Table-1.

Section-wise Energy Consumption in an Integrated Wood/Agro Based Mill


Using Conventional Recovery System

S. Section Power Steam


No. Consumption, Consumption,
kWh/ton of paper ton/ton of paper
1 Pulp Mill (including Raw material 300-325 1.2-2.5
cleaning, Digester, screening & washing
and bleach plant)
2 Recovery Section 250-300 3.0-3.5
3 Stock Preparation & Paper Machine 350-450 2.5-4.0
4 Effluent Treatment Plant 75-100 -
5 Power Generation Plant 150-200 6.0-6.5
6 Others (including ClO2, O2 plant, office, 100-125 -
street light)
Total 1,225-1500 12.7- 16.5

Table-2. Section-wise Energy Consumption in an Integrated Agro Based Mill Using


Non-Conventional Recovery System

S. Section Power Steam


No. Consumption, Consumption,
kWh/t paper t/t paper
1 Pulp Mill (including Raw material 300- 325 1.2-2.5
cleaning, Digester, screening & washing
and bleach plant)
2 Recovery Section (including evaporator 75 -100 1.0-1.7
and incinerator)
3 Stock Preparation & Paper Machine 350 – 450 2.5-3.5
4 Effluent Treatment Plant 75 – 90 -
5 Power Generation Plant 125 -200 6.5-7.0
6 Others (including ClO2, O2 plant, office, 100 -125 -
street light)
Total 1025 – 1290 11.2 -14.7
Table-3. Section-wise Energy Consumption in RCF Based Mill Producing White Grade of
Paper using Deinking and Oxidative Bleaching Systems

S. Section Power Steam


No. Consumption, Consumption,
kWh/t paper t/t paper
1 Pulper and pulp cleaning (HD Cleaner & 300-350 0.50-0.70
Centrcleaner, De-Inking & oxidative
bleaching)
2 Stock Preparation & Paper Machine 350-450 2.10 -3.00
3 ETP 40-45 -
4 Power Generation Plant 100-110 6.00-6.60
5 Others (WTP, Office, Street lights, 40-45 -
Workshops)
Total 830-1,000 8.60-10.30

Table-4. Section-wise Energy Consumption in RCF based mill without Deinking


systems.
S. Section Power Steam
No. Consumption, Consumption,
kWh/t paper t/t paper
1 Pulper and pulp cleaning (HD Cleaner & 100- 130 0.25
Centrcleaner)
2 Stock Preparation & Paper Machine 225- 250 2.1-3.0
3 ETP 40-45 -
4 Others (WTP, Office, Street lights, 25- 40 -
Workshops)
Total 390-465 2.35-3.25