Академический Документы
Профессиональный Документы
Культура Документы
375
BEGINNING OF
BAR SUPPORT
DOWEL BARS CONCRETE PAVEMENT
28mmØ x 0.60 m
FLARING
MINIMUM
1.68
1000
FLARING OF NEW CONCRETE PAVEMENT
300
3.35
1L 1K NOTE:
1.68
S-7 S-7 S-7 S-7
THE EXISTING CONCRETE PAVEMENT SHALL BE CHIPPED OFF PERPENDICULARLY TO THE
EXISTING BASE ABOUT 300 mm WIDE TO A DISTANCE WHERE THE FLARE IS LESS THAN 1000
EXISTING CONCRETE PAVEMENT mm AND NECESSARY DOWEL BARS SHALL BE PROVIDED TO CONNECT THE NEW PAVEMENT
WITH THE EXISTING PAVEMENT.
2.25 2.25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
16mmØ x 0.60 m SPANNED AT 0.75 m O.C. V A R I A B L E
STANDARD PLAN FOR PCCP 0.280 m THICK AND 6.7 m WIDE PLAN
SPANNING = 4.50 m SCALE : 1:100 MTS. 1J (SHOWING FLARING OF EXISTING CONCRETE PAVEMENT)
2.25
0.60 m
Te
2Te
0.375 0.38 0.38 0.38 0.38 0.38 0.375 16mmØ TIE-BAR GROUT
5
3
1
0.03
1
m THK.
0.28 m THK.
Te
EXISTING
206
Te
NEW PAVEMENT
PAVEMENT
Tn
Tn
WHERE:
3
1
0.10 0.20
0.28
Tn - 12Te
0.03
6-16mmØ x 0.60 m EXISTING PAVEMENT NEW PAVEMENT Te = THICKNESS OF EXISTING PAVEMENT
Te
3.35 (HALF LANE) SPANNED @ 0.75 m O.C. Tn = THICKNESS OF NEW PAVEMENT GENERAL NOTES:
3
0.60 m
1
1. MATERIALS AND WORKMANSHIP SHALL CONFIRM
Tn - Te
28mmØ TIE-BAR WITH THE "DPWH STANDARD SPECIFICATIONS FOR
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
0.03 HIGHWAYS, BRIDGES AND AIRPORTS, 2004"
m THK.
0.28 m THK.
0.03
13
25
5
COLD APPLIED LIQUID RUBBER COMPOUND AFTER
25 THE CONCRETE HAD BEEN CURED AND BEFORE
FIXED SLIDING OPENING PAVEMENT TO TRAFFIC. PENETRATION
METAL DOWEL CAP GAUGE ASPHALT SEAL ON CONCRETE JOINT SHOULD BE
POURED IN SUCH MANNER THAT SPILLING WILL BE
NO. 18 25 mm INSIDE DIAMETER
ELIMINATED. THUS, PROVIDE A SMOOTH RIDING
BE PLACED ON EACH DOWEL SURFACE.
BAR ON ALTERNATE END 9. ALL TRAVERSE JOINTS, EXCEPT CONSTRUCTION
JOINT SHALL BE CONTINUOUS FROM EDGE TO
20 mm PREMOLDED EDGE.
HALF OF THE BAR ON THE SIDE OF THE METAL 10. ALL LONGITUDINAL JOINTS SHALL MEET AT
EXPANSION FILLER
DOWEL CAP SHALL BE PAINTED W/ RED LEAD INTERSECTIONS WITH NO GAPS OR OFFSET.
AND THEN GREASED 11. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.
12. AVOID STOPPAGE OF FORMWORKS ALONG
TRANSVERSE CONTACT JOINT
CURVES.
OF WEAKENED PLANE JOINT 13. DRILLING OF HOLES ON EXISTING PCCP AN OTHER
STRUCTURES SHALL BE PERFORMED USING
POWER TOOLS. THE HOLES SHALL BE PROPERLY
CLEANED BEFORE GROUT/EPOXY INJECTION AND
DETAILS OF BAR SPACING ALONG CURVES 2B DETAIL OF EXPANSION JOINT (DOWELLED) AT INSTALLATION OF DOWELS OR TIE BARS.
2A
SCALE : NTS CERTAIN INTERSECTIONS AND STRUCTURES
SCALE : NTS
PREPARED BY: PROJECT TITLE: SHEET CONTOUR: CHECKED : RECOMENDED : APPROVED : SET NO : SHEET NO: