Open
. No: 95-Noted. P&ID mark-ups on Design Review Master are not incorporated. Open
. No: 98-Check P&IDs no appropriately. (Typ.)
. No: 105-Noted. Open
. No: 110-Noted. Open
. No: 113-Response not accepted. Arrangement shown in this P&ID as kerbed area with valve to be typically sho
. No: 114-Noted. Open
. No: 115-Noted. Open
. No: 117-Noted. Open
. No: 120-Noted. Open
. No: 121-Not accepted. All vent shall be treated to comply environmental norms. Accordingly arrangement to b
. No: 123-Noted. Open
. No: 124-Noted. Open
. No: 125-Noted. Open
. No: 130-Noted, adding high quality water into waste grade water is not recommended from environmental poi
. No: 131-Noted. Open
. No: 132-Noted. To be depicted in P&ID 9686-8110-25-740-1012. Show proofing document. Open
. No: 137-Noted. Open
. No: 143-Not accepted. In order to identify dynamic behavior in firewater network, it is required to perform Fire
. No: 146-Noted. Open
of PO in OLGA Software. Open.
d/s FB valve is not shown on BPS discharge PSV etc. Typically, applicable at all locations. Open
ection with valve. Also cover by note in P&ID.
previous note 22. Discuss, if not clear.
hall be available" Open

em as per philosophy and address. Open

Company review. Open

not clear. To be clarified by CPP. Open

Refer HAZOP action 35. Open.

, applicable to all P&IDs. Open

per Civil TQ. Proofing documents to be furnbished. Open.


valve to be typically shown in other P&ID where kerbed areas are there. Open

rdingly arrangement to be provided. Open

d from environmental point of view. Review accordingly. Open

ment. Open

required to perform Fire water transient analysis by CPP. Open


1
2
3
4
5
6
7
8
9

10

11
12
13
14
15
16
17
18
19

20

21
22
23
24
25
26
27

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113

114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
Note
To be provid
 Noted & Incorporated. However, note
Note
Note
Note
 Noted. The MOV legend
Note
Note

As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if it is discharging to atmosp

For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation valves have not been p

Hence, FB valves have been depicte


Note
Note
The valve or valve pit is not required here and hence it has been removed from latest version of PIDs. V
The note was wrongly appearing in the subject PID. It is correctly show
Note
 Provisio
Note
The note has already bee
Axial stop has been provided at PSV discharge as a normal enginee

As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if is discharging to atmosph

For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation valves have not been p

Hence, FB valves have been depicte


Note
 Bypass line is not env
Note
Note
Full vacuum and Surge are
 Note refe
 During closure of the MOV, the flow will b
Reverse flow is not envisaged as flow will occur based on pressure difference, and pump suction will be on the lower pressure si
of the pressure differen
The line has been changed to piping from onshore pipeline as per the latest TQ reply and company
Note
Note
Note
The line has been changed to piping from onshore pipeline as per the latest
The line has been changed to piping from onshore pipeline as per the latest TQ reply and company app
Note
Note
Note
There is no underground line after the PCSW pit. The content has to be pump
Note
PID for Potable Water and irrigation water
Purging connection and note has been already provided. Attachment is also provided. Attachment number is updated.
Note
Note
 Refer IQ-0144. All action
Note
Note
Note
Note
Note
Note
Note
Note
Relevant HO
Note
The Roof drains sumps have been removed since the tank type has
The Roof drains sumps have been removed since the tank type ha
The observation sump
The motor type h
Note
Sampling connection legend has been
Pump in Sampling System is part of Vendor scope. Howe
Nozzle orientation for size 12" above is modelled and line
Note
The HAZOP action has been closed. Kindly review the HAZOP close out HAZOP Action or Recommendation no.: 32
Note
Note
Noted & Incorporated 
Tanker connection will be finalised after
Spare pump is not envisaged as this entire operation is intermittent, e
Noted & Incorporated the relevant comments
The TQ option has been with
All future valves coming in phase 1.2 are under E
Noted & Incorporated the relevant comments
 Noted & Incorporated the relevant comments
Noted & Incorporated the relevant comments
Note
The levels have been updated in the lat
The Design Basis has been updat
Noted. Vent calculation will be covered in Process Calculation Dossier (9686-8110-CA-000-1001).
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Noted & incorporated. 
Note
Noted & Incorporated the relevant comments
Note has been rewritten
Noted & Incorporated the relevant comments
Note
Note
Note
Note
Note
Alrea
Note
Note
Note
A minimum distance for maintenance has been maintained between

Note
Please note with reference to the PID (9686-8110-25-711-1002), the ARC va
Note
The Updated Calculations ha
Note
Note
Valve pit is already
As per Waste Water Drainage Philosophy Doc No: 9686-8110-PH-000-1009, the definition of kerbed area m
Additionally, as per section 5.3.1, the run off from the surface has t

 The backwash is coming from mineraliz


Note
Revie
Note
Note
The Corrosion Protection requirement is covered in detail in SPECIFICATION FOR CP MATERIALS AND EQUIP
Noted
Noted & Incorporated the relevant comments

Note
Note
Note
Note
The line has been deleted in latest revision of PIDs. Kindly refe
Review has been conducted and the number of sumps based
Sample connection is already provided in Irrigation Water Tank, PID
1
2

4
5
6
7
8
9

10

11
12

13

14

15
16

17

18

19

20
20

21
22
23
24
25
26

27

28

29

30
31
32

33

34

35
36
37

38

39

40

41

42
43
44
45
46
47
48
49
50
51
52
53
54

55

56

57
58
59

60

61

62

63

64

65
66
67

68

69

70

71

72

73

74

75

76
77

78
79

80
81
82
83
84
85
86
87
88
89
90
91
92

93

94

95

96
97
98
99
100
101
102
103
104

105

106
107

108

109
110
111
112

113
114

115

116
117
118
119

120

121

122

123
124
125
126
127
128
129

130

131

132
Noted & Incorporated.
To be provided after vendor response.

 Noted & Incorporated. However, note for non-intrusive type for pig signaller already exists.

Noted & Incorporated 


Noted & Incorporated.
Noted & Incorporated 
 Noted. The MOV legend is in line with the project requirement.
Noted & Incorporated 
Noted & Incorporated 

As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if it is
discharging to atmosphere. Hence isolation valve at outlet piping is not required. Hence FB is
not depicted wherever isolation valve is not required.

For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation
valves have not been provided in single PSVs. However, since at certain places, isolation
valves have been shown in FEED design, it has been retained.

Hence, FB valves have been depicted wherever isolation valves have been provided.

Noted & Incorporated.


Noted & Incorporated. 
The valve or valve pit is not required here and hence it has been removed from latest version
of PIDs. Valve pits are only provided before the entry of underground lines into the sumps so
that the sumps can be isolated.
The note was wrongly appearing in the subject PID. It is correctly shown in PID 730-1002
(Note 9). There is no requirement of showing this note in this PID.
Noted & Incorporated 
 Provision in future is provided

Noted & Incorporated 

The note has already been provided in the current issue of PIDs.
Axial stop has been provided at PSV discharge as a normal engineering procedure and as per
stress analysis. It has been welded to the pipe support.
As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if is
discharging to atmosphere. Hence isolation valve at outlet piping is not required. Hence FB is
not depicted wherever isolation valve is not required.
For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation
valves have not been provided in single PSVs. However, since at certain places, isolation
valves have been shown in FEED design, it has been retained.

Hence, FB valves have been depicted wherever isolation valves have been provided.

Noted & Incorporated 


 Bypass line is not envisaged as the service is intermittent. 
Noted & Incorporated.
Noted & Incorporated.
Full vacuum and Surge are mentioned in the Line Classification List. 
 Note reference has been updated.
 During closure of the MOV, the flow will be routed through the FCV hence PZHH is not
required.

Reverse flow is not envisaged as flow will occur based on pressure difference, and pump
suction will be on the lower pressure side. During closure of the MOV, the flow will be routed
through the FCV and back to the pump suction and not to the suction header because of the
pressure difference. Hence reverse flow is not possible.

The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well. Hence no
provision for pigging is required.
Noted & Incorporated.
Noted & Incorporated.
Noted & Incorporated.

The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well.
The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well. The transition
piece has been removed accordingly.
Noted & Incorporated.
Noted & Incorporated.
Noted & Incorporated.

There is no underground line after the PCSW pit. The content has to be pumped either by
vacuum truck, or by pump so no isolation is required downstream of the sump.

Noted & Incorporated.


PID for Potable Water and irrigation water to be developed after the finalisation of Unit Plot
Plans
Purging connection and note has been already provided. Attachment is also provided.
Attachment number is updated.
Noted & Incorporated.
Noted & Incorporated.
 Refer IQ-0144. All actions have been closed. No impact on PIDs.
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Relevant HOLDS already under place. 
Noted & Incorporated.
The Roof drains sumps have been removed since the tank type has been changed to internal
floating roof. Note 24 has been updated accordingly. 
The Roof drains sumps have been removed since the tank type has been changed to internal
floating roof. Note 24 has been updated accordingly.
The observation sump representation has been updated. 
The motor type has already been updated to M2.
Noted & Incorporated 

Sampling connection legend has been issued. All the details required are mentioned in it.

Pump in Sampling System is part of Vendor scope. However, the location of Pump shall be
shown in Unit Plot Plan in later stage.
Nozzle orientation for size 12" above is modelled and lines are routed accordingly. Same shall
be reviewed in 30% Model Review.
Noted & Incorporated 
The HAZOP action has been closed. Kindly review the HAZOP close out HAZOP Action or
Recommendation no.: 32
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 

Tanker connection will be finalised after the confirmation from Road tanker service provider. 

Spare pump is not envisaged as this entire operation is intermittent, even if the running
pump trips, vacuum truck connection can be used for unloading. 
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
The TQ option has been withdrawn. The FEED arrangement is retained.
All future valves coming in phase 1.2 are under EPC 1.1.2 scope, and have been shown
accordingly at all places. 
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
 Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated.
The levels have been updated in the latest issue of PIDs.

The Design Basis has been updated to reflect the change. Refer Section 11.4.2.1.
Noted. Vent calculation will be covered in Process Calculation Dossier (9686-8110-CA-000-
1001).
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & incorporated. 
Noted & Incorporated 
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Note has been rewritten and details have also been depicted.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Already insured in PIDs. 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
A minimum distance for maintenance has been maintained between the two pumps. A
distance of 3 meters has been provided between the pumps.  
Closed. 
Noted & Incorporated 

Please note with reference to the PID (9686-8110-25-711-1002), the ARC valve is outside the
battery limit of the Vendor & not part of pump vendor scope of supply.

Noted & Incorporated 


The Updated Calculations have been issued as a part of Process Dossier.
Noted & Incorporated 
Noted & Incorporated.
Valve pit is already provided near the PCSW sump. 
As per Waste Water Drainage Philosophy Doc No: 9686-8110-PH-000-1009, the definition of
kerbed area mentions “Runoff from kerbed areas is normally uncontrolled to prevent
unintended overflows to surrounding systems”.
Additionally, as per section 5.3.1, the run off from the surface has to be uncontrolled hence
no valve pit is required at the outlet of the kerbed area.
Noted. 
 The backwash is coming from mineralization package will be updated based on vendor
input.
Noted & Incorporated.
Reviewed by I&C. Closed
Noted & Incorporated 
Noted & Incorporated 
The Corrosion Protection requirement is covered in detail in SPECIFICATION FOR CP
MATERIALS AND EQUIPMENT Doc No: 9686-8360-SP-000-2505. The Mechanical Datasheet
for Potable Water Tanks also covers the requirement.
Noted and Incorporated.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
 Noted
Noted. 
Noted.  
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
Noted & Incorporated 
The line has been deleted in latest revision of PIDs. Kindly refer HAZOP REVIEW REPORT ‘Doc
No: 9686-8150-RP-000-2002-Attachment 5.
Review has been conducted and the number of sumps based on elevation has been finalized
and shown in the latest issue of the PIDs.
Sample connection is already provided in Irrigation Water Tank, PID - 9686-8110-25-740-
1019. Hence no requirement of another one in PID 740-1012.

Вам также может понравиться