This document has been prepared for the exclusive use of Altura Lithium Operations Pty Ltd.
Copying this document without the permission of Altura Lithium Operations Pty Ltd is not permitted.
ALTURA LITHIUM OPERATIONS PTY LTD
HSE Management System Manual
Table of Contents
1.0 Summary............................................................................................................................................... 6
2.0 Purpose ................................................................................................................................................. 6
3.0 Objective ............................................................................................................................................... 6
4.0 Scope .................................................................................................................................................... 7
5.0 References ............................................................................................................................................ 7
6.0 Definitions and Abbreviations ............................................................................................................... 7
7.0 Accountabilities & Responsibilities ....................................................................................................... 9
8.0 Leadership & Commitment ................................................................................................................... 9
8.1 Policy .......................................................................................................................................... 9
8.2 Health Safety and Environment Management System Structure ............................................. 10
8.3 HSEMS Description .................................................................................................................. 10
8.4 Organisation Structure .............................................................................................................. 12
8.4.1 Altura Lithium Operations Pty Ltd ............................................................................... 12
8.4.2 Health, Safety & Environment Support ....................................................................... 12
8.5 Leadership & Commitment ....................................................................................................... 12
8.6 The Altura Management Team ................................................................................................. 12
8.7 Resources ................................................................................................................................. 12
8.7.1 Altura HSE Resources ................................................................................................ 12
8.7.2 Operational HSE Resources ....................................................................................... 13
8.7.3 Other HSE Resources ................................................................................................. 13
9.0 Planning .............................................................................................................................................. 14
9.1 Hazard Identification, Risk Assessment & Control ................................................................... 14
9.2 Hazard Identification Studies: HAZID ....................................................................................... 14
9.3 Hazard & Operability Studies: HAZOP ..................................................................................... 15
9.4 Construction Hazard Assessment Implication Reviews: CHAIR .............................................. 15
9.5 Construction Risk Assessment Workshop: CRAW .................................................................. 15
9.6 Job Hazard Analysis & Safe Work Method Statements: JHA / SWMS .................................... 15
9.7 Take 5 ....................................................................................................................................... 15
9.8 Legislative & Other Compliance ............................................................................................... 16
9.9 Management Plans ................................................................................................................... 16
10.0 Objectives, Targets & Performance Standards .................................................................................. 16
10.1 Objectives, Targets & Performance Standards ........................................................................ 16
10.2 Site Objectives, Targets & Performance Standards ................................................................. 17
10.3 Reward & Recognition Programs ............................................................................................. 17
11.0 Training, Competency & Awareness .................................................................................................. 17
11.1 Training Needs Analysis ........................................................................................................... 17
11.2 Inductions ................................................................................................................................. 17
11.3 Licencing & Certificates ............................................................................................................ 17
11.4 Verification of Competency....................................................................................................... 18
ALTURA LITHIUM OPERATIONS PTY LTD
HSE Management System Manual
1.0 Summary
Altura Lithium Operations Pty Ltd is building a leading position in the independent supply of lithium raw
materials, with a world class lithium project at Pilgangoora ready to set the platform and be the first
new hard rock supplier in 2017. The Altura team has a track record of delivering mining projects with
Pilgangoora the most advanced stage, near term producing lithium project; solid offtake partners and
a market providing substantial growth opportunities to ensure positive shareholder returns.
2.0 Purpose
Altura places the protection of people above all other business considerations. No person should suffer
any ill effects arising from work undertaken for Altura.
In support of this objective, Altura recognises its responsibility for maintaining the workplace through
the implementation and maintenance of an appropriate HSE Management System.
The Altura Health, Safety and Environmental Management System (HSEMS) comprises of the:
Health, Safety and Environment (HSE) Policy
Risk Management Policy
Code of Conduct Policy
HSE Management System Manual (This document)
HSE Contractor Requirements Manual
HSE Management System Standards
The HSEMS is an integral part of the overall management system at Altura. It is designed to
complement other systems used within the organisation and provides a systematic management
approach to assist in both leading to sustained improvements in HSE performance and meeting legal
requirements.
The HSEMS includes safety goals and performance targets, risk assessments, responsibilities and
authorities, rules and standards, and monitoring and evaluation processes.
The purpose of this manual is to provide a detailed description of the HSEMS Standards and to
document their application within Altura. The standards provide a framework for the management of
HSE related risks, consistent with legislative requirements and recognised standards listed below:
AS / NZS 4801 Occupational Health & Safety Management System
ISO 14001 Environmental Management System
Western Australian Mines Safety and Inspection Regulations 1995
Western Australian Mines Safety and Inspection Act 1994
Environmental Protection Act 1986 (WA)
Mining Act 1978
Dangerous Goods Safety Act 2004
3.0 Objective
The HSEMS has been developed to provide an over-arching framework for HSE. This will assist in the
management of risks associated with all activities undertaken by / for Altura. The system provides a
structure for creating, developing, managing and reporting HSE issues on a continuous improvement
basis.
The Health, Safety Management System Manual is to ensure that:
The HSE requirements of Altura are detailed to all personnel
This manual is for use by all personnel who will use the HSEMS documents so as to comply
with the system
Document and communicate the framework of the Altura HSEMS
4.0 Scope
This HSEMS Manual is applicable to all activities conducted by personnel working for or at the direction
of Altura, including contractors and (where applicable) joint venture partners.
5.0 References
AS Australian Standard
JHA Job Hazard Analysis. Has same meaning as JSA / JSEA etc
8.1 Policy
Altura policies are issued under the signature of the Altura Managing Director, and include:
Health, Safety and Environmental Policy
Risk Management Policy
Code of Conduct Policy
Altura policies apply to all of the Altura activities including those contracted companies. Copies
are available via the company web site, and are on display throughout workplaces.
Altura policies are communicated to all employees and contractors during company inductions,
and will be periodically reviewed and if necessary, revised, by the Altura Management Team,
to reflect any change in conditions or standards applicable to Altura.
The above policies are supported and given effect by the implementation of this Health Safety
and Environment Management System.
A copy of the Altura Health Safety and Environment Policy is included as an appendix of this
HSEMS Manual.
ELEMENT DETAIL
HSE Policy The HSE Policy establishes the overall direction for Altura `s approach
to Health Safety and Environment Management and provides tangible
evidence of management’s commitment to the achievement of its
aims. The policy is authorised by the Altura Managing Director, and is
applicable to all of the Altura operations, including those of its
contractors whilst engaged at an Altura operation.
HSEMS Manual The HSEMS Manual defines and provides the framework within which
Altura policy is given effect. The manual is authorised and approved
~this document~
by the Altura`s General Manager, and is applicable to all of the Altura
operations, including those of its contractors whilst engaged at an
Altura operation.
ELEMENT DETAIL
The HSEMS Manual details a systematic approach to the
management and continual improvement of HSE performance in
accordance with ASNZS 4801, WA Mines Health Safety Act &
Regulations
HIRAC In accordance with Altura`s HSE Policy all operations are required to
“Wherever we operate we will develop and implement risk
assessments and maintain a HSE Management System that is
consistent with internationally reconised standards and practices so
as to establish, monitor and maintain a safe workplace.”
Hazard Identification, Risk Assessment and Control are achieved by
use of HAZOP’s, CHAIR’s, HAZID’s, CRAW’s, JHA & Take 5. These
fundamental risk assessment tools are utilised in order to identify
hazards, assess risks and establish appropriate controls so as to
provide and maintain safe workplaces.
Registered / Exploration, Site, Project and Construction Managers are
responsible for ensuring that the appropriate risk assessments have
been completed for their project, workplace or work scope, and for
authorising the implementation of identified controls.
Site Specific HSE Each work scope is required to develop Site Specific HSE
Plans Management Plan which documents the manner in which the
company undertaking the work scope will comply with Altura`s HSE
Policy & HSEMS Standards, in accordance with the systematic
approach outlined in this HSEMS Manual.
HSE Management Plans are required to document the manner in
which hazards identified as part of the HIRAC processes are to be
eliminated or managed.
Site specific HSE Management Plans shall be authorised and
approved by the Manager who has overall control and responsibility
for the personnel for the work scope.
In all cases, HSE Management Plans should be approved for use by
a Altura representative before commencement of that work scope.
Site Specific HSE Site specific HSE Documents will be supplied as required or deemed
Documents necessary to meet Altura`s HSEMS requirements by each company
entity engaged at a Altura work place.
Site specific documents may not over-ride or conflict with Altura
HSEMS Manual and Standards and may only provide for an
equivalent or higher level of hazard control, or for the creation of
systems beyond those provided for by the Altura HSEMS Manual and
Standards.
Site specific documents shall be reviewed by Altura`s Management
and shall only apply to the company entity for which they are
ELEMENT DETAIL
developed and shall at all times be regarded as supplemental to
Altura`s HSEMS Standards.
8.7 Resources
Responsibility for ensuring that adequate human, financial and physical resources are
available to implement HSE policy is shared between Altura`s Corporate Functions and Altura
Operational Functions with the following general guidelines applying:
9.0 Planning
9.6 Job Hazard Analysis & Safe Work Method Statements: JHA / SWMS
Routine, low risk, or repeatable activities for which a Altura HSEMS Standard or Site Specific
HSE Document has been developed are considered to be covered by a Safe Work Method
Statement providing that the actual activity and conditions under which it occurs are the same
as those described by the Standard or Document.
Where a work activity is neither routine, low risk nor repeatable or where no Altura HSEMS
Standard or Site Specific Document is available to detail the manner in which the activity is to
be completed safely, the supervisor in charge of the work activity shall direct that a JHA be
performed and a SWMS developed.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-003 Job Hazard Analysis & Safe Work Method Statements
9.7 Take 5
The Take 5 process forms the final link in the HIRAC process, requiring personnel to perform
a final check and confirmation that their work area and / or the activity they are about to perform
is safe and without risk to their health and safety, or the health and safety of any person who
may be impacted upon by their activities.
If any Health, Safety control required by the Altura HSMS Standard, Site Specific HS
Document, or JHA/SWMS applicable to the work activity is not in place, work may not
commence until the control is implemented.
11.2 Inductions
All personnel shall have received a comprehensive induction prior to commencing work.
The induction provides an overall awareness of:
HSE Policy, Objectives and Targets
Company & workplace organisation including key contact personnel
Hazard & incident reporting requirements
Workplace Hazards, Controls and Emergency procedures
Records are maintained onsite to confirm attendance.
Any personnel who has reasonable grounds to believe that continuing to work would expose
them or others to injury or harm or impact to the environment, shall stop work and discuss the
issue with their direct supervisor immediately.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-012 Issue Resolution
Full details regarding these processes are contained within the relevant Altura standards.
The HAZID process includes an assessment of all HSE Hazards and Risks, including those
hazards and risks associated with the procurement of materials and services, and the
management of sub-contractors.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-002 HIRAC
AJM-HSEMS-STD-003 Job Hazard Analysis & Safe Work Method Statements
AJM-HSEMS-STD-005 Take 5
As soon as practically possible, the EAP provider will be informed and placed on standby to
assist with professional debriefing for incidents such as assaults, fatalities, serious accidents
and suicides/deaths.
Refer to: AJM-HSEMS-STD-025 Employee Assistance & Critical Incident Response
17.2 Hazards
Altura recognises the importance of identifying and reporting hazards as a key driver in their
elimination.
The Altura HSEMS Standards for Hazard Observation Reporting and Workplace Inspection
apply across all work scopes.
These processes are communicated to all personnel during inductions, stewarded by the
responsible Site, Project Construction manager, and reported and monitored in accordance
Altura`s HSEMS Standard for HSE Performance Reporting.
Where contractor specific requirements dictate the use of differing but equivalent processes,
those processes can be utilised and reported on as though they were the Altura processes.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-004 Hazard Reporting
AJM-HSEMS-STD-017 Workplace Inspection
17.3 Behaviour
Altura is committed to continual improvement and recognises the role of behavioural factors in
influencing HSE performance and outcomes and demonstrating management commitment.
A structured Safe Act Observation program (SAO) operates across all sites and is reported on
and monitored in accordance Altura`s HSEMS Standards for HSE Performance Reporting.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-006 Safe Act Observation
18.0 Environment
19.1 Audits
Altura have an established HSEMS Audit program designed to provide management with
assurance that Altura HSE Policy, HSEMS Standards and other requirements outlined within
this HSEMS Manual are implemented and maintained across all of Altura`s operations.
The audit program further serves to reinforce management’s commitment too continual HSE
improvement and raise awareness amongst all personnel, of the priority placed upon HSE
performance.
The Altura audit schedule is prepared on an annual basis, updated as required, and published
as part of the Altura Monthly HSE Performance Report.
For detailed requirements and guidance,
Refer to: AJM-HSEMS-STD-018 Auditing
19.2 Non-Conformance
Where Audits identify that the Altura HSE Policy, Standards and other requirements as outlined
within this HSEMS Manual are either not implemented, or are improperly implemented, a non-
conformance report will be raised.
Non-Conformance reports will be entered into the site’s Corrective Action Register and require
an agreed response from the relevant work scope Manager prior to closure.
For detailed requirements and guidance,
21.0 Appendices
Appendix A: Health, Safety & Environmental Policy
Appendix B: Accountabilities & Responsibilities
Position: Supervisor
Accountable To: Site, Project or Construction Manager
HS Responsibilities
Provide direction to employees in Safe Work Practices and compliance with the Altura HSMS
Standards and Site Specific HSE Documentation;
Other specific responsibilities as detailed within Altura`s HSMS Standards;
Actions Required
Participate in CRAW’s;
Monitor employee Fitness for Work and conduct pre-start alcohol breath testing;
Conduct daily pre-start shift briefings which include a discussion of HS aspects of the work;
Consult with HS personnel, including elected representative, and review and approve JHA / SWMS for
tasks;
Instruct personnel in the requirements of the Altura HSMS Standards and Site Specific HSE
Documentation applicable to their tasks;
Stop works where activities do not comply with agreed HSMS Standards or site HSE documentation;
Complete Safe Act Observations to provide feedback to personnel;
Conduct documented Workplace Inspections to ensure activities conform to requirements;
Respond to Hazard Observations raised by employees;
Respond to, report and investigate all incidents within area of responsibility, and apply skill and