. No: 60-Sampling connection pump flow, nozzle elevation, and sampling philosophy is not clear. To be clarified
. No: 64-Pump protection is required irrespective of continuous/intermittent operation. Refer HAZOP action 35.
. No: 68-Noted. Open due to vendor information
. No: 70-Noted but proofing document is not attached. Open
. No: 71-Noted. All TQ have been replied. However, provide TQ no. Open
. No: 72-Its not only for future valves but all valves. Refer reply above for Sr. No. 66. Open
. No: 73-Noted but proofing document is not attached. Open
. No: 74-Noted but proofing document is not attached. Open
. No: 75-Noted but proofing document is not attached. Open
. No: 77-Noted. Open actions to be closed before issuing of IFA revision P&IDs. Typically, applicable to all P&IDs.
. No: 78-All process related documents to be updated with revised rainfall intensity as per Civil TQ. Proofing doc
. No: 91-Noted. Open.
. No: 94-Noted. However, note is incomplete. Discuss. Open
. No: 95-Noted. P&ID mark-ups on Design Review Master are not incorporated. Open
. No: 98-Check P&IDs no appropriately. (Typ.)
. No: 105-Noted. Open
. No: 110-Noted. Open
. No: 113-Response not accepted. Arrangement shown in this P&ID as kerbed area with valve to be typically sho
. No: 114-Noted. Open
. No: 115-Noted. Open
. No: 117-Noted. Open
. No: 120-Noted. Open
. No: 121-Not accepted. All vent shall be treated to comply environmental norms. Accordingly arrangement to b
. No: 123-Noted. Open
. No: 124-Noted. Open
. No: 125-Noted. Open
. No: 130-Noted, adding high quality water into waste grade water is not recommended from environmental poi
. No: 131-Noted. Open
. No: 132-Noted. To be depicted in P&ID 9686-8110-25-740-1012. Show proofing document. Open
. No: 137-Noted. Open
. No: 143-Not accepted. In order to identify dynamic behavior in firewater network, it is required to perform Fire
. No: 146-Noted. Open
of PO in OLGA Software. Open.
d/s FB valve is not shown on BPS discharge PSV etc. Typically, applicable at all locations. Open
ection with valve. Also cover by note in P&ID.
previous note 22. Discuss, if not clear.
hall be available" Open
ment. Open
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
Note
To be provid
Noted & Incorporated. However, note
Note
Note
Note
Noted. The MOV legend
Note
Note
As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if it is discharging to atmosp
For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation valves have not been p
As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if is discharging to atmosph
For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation valves have not been p
Note
Please note with reference to the PID (9686-8110-25-711-1002), the ARC va
Note
The Updated Calculations ha
Note
Note
Valve pit is already
As per Waste Water Drainage Philosophy Doc No: 9686-8110-PH-000-1009, the definition of kerbed area m
Additionally, as per section 5.3.1, the run off from the surface has t
Note
Note
Note
Note
The line has been deleted in latest revision of PIDs. Kindly refe
Review has been conducted and the number of sumps based
Sample connection is already provided in Irrigation Water Tank, PID
1
2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
Noted & Incorporated.
To be provided after vendor response.
Noted & Incorporated. However, note for non-intrusive type for pig signaller already exists.
As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if it is
discharging to atmosphere. Hence isolation valve at outlet piping is not required. Hence FB is
not depicted wherever isolation valve is not required.
For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation
valves have not been provided in single PSVs. However, since at certain places, isolation
valves have been shown in FEED design, it has been retained.
Hence, FB valves have been depicted wherever isolation valves have been provided.
The note has already been provided in the current issue of PIDs.
Axial stop has been provided at PSV discharge as a normal engineering procedure and as per
stress analysis. It has been welded to the pipe support.
As per API 521-Part 1, Figure 10, isolation valve is not required in discharge piping if is
discharging to atmosphere. Hence isolation valve at outlet piping is not required. Hence FB is
not depicted wherever isolation valve is not required.
For Inlet piping isolation valve are required only if a spare PSV is provided. Hence isolation
valves have not been provided in single PSVs. However, since at certain places, isolation
valves have been shown in FEED design, it has been retained.
Hence, FB valves have been depicted wherever isolation valves have been provided.
Reverse flow is not envisaged as flow will occur based on pressure difference, and pump
suction will be on the lower pressure side. During closure of the MOV, the flow will be routed
through the FCV and back to the pump suction and not to the suction header because of the
pressure difference. Hence reverse flow is not possible.
The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well. Hence no
provision for pigging is required.
Noted & Incorporated.
Noted & Incorporated.
Noted & Incorporated.
The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well.
The line has been changed to piping from onshore pipeline as per the latest TQ reply and
company approval. The same has been updated in latest issue of PIDs as well. The transition
piece has been removed accordingly.
Noted & Incorporated.
Noted & Incorporated.
Noted & Incorporated.
There is no underground line after the PCSW pit. The content has to be pumped either by
vacuum truck, or by pump so no isolation is required downstream of the sump.
Sampling connection legend has been issued. All the details required are mentioned in it.
Pump in Sampling System is part of Vendor scope. However, the location of Pump shall be
shown in Unit Plot Plan in later stage.
Nozzle orientation for size 12" above is modelled and lines are routed accordingly. Same shall
be reviewed in 30% Model Review.
Noted & Incorporated
The HAZOP action has been closed. Kindly review the HAZOP close out HAZOP Action or
Recommendation no.: 32
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Tanker connection will be finalised after the confirmation from Road tanker service provider.
Spare pump is not envisaged as this entire operation is intermittent, even if the running
pump trips, vacuum truck connection can be used for unloading.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
The TQ option has been withdrawn. The FEED arrangement is retained.
All future valves coming in phase 1.2 are under EPC 1.1.2 scope, and have been shown
accordingly at all places.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated.
The levels have been updated in the latest issue of PIDs.
The Design Basis has been updated to reflect the change. Refer Section 11.4.2.1.
Noted. Vent calculation will be covered in Process Calculation Dossier (9686-8110-CA-000-
1001).
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & incorporated.
Noted & Incorporated
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Note has been rewritten and details have also been depicted.
Noted & Incorporated the relevant comments and attachments provided along with the
original comment.
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
Already insured in PIDs.
Noted & Incorporated
Noted & Incorporated
Noted & Incorporated
A minimum distance for maintenance has been maintained between the two pumps. A
distance of 3 meters has been provided between the pumps.
Closed.
Noted & Incorporated
Please note with reference to the PID (9686-8110-25-711-1002), the ARC valve is outside the
battery limit of the Vendor & not part of pump vendor scope of supply.