Post-Tensioned
Industrial Floors
Joint-less
No Cracks
No waving
Engineered
Controlled
Techinfloor ®
Innovative technologies for flooring
Post-tension: from major buildings
P
ost-tension, applied to industrial floors represents a revolution
in the Market, a new concept of quality and professional
approach.
Techinfloor is the exclusive Distributor in Europe of the Post-
tension System, called TENSIOPAV, developed within an
International partnership with ORI Martin Group, with SLM
- Siderurgica Latina Martin -, manufacturing Company of steel
unbounded strands and cables, and with TTM, a leader Firm in
planning and application of the Post-tension System on major
building jobs such as bridges, aqueducts, Interports, etc.
TTM provides complete consultancy support, from the
planning phase to supply of the Post-tension Hard ware and designed, from the thickness of the plate, to the strand
(accessories, electronics, stressing jacks), to the final disposition and the additional armor, as well as the specific
tensioning phases. Such innovative Technology consists on characteristics of the concrete.
replacing the traditional armor (electro-sealed nest, metallic The concrete mix design, the pre-qualified recipe verifying
fibers, synthetic fibers, glass fibers, etc.) with unbounded, the characteristics of the mix in the concrete trucks, and the
greased and sheathed, drowned in the concrete steel strands, constant control techniques applied directly on the job site, will
then Post-tensioned with hydraulic stressing jacks. create a mapping of the constructive whole process.
TENSIOPAV System is guaranteed: from the initial engineered A floor finalized with the TENSIOPAV System will therefore
planning which influences the effects of all operation, to the result scientifically projected, punctually checked and guar-
typical techniques of the foundation, up to resistance against anteed with a 10 Years Posthumous Policy Insurance
the loads, both static and dynamic; everything is engineered covering replacement of partial or total work.
The advantages
• No more Joints
• No more cracks
• No more waving effects
• No more gradient differences among the edges of the plates
• Thickness reduction of the plate
• Flatness and improved link among the plates
• Maintenance costs dramatically reduced
• Better comfort of use
• Better image and aesthetical effect
• Control of the whole building process (from the steel strand
production to the final floor finalization)
• Posthumous 10 Years Insurance Policy
to concrete industrial surfaces
P
reparation of the foundation represents the first operational and fundamental step into the construction
of a Post-Tensioned surface using the TENSIOPAV System.
The interventions particularly to be taken care of, are the ones related to the followings essential
requirements:
• Compact pressure in order to avoid yeldings when the floor is in exercise phase;
• Leveling, in order to allow the free slide of the plate.
It results therefore fundamental, to perform technical surveys focusing on the Deformation Degree of
the foundation, applying tests on the plate, both static and dynamic.
T
he closing procedure of the assembly plates
has been optimized with the definition of
the Easy-system Closing Procedure, that
guarantees rapidity and precision while in the
phase of concrete placement preparation: the
following phases result rapid and secure and
the construction joints are properly sealed
and proteceted.
The carrying out of the steel strands takes place on the job
site thanks to a system patented by TTM, our Partner in
Post-tensioning: the spool is loaded on a base with
a particular cone connected to a pushing system controlled
by an hydraulic device. The particular mechanism allows
to develop the spool in simple way and in full safety,
paying particular attention to the free end of the spool,
that can result dangerous even if engaged into the conic
base.
The spool is pushed out beginning from the cone, which
controls the carrying out process and allows the correct
placement of the long strands all over the floor.
The strand goes out from the wheel along a metallic line, and once
fixed the desired length, the strand is cut to measure coherent
with the project.
The repeated operation creates the set of strand necessary to the
job in an easy, safe and fast way.
Strand nest Placement and Heads fixing
The heads anchorage is done fixing the wedges in the heads at the end of
the strand, through the following operations:
• cut of PVC cover, approximately for 5 cms, from the end of the strand;
• positioning of the heads on the strand and insertion of the wedge in
order to assure its fixing; this operation is necessary in order to fix, in
a total safe environment, the passive head which, drowned into the
concrete, will be highly solicited during the Post-tension action.
The consequent consists of putting to strands on a network design,
distancing them correctly in both directions, and sealing each single
intersection in a way that can guarantee the correct positioning after the
concrete trucks have delivered the cements.
Additional passive armors
Piston excursion
Strand Extension
Post-tensioned Floor
Head Office
Strada Paolo VI nr. 15
91022 Castelvetrano (TP)
Contacts
Trapani
Tel xx39 - 0924 92 20 66
Fax xx39 - 0924 92 25 52
Bergamo
Tel xx39 - 035 44 90 412
Milano
Tel xx39 - 02 97 48 02 17
Members of
The ideal solution for