Вы находитесь на странице: 1из 8

LIFTING PLAN TO TRANSFER THE

PIPES FROM THE WHARF TO THE


DRUM BOAT
SUBSEA SERVICES INCORPORATED
PARAMETERS
• WORK LOCATION = RACAHE WHARF
• DRUMBOAT CAPACITY = 3 TONS
• WEIGTH OF EXPECTED
LOAD OF DRUMBOAT = 2 TONS
• SHACKLE CAPACITY (3 PCS) = 2 TONS
• CHAINBLOCK CAPACITY (3 PCS) = 3 TONS
• BOOMTRUCK = 14 TONS
• SEA CONDTION = CALM
• SERVICE BOAT = MOTORIZED BANCA
NEW/REPAIRED SPOOL PIPE WILL BE LIFT UP USING
BOOMTRUCK WITH 14 TONS CAPACITY DOWN TO
SEABED APPROX. 2 METERS FROM THE EDGE OF PIER
ONCE THE NEW/REPAIRED SPOOL PIPE ALREADY AT
SEABED , THE DRUMBOAT WILL THEN POSITION AT THE
TOP OF PIPE
THE 3 UNITS CHAINBLOCK WILL THEN POSITION AT BOTH
ENDS OF SPOOL PIPE AND IN THE MIDDLE, HOIST UP
EASY UNTIL IT FLOAT IN THE WATER
SECURE SPOOL PIPE WITH LASHING ROPE AND THEN
TOW BY MOTORIZED BOAT GOING TO WORKSITE OF
REPLACEMENT
REPEAT THE ABOVE PROCEDURE FOR ANOTHER SPOOL TO BE REPAIRED

-END-