EXECUTED BY UPEIDA:
1) Ganga Expressway
The longest expressway of the country, Ganga Expressway is likely to be 1,020
km long. The highway project, which will be developed in two phases will see 596
km long stretch from Meerut to Prayagraj in phase one.
Under phase two of the expressway, 110 km long road stretch will be developed
from Tigri to Uttar Pradesh-Uttarakhand border and another road stretch of 314
km will be developed from Prayag Raj to Ballia.
The phase one will cover 12 districts namely, are Meerut, Hapur, Sambhal,
Jyotibha Phule Nagar, Budaun, Shahjahanpur, Hardoi, Unnao, Farrukhabad, Rae
Bareli, Pratapgarh and Prayagraj.
It will include four lanes (expandable to six lanes green field), right of way 110
metres with a design speed of 120 kmph. Also, as many as 8 road over bridges
as well as 18 flyovers will be constructed.
Tenders are floated for finalising DPR Consultants.
2) PRAYAGARAJ EXPRESSWAY:
7) Estimated length of the Expressway is approximately 952 km. and that of links is
95 kms. Its estimated cost is approximately Rs. 30,000 crores
4) 08-Lane Access Controlled Expressways from Greater
Noida to Ballia
8-Lane Access Controlled Expressway starts from Eastern Peripheral
Expressway near village Sirsi in Greater Noida passing through Gautambudh
Nagar to State Highway no. 34 near Phephana in district Ballia. The project has
been developed on DBFO basis on PPP Model. All expenses on the project to be
borne by the Concessionaire. No financial assistance/grant/fund is being provided
by GoUP.
Estimated length of the Expressway is approximately 952 km. and that of links is
95 kms. Its estimated cost is approximately Rs. 30,000 crores.
On one end of the expressway, NCR, Noida, Greater Noida and Ghaziabad has
shown accelerated growth and increased industrial and commercial activity in the
past few years. Greater Noida is one of the most modern and well planned
industrial and commercial-cum-residential townships falling within the National
Capital Region of India and is adjacent to Noida, one of the largest industrial
townships in Asia. Greater Noida also serves as a satellite township in the NCR
and will have all proposed facilities like railway station and airport in the future.
The approximate length of UGC Expressway (8 lanes) will be 147.8 km. while
length of Link Expressway (6 lanes) will be approx. 68.5km. Service road (2
lanes) will be provided in the length of approx. 97.30km.
There will be 52 nos. underpasses and 7 nos. ROBs across the project.
The cost of the project with navigation will be approx. 8719 crores.
6) Bijnore-Moradabad-Fategarh Expressway.
According to vide G.O. no. 695A/77-3-2008-34M/07TC dated Feb.28.2008
issued by Industrial Development Department-3,GoUP, UPEIDA has been
entrusted the expressway Project “Bijnore-Moradabad- Fategarh on the bank of
river Ram Ganga” for development under PPP Model.
9) Agra-Kanpur Expressway.
According to vide G.O. no. 695A/77-3-2008-34M/07TC dated Feb.28.2008 issued
by Industrial Development Department-3,GoUP, UPEIDA has been entrusted the
expressway Project “Agra-Kanpur (on the bank of river Yamuna) ” for
development under PPP Model.
UP DEFENCE CORRIDOR:
Uttar Pradesh Defence Industrial Corridor took off to an encouraging start with
the announcement of investments worth over Rs. 3700 crore in defence
production at the Meet organized at Aligarh on 11 August 2018.
Hon’ble Defence Minister, Govt. of India Smt Nirmala Sitharaman said “Instead of
using our own production facilities, we are blindly buying from abroad. Prime
Minister is of the view...mobilise and activate these units, and link the private
sector with them, so that there is a reduction in the import bill."