Approved District Rate of Labour and Construction Materials

District
District Unit Rate
Approved Rate Transportation Unit Rate
SN Description Unit Rate with for
Rate without Cost by truck for Users
VAT Contractor
VAT

A Labour
1 Mason/Skill labour MD 750.00 750.00 750.00

2 Unskill Labour MD 535.00 535.00 535.00

3 Plumber MD 750.00 750.00 750.00

4 Carpenter MD 750.00 750.00 750.00

5 Helper MD 535.00 535.00 535.00

B Equipments
1 Mini Truck 3-5 Ton Hour 440.00 57.20 497.20 440.00

2 Truck/tripper-8 ton Hour 605.00 78.65 683.65 605.00

3 Static Roller Hour 0.00 0.00 0.00

4 Vibrating Roller 10 tan Hour 1650.00 214.50 1864.50 1650.00

5 Pneumatic Wheel Roller Hour 0.00 0.00 0.00

6 Bitumen distributor Hour 1300.00 169.00 1469.00 1300.00

7 Bitumen Boiler Hour 180.00 23.40 203.40 180.00

8 Bitumen Sprayer hour 260.00 33.80 293.80 260.00

9 Grader Hour 2255.00 293.15 2548.15 2255.00

10 Loader Hour 1200.00 156.00 1356.00 1200.00

11 Water Tanker Hour 825.00 107.25 932.25 825.00

12 Air compressor Hour 250.00 32.50 282.50 250.00

13 Chips Spreader Hour 300.00 39.00 339.00 300.00

14 Excavator PC-200 Hour 1650.00 214.50 1864.50 1650.00

C Local Material
Royaltee for gravel and stone cum 0

1 Stone for terai Cum 1100.00 #VALUE!

2 Stone boulder at hillarea at road head cum 0.0000 0.00 0.00

3 Sand/River Spall/Chokar Cum 700.00 #VALUE!

4 Brick 1 no No 16.24 2.11 0 18.35 16.24

5 2nd class Brick No 15.30 1.99 0 17.29 15.30

6 Picket Brick No 15.74 2.05 17.79 15.74

7 Solid concrete Brick No 13.00 1.69 0 14.69 13.00

8 Crushed Aggregate 5-10mm Cum 1050.00 860.4600 1910.46 1910.46

9 Crushed Aggregate 10-20 mm Cum 1150.00 860.4600 2010.46 2010.46

10 Crushed Aggregate 20-40 mm chisang Cum 1000.00 860.4600 1860.46 1860.46

11 Base aggregate 40mm down Cum 1000.00 860.4600 1860.46 1860.46

12 Natural river Aggregate 5-10 mm Cum 1050.00 860.4600 1910.46 1910.46

1
0

District
District Unit Rate
Approved Rate Transportation Unit Rate
SN Description Unit Rate with for
Rate without Cost by truck for Users
VAT Contractor
VAT

13 Natural river Aggregate 10-20 mm Cum 1150.00 860.4600 2010.46 2010.46

14 Natural river Aggregate 20-40 mm Cum 1000.00 860.4600 1860.46 1860.46

15 10mm down silicon/ Chips Cum 1000.00 860.4600 1860.46 1860.46

16 cruser run 63mm down for Sub base Cum 650.00 860.4600 1510.46 1510.46

17 Sub base 75 mm down RBM Cum 350.00 860.4600 1210.46 1210.46

18 Bamboo Pc 250.00 0.0000 250.00 250.00

19 Sal Wood cum 204798.00 26623.74 231421.74

20 Local Wood cum 77682.00 77682.00

21 Laterite/Red Soil/fill material Cum 0.00 0 394.76 394.76 394.76

22 Mud/Soil Cum 100.00 0.00 394.7625 494.76 494.76

23 Water Cum 0 0.00 0.00 0.00

24 Crusher Dust Cum 900.00 0.0000 900.00 900.00

25 Fire wood Kg 18.00 18.00 18.00

26 Sand at hillarea from local pit to road head Cum 1350.00 0.00 1350.00 1350.00

27 hand crushed aggrigate hillarea Cum 2000.00 0.00 2000.00 2000.00

D Foreign Materials 0 0.00 0.00

1 Cement PPC mt 15000.00 1950 0.00 16950.00

2 Cement OPC mt 17000.00 2210 0.00 19210.00

3 White cement Kg 29.00 3.77

4 Reinforcement Steel 0 0.00 0.00 0.00

5 Tor Kari 4.75 amd 7mm dia mt 85000.00 11050 #VALUE!

6 8mm dia mt 86000.00 11180 #VALUE!

7 10mm dia to 20mm dia mt 83000.00 10790 #VALUE!

8 25mm dia mt 85000.00 11050 #VALUE!

9 28-32mm dia mt 86000.00 11180 #VALUE!

10 Annealed wire Kg 100.00 13 0.00 113.00 100.00

11 Barbed wire 12# to 14# Kg 102.00 13.26 0.00 115.26 102.00

12 MS Angle Kg 0 0.00 0.00 0.00

13 MS Nut bolts kg 195.00 25.35 0.00 220.35 195.00

14 Gabion wire Medium Zinc Coated 0 0.00 0.00 0.00

15 8 SWG Kg 83.00 10.79 0.00 93.79 83.00

16 10 SWG Kg 83.00 10.79 0.00 93.79 83.00

17 12 SWG Kg 84.00 10.92 0.00 94.92 84.00

18 Gabion wire Heavy Zinc Coated 0 0.00 0.00

19 8 SWG Kg 91.00 11.83 0.00 102.83 91.00

20 10 SWG Kg 91.00 11.83 0.00 102.83 91.00

21 12 SWG Kg 92.00 11.96 0.00 103.96 92.00

2
0

District
District Unit Rate
Approved Rate Transportation Unit Rate
SN Description Unit Rate with for
Rate without Cost by truck for Users
VAT Contractor
VAT

22 Heavy zinc coated machine made Mesh sqm 200.00 26.00 0.00 226.00 200.00

23 GI barbed wire Kg 0 0.00 0.00 0.00

24 Hot deep galvanization Kg 60.00 7.80 0.00 67.80 60.00

25 Nail फललमम ककलल Kg 90.00 11.7 0.00 101.70 90.00

26 Diesel Lit 97.50 12.675 0.00 110.18 97.50

27 Kerosin oil Lit 97.50 12.675 0.00 110.18 97.50

28 Bitumen 80/100 Kg 97.50 12.675 0.00 110.18 97.50

29 GI Pipe -50 mm dia midium duety meter 532.00 69.16 0.00 601.16 532.00

30 jute Rope Kg 120.00 15.6 0.00 135.60 120.00

31 Geo-Textile sqm 0 0.00 0.00 0.00

32 NP-3 Hume pipe-300mm dia nos 9350.00 1215.5 0.00 10565.50 9350.00

33 NP-3 Hume pipe-450mm dia nos 11550.00 1501.5 0.00 13051.50 11550.00

34 NP-3 Hume pipe-600mm dia nos 14630.00 1901.9 0.00 16531.90 14630.00

35 NP-3 Hume pipe-750mm dia nos 19250.00 2502.5 0.00 21752.50 19250.00

36 NP-3 Hume pipe-900mm dia nos 23100.00 3003 0.00 26103.00 23100.00

37 NP-3 Hume pipe-1200mm dia nos 39600.00 5148 0.00 44748.00 39600.00

38 CGI sheet 26 guage heavy 65 kg plain bundle 10890.00 1415.7 0.00 12305.70 10890.00

39 CGI sheet 28 guage medium 50 kg .. bundle 8460.00 1099.8 0.00 9559.80 8460.00

40 CGI sheet 26 guage light 55kg .. bundle 9420.00 1224.6 0.00 10644.60 0.00

41 CGI sheet 26 guage heavy 65 kg colored bundle 12770.00 1660.1 0.00 14430.10 12770.00

42 CGI sheet 28 guage light 42 kg colored bundle 8800.00 1144 0.00 9944.00 8800.00

ordinary nut bolts kg 195.00 25.35 220.35 195.00

43 J -hook , J nut bolts kg 145.00 18.85 0.00 163.85 145.00

44 washer kg 190.00 24.7 0.00 214.70 190.00

45 Bitumen washer pkt 35.00 4.55 0.00 39.55 35.00

46 26 guage .4mm ridge cover heavy 4 ft wide pata 1610.00 209.3 0.00 1819.30 1610.00

47 28 guage .3mm ridge cover medium pata 1240.00 161.2 0.00 1401.20 1240.00

48 GI Plain sheet 28 guage M Grade Sqm 0.00 0.00 0.00 0.00

49 Clay tile No 0 0.00 0.00 0.00

50 Hold fast no 12.86 1.67 0.00 14.53 12.86

51 100mm kabja no 30.00 3.90 0.00 33.90 30.00

52 150 mm cheskani no 75.00 9.75 0.00 84.75 75.00

53 300 mm cheskani no 165.00 21.45 0.00 186.45 165.00

54 300mm locking set no 290.00 37.70 0.00 327.70 290.00

55 handle 6" no 70.00 9.10 0.00 79.10 70.00

56 handle 4" no 55.00 7.15 0.00 62.15 55.00

57 75 mm kabja no 19.00 2.47 0.00 21.47 19.00

3
0

District
District Unit Rate
Approved Rate Transportation Unit Rate
SN Description Unit Rate with for
Rate without Cost by truck for Users
VAT Contractor
VAT

58 100 mm cheskani no 50.00 6.50 0.00 56.50 50.00

59 plain glass 4mm sqm 699.40 90.92 0.00 790.32 699.40

60 4mm commercial ply wood sqm 322.80 41.96 0.00 364.76 322.80

61 6mm commercial ply wood sqm 591.80 76.93 0.00 668.73 591.80

62 6mm water proof ply wood sqm 753.20 97.92 0.00 851.12 753.20

63 19mm water proof ply wood sqm 1506.40 195.83 0.00 1702.23 1506.40

64 snocem paint Kg 55.00 7.15 0.00 62.15 55.00

65 Thinner lit 300.00 39.00 0.00 339.00 300.00

66 enamel paint lit 566.00 73.58 0.00 639.58 566.00

67 emulsion paint lit 1040.00 135.20 0.00 1175.20 1040.00

68 metal primer lit 322.00 41.86 0.00 363.86 322.00

69 almunium paint lit 561.00 72.93 0.00 633.93 561.00

70 red oxide lit 412.00 53.56 0.00 465.56 412.00

71 grill 3x20, 5x20, 5x25 kg 120.00 15.60 0.00 135.60 120.00

72 grill , 5x25 kg 125.00 16.25 141.25 125.00

73 grill Sqare road kg 150.00 19.50 169.50 150.00

74 truss , Grill febrication connection charge kg 25.00 0.00 25.00 25.00

75 collasable gate 4" or 3" gap kg 125.00 16.25 0.00 141.25 125.00

76 channel truss kg 135.00 17.55 0.00 152.55 135.00

77 Tubelor truss kg 135.00 17.55 0.00 152.55 135.00

78 Spiral stair kg 160.00 20.80 0.00 180.80 160.00

79 ordinary rolling shutter 3.5 kg/sq.feet Sqm 5487.60 713.39 0.00 6200.99 5487.60

80 hydrolick door spring GP no. 1375.00 178.75 1553.75 1375.00

81 ordinary door spring local GP no. 375.00 48.75 423.75 375.00

82 5-6 mm metal gate kg 125.00 16.25 0.00 141.25 125.00

83 Black pipe kg 94.00 12.22 0.00 106.22 94.00

84 Mortice Lock set (pittal) no 1475.00 191.75 0.00 1666.75 1475.00

85 Mortice Lock set (steel neckle) no 875.00 113.75 988.75 875.00

86 Compound Gate 35Kg/sqm Kg 125.00 16.25 0.00 141.25 125.00

E Flooring items 0 0.00 0.00

1 Plain Marble 16mm thickness Sqm 1721.60 223.808 0.00 1945.41 1721.60

2 Colored Marble 16mm thickness Sqm 1506.40 195.832 0.00 1702.23 1506.40

3 poriciline glazed wall tiles Coloured Sqm 1022.20 132.886 0.00 1155.09 1022.20

4 Poriciline glazed floor tiles plain Sqm 753.20 97.916 0.00 851.12 753.20

5 Marble chips Kg 20.00 2.6 0.00 22.60 20.00

6 Linced oil Lit 0 0.00 0.00 0.00


0.00 0.00 0.00

4
Asphalt Plant* Universal Spot Mix : Wylie Up to 10 Ton 400 2800

Asphalt Plant* Bram Millar Up to 10 Ton 500 3500

Ashalt Paver Blow Knox BK 165 1400 9800

Ashalt Mixer Bel Mix 1000 7000

Broom Road Towed 260 1820

Boring Rig TONE 1200 8400

Air Compressor Kirloskar , WR 250, SC 0707C, 150 To 275cfm 250 1750

Air Compressor Holman, D250CFM, 175 MK 1 250 1750

Air Compressor Maruma ES3 250 1750

Crane Mobile Tadano TS 100L 5+ To 10 Ton 3100 21700

Crane Mobile Tadano TS 150L 10+ To 15 Ton 3500 24500

Cutter Concrete Weber SM 182R 250 1750

Cutter Concrete Mikasa MCD 218 DX 250 1750

Dozer Wheel Hanomag D66C, D66D 181 To 230 HP 2100 14700

Dozer Wheel CAT 814 181 To 230 HP 2100 14700

Dozer Track Komatsu D85ESS 181 To 230 HP 3000 21000

Dozer Track CAT D7G 181 To 230 HP 3000 21000

Dozer Track Shangdong TY 220 181 To 230 HP 3000 21000

Dozer Track Hanomag D700C, D700D 181 To 230 HP 2000 14000

Dozer Track Komatsu D85 181 To 230 HP 2000 14000

Dozer Track Yishan TY 160 126 To 180 HP 1800 12600

Dozer Track BEML D65E8 126 To 180 HP 1800 12600

Dozer Track CAT D6H 126 To 180 HP 1800 12600

Dozer Track Komatsu D53A-17; D50A 80 To 125 HP 1800 12600

Dozer Track Komatsu D 50A - 17 80 To 125 HP 1800 12600

Dozer Track CAT D3B 0 To 79 HP 1000 7000

Bitumin Distributor Bedford TJ 1090 4 To 6 KL 1300 9100

Bitumin Distributor ETNYRE/4700; ETNTYRE/M4144 To 6 KL 1300 9100

Bitumin Distributor Isuzu/Hanta; Hanta/Hino FF17 4 To 6 KL 1300 9100

Rock Drill(Pneum) 130 910

Mini Dumper Pengyuan FC 15 1 To 4 Cu. M. 250 1750

Mini Dumper Changai FC 1 1 To 4 Cu. M. 250 1750

Mini Dumper Stott & Pitt SD 011 1 To 4 Cu. M. 250 1750

Mini Dumper Thawaties 1 To 4 Cu. M. 550 3850

5
Asphalt Plant* Universal Spot Mix : Wylie Up to 10 Ton 400 2800

Excavator Track Daewoo Solar 130LC - V 1 To 110 HP 1200 8400

Excavator Track Kobelco SK 115 SR-1E 1 To 110 HP 1200 8400

Excavator Track Daewoo SL 220 111 To 150 HP 1800 12600

Excavator Track Komatsu PC 150-5A 111 To 150 HP 1800 12600

Excavator Track Hitachi EX 200 - 3 111 To 150 HP 1800 12600

Excavator Track JCB - 820 Super; JCB - 820 111 To 150 HP 1800 12600

Excavator+ Breaker Daewoo SL220 With SOOSAN 111 To 150 HP 2100 14700

Forklift Truck Mitsubishi < 2.5 Ton 400 2800

Generator* Kubota ASK-R 350 Up to 10 KVA 150 1050

Generator* Denyo DBF-3Y; DBF 7.5Y Up to 10 KVA 150 1050

Generator* Robin Up to 10 KVA 150 1050

Generator* Caterpillar Up to 10 KVA 150 1050

Generator* Kirloskar RB 33 Up to 10 KVA 150 1050

Generator* Osaka/Seimeitsu SAS - 130Y 10 To 30 KVA 150 1050

Generator* Kirloskar 30+ To 50 KVA 350 2450

Grader Motor Komatsu GD 511R - 1 135 HP 1600 11200

Grader Motor Chapion 710 ; 710R 135 HP 1600 11200

Grader Motor CAT 120G 125 HP 1600 11200

Grader Motor Mitubishi MG 350R 135 HP 1600 11200

Grader Motor BEML BG605 - 6216 145 HP 1600 11200

Grader Motor Aveling Barford ASG 12G; TG 135 HP 1200 8400

Grader Motor Niigata N530 PSA 135 HP 1200 8400

Grader Motor Komatsu 405A - 1 90 HP 1200 8400

Chips Spreader Phoenix/Tail Gate Mounted 300 2100

Bitumin Heater Span Eng. Up to 2 KL 180 1260

Loader Wheel JCB 425 1.75 Cu M 1000 7000

Loader Wheel Aveling Barford 1.75 Cu M 1000 7000

Loader Wheel EJCB - 430 1.7 Cu M 1000 7000

Loader Wheel Komatsu WA 100 - 1 1.2 Cu M 1000 7000

Loader Wheel Komatsu WA 180 - 3 1.8 Cu M 1200 8400

Loader Wheel Furukawa FL 200; FL 230 - I 1.9 - 2.3 Cu M 1200 8400

Loader Wheel Furukawa FL 200 - I 1.9 - 2.3 Cu M 1200 8400

Loader Wheel Kawasaki KSS 70; KLD 70 1.9 - 2.2 Cu M 1200 8400

Loader Wheel CAT 950 > 1.8 Cu M 1200 8400

Loader Wheel Michigan Clark 75 - IIIA > 1.8 Cu M 1200 8400

Loader Wheel Hyuandai HL 757 - 7 2.5 Cu M 1500 10500

6
Asphalt Plant* Universal Spot Mix : Wylie Up to 10 Ton 400 2800

Loader Wheel Kawasaki 70ZIV - 2 2.2 Cu M 1500 10500

Loader Wheel Kawasaki 70ZIV; WL03 - 70Z 2.2 Cu M 1500 10500

Loader Wheel Kawasaki 70Z - IV Hino 2.2 Cu M 1500 10500

Back Hoe Loader JCB 3CX - 4 < 90 HP 1000 7000

Water Pump (Engine) Sykes Univac Up To 4" 150 1050

Water Pump (Engine) Yanmar/ YKS - 3DW Up To 4" 150 1050

Water Pump (Engine) Sykes Univac 4 To 6 " 200 1400

Water Pump (Engine) Yanmar/ YKS - 6DFA 4 To 6" 200 1400

Water Pump (Elect.) 5 HP 150 1050

Water Pump (Elect.) 7.5 HP 150 1050

Pile Driver* 10 Ton 3000 21000

Roller 3 Wheel Aveling Barford DC 011 Up to 12 Ton 500 3500

Roller 3 Wheel Johs Moller Rambo Up to 12 Ton 500 3500

Roller 3 Wheel Speedcraft DRR 10 - S Up to 12 Ton 500 3500

Roller 3 Wheel Luoyang 3Y8 / 10 Up to 12 Ton 500 3500

Roller 3 Wheel Aveling Barford DC 012 Up to 12 Ton 500 3500

Roller 3 Wheel Albaret TR - 10 Up to 12 Ton 500 3500

Roller 3 Wheel Kawasaki KMRH - 12 Up to 12 Ton 500 3500

Roller 3 Wheel Sakai 7608 Up to 12 Ton 500 3500

Roller Pneumatic Dynapac CP 15 Up to 20 Ton 1200 8400

Roller Pneumatic Hamm GRW - 10 Up to 20 Ton 1200 8400

Roller Pneumatic Stavostroj VP 200 Up to 20 Ton 1200 8400

Roller Pneumatic Dynapac CP 20 Up to 20 Ton 1200 8400

Roller Pneumatic Sakai TS7409 Up to 20 Ton 1000 7000

Roller Vib. Pedestrain Bomag BW 71E - 2 Up to 0.5 Ton 400 2800

Roller Vib. Pedestrain Bomag BW 71E Up to 0.5 Ton 400 2800

Roller Vib. Pedestrain Benford 1 - 71L / 2 - 75B Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Holman / Com CS 71 Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Mortimor CPM/71 Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Bomag BW 55E Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Benford 1 - 71EEP/ 1 - 71 B Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Benford Up to 0.5 Ton 300 2100

Roller Vib. Pedestrain Benford 1 - 71BPL Up to 0.5 Ton 300 2100

Roller Vib. Sheepfoot Tampo Up to 10 Ton 700 4900

Roller Vib. Self Prop. Johs Moller VT 13 / VT 21 Up to 3 Ton 550 3850

Roller Vib. Self Prop. Sakai SG 500 3 + Upto 6 Ton 800 5600

7
Asphalt Plant* Universal Spot Mix : Wylie Up to 10 Ton 400 2800

Roller Vib. Self Prop. Larsen & Turbo W1104 3 + Upto 6 Ton 800 5600

Roller Vib. Self Prop. Bomag BG 605 3 + Upto 6 Ton 800 5600

Spayer Emulsion Hotta ESC - 10 E Up to 1 KL 260 1820

Truck Flatbed/Crane Dong Feng/AEDLUS Up to 7 Ton 800 5600

Truck Flatbed/Crane Tata SE 1210/42 Up to 7 Ton 800 5600

Truck Flatbed/Crane Tata Usha 1210B/42 Up to 7 Ton 800 5600

Truck Flatbed/Crane Isuzu HTR Up to 7 Ton 800 5600

Truck Flatbed Ashok Leyland CS 42 Up to 150 HP 450 3150

Truck Flatbed Hino FF 173KA Up to 150 HP 450 3150

Truck Flatbed Isuzu HTR 114-03 Up to 150 HP 450 3150

Truck Flatbed Isuzu TXD 50 Up to 150 HP 450 3150

Truck Tipper Tata SK 1210/36 Up to 150 HP 450 3150

Truck Tipper A/Leyland Commet 3/15; Up to 150 HP 450 3150

Truck Tipper Tata SE 1210 /36 Up to 150 HP 450 3150

Truck Tipper A/ Leyland Commet 3/21 Up to 150 HP 450 3150

Truck Tipper A/ Leyland Commet Up to 150 HP 450 3150

Truck Tipper A/Leyland Commet Up to 150 HP 450 3150

Truck Tipper Isuzu HTR 113-03 Up to 150 HP 450 3150

Truck Tipper Hino KR 120 E Up to 150 HP 450 3150

Truck Tipper Isuzu SBR 322; TXD 40 Up to 150 HP 450 3150

Truck Tipper Nissan CPC 14E From 150+ HP 1100 7700

Truck Tipper Isuzu TDJ From 150+ HP 1100 7700

Truck Tipper Nissan CKB 450EDN From 150+ HP 1100 7700

Mini Truck Mah & Mah Cab 576 300 2100

Mini Truck Tata 407 300 2100

Mini Truck Mah. Nis. Allw. Cab 576 300 2100

Mini Truck Mits. Can. Eich./ FE444 300 2100

Mini Truck Mitsu. Eicher EE 44EXR 300 2100

Trailer Tractor Isuzu CXZ81Q 10 + to 25 Ton 2200 15400

Trailer Tractor Hino HE 335 10 + to 25 Ton 2200 15400


Trailer Tractor Mitsubishi FV 515 HRR 10 + to 25 Ton 2200 15400
Trailer Tractor Nissan CW - 50 GTN 10 + to 25 Ton 2200 15400

8
Asphalt Plant* Universal Spot Mix : Wylie Up to 10 Ton 400 2800

Trailer Tractor Mitsubishi FV 515 HRR From 25 +Ton 2700 18900


Water Tanker AL/ Commet; ALCO- 3/15 Up to 8 KL 550 3850
Water Tanker Tata/SE 1210/48 Up to 8 KL 550 3850
Water Tanker A/ Leyland Commet CS 42 Up to 8 KL 550 3850
Water Tanker Hino Up to 8 KL 550 3850
Water Tanker Isuzu HTR Up to 8 KL 550 3850
Water Tanker Isuzu SBR 312; TXD 50 Up to 8 KL 550 3850
Trailer MAECO / Nepal 140 980
Tractor HMT 4511 Up to 85 HP 300 2100
Tractor International Sona. DI 745 III Up to 85 HP 300 2100
Tractor Tractor & Farm MF 245 DI-J Up to 85 HP 300 2100
Tractor Hindustan G 453 - DI Up to 85 HP 300 2100
Tractor Escort E 355 N Up to 85 HP 300 2100
Tractor Mahendra 545 Up to 85 HP 300 2100
Tractor Ford 3610 Up to 85 HP 300 2100
Tractor Kubota Up to 85 HP 300 2100
Tractor Ford New Holland Up to 85 HP 300 2100
Tractor with trailer Ford 6610 Up to 85 HP 440 3080
Tractor with trailer Massey Ferguson MF 20B Up to 85 HP 440 3080
Vibrator Engine Mikasa; Mikasa MV1-GE 120 840
Vibrator Needle BP 25; BP 35 100 700
Vibrator Needle V 635; V 654 100 700
Compactor H/Towed Jaypee Up to 450 KG 130 910
Compactor H/Towed MIKASA MVC -110D Up to 450 KG 130 910
Welding Arc 30 + KVA 1150 8050

9
Transportation rate of construction materials by 8 MT truck including loading and unloading
Truck Rate NRs 605.0
Name of the Project : Diesel (without VAT) NRs 95.50
village municiplty gramthan 1 Unskill Labor Rate NRs 535.0
Skill labor rate NRs 750.0
(DOR norms 8.04)
Travel time for truck Fuel nxT liter Labours MD
Types of Speed Rate Per Market
S.N. Description of Materials Unit T=2x(d1/v1
Road Km/hr Truck Amount Liter Amount MD Amount Unit Quarry Name
+d2/v2+d3/v3)
Earthen 10 1 0.00
1 Excavated Soil Cum Gravel 20 2 0.40 0.1725 104.36 0.80 76.4 0.40 214.00 394.76
Bituminous 40
Earthen 10 0.00
2 Sand, Surkhi, Stone Dust, Chips Cum Gravel 20 0.00 0.0975 58.99 0.00 0 0.30
Bituminous 40
Earthen 10 0.5 0.00
Gravel,river shingle, broken stone
3 aggregates and bats Cum Gravel 20 5 1.75 0.4000 242.00 3.68 350.96 0.50 267.50 860.46 kerabari
Bituminous 40 23
Earthen 10 0.00
4 Boulder/Cobbles/quarry stone Cum Gravel 20 0.00 0.1575 95.29 0.00 0 0.50
Bituminous 40
Earthen 10 0.00
Cement, Reinforcement Steel ,gabion wire,
5 MT Gravel 20 0.00 0.0900 54.45 0.00 0 0.40
Fabricated Steel, G.I,C.I, Pipes, RCC
Kg
Precast Element Bituminous 40
Earthen 10
MT 20
6 Bitumen Gravel 0.00 0.1500 90.75 0.00 0 1.00
Bituminous 40
Earthen 10 0.00
7 Timber for temporary works Cum Gravel 20 0.00 0.0825 49.91 0.00 0 0.30
Bituminous 40
Earthen 10 0.04 30.00
8 RCC hume pipe-900mm dia-meter Meter Gravel 20 0.00 0.1050 63.53 0.00 0 0.40
Bituminous 40
Earthen 10 0.03 22.50
9 RCC hume pipe-750mm dia-meter Meter Gravel 20 0.00 0.0963 58.23 0.00 0 0.33
Bituminous 40
Earthen 10 0.02 15.00
10 RCC hume pipe-600mm dia -meter Meter Gravel 20 0.00 0.0945 57.17 0.00 0 0.25
Bituminous 40
Earthen 10 0.01 7.50
11 RCC hume pipe-450mm dia-meter Meter Gravel 20 0.00 0.0928 56.11 0.00 0 0.17
Bituminous 40
Earthen 10 0.00
12 Rock Material Cum Gravel 20 0.00 0.1350 81.68 0.00 0 0.50
Bituminous 40
Earthen 10 0.01 7.50
13 Fuel,Water (by tanker) KL Gravel 20 0.00 0.1400 84.70 0.00 0 0.10

Page 10 of 81
Fuel,Water (by tanker) KL
Bituminous 40

Page 11 of 81
Rate Analysis 12

Project Name:- 0

EARTHWORK AND SITE CLEARANCE


Site Clearance-One sqm DoLIDAR-01
Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 0.04 535.00 21.40 T&P 3% 0.64
Sub-Total 21.40 0.64
Rate per Sqm 22.04

Earthwork in excavation for road way, Drain and structure Foundation

Ordinary Soil-One cum DoLIDAR-05a


Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 0.50 535.00 267.50 T&P 3% 8.03
Sub-Total 267.50 8.03
Rate per Cum 275.53

Hard Soil-One cum DoLIDAR-05b


Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 0.6 535.00 321.00 T&P 3% 9.63
Sub-Total 321.00 9.63
Rate per Cum 330.63

Ordinary Rock-One cum DoLIDAR-05c


Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 2.0 535.00 1070.00 T&P 3% 32.1
Sub-Total 1070.00 32.1
Rate per Cum 1102.10

Earthwork in Back filling behind structure with compaction

Ordinary Soil with compaction by rammer-One cum DoR 2.12-(2-25Kha)


Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 0.25 535.00 133.75 T&P 3% 4.01
Sub-Total 133.75 4.01
Rate per Cum 137.76

b. Hard Soil-One cum DoR 2.12-(2-25Kha)


Labour Material and Equipment
Category MD Rate Amount Type Quantity Rate Amount
Unskilled Labour 0.32 535.00 171.20 T&P 3% 5.14
Sub-Total 171.20 5.14
Rate per Cum 176.34

c.Boulder mixed soil -One cum DoR 2.12-(2-25Kha)


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 0.30 535.00 160.50 T&P 3% 4.82

Rate Analysis, Bardiya


Rate Analysis 13

Sub-Total 160.50 4.82


Rate per Cum 165.32

Rate Analysis, Bardiya


Rate Analysis 14

Laying of fillter material adacent to structures-One Cum DoLIDAR-17


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 0.00 Granular material Cum 1.10 1510.46 1661.51
Unskilled Labour 2.00 535.00 1070.00
Sub-Total 1070.00 1661.51
Rate per Sqm 2731.51

Stripping of top soil -One Sqm DoLIDAR-12a


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Stripping of top soil-12.a T&P 3% 1.93
Unskilled Labour [0.8*0.15] 0.12 535.00 64.20
Sub-Total 64.20 1.93
Rate per Sqm 66.13

Turfingwith sods-One Sqm DoLIDAR-12a


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Stripping of top soil-12.a T&P 3% 2.25
Unskilled Labour [0.8*0.12] 0.10 535.00 53.50

Turfing with sods-12.c


Unskilled Labour 0.04 535.00 21.40
Sub-Total 74.90 2.25
Rate per Sqm 77.15

Construction of Roadway Embankment

Local fill material with watering compaction (Manual) -One cum DoLIDAR-10
Material and
Labour
Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 T&P 3% 12.0375
Unskilled Labour 0.75 535.00 401.25 Roller Hour 0.116 0.00 0.00
Sub-Total 401.25 12.04
Rate per Cum 413.29

Local fill material natural loose filling (manual)-One cum DoLIDAR-10


Material and
Labour
Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 T&P 3% 12.04
Unskilled Labour 0.75 535.00 401.25
Sub-Total 401.25 12.04
Rate per Cum 413.29

Roadway construction with imported fill material (natural Compaction)-One cum


Material and
Labour
Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Imported fill material cum 1.10 394.76 434.24
Unskilled Labour 0.25 535.00 133.75 tools and plants -3% 3% 4.01
Sub-Total 133.75 438.25
Rate per Cum 572.00

Rate Analysis, Bardiya


Rate Analysis 15

Roadway construction with imported fill material Compaction by roller)-One cum


Material and
Labour
Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Imported fill material cum 1.10 394.76 434.24
Unskilled Labour 0.25 535.00 133.75 Roller (Dolidar 26a) hour 0.09 1864.50 167.81
Diesel liter 1.08 110.18 118.99
Sub-Total 133.75 721.04
Rate per Cum 854.79

Bitumen Pavement Work

Construction of Sub-base (Loose )- One Cum DoR-12.02


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.01 750.00 3.75 Gravel 63mm down Cum 1.00 1510.46 1510.46
Unskilled Labour 1.05 535.00 561.75

Sub-Total 565.50 1510.46


Rate per Cum 2075.96

Construction of Sub-base with watering and Rolling- One Cum DoR-12.01


Labour Material and Equipment

Category MD Rate Amount Type Unit Quantity Rate Amount

Skilled labour 0.005 750.00 3.75 Gravel 63mm down Cum 1.280 1510.46 1933.39
Unskilled Labour 0.040 535.00 21.40 Water Browser hour 0.038 932.25 35.43
Roller Hour 0.022 0.00 0.00
Grader Hour 0.022 2548.15 56.06
Diesel Liter 0.792 110.18 87.26
Loader hour 0.011 1356.00 14.92
Royaltee cum 1.280 0.00 0.00
gravel collection cum 1.280 350.00 448.00
Sub-Total 25.15 2575.06
Rate per Cum 2600.21

Subgrade preparation- One Cum DOR 10.1,10.3


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.010 750.00 7.50 Roller Hour 0.017 1864.50 31.70
Unskilled Labour 0.100 535.00 53.50 Grader Hour 0.010 2548.15 25.48
Diesel Liter 0.122 110.18 13.44
Sub-Total 61.00 70.62
Rate per Cum 131.62
Rate per sqm avg 20cm 26.32

Construction of Base Course- One Cum DOR 12.06


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.005 750.00 3.75 Crushed aggregate Cum 1.200 1860.46 2232.55
Unskilled Labour 0.020 535.00 10.70 Water Browser Hour 0.033 932.25 30.76
Roller Hour 0.033 1864.50 61.53
Grader Hour 0.033 2548.15 84.09
Loader Hour 0.011 1356.00 14.92

Rate Analysis, Bardiya


Rate Analysis 16

Diesel Liter 0.990 110.18 109.07


Sub-Total 14.45 2532.92
Rate per Cum 2547.37

Rate Analysis, Bardiya


Rate Analysis 17

Construction of prime coat- One liter DOR-13.03


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.0030 750.00 2.25 Bitumen 80/100 Kg 1.0500 110.18 115.68
Unskilled Labour 0.0460 535.00 24.61 Kerosene Kg 0.1000 110.18 11.02
Diesel liter 0.2750 110.18 30.30
Boiler with operator Hour 0.0025 203.40 0.51
Bitumen Sprayer Hour 0.0025 293.80 0.73
Air compressor Hour 0.0030 282.50 0.85
Sub-Total 26.86 159.09
Rate per Liter 185.95

Construction of Tack coat- One liter DOR 13.01


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.0030 750.00 2.25 Bitumen Cum 1.0500 110.18 115.68
Unskilled Labour 0.0460 535.00 24.61 kerosene Liter 0.1000 110.18 11.02
Diesel Liter 0.275 110.18 30.30
Boiler hour 0.0025 203.40 0.51
Sprayer Cum 0.003 293.80 0.73
Air compresser hour 0.0030 282.50 0.85
Sub-Total 26.86 159.09
Rate per Liter 185.95

Construction of premix Carpet- One cum DOR 13.09


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.45 750.00 337.50 Chips aggregate Cum 1.20 1860.46 2232.55
Unskilled Labour 4.50 535.00 2407.50 Bitumen 80/100 liter 77.00 110.18 8483.48
Kerosene Liter 7.70 110.18 848.35
Diesel Liter 3.50 110.18 385.61
Static Roller hour 0.50 0.00 0.00
Sprayer hour 0.50 293.80 146.90
Sub-Total 2745.00 12096.89
Rate per cum 14841.89

Providing and laying sand Seal- One sqm DOR 13.07


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.010 750.00 7.50 Sand Cum 0.0120 #VALUE! #VALUE!
Unskilled Labour 0.014 535.00 7.49 Bitumen 80/100 liter 0.6600 110.18 72.72
Kerosene liter 0.0100 110.18 1.10
Diesel hour 0.0810 110.18 8.92
Boiler hour 0.0040 203.40 0.81
Roller hour 0.0040 0.00 0.00
Sprayer hour 0.0010 293.80 0.29
Sub-Total 14.99 #VALUE!
Rate per Sqm #VALUE!

Construction of Roadway by Excavator including mobilization and demobilization of Machine


Soft soil District Rate
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Excavation by mach cum 1.00 60.00 60.00
Unskilled Labour 0.05 535.00 26.75 0.00
Sub-Total 26.75 60.00

Rate Analysis, Bardiya


Rate Analysis 18

Rate per Cum 86.75

Rate Analysis, Bardiya


Rate Analysis 19

Hard soil District Rate


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Excavation by mach cum 1.00 70.00 70.00
Unskilled Labour 0.05 535.00 26.75 0.00
Sub-Total 26.75 70.00
Rate per Cum 96.75

Soft Rock District Rate


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Excavation by mach cum 1.00 180.00 180.00
Unskilled Labour 0.05 535.00 26.75 0.00
Sub-Total 26.75 180.00
Rate per Cum 206.75

Medium Rock District Rate


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Excavation by mach cum 1.00 400.00 400.00
Unskilled Labour 0.05 535.00 26.75 0.00
Sub-Total 26.75 400.00
Rate per Cum 426.75

Hard Rock District Rate


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Excavation by mach cum 1.00 1150.00 1150.00
Unskilled Labour 0.05 535.00 26.75 0.00
Sub-Total 26.75 1150
Rate per Cum 1176.75

Stone Soling and Masonry Work

Dry Stone Soling on prepared bedding -One cum DoLIDAR-49


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Boulder Cum 1.1 #VALUE! #VALUE!
Unskilled Labour 1.00 535.00 535.00
Sub-Total 535.00 #VALUE!
Rate per Cum #VALUE!

Stone Soling with spalls/sand -One cum DoLIDAR-49


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 Stone Cum 1.10 #VALUE! #VALUE!
Unskilled Labour 1.25 535.00 668.75 River spalls/sand Cum 0.25 #VALUE! #VALUE!
Sub-Total 668.75 #VALUE!
Rate per Cum #VALUE!

Dry Stone Masonry Work for hill -One cum DoLIDAR-49


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.50 750.00 375.00 Boulder Cum 1.1 0.00 0.00
Unskilled Labour 1.75 535.00 936.25

Rate Analysis, Bardiya


Rate Analysis 20

Sub-Total 1311.25 0.00


Rate per Cum 1311.25

Rate Analysis, Bardiya


Rate Analysis 21

Un-coursed Rubble masonry - One cum


In (1:3) cement Mortar DoLIDAR-38-A
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.75 750.00 1312.50 Cement Kg 148.00 16950.00 2508600.00
Unskilled Labour 3.46 535.00 1851.10 sand Cum 0.44 #VALUE! #VALUE!
stone Cum 1.10 #VALUE! #VALUE!
Sub-Total 3163.60 #VALUE!
Rate per Cum #VALUE!

In (1:4) cement Mortar DoLIDAR-38-A


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.75 750.00 1312.50 Cement Kg 116.00 16950.00 1966200.00
Unskilled Labour 3.49 535.00 1867.15 sand Cum 0.47 #VALUE! #VALUE!
stone Cum 1.10 #VALUE! #VALUE!
Sub-Total 3179.65 #VALUE!
Rate per Cum #VALUE!

In (1:6) cement Mortar-One cum DoLIDAR-38-B


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.75 750.00 1312.50 Cement Kg 92.00 16950.00 1559400.00
Unskilled Labour 3.54 535.00 1893.90 sand Cum 0.50 #VALUE! #VALUE!
stone Cum 1.10 #VALUE! #VALUE!
Sub-Total 3206.40 #VALUE!
Rate per Cum #VALUE!

Square Rubble Coursed Masonry-Second sort

In (1:3) cement Mortar-One cum DoLIDAR-38-C

Labour Material and Equipment


Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 2.50 750.00 1875.00 Cement Kg 148.00 16950.00 2508600.00
Unskilled Labour 5.96 535.00 3188.60 sand Cum 0.44 #VALUE! #VALUE!
stone Cum 1.30 0.00 0.00
Sub-Total 5063.60 #VALUE!
Rate per Cum #VALUE!

In (1:4) cement Mortar-One cum DoLIDAR-38-C


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 2.50 750.00 1875.00 Cement Kg 116.00 16950.00 1966200.00
Unskilled Labour 5.99 535.00 3204.65 sand Cum 0.47 #VALUE! #VALUE!
stone Cum 1.30 0.00 0.00
Sub-Total 5079.65 #VALUE!
Rate per Cum #VALUE!

In (1:6) cement Mortar-One cum DoLIDAR-38-C


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 2.50 750.00 1875.00 Cement Kg 92.00 16950.00 1559400.00
Unskilled Labour 6.04 535.00 3231.40 sand Cum 0.50 #VALUE! #VALUE!
stone Cum 1.30 0.00 0.00
Sub-Total 5106.40 #VALUE!

Rate Analysis, Bardiya


Rate Analysis 22

Rate per Cum #VALUE!

Rate Analysis, Bardiya


Rate Analysis 23

Brck Masonry in cement Mortar

In (1:3) cement Mortar-One cum DoLIDAR-37a


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.00 750.0 750.00 Cement Kg 130.00 16950.00 2203500.00
Unskilled Labour 3.97 535.0 2123.95 sand Cum 0.33 #VALUE! #VALUE!
Brick Cum 400.00 18.35 7340.48
Sub-Total 2873.95 #VALUE!
Rate per Cum #VALUE!

In (1:4) cement Mortar-One cum DoLIDAR-37b


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.00 750.0 750.00 Cement Kg 100.00 16950.00 1695000.00
Unskilled Labour 3.99 535.0 2134.65 sand Cum 0.35 #VALUE! #VALUE!
Brick Cum 400.00 18.35 7340.48
Sub-Total 2884.65 #VALUE!
Rate per Cum #VALUE!

In (1:6) cement Mortar-One cum DoLIDAR-37b


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 1.00 750.0 750.00 Cement Kg 70.00 16950.00 1186500.00
Unskilled Labour 4.02 535.0 2150.70 sand Cum 0.38 #VALUE! #VALUE!
Brick Cum 400.00 18.35 7340.48
Sub-Total 2900.70 #VALUE!
Rate per Cum #VALUE!

Cement Concrete and Plaster Work

Plain Cement Concrete in foundation Using Crushed Aggregate DoLIDAR-41-A

In (1:3:6) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 220.00 16950.00 3729000.00
Unskilled Labour 3.25 535.00 1738.75 sand Cum 0.47 #VALUE! #VALUE!
Crushed Aggr-40mm Cum 0.65 1860.46 1209.30
Crushed Aggr-20mm Cum 0.24 2010.46 482.51
Sub-Total 2233.75 #VALUE!
Rate per Cum #VALUE!

In (1:2:4) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 320.00 16950.00 5424000.00
Unskilled Labour 3.31 535.00 1770.85 sand Cum 0.44 #VALUE! #VALUE!
Crushed Aggr-40mm Cum 0.52 1860.46 967.44
Crushed Aggr-20mm Cum 0.22 2010.46 442.30
Crushed Aggr-10mm Cum 0.11 1910.46 210.15
Sub-Total 2265.85 #VALUE!
Rate per Cum #VALUE!

Rate Analysis, Bardiya


Rate Analysis 24

In (1:1.5:3) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 320.00 16950.00 5424000.00
Unskilled Labour 3.31 535.00 1770.85 sand Cum 0.44 #VALUE! #VALUE!
Crushed Aggr-20mm Cum 0.22 2010.46 442.30
Crushed Aggr-10mm Cum 0.11 1910.46 210.15
Sub-Total 2265.85 #VALUE!
Rate per Cum #VALUE!

14 Plain Cement Concrete in Super structure Using Crushed Aggregate DoLIDAR-41-B

In (1:2:4) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 320.00 16950.00 5424000.00
Unskilled Labour 4.31 535 2305.85 sand Cum 0.44 #VALUE! #VALUE!
Crushed Aggr-40mm Cum 0.52 1860.46 967.44
Crushed Aggr-20mm Cum 0.22 2010.46 442.30
Crushed Aggr-10mm Cum 0.11 1910.46 210.15
Sub-Total 2800.85 321.29 #VALUE! #VALUE!
Rate per Cum #VALUE!

In (1:1.5:3) -One cum DoLIDAR-41-B


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 400.00 16950.00 6780000.00
Unskilled Labour 4.37 535.00 2337.95 sand Cum 0.42 #VALUE! #VALUE!
Crushed Aggr-20mm Cum 0.57 1860.46 1060.46
Crushed Aggr-10mm Cum 0.29 1910.46 554.03
Sub-Total 2832.95 #VALUE!
Rate per Cum #VALUE!

Plain Cement Concrete in foundation using natural river aggregate DoLIDAR-41-A

In (1:3:6) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 220.00 16950.00 3729000.00
Unskilled Labour 3.25 535.00 1738.75 sand Cum 0.47 #VALUE! #VALUE!
Natural Agg.-40mm Cum 0.65 1860.46 1209.30
Natural Agg.-20mm Cum 0.24 2010.46 482.51
Sub-Total 2233.75 #VALUE!
Rate per Cum #VALUE!

In (1:2:4) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 320.00 16950.00 5424000.00
Unskilled Labour 3.31 535.00 1770.85 sand Cum 0.44 #VALUE! #VALUE!
Natural Agg.-40mm Cum 0.52 1860.46 967.44
Natural Agg.-20mm Cum 0.22 2010.46 442.30
Natural Agg.-10mm Cum 0.11 1910.46 210.15
Sub-Total 2265.85 #VALUE!

Rate Analysis, Bardiya


Rate Analysis 25

Rate per Cum #VALUE!

Rate Analysis, Bardiya


Rate Analysis 26

In (1:1.5:3) -One cum DoLIDAR-41-B


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 400.00 16950.00 6780000.00
Unskilled Labour 3.31 535.00 1770.85 sand Cum 0.42 #VALUE! #VALUE!
Crushed Aggr-20mm Cum 0.57 2010.46 1145.96
Crushed Aggr-10mm Cum 0.29 1910.46 554.03
Sub-Total 2265.85 #VALUE!
Rate per Cum #VALUE!

Plain Cement Concrete in Super structure using natural river aggregate DoLIDAR-41-B

In (1:2:4) -One cum


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 320.00 16950.00 5424000.00
Unskilled Labour 4.31 535.00 2305.85 sand Cum 0.44 #VALUE! #VALUE!
Natural Agg.10-20mm Cum 0.85 1860.46 1581.39
Sub-Total 2800.85 #VALUE!
Rate per Cum #VALUE!

In (1:1.5:3) -One cum DoLIDAR-41-B


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.66 750.00 495.00 Cement Kg 400.00 16950.00 6780000.00
Unskilled Labour 4.37 535.00 2337.95 sand Cum 0.42 #VALUE! #VALUE!
Natural Agg.10-20mm Cum 0.86 2010.46 1729.00
Sub-Total 2832.95 #VALUE!
Rate per Sqm #VALUE!

20mm thick Cement Plaster work

In (1:4) cement Mortar -One Sqm DoR-12-4-Kha


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.14 750.00 105.00 Cement Kg 8.100 16950.00 137295.00
Unskilled Labour 0.19 535.00 101.65 Sand Cum 0.022 #VALUE! #VALUE!
Sub-Total 206.65 #VALUE!
Rate per Sqm #VALUE!

In (1:6) cement Mortar -One Sqm DoR-12-4-Gha


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.14 750.00 105.00 Cement Kg 5.70 16950.00 96615.00
Unskilled Labour 0.19 535.00 101.65 Sand Cum 0.02 #VALUE! #VALUE!
Sub-Total 206.65 #VALUE!
Rate per Sqm #VALUE!

12.5 mm thick Cement Plaster work

In (1:3) cement Mortar -One Sqm DoLIDAR-37-B-b


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.150 750.00 112.50 Cement Kg 4.630 16950.00 78478.50
Unskilled Labour 0.135 535.00 72.23 Sand Cum 0.0138 #VALUE! #VALUE!

Rate Analysis, Bardiya


Rate Analysis 27

Sub-Total 184.73 #VALUE!


Rate per Sqm #VALUE!

Rate Analysis, Bardiya


Rate Analysis 28

In (1:4) cement Mortar -One Sqm DoLIDAR-37-B-c


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.150 750.00 112.50 Cement Kg 3.630 16950.00 61528.50
Unskilled Labour 0.135 535.00 72.23 Sand Cum 0.0146 #VALUE! #VALUE!
Sub-Total 184.73 #VALUE!
Rate per Sqm #VALUE!

Flush Pointing-One Sqm DoLIDAR-37-C


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.069 750.00 51.60 Cement Kg 0.9600 16950.00 16272.00
Unskilled Labour 0.060 535.00 32.10 Sand Cum 0.0029 #VALUE! #VALUE!
Sub-Total 83.70 #VALUE!
Rate per Sqm #VALUE!

Rulled Pointing (1:3) cement Mortar -One Sqm DoLIDAR-37-E


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.138 750.00 103.20 Cement Kg 0.9600 16950.00 16272.00
Unskilled Labour 0.120 535.00 64.20 Sand Cum 0.0029 #VALUE! #VALUE!
Sub-Total 167.40 #VALUE!
Rate per Sqm #VALUE!

Formwork

Formwork for beam and slab-One sqm


a. Localwood formwork-One sqm DoLIDAR-39
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.17 750.00 129.00 Local wood Cum 0.0088 77682.00 681.01
Unskilled Labour 0.26 535.00 137.50 Nails Cum 0.2500 101.70 25.43
Scrap Value 25% -170.25
Sub-Total 266.50 536.19
Rate per Sqm 802.69

b. 12mm thick Waterproof Plywood formwork-One sqm


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.17 750.00 129.00 Waterproof Plywood sqm 0.18 #VALUE! #VALUE!
Unskilled Labour 0.26 535.00 137.50 Nails Cum 0.35 101.70 35.60
Local wood for batten Cum 0.0083 77682.00 647.35
Scrap Value 25% #VALUE!
Sub-Total 266.50 #VALUE!
Rate per Sqm #VALUE!

c. 19mm thick Waterproof Plywood formwork-One sqm


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.17 750.00 129.00 Waterproof Plywood/6 sqm 0.192 #VALUE! #VALUE!
Unskilled Labour 0.26 535.00 137.50 Nails Cum 0.35 101.70 35.60
Local wood for batten/6 Cum 0.0083 77682.00 647.35
Scrap Value 25% #VALUE!

Rate Analysis, Bardiya


Rate Analysis 29

Sub-Total 266.50 #VALUE!


Rate per Sqm #VALUE!

Rate Analysis, Bardiya


Rate Analysis 30

Steel Works

Reinforcement for RCC Work-One Kg


a. 4.75 and 7 mm dia DoLIDAR-40
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.007 750.00 5.25 Steel Kg 1.05 #VALUE! #VALUE!
Unskilled Labour 0.007 535.00 3.75 Anneled Wire Kg 0.01 113.00 1.13
Sub-Total 9.00 #VALUE!
Rate per Kg #VALUE!

b. 8 m diameter DoLIDAR-40
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.007 750.00 5.25 Steel Kg 1.05 #VALUE! #VALUE!
Unskilled Labour 0.007 535.00 3.75 Anneled Wire Kg 0.01 113.00 1.13
Sub-Total 9.00 #VALUE!
Rate per Kg #VALUE!

c. 10 mm diameter DoLIDAR-40
Labour Material and Equipment

Category MD Rate Amount Type Unit Quantity Rate Amount

Skilled labour 0.007 750.00 5.25 Steel Kg 1.05 #VALUE! #VALUE!


Unskilled Labour 0.007 535.00 3.75 Anneled Wire Kg 0.01 113.00 1.13
Sub-Total 9.00 #VALUE!
Rate per Kg #VALUE!

d. 12 to 25 mm diameter DoLIDAR-40
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.007 750.00 5.25 Steel Kg 1.05 #VALUE! #VALUE!
Unskilled Labour 0.007 535.00 3.75 Anneled Wire Kg 0.01 113.00 1.13
Sub-Total 9.00 #VALUE!
Rate per Kg #VALUE!

Gabion Works

Fabrication of Gabion Boxes Medium Zinc Coater GI Wire Hexagonal Mesh 100x120 Including rolling, cutting, weaving,
assembling, placing in position stretching, packing with stone and binding all complete
a. Box Size-2x1x1 DoLIDAR 44-1-Bii/44-2-i/45
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.39 750.00 292.50 Mesh Wire-10SWG Kg 23.43 93.79 2197.50
Unskilled Labour 0.20 535.00 107.00 Selvage Wire-8 SWG Kg 2.40 93.79 225.10
Assembling- [44.2-i]
Unskilled Labour 0.09 535.00 48.15 Binding wire-12SWG Kg 0.95 94.92 90.17
Stone Packing -[45]
Skilled labour 0.60 750.00 450.00 Stone Cum 2.20 #VALUE! #VALUE!
Unskilled Labour 1.50 535.00 802.50
Sub-Total 1700.15 #VALUE!
Rate per Box #VALUE!

Rate Analysis, Bardiya


Rate Analysis 31

b. Box Size-3x1x1 DoLIDAR 44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.57 750.00 427.50 Mesh Wire-10SWG Kg 34.08 93.79 3196.36
Unskilled Labour 0.28 535.00 149.80 Selvage Wire-8 SWG Kg 3.36 93.79 315.13
Assembling- [44.2-i]
Unskilled Labour 0.13 535.00 69.55 Binding wire-12SWG Kg 1.30 94.92 123.40
Stone Packing -[45]
Skilled labour 0.90 750.00 675.00 Stone Cum 3.30 #VALUE! #VALUE!
Unskilled Labour 2.25 535.00 1203.75
Sub-Total 2525.60 42.04 #VALUE! #VALUE!
Rate per Box #VALUE!

c. Box Size-1.5x1x1 DoR24.01.02 DoLIDAR44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.39 750.00 292.50 Mesh Wire-10SWG Kg 19.75 93.79 1852.35
Unskilled Labour 0.20 535.00 107.00 Selvage Wire-8 SWG Kg 2.40 93.79 225.10
Assembling- [44.2-i]
Unskilled Labour 0.09 535.00 48.15 Binding wire-12SWG Kg 0.95 94.92 90.17
Stone Packing -[45]
Skilled labour 0.45 750.00 337.50 Stone Cum 1.65 #VALUE! #VALUE!
Unskilled Labour 1.13 535.00 601.88
Sub-Total 1387.03 #VALUE!
Rate per Box #VALUE!

Fabrication of Gabion Boxes Heavy Zinc Coater GI Wire Hexagonal Mesh 100x120 Including rolling, cutting, weaving,
assembling, placing in position stretching, packing with stone and binding all complete
a. Box Size-2x1x1 DoLIDAR 44-1-Bii/44-2-i/45
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.39 750.00 292.50 Mesh Wire-10SWG Kg 23.43 102.83 2409.31
Unskilled Labour 0.20 535.00 107.00 Selvage Wire-8 SWG Kg 2.40 102.83 246.79
Assembling- [44.2-i]
Unskilled Labour 0.09 535.00 48.15 Binding wire-12SWG Kg 0.95 103.96 98.76
Stone Packing -[45]
Skilled labour 0.60 750.00 450.00 Stone Cum 2.20 #VALUE! #VALUE!
Unskilled Labour 1.50 535.00 802.50
Sub-Total 1700.15 #VALUE!
Rate per Box #VALUE!

b. Box Size-3x1x1 DoLIDAR 44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.57 750.00 427.50 Mesh Wire-10SWG Kg 34.08 102.83 3504.45
Unskilled Labour 0.28 535.00 149.80 Selvage Wire-8 SWG Kg 3.36 102.83 345.51
Assembling- [44.2-i]
Unskilled Labour 0.13 535.00 69.55 Binding wire-12SWG Kg 1.30 103.96 135.15
Stone Packing -[45]
Skilled labour 0.90 750.00 675.00 Stone Cum 3.30 #VALUE! #VALUE!
Unskilled Labour 2.25 535.00 1203.75
Sub-Total 2525.60 #VALUE!

Rate Analysis, Bardiya


Rate Analysis 32

Rate per Box #VALUE!

Rate Analysis, Bardiya


Rate Analysis 33

c. Box Size-1.5x1x1 DoR24.01.02 DoLIDAR44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Mesh Weaving-[44.1-B]
Skilled labour 0.39 750.00 292.50 Mesh Wire-10SWG Kg 19.75 102.83 2030.89
Unskilled Labour 0.20 535.00 107.00 Selvage Wire-8 SWG Kg 2.40 102.83 246.79
Assembling- [44.2-i]
Unskilled Labour 0.09 535.00 48.15 Binding wire-12SWG Kg 0.95 103.96 98.76
Stone Packing -[45]
Skilled labour 0.45 750.00 337.50 Stone Cum 1.65 #VALUE! #VALUE!
Unskilled Labour 1.13 535.00 601.88
Sub-Total 1387.03 #VALUE!
Rate per Box #VALUE!

Machine made Gabion Boxes Heavy Zinc Coated GI Wire Hexagonal Mesh 100x120 Including assembling, placing in position
stretching, packing with stone and binding all complete

a. Box Size-2x1x1 DoLIDAR 44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Assembling- [44.2-i] Machine made mesh sqm 11.00 226.00 2486.00
Unskilled Labour 0.09 535.00 48.15 Binding wire-12swg Kg 0.95 103.96 98.76
Stone Packing -[45]
Skilled labour 0.60 750.00 450.00 Stone Cum 2.20 #VALUE! #VALUE!
Unskilled Labour 1.50 535.00 802.50
Sub-Total 1300.65 #VALUE!
Rate per Box #VALUE!

a. Box Size-3x1x1 DoLIDAR 44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Assembling- [44.2-i] Machine made mesh sqm 16.00 226.00 3616.00
Unskilled Labour 0.09 535.00 48.15 Binding wire-12swg Kg 0.95 103.96 98.76
Stone Packing -[45]
Skilled labour 0.90 750.00 675.00 Stone Cum 3.30 #VALUE! #VALUE!
Unskilled Labour 2.25 535.00 1203.75
Sub-Total 1926.90 #VALUE!
Rate per Box #VALUE!

a. Box Size-1.5x1x1 DoLIDAR 44-1-Bii/44-2-i/45


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Assembling- [44.2-i] Machine made mesh sqm 9.00 226.00 2034.00
Unskilled Labour 0.09 535.00 48.15 Binding wire-12swg Kg 0.95 103.96 98.76
Stone Packing -[45]
Skilled labour 0.45 750.00 337.50 Stone Cum 1.65 #VALUE! #VALUE!
Unskilled Labour 1.13 535.00 604.55
Sub-Total 990.20 #VALUE!
Rate per Box #VALUE!

Rate Analysis, Bardiya


Rate Analysis 34

Hume pipe culvert work

Preparation of granular bedding for pipe with granular material-One Cum DoLIDAR-46
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 750.00 0.00 Granular material Cum 1.10 1510.46 1661.51
Unskilled Labour 1.00 535.00 535.00 Water Cum 0.10 0.00 0.00
Sub-Total 535.00 1661.51
Rate per Sqm 2196.51

Laying, Fitting, fixing of Hume pipe-one meter


a. 300 mm dia DoLIDAR-47
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.02 750.00 15.00 NP3 pipe-300 mm dia meter 1.00 10565.50 10565.50
Unskilled Labour 0.10 535.00 53.50 Cement Kg 0.75 16950.00 12712.50
jute Kg 1.00 135.60 135.60
Sub-Total 68.50 23413.60
Rate per Sqm 23482.10

b. 450 mm dia DoLIDAR-47


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.02 750.00 15.00 NP3 pipe-450 mm dia meter 1.00 13051.50 13051.50
Unskilled Labour 0.10 535.00 53.50 Cement Kg 0.75 16950.00 12712.50
jute Kg 1.00 135.60 135.60
Sub-Total 68.50 25899.60
Rate per Sqm 25968.10

600 mm dia DoLIDAR-47


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.05 750.00 37.50 NP3 pipe-600 mm dia meter 1.00 16531.90 16531.90
Unskilled Labour 0.20 535.00 107.00 Cement Kg 2.00 16950.00 33900.00
jute Kg 2.00 135.60 271.20
Sub-Total 144.50 50703.10
Rate per Sqm 50847.60

750 mm dia DoLIDAR-47


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.10 750.00 75.00 NP3 pipe-750 mm dia meter 1.00 21752.50 21752.50
Unskilled Labour 0.30 535.00 160.50 Cement Kg 3.00 16950.00 50850.00
jute Kg 2.50 135.60 339.00
Sub-Total 235.50 72941.50
Rate per Sqm 73177.00

900 mm dia DoLIDAR-47


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.15 750.00 112.50 NP3 pipe-900 mm dia meter 1.00 26103.00 26103.00
Unskilled Labour 0.50 535.00 267.50 Cement Kg 4.50 16950.00 76275.00
jute Kg 3.00 135.60 406.80

Rate Analysis, Bardiya


Rate Analysis 35

Sub-Total 380.00 102784.80


Rate per Sqm 103164.80

Rate Analysis, Bardiya


Rate Analysis 36

1200 mm dia DoLIDAR-47


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.15 750.00 112.50 NP3 pipe-1200 mm dia meter 1.00 44748.00 44748.00
Unskilled Labour 0.50 535.00 267.50 Cement Kg 6.50 16950.00 110175.00
jute Kg 4.00 135.60 542.40
Sub-Total 380.00 155465.40
Rate per Sqm 155845.40

Dismantling of Structures

Brick Masonry-One cum DoLIDAR-3


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 1.500 535.00 802.50 Tools and Plants 3.00% 24.08
Sub-Total 802.50 24.08
Rate per Cum 826.58

Stone masonry work- One Cum DoLIDAR-3


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 2.000 535.00 1070.00 Tools and Plants 3.00% 32.10
Sub-Total 1070.00 32.10
Rate per Cum 1102.10

Concrete- One Cum DoLIDAR-3


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 3.000 535.00 1605.00 Tools and Plants 3.00% 48.15
Sub-Total 1605.00 48.15
Rate per Cum 1653.15

Concrete and flexible pavement work- One Cum DoLIDAR-3


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 4.000 535.00 2140.00 Tools and Plants 3.00% 64.20
Sub-Total 2140.00 64.20
Rate per Cum 2204.20

Rate Analysis, Bardiya


Norms for Rate Analysis
Activity Group:- 8 : Quarries, Borrow pits, stock pile and Spoil areas.

Spec. Labour Materials Equipment


Activit
Claus Description of works Unit Remarks
y Nos
e No.
Unskilled
Skilled Type Unit Qty. Type Unit Qty.
(MD)
8.04. Transportation of materials Travel time (T) for truck to be used for this activity shall be determined as follows:
by truck, including loading,
unloading and stacking by
800 manpower lead upto 10m
T=2x{d1/v1+d2/v2+d3/v3+………………..dn/vn}, where d1,d2,d3………dn and v1,v2,v3……..vn are the streches of distances to be travelled and
corresponding average speeds on these streches.

3 MT 5 MT 8 MT 3 MT 5 MT 8 MT 3 MT 5 MT 8 MT 3 MT 5 MT 8 MT
8.04.01
1) Excavated earth work
1 a) Soil Material m3 0.40 0.40 0.40 Fuel lit 3.2 x T 2.4xT 2xT Truck hr 0.4x(T+0.75) 0.24x(T+0.75) 0.15x(T+0.75) T=travel time for
truck
12 b) Rock/Material m 3
0.50 0.50 0.50 Fuel lit 4xT 3xT 2.3xT Truck hr 0.5x(T+0.75) 0.3x(T+0.75) 0.18x(T+0.75)

2 2) Sand m3 0.30 0.30 0.30 Fuel lit 3xT 2.2xT 1.7xT Truck hr 0.37x(T+0.75) 0.22x(T+0.75) 0.13x(T+0.75) T=travel time for
truck

3) Gravel, river shingle,


3 broken stone aggregates m3 0.50 0.50 0.50 Fuel lit 3.4xT 2.6xT 2.1xT Truck hr 0.43x(T+0.75) 0.26x(T+0.75) 0.16x(T+0.75) T=travel time for
and bats.
truck

4 4) Boulder, Cobbles, m3 0.50 0.50 0.50 Fuel lit 4.5xT 3.4xT 2.7xT Truck hr 0.57x(T+0.75) 0.34x(T+0.75) 0.21x(T+0.75) T=travel time for
quarry stone truck

5)Dressed Stone m3 0.60 0.60 0.60 Fuel lit 4.2xT 3.2xT 2.6xT Truck hr 0.53x(T+0.75) 0.32x(T+0.75) 0.2x(T+0.75) T=travel time for
truck

6)Bricks 1000 nos 0.60 0.60 0.60 Fuel lit 6.6xT 5xT 4xT Truck hr 0.83x(T+0.75) 0.5x(T+0.75) 0.31x(T+0.75) T=travel time for
truck

5 7)Cement t 0.40 0.40 0.40 Fuel lit 2.6xT 2.xT 1.5xT Truck hr 0.33x(T+0.75) 0.2x(T+0.75) 0.12x(T+0.75) T=travel time for
truck

8)Reinforcement Steel and t 0.60 0.60 0.60 lit 2.6xT 2.xT 1.5xT Truck hr 0.33x(T+0.75) 0.2x(T+0.75) 0.12x(T+0.75) T=travel time for
gabion wire
Norms for Rate Analysis
Activity Group:- 8 : Quarries, Borrow pits, stock pile and Spoil areas.

Spec. Labour Materials Equipment


Activit
Claus Description of works Unit Remarks
y Nos
e No.
Unskilled
Skilled Type Unit Qty. Type Unit Qty.
8)Reinforcement Steel and (MD)
gabion wire truck

6 9) Bitumen 1000 lit 1.00 1.00 1.00 Fuel lit 3 xT 3xT 2.6xT Truck hr 0.40x(T+0.75) 0.3x(T+0.75) 0.2x(T+0.75) T=travel time for
truck
10) GI, CI, Pipe and fittings t 1.00 1.00 1.00 Fuel lit 2.6xT 2xT 1.5xT Truck hr 0.33x(T+0.75) 0.2x(T+0.75) 0.12x(T+0.75) T=travel time for
truck
11)Timber for temporary
7 m3 0.30 0.30 0.30 Fuel lit 2.4xT 1.8xT 1.4xT Truck hr 0.3x(T+0.75) 0.28x(T+0.75) 0.11x(T+0.75) T=travel time for
works
truck

12) Fabricated Structural


m3 0.50 0.50 0.50 Fuel lit 3.2xT 2.4xT 2xT Truck hr 0.4x(T+1.25) 0.24x(T+1.25) 0.15x(T+1.25) T=travel time for
Timber
truck

13) Fabricated Structural


t 4.00 4.00 4.00 0.40 0.40 0.40 Fuel lit 3.2xT 2xT 1.5xT Truck hr 0.4x(T+1.25) 0.2x(T+1.25) 0.12x(T+1.25) T=travel time for
Steel
truck
14)RCC Precast Element t 1.00 1.00 1.00 Fuel lit 2.6xT 2xT 1.5xT Truck hr 0.33x(T+0.75) 0.2x(T+0.75) 0.12x(T+0.75) T=travel time for
truck
15)Equiptment &
truck 10.00 15.00 20.00 2.00 3.00 4.00 Fuel lit 8xT 10xT 13xT Truck hr 1x(T+1.75) 1x(T+1.75) 1x(T+1.75) T=travel time for
accessories
etc.requiring careful
truck
handling
16) RCC hume pipe
8 a) 900mm dia m 0.40 0.40 0.40 0.04 0.04 0.04 Fuel lit 1.6xT 1.3xT 0.78xT Truck hr 0.2x(T+1.75) 0.13x(T+1.75) 0.06x(T+1.75) T=travel time for
truck

9 b) 750mm dia m 0.33 0.33 0.33 0.03 0.03 0.03 Fuel lit 1.3xT 1.1xT 0.69xT Truck hr 0.16x(T+1.75) 0.11x(T+1.75) 0.055x(T+1.75) T=travel time for
truck
10 c) 600mm dia m 0.25 0.25 0.25 0.02 0.02 0.02 Fuel lit 1xT 0.8xT 0.6xT Truck hr 0.13x(T+1.75) 0.08x(T+1.75) 0.054x(T+1.75) T=travel time for
truck
11 c) 450mm dia m 0.17 0.17 0.17 0.01 0.01 0.01 Fuel lit 0.7xT 0.5xT 0.51xT Truck hr 0.1x(T+1.75) 0.05x(T+1.75) 0.053x(T+1.75) T=travel time for
truck
Truck+
0.33x(T+0.25) 0.2x(T+0.5)+0 0.12x(T+0.75)
13 17) Water 1000 lit 0.10 0.10 0.10 0.01 0.01 0.01 Fuel lit 2.6xT 2.0xT 1.5xT Pump hr T=travel time for
+0.05 .05 +0.05
10cmdia
truck
Cost Estimate of Double Cell RC Humepipe Culvert -600 mm

#REF! Drawing No-S-01

Length Breadth Depth


SN Description of Items No Quantity Unit Rate Amount
meter meter meter

1 Earth work excavation in foundation in ordinary soil

Head Wall 2 5.70 1.30 0.90 13.34

Humepipe Bed 1 5.28 2.33 0.45 5.54

18.88 Cum 275.53 5202.01

2 Cement Concrete M10 in natural river aggregate


Head Wall 2 5.70 1.30 0.10 1.48 Cum #VALUE! #VALUE!

3 Square Rubble-Coursed Rubble masonry (second sort)


in (1:4) cement sand Mortar

Head Wall-[0.45+1.1]/2 2 5.70 0.78 2.17 19.30

Parapet wall 2 5.70 0.30 0.30 1.03

Deduction of Hume pipe 4 0.47 0.75 -1.40


18.92 Cum #VALUE! #VALUE!

4 Granular Compacted material for Humepipe bed 1 5.28 2.33 0.25 3.08 Cum 2196.51 6755.59

5 Supply, Laying, Jointing fitting of NP-3 Humepipe -600 m 6 2.50 15.00 Rm 50847.60 762714.00

6 Cement Concrete M15/20 in natural river aggregate


for caping of Head wall 2 5.70 0.45 0.05 0.26 Cum #VALUE! #VALUE!

7 20 mm thick Flush Rulled cement pointing (1:3)

Head Wall 2 5.70 1.37 15.62

Parapet Wall 4 6.15 0.30 7.38

Deduction of Hume pipe 4 3.14 0.14 -1.81


21.19 Sqm #VALUE! #VALUE!

8 Local wood form work for PCC work

Bottom of head wall 2 14.00 0.1 2.8

Caping on top 2 12.30 0.05 1.23

4.03 Sqm 802.69 3234.84


9 Earthwork in back filling in culvert withwatering and
Compaction by hand rammer

Pipe encasement 1 4.34 2.33 0.80 8.09

Carriageway including cushion 1 30.00 6.25 1.37 256.88

Behind of Head wall 2 5.70 0.60 0.80 5.47

deduction of humepipe 2 4.34 0.47 -4.04

266.40 Cum 137.76 36699.28


Total Cost NRs #VALUE!
g]kfn ;/sf/ ÷ lhNnf ljsf; ;ldltsf] sfof{no

b/ ljZn]if0f @)&)÷&!
-7]Ssfjf6 sfd u/fpg] k|of]hgsf nflu_
! !@–#) ;]=dL= uf]nfO{sf] ?v 9fNg] sfo{ xfFufx? sf6L ?vsf] 6'qmf kf/L lgdf{0f :ynaf6 !% dL
!–! s ug]{ sfo{ ;d]t .
b/ ljZn]if0fsf] nflu ?v ;+Vof ! lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.13 hjfg 535.00 69.55 69.55
jf:tljs b//]6 69.55
b/ k|lt ! ?vsf] !% k|ltzt cf]e/x]8 vr{ 10.43
?= 79.98 k}= hDdf b/ /]6 79.98

@ !#& ;]=dL=uf]nfO{sf] ?v 9fNg] sfo{ xfFufx? sf6L ?vnfO{ 6'qmf kf/L lgdf{0f :ynaf6 !% dL6
!–! Vf cfbL sfo{ ;d]t
b/ ljZn]if0fsf] nflu ?v ;+Vof ! lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds HofdL 4.00 hjfg 535.00 2140.00 2140.00
jf:tljs b//]6 2140.00
b/ k|lt ! ?vsf] !% k|ltzt cf]e/x]8 vr{ 321.00
?= 2461.00 k}= hDdf b/ /]6 2461.00

# !@–#) ;]=dL= uf]nfO{sf] ?v h/f lemSg] sfo{ h/f p7fpg] / lgdf{0f :ynaf6 !% dL
!–@ s
b/ ljZn]if0fsf] nflu ?v ;+Vof ! lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.40 hjfg 535.00 214.00 214.00
jf:tljs b//]6 214.00
b/ k|lt ! ?vsf] !% k|ltzt cf]e/x]8 vr{ 32.10
?= 246.10 k}= hDdf b/ /]6 246.10

$ afSnf] emf/kft sf6\g] h/f lemSg] / lgdf{0f :ynaf6 @% dL6/ b"/L;Dd af]sfgL ug]{
!–# b/ ljZn]if0fsf] nflu ! j=dL= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.04 hjfg 535.00 21.40 21.40
jf:tljs b//]6 21.40
b/ k|lt j=dL=sf] !% k|ltzt cf]e/x]8 vr{ 3.21
?= 24.61 k}= hDdf b/ /]6 24.61

% ;km}{;nfO{ 8|]l;Ë ug]{ sfo{ , vfN6f] k'g]{ , p7]sf] df6f] sf6\g] , ;tx ldnfpg] cflb
!–& b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.01 hjfg 535.00 5.35 5.35
jf:tljs b//]6 5.35
b/ k|lt j=dL=sf] !% k|ltzt cf]e/x]8 vr{ 0.80
?= 6.15 k}= hDdf b/ /]6 6.15

^
!–* df]6fO{ !%–@) ;]=dL=_
b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.16 hjfg 535.00 85.60 85.60
jf:tljs b//]6 85.60
b/ k|lt j=dL=sf] !% k|ltzt cf]e/x]8 vr{ 12.84
?= 98.44 k}= hDdf b/ /]6 98.44

& ;fO6 ;kmf ug]{ sfd -emf/kft sf6\g], ?v 9fNg] / x6fpg] sfd .
@%-!)_ b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.06 hjfg 535.00 32.10 32.10
jf:tljs b//]6 32.10
b/ k|lt j=dL=sf] !% k|ltzt cf]e/x]8 vr{ 4.82
?= 36.92 k}= hDdf b/ /]6 36.92

* g/d k|sf/sf] Sn] / l;N6L df6f]df ;j} lsl;dsf] vGg] sfd !) dL6/ ;Dd jf]sgL l8:kf]hn
@–! b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.70 hjfg 535.00 374.50 374.50
oflGqs pks/ Hofldsf] Hofnfsf] 11.23
jf:tljs b//]6 385.73
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 57.86
?= 443.59 k}= 12.57 hDdf b/ /]6 443.59

`
( ;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf -#) ;]=dL=;Dd_ ld;]sf] df6f] ;a} lsl;dsf] vGg]
@–@ l8:kf]hn / !=% dL6/;Dd lnˆ6 ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.80 hjfg 535.00 428.00 428.00
oflGqs pks/0f Hofldsf] Hofnfsf] #Ü n] 12.84
jf:tljs b//]6 440.84
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 66.13
?= 506.97 k}= hDdf b/ /]6 506.97

!) ;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg], kfgL 5g]{ / Hofldåf
@ -@%_s-!) dL= b"/Laf6 cf];fg]{_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.50 hjfg 535.00 267.50 267.50
jf:tljs b//]6 267.50
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 40.13
?= 307.63 k}= hDdf b/ /]6 307.63

!! ;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg], kfgL 5g]{ / Hofldåf
@ -@%_s!) dL= b"/Laf6 9'jfgL ug{ df6f]sf] d"No ;d]t
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.50 hjfg 535.00 267.50 267.50
lgdf{0f ;fdu|L df6f] 1.20 3=dL= 300.00 360.00 360.00
jf:tljs b//]6 627.50
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 94.13
?= 721.63 k}= hDdf b/ /]6 721.63

!@ ;fdfGo df6f]n] kfgL g5l/sg k'g]{ sfd


@ -@%_v b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.25 hjfg 535.00 133.75 133.75
jf:tljs b//]6 133.75
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 20.06
?= 153.81 k}= hDdf b/ /]6 153.81

!# hu jf vf8naf6 kfgL kDk ug]{ .


@ – #$ b/ ljZn]if0fsf] nflu %))) ln6/ lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds l;kfn' kDk 0.50 306f 750.00 375.00 375.00
jf:tljs b//]6 375.00
b/ k|lt %))) ln= sf] !% k|ltzt cf]e/x]8 vr{ 56.25
?= 431.25 k}= hDdf b/ /]6 431.25

gf]6 M o;df kl/df0f kDksf] Ifdtf cg';f/ /fVg] .

!$ jfn'jf eg]{, kfgL 5g]{ / HofdLåf/f sDk}S6 ug]{ sfd -!) dL=9'jfgL_
@ – $@ b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds Hofld 0.20 hjfg 535.00 107.00 107.00
lgdf{0f ;fdu|L e/f}6 jfn'jf 1.00 3=dL= 0.00 0.00
jf:tljs b//]6 107.00
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ 16.05
?= 123.05 k}= 3.49 hDdf b/ /]6 123.05
!%
% -!_ s !e'O{tNnfdf d]lzgåf/f agfOPsf] O{6fsf] uf/f]sf] l;d]G6 d;nf -!M#_ df
% -@_ s d;nf tof/ u/L d;nfdf uf/f] nufpg] sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.20 hjfg 535.00 107.00 2409.00
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.13 d]=6= 19210.00 2497.30 9561.70
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 3.21
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

!^
% -!_ s !e'O{tNnfeGbf dfly d]lzgåf/f agfOPsf] O{6fsf] uf/f]sf] l;d]G6 d;nf -
% -@_ v ug]{,d;nf tof/ u/L d;nfdf uf/f nufpg] sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.70 hjfg 535.00 374.50 2676.50
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.13 d]=6= 19210.00 2497.30 9561.70
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 11.24
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

!&
% -!_ s @e'O{tNnfdfd]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M$_ to
% -@_ ssfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.20 hjfg 535.00 107.00 2409.00
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 19210.00 1921.00 1921.00
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 3.21
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

!*
% -!_ s e'O{tNnf eGbf dfly d]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -
% -@_ sfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.70 hjfg 535.00 374.50 2676.50
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 19210.00 1921.00 8985.40
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 11.23
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

!(
% -!_ se'O{tNnfdf d]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M%_ to
% -@_ ssfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.20 hjfg 535.00 107.00 2409.00
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.09 d]=6= 19210.00 1728.90 8793.30
afn'jf vf]nfsf] 0.31 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 3.21
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@)
% -!_ se'O{tNnfeGbf dfly d]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -
% -@_ vsfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.70 hjfg 535.00 374.50 2676.50
O{6f 435 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.09 d]=6= 19210.00 1728.90 8793.30
afn'jf vf]nfsf] 0.31 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 11.23
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@!
% -!_ s #e'O{tNnfdfd]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M^_ to
% -@_ ssfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.20 hjfg 535.00 107.00 2409.00
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.07 d]=6= 19210.00 1344.70 8409.10
afn'jf vf]nfsf] 0.30 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 3.21
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@@
% -!_ s #e'O{tNnfeGbfdfly d]lzgåf/f agfOPsf] O{6f pknAw ug]{, l;d]G6 d;nf -
% -@_ vsfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.70 hjfg 535.00 374.50 2676.50
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.07 d]=6= 19210.00 1344.70 8409.10
afn'jf vf]nfsf] 0.30 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 11.23
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@#
% -!_ v !e'O{tNnfdf lrDgL e§fsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M#_ tof/ u/L
% -@_ ssfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.20 hjfg 535.00 107.00 2409.00
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fd l;d]G6 0.13 d]=6= 19210.00 2497.30 9561.70
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 3.21
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@$
% -!_ v !e'O{tNnfeGbfdfly lrDgL e§fsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M#_ t
% -@_ vsfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL 0.70 hjfg 535.00 374.50 2676.50
O{6f 435.00 uf]6f 16.24 7064.40
lgdf{0f ;fdu|L l;d]G6 0.13 d]=6= 19210.00 2497.30 9561.70
afn'jf vf]nfsf] 0.27 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 11.23
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!

@%
% -!_ v @e'O{tNnfdflrDgL e§fsf] O{6f pknAw ug]{, l;d]G6 d;nf -!M$_ tof/ u/L
% -@_ ssfd #) dL6/;Dd 9'jfgL ;lxt
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.50 hjfg 750.00 1125.00
>lds v_ HofdL 2.20 hjfg 535.00 1177.00
u_ HofdL hjfg 535.00 0.00 2302.00
O{6f 405.00 uf]6f 16.24 6577.20
lgdf{0f ;fdu|L l;d]G6 0.10 d]=6= 0.00 0.00 6577.20
afn'jf vf]nfsf] 0.28 3=dL= #VALUE! #VALUE!
v6sf] ;ffdfg -u_ sf] #Ü n] 0.00
jf:tljs b//]6 #VALUE!
b/ k|lt 3=dL=sf] !% k|ltzt cf]e/x]8 vr{ #VALUE!
?= #VALUE! k}= hDdf b/ /]6 #VALUE!
$$ hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{ #) dL6/
& –@ 3 -lk=;L=;L= !M@M$_
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 1.00 hjfg 750.00 750.00
>lds
v_ HofdL 4.00 hjfg 535.00 2140.00 2890.00
l;d]G6 0.32 d]=6= 0.00 0.00
$) dL=dL= d]l;gn] 0.52 3=dL= 2010.46 1045.43
lgdf{0f ;fdu|Lkm'6fPsf]
@) dL=dL= d]l;gn] 0.22 3=dL= 2010.46 442.30
km'6fPsf]
!) dL=dL= d]l;gn] 0.11 3=dL= 1910.46 210.15
km'6fPsf]
v;|f] afn'jf 0.445 3=dL= #VALUE! #VALUE! #VALUE!
#VALUE!
!% k|ltzt cf]e/x]8 vr{ #VALUE!
b/ k|lt 3=dL=sf] hDdf b/ /]6 #VALUE!
?= #VALUE! k}= #VALUE!

(
33. 33
×0 . 75=4 . 16 2 . 03
6 ×0 . 75=0 .25375 )
6

!@# ;'Vvf O{6f RofK6f] 5fKg] sfd .


!!–!% s b/ ljZn]if0fsf] nflu !) j=dL= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 0.5 hjfg 750.00 375.00
>lds
v_ HofdL 1.0 hjfg 535.00 535.00 910.00
O{6f 350.00 uf]6f 16.24 5684.00
lgdf{0f ;fdu|L
jfn'jf vf]nfsf] 0.71 3=dL= 0.00 0.00 5684.00
b/ k|lt j=dL=sf] jf:tljs b//]6 6594.00
7446.60 b/ k|lt j=dL=sf] !% k|ltzt cf]e/x]8 vr{ 852.60
10 ?= 744.66 k}= hDdf b/ /]6 7446.60

!#% !@=% dL=dL= afSnf] l;d]G6 afn'jf -!M$_ df l;lnË jfx]s cGoq Knfi6/ u
!@–! u b/ ljZn]if0fsf] nflu !)) j=dL= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
s_ l;kfn' 12.00 hjfg 750.00 9000.00
>lds
v_ HofdL 16.00 hjfg 535.00 8560.00 17560.00
l;d]G6 0.538 d]=6= 0.00 0.00
lgdf{0f ;fdu|L
afn'jf vf]nfsf] 1.46 3=dL= 0.00 0.00 0.00
b/ k|lt a=dL=sf] jf:tljs b//]6 17560.00
17560.00 b/ k|lt a=dL=sf] !% k|ltzt cf]e/x]8 vr{ 0.00
100 ?= 175.60 k}= hDdf b/ /]6 17560.00
{0f :ynaf6 !% dL6/ b"/L;Dd af]sfgL

0f :ynaf6 !% dL6/ b'/L;Dd af]sgL ug]{


u|fdyfg ufpFkflnsf

b/ ljZn]if0f @)&%÷&^
-pkef]Stf jf6 sfd u/fpg] k|of]hgsf nflu_
% ;km}{;nfO{ 8|]l;Ë ug]{ sfo{ , vfN6f] k'g]{ , p7]sf] df6f] sf6\g] , ;tx ldnfpg] cflb
!–& b/ ljZn]if0fsf] nflu ! j=ld= lnOPsf]
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd
PsfO{
>lds Hofld 0.01 hjfg 535.00 5.35
jf:tljs b//]6
b/ k|lt j=dL=sf] Eof6,!# Ü - lgdf{0f ;fd
?= 5.35 k}= hDdf b/ /]6
\g] , ;tx ldnfpg] cflb
k|To]s ;|
f]t ;fwgsf]
hDdf
5.35
5.35
0.00
5.35
29

-h]g/n_ l;len sfo{sf] cfO6d b//]6 ;f/f+z – @)^(÷&)


lhNnf k|fljlws sfof{no,cfO6d
df]/ª
b/, cfO6d b/
l;=gcfO6d ljj/0f OsfO{ s}lkmot
-pkef]Qm -7]Ssfaf6
sfo{ ;d"x …sÚ M– ;fO{6 ;kmf ug]{ sfd faf6_ _
;km}{;nfO{ 8|]l;Ë ug]{ sfo{ , vfN6f] k'g]{ ,
5 !–& p7]sf] df6f] sf6\g] , ;tx ldnfpg] cflb sfo{ ;d]t Ps ?= 5.35 6.15
-;le{;/f]8 cflb_
dflyNNff] df6f] vGg] sfd, lgdf{0f :ynaf6 jflx/
6 !–* af]sgL ug]{ ;d]t -df6f]sf] txsf] df]6fO{ !%– j=dL= ?= 85.60 98.44
@) ;]=dL=_
;fO6 ;kmf ug]{ sfd -emf/kft sf6\g], ?v 9fNg] /
7 @%-!)_ j=dL= ?= 32.10 36.92
x6fpg] sfd .
sfo{ ;d"x …vÚ M– df6f] sf6\g] / k'g]{ sfd
g/d k|sf/sf] Sn] / l;N6L df6f]df ;j} lsl;dsf]
8 @–! vGg] sfd !) dL6/ ;Dd jf]sgL l8:kf]hn / !=% #=dL= ?= 385.73 443.59
dL6/;Dd lnˆ6 ;d]t
;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf
-#) ;]=dL=;Dd_ ld;]sf] df6f] ;a} lsl;dsf] vGg]
9 @–@ #=dL= ?= 440.84 506.97
sfd !) dL6/ af]sgL l8:kf]hn / !=% dL6/;Dd
lnˆ6 ;d]t
;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf]
10 @ -@%_stxdf km}nfpg], kfgL 5g]{ / Hofldåf/f sDk}S6 #=dL= ?= 267.50 307.63
ug]{ sfd ;d]t -!) dL= b"/Laf6 cf];fg]{_
;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf]
txdf km}nfpg], kfgL 5g]{ / Hofldåf/f sDk}S6
11 @ -@%_s #=dL= ?= 662.26 721.63
ug]{ sfd ;d]t !) ls=dL= b"/Laf6 9'jfgL ug]{
;fy} l/Ë/f]8;Ddsf] df6f]sf] d"No ;d]t
;fdfGo df6f]n] kfgL g5l/sg k'g]{ sfd -df6f]sf]
12 @ -@%_v #=dL= ?= 133.75 153.81
d"No afx]s_ .
jfn'jf eg]{, kfgL 5g]{ / HofdLåf/f sDk}S6 ug]
14 @ – $@ #=dL= ?= 1034.50 123.05
{ sfd -!) dL=9'jfgL_
sfo{ ;d"x …uÚ M– O{+6fsf] sfd
e'O{tNnfdf d]lzgåf/f agfOPsf] O{6fsf] uf/f]sf]
15 % -!_ s !l;d]G6 d;nf -!M#_ df nufpg] sfd O{+6f #=dL= ?= #VALUE! #VALUE!
pknAw ug]{,
e'O{tNnfdf lrDgL e§fsf] O{6f pknAw ug]{,
17 % -!_ s l;d]G6 d;nf -!M$_ tof/ u/L uf/f] nufpg] sfd #) #=dL= ?= #VALUE! #VALUE!
dL6/;Dd
e'O{tNnf9'jfgL
eGbf ;lxt
dfyL lrDgL e§fsf] O{6f
18 % -!_ s pknAw ug]{, l;d]G6 d;nf -!M$_ tof/ u/L uf/f] #=dL= ?= #VALUE! #VALUE!
nufpg] sfd #) dL6/;Dd 9'jfgL ;lxt
e'O{tNnfdf lrDgL e§fsf] O{6f pknAw ug]{,
19 % -!_ s l;d]G6 d;nf -!M^_ tof/ u/L uf/f] nufpg] sfd #) #=dL= ?= #VALUE! #VALUE!
dL6/;Dd 9'jfgL
e'O{tNnf eGbf ;lxt
dfyL lrDgL e§fsf] O{6f
20 % -!_ s pknAw ug]{, l;d]G6 d;nf -!M^_ tof/ u/L uf/f] #=dL= ?= #VALUE! #VALUE!
nufpg] sfd #) dL6/;Dd 9'jfgL ;lxt
sfo{ ;d"x …3Ú M– 9'Ëfsf] sfd
9'+ufsf] -/a'n_ uf/f]sf] sfd ;fx|f] Ans:6f]g
31 ^ -s_ !–!pknAw ug]{, l;d]G6 d;nf !M# tof/ u/L uf/f] #=dL= ?= #VALUE! #VALUE!
nufpg] !) dL6/;Dd 9'jfgL ;lxt
9'+ufsf] -/a'n_ uf/f]sf] sfd ;fx|f] Ans:6f]g
24 pknAw ug]{, l;d]G6 d;nf !M$ tof/ u/L uf/f] #=dL= ?= #VALUE! #VALUE!
nufpg]
9'+ufsf]sfd k'/f !)
-/a'n_ dL6/;Dd
uf/f]sf] sfd 9'jfgL ;lxt
;fx|f] Ans:6f]g
25 pknAw ug]{, l;d]G6 d;nf !M^ tof/ u/L uf/f] #=dL= ?= #VALUE! #VALUE!
nufpg]
9'+ufsf]sfd k'/f !)
-/a'n_ dL6/;Dd
uf/f]sf] sfd 9'jfgL ;lxt
;fx|f] Ans:6f]g
26 pknAw ug]{, ;'Vvf uf/f] nufpg] sfd k'/f #) #=dL= ?= 1820.00 3323.50
dL6/;Dd 9'jfgL ;lxt
9'+ufsf] -/a'n_ uf/f] cfr{ jf t];f]{ ;txdf nufpg]
36 ^–#–! #=dL= ?= #VALUE! #VALUE!
sfd Ans :6f]g pknAw u/L l;d]G6 d;nf !M$ tof/

39 ^ –#–%s'+b]sf] 9'+ufsf] sfd l;d]G6 afn'jf -!M^_ df #=dL= ?= #VALUE! #VALUE!

husf] vf8ndf 9'+uf eg]{ / n]en ug]{ sfd #)


31 #=dL= ?= 802.50 922.88
dL6/;Dd 9'jfgL
sfo{ ;d"x …ªÚ M– l;d]G6 s+qmL6sf] sfd
hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd
42
& –@–v dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;lxt .
` ?= #VALUE! #VALUE!

tof/ ug]{M hf+r ug]{M l:js[t ug]{M]


30

-h]g/n_ l;len sfo{sf] cfO6d b//]6 ;f/f+z – @)^(÷&)


lhNnf k|fljlws sfof{no,cfO6d
df]/ª
b/, cfO6d b/
l;=gcfO6d ljj/0f OsfO{ s}lkmot
-pkef]Qm -7]Ssfaf6
hu -leQf kvf{n_df l;d]G6 s+lqm6 ug]{ sfd faf6_ _
42 & –@ u dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;lxt '- #=dL= ?= #VALUE! #VALUE!
lk=;L=;L= !M#M^_
hu -leQf kvf{n_df l;d]G6 s+lqm6 ug]{ sfd
43 & –@ 3 dfn;fdfg pknAw ug]{ #) dL6/;Dd 9'jfgL ;lxt '- #=dL= #VALUE! 0.00
lk=;L=;L= !M@M$_
;'k/ :6Sr/, 8]s :n]a ljdx?df l;d]G6 s+lqm6 ug]
45 & –@ 3 { sfd dfn;fdfg pknAw ug]{ #) dL6/;Dd #=dL= ?= 13739.36 7939.63
9'jfgL ;d]t '-lk=;L=;L= !M@M$_
hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd jf6/
45 & –@ 3 k|'km s]ldsn ;lxt dfn;fdfg pknAw ug]{ #=dL= ?= #VALUE! #VALUE!
-lk=;L=;L= !M@M$_
;'k/ :6Sr/, 8]s :n]a ljdx?df ;lxt l;d]G6 s+lqm6
47 &–$ v ug]{ sfd dfn;fdfg pknAw ug]{ #) dL6/;Dd #=dL= ?= 13728.99 #VALUE!
9'jfgL ;d]t '-lk=;L=;L= !M!=%M#_
;'k/ :6Sr/, 8]s :n]a ljdx?df l;d]G6 P8ldSr/ ;lxt
48 &–$ u l;d]G6 s+lqm6 ug]{ sfd dfn;fdfg pknAw ug]{ #=dL= ?= #REF! #VALUE!
#) dL6/;Dd 9'jfgL ;d]t -lk=;L=;L= !M!=M@_
sfo{ ;d"x …rÚ M– kmdf{sf] sfd
sf7df kmdf{ agfpg] sfd, dfn;fdfgsf] pknlAw,
5gf}6 ug]{, gS;f cg';f/ kmdf{ /fVg] lsnf / cGt/
49 * –@ s j=dL= ?= 680.33 332.34
nufpg] kmdf{ lemSg], x6fpg] #) ld6/;Dd
9'jfgL ;lxt kmz{ / :n]j h:tf sfd
sf]nd tyf Pj'6d]G6sf] nflu -kf]i6_
50 * –# s kmdf{ nufpgnfO{ v8f ug]{, sfd ldnfpg], lsnf j=dL= ?= 1151.07 695.03
nufpg] eTsfpg] / x6fpg] / #) ld6/

kmnfdsf] kfOksf] k|f]k , KnfOjf]8{ k|of]u u/L


51 * –$ s j=dL= ?= 498.07 332.34
km;{ / :nfjsf] nflu kmdf{ agfpg] sfd .
6]Grsf] sfddf cfjZos kg]{ v'nf lsl;dsf] sf7sf]
54 * –!# v sfd pknlAw tyf h8fg ;d]t !=% dL= b]lv # j=dL= ?= 506.54 10.46
dL= eGbf sd ulx/fO{df .
sfo{ ;d"x …5Ú M– 5fgfsf] sfd
dfn;fdfg pknAw u/L )=%) dL=dL= -@^ u]h
59 (–! x]eL _ afSnf] ;L=hL=cfO{= zL6 -Kn]g j=dL= ?= 1223.73 1113.41
h:tfkftfsf]pknAw
dfn;fdfg _ 5fgf u/L
5fpg] sfddL=dL=
)=$! k'/f . -@^ u]h
60 d]l8od _ afSnf] ;L=hL=cfO{= zL6 -Kn]g j=dL= ?= 1026.89 877.79
h:tfkftfsf]pknAw
dfn;fdfg _ 5fgf u/L
5fpg] sfd k'/f
)=#% .
dL=dL= -@^ u]h
61 nfO6 _ afSnf] ;L=hL=cfO{= zL6 -Kn]g j=dL= ?= 341.60 215.67
h:tfkftfsf]pknAw
dfn;fdfg _ 5fgf u/L
5fpg]
@^sfd k'/f
u]h .
nfO6-)=#%
66 (–! ld=ld=_ /+lug zL6sf] w'/L agfO{ h8fg ug] /=dL= ?= 695.60 925.84
{ sfd k'/f .
dfn;fdfg pknAw u/L Sn] 6fO{n 5fgf 5fpg]
69 (–^ j=dL= ?= 130.25 130.25
sfd .
sfo{ ;d"x …hÚ M– sf7sf] sfd
;fnsf7sf] rf}s; agfO hf]8\g] sfd . -9f]sf gfk ())
72 !)–! X @!)) dL=dL= sf7sf] ;fO{h !)) X &% #=dL= ?= 283863.53 32051.65
dL=dL=_
s' sf7sf] rf}s; agfO hf]8\g] sfd . 9f]sf gfk ())
73 !)–! X @!)) dL=dL= sf7sf] ;fO{h !)) X &% #=dL= ?= 115007.30 27953.80
dL=dL=_.
#* dL=dL= afSnf] lr/fg cu|fv sf7sf] k|m]d
xfnL km]lG;L l8nfvfkf agfO{ h8fg ug]{ . '-
74 !)–@ j=dL= ?= 13474.82 4287.72
vfkfsf] gfk !=)& dL= !=(*@ dL== @=!!$ j=
dL=_
#* dL=dL= afSnf] lr/fg cu|fv sf7sf] k|m]d
xfnL ;fwf/0f l8nfvfkf agfO{ h8fg ug]{ . '-
75 !)–@ j=dL= ?= 13460.98 4287.72
vfkfsf] gfk !=)& dL=X !=(*@ dL== @=!!$
j=
#* dL=_
X &% dL=dL=lr/fg ;fn sf7sf] k|m]d
77 !)–$ agfO{ $ dL=dL= ;fwf/0f P]gf vfkf agfO{ h8fg j=dL= ?= 9257.24 4260.72
ug]{ .
#* dL=dL= afSnf] cu|fv sf7sf] k|m]ddf $
81 !)–& dL=dL= sdl;{on KnfO{p8 b'j} tkm{ 7f]sL j=dL= ?= 7781.37 4244.95
ˆn; dL=dL=
#* vfkf agfO{ hf]8\g]
afSnf] cu|fv .sf7sf] k|m]ddf $
dL=dL= sdl;{on KnfO{p8 b'j} tkm{ 7f]sL ˆn;
82 !)–& j=dL= ?= 7781.37 4244.95
vfkf agfO{ hf]8\g] .

tof/ ug]{M hf+r ug]{M l:js[t ug]{M]


31

-h]g/n_ l;len sfo{sf] cfO6d b//]6 ;f/f+z – @)^(÷&)


lhNnf k|fljlws sfof{no,cfO6d
df]/ª
b/, cfO6d b/
l;=gcfO6d ljj/0f OsfO{ s}lkmot
-pkef]Qm -7]Ssfaf6
#* dL=dL= afSnf] cu|fv sf7sf] k|m]ddf @* u]h faf6_ _
83 !)–( j=dL= ?= 6990.53 3534.96
hL=cfO{= Kn]g zL6 b'j} k§L vfkf agfO{ hf]8\g] .
#* dL=dL= afSnf] cu|fv sf7sf] k|m]ddf ^
dL=dL= jf6/k|'km KnfO{p8 Pstkm{ / csf]
84 !)–& j=dL= ?= 8096.17 4565.32
{tkm{ $ dL=dL= sdl;{on KnfOp8 7f]sL ˆn;
vfkf agfO{ hf]8\g] .
103 !)–!& s' sf7sf] jLd lnG6n cflb agfO{ hf]8\g] . #=dL= ?= 92059.70 99003.69

@% dL=dL= cu|fv sf7sf] O{E; -d'7n_


104 a=dL= ?= 6485.77 83.40
agfO{ hf]8\g] .
!)–!(
sfo{ ;d"x …emÚ M– ˆnf]l/Ësf] sfd
#* dL=dL= -!½Æ_ afSnf] l;d]G6 s+qmL6 -!
90 !!–! vM@M$_ ˆnf]/ 9nfg u/L l;d]G6 3f]6L tof/ ug]{ j=dL= ?= 551.72 #VALUE!
.
%) dL=dL= -@Æ_ afSnf] l;d]G6 s+qmL6 -!
91 !!–! Uf M@M$_ ˆnf]/ 9nfg u/L l;d]G6 3f]6L tof/ ug] j=dL= ?= 684.40 #VALUE!
{.
&% dL=dL= -#Æ_ afSnf] l;d]G6 s+qmL6 -!
92 !!–! 3 M@M$_ ˆnf]/ 9nfg u/L l;d]G6 3f]6L tof/ ug] j=dL= ?= 948.55 #VALUE!
{.
103 !!–!% s ;'Vvf O{6f RofK6f] 5fKg] sfd . j=dL= ?= #VALUE! 744.66

104 !!–!% v ;'Vvf O{6f 7f8f] 5fKg] sfd . j=dL= ?= #VALUE! 939.86

105 !!–!^ ;'Vvf 9+'uf 5fKg] sfd . #=dL= ?= #VALUE! 2622.50

108 !!–!( s km\nf]l/Ë sfo{sf nflu afn'jfn] eg]{ sfd . #=dL= ?= #VALUE! #VALUE!
!% dL=dL= b]lv !%) dL=dL= 6'qmf O{6fn]
129 !!–@) v #=dL= ?= 1218.65 1218.65
eg]{ sfd .
sfo{ ;d"x …`Ú M– Knfi6/sf] sfd
!@=% dL=dL= afSnf] l;d]G6 afn'jf Knfi6/ -!
114 !@–! v j=dL= ?= #VALUE! 219.50
M$_ efudf l;lnËdf ug]{ .
!@=% dL=dL= afSnf] l;d]G6 afn'jf -!M$_ df
115 !@–! u j=dL= ?= #VALUE! 175.60
l;lnË jfx]s cGoq Knfi6/ ug]{ .
!@=% dL=dL= afSnf] l;d]G6 afn'jf -!M^_ df
116 !@–! 3 j=dL= ?= #VALUE! 175.60
sfd ug]{ . afSnf] l;d]G6 afn'jf Knfi6/ -!M$_
@) dL=dL=
118 !@–$ v j=dL= ?= #VALUE! 206.65
efudf .
@) dL=dL= afSnf] l;d]G6 afn'jf Knfi6/ -!M^_
119 !@–$ u j=dL= ?= #VALUE! 206.65
efudf .
130 !!–@) # dL=dL= df]6fO{ d;Lgf] l;d]G6 3f]6\g] sfd . j=dL= ?= 128.50 128.50
sfo{ ;d"x …6Ú M– /+u /f]ugsf] sfd
128 !#–$ s jf6/ k|'km l;d]G6 k]G6 Ps sf]6 nufpg] sfd . j=dL= ?= 40.49 38.34

129 !#–$ v jf6/ k|'km l;d]G6 k]G6 b'O{ sf]6 nufpg] sfd . j=dL= ?= 94.39 90.92
!#– tof/L Ogfd]n k]G6 Ps sf]6 nufpg] .' -Ps sf]6 k|
130 j=dL= ?= 86.75 86.75
%s,v fOd/ ;lxt_
!#– tof/L Ogfd]n k]G6 b'O{ sf]6 nufpg] .-Ps sf]6
131 j=dL= ?= 262.59 132.80
%s,v,u k|fO{d/ ;lxt_
!#–
132 tof/L Ogfd]n k]G6 c:t/ ljgf b'O{ sf]6 nufpg] . j=dL= ?= 248.43 132.80
%s,v,u
!#– tof/L Knfli6s Odn\;g k]G6 Ps sf]6 nufpg] . -Ps
133 j=dL= ?= 223.54 194.39
%s,v sf]6 c:t/ ;lxt_
!#– tof/L Knfli6s Odn\;g k]G6 b'O{ sf]6 nufpg] .
135 j=dL= ?= 351.86 324.16
%s,v,u-Ps sf]6 c:t/ ;lxt_
Ps sf]6 c:t/ u/L b'O{ sf]6 tof/L Pno"ldlgod
136 !#–^ j=dL= ?= 236.27 238.00
k]G6 ug]{ .
Ps sf]6 c:t/ nufO{ b'O{ sf]6 /]8 cS;fO{8
137 !#–& j=dL= ?= 257.00 258.69
nufpg] sfd .
149 !#– % v c:t/ jfx]s Pssf]6 tof/L Ogfd]n k]G6 ug]{ sfd . j=dL= ?= 113.24 48.20
c:t/ jfx]s b'O{sf]6 tof/L Ogfd]n k]G6 ug]{ sfd
150 !#–%v,u j=dL= ?= 209.88 94.25
.c:t/ jfx]s Ps sf]6 Knfli6s OdN;g k]G6 ug]{ sfd
151 !#–% v j=dL= ?= 153.96 155.84
.c:t/ jfx]s b'O{ sf]6 Knfli6s OdN;g k]G6 ug]
152 !#–% v,u j=dL= ?= 282.28 285.61
{ sfd .

tof/ ug]{M hf+r ug]{M l:js[t ug]{M]


32

-h]g/n_ l;len sfo{sf] cfO6d b//]6 ;f/f+z – @)^(÷&)


lhNnf k|fljlws sfof{no,cfO6d
df]/ª
b/, cfO6d b/
l;=gcfO6d ljj/0f OsfO{ s}lkmot
-pkef]Qm -7]Ssfaf6
153 !#–^ c:t/ jfx]s Ps sf]6 cfNd'lgod k]G6 ug]{ sfd . j=dL= ?= faf6_
82.63 _
83.24
154 !#–^ c:t/ jfx]s b'O{ sf]6 cfNd'lgod k]G6 ug]{ sfd . j=dL= ?= 168.25 168.25
155 !#–& c:t/ jfx]s Ps sf]6 /]8 cS;fO8 k]G6 ug]{ sfd . j=dL= ?= 53.90 53.90
156 !#–& c:t/ jfx]s b'O{ sf]6 /]8 cS;fO8 k]G6 ug]{ sfd . j=dL= ?= 107.75 107.75
sfo{ ;d"x …0fÚ M– kmnfdsf] sfd
cf/=;L=;L= nflu kmnfd] 808L sf6\g], df]8\g]
194 497-5 S]=hL= ?= #VALUE! 117.82
gS:ff cg';f/ 7fpFdf /fvL afFWg] sfd
# X @) dL=dL= kmnfd] lu|n agfO{ vfS;L
195 @$–! s j=dL= ?= 2457.75 2501.25
nufO{ Pn'ldlgod k]G6 ;d]t u/L hf]8\g]
% X @) dL=dL= kmnfd] lu|n agfO{ vfS;L
196 @$–! v j=dL= ?= 0.00 0.00
nufO{ Pn'ldlgod k]G6 ;d]t u/L hf]8\g]
kmnfd] sf]nfK;Lan u]6 k]lG6Ë / h8fg ;d]t ug]
197 @$–$ j=dL= ?= 6130.25 5750.00
{ -$" Uofkdf_.
kmnfd] /f]lnË ;6/ agfO{ h8fg ug]{ / k]G6LË /
198 @$–@ j=dL= ?= 217825.58 238523.31
Hofnf ;d]t .
sDkfp08 kmnfd] u]6 agfO{ hf]8\g] k]lG6Ë /
199 @$–# j=dL= ?= 5734.75 6490.31
Hofnf ;d]t .
sfnf] kmnfd] kfO{ksf] 6«; agfO{ k|fOd/
203 230 S]=hL= ?= 188.91 190.94
k]G6 ;lxt ;fO6df lgb]{zfg';f/ h8fg ug]{ sfd .
sfnf] kmnfd] kfO{ksf] kln{Ë agfO{ k|fOd/
204 231 j=dL= ?= 162.04 164.04
k]G6 ;lxt h8fg ug]{ sfd .

tof/ ug]{M hf+r ug]{M l:js[t ug]{M]


u|fdyfg ufpFkflnsf
ufpF sfo{kflnsfsf] sfof{no
t]tl/of,df]/Ë
dÚNof°g kmf/d

of]hgfsf] gfdM सकजललो मलरर्ग कनिमलर्गण गलवमल d=n]=k=kmf=g+= 168


of]hgf :ynM गलमथलनि ०१
p=; sf] gfdM e'QmfgL e}r/ g+=M
sfof{b]z ldltM 2076.01.11 e'QmfgL ldltM
sfd ;DkGg ug"{ kg]{ ldltM 2076.03.15 gfkL lstfasf] k[i& ;+VofM
cWofjlws ePsf] sfd cl#Nnf] landf r(]sf] xfn ePsf]
s|=;+= sfdsf] ljj/)F OsfO{ s}lkmot
kl/df)F b/ /sd kl/df)F b/ /sd kl/df)F b/ /sd

1 Earthwork excavation in soft soil by Cum 2794.20 79.10 221021.22 0.00 79.10 0.00 2794.20 79.10 221021.22
machine

2 Subgrade dressing works with prper Sqm 4400.00 5.35 23540.00 0.00 5.35 0.00 4400.00 5.35 23540.00
levelling

3 Ordinary Soil Filling Works with Cum 2433.75 394.76 960753.23 0.00 394.76 0.00 2433.75 394.76 960753.23
transportation

sub grade preparation compaction


4 by roller, grader water browser with Sqm 6215.00 32.96 204862.55 0.00 32.96 0.00 6215.00 32.96 204862.55
not more than 20 cm as per
specification all complete

5 Surveying and levelling of site to Job 1.00 P/S 50000.00 0.00 P/S 0.00 1.00 P/S 50000.00
find proper levevelled design
6 Information Board Job 1.00 P/S 6500.00 0.00 P/S 0.00 1.00 P/S 6500.00
जममल 1466677.00 0.00 1466677.00
उ.स. कलो सकह :
of] lan adf]lhdsf] hDdf ? 1466677.00
clwNnf] lanaf^ e'QmfgL ePsf] ? 0.00
af¤sL lbg" kg]{ ?M 1466677.00
s_ k]ZsLM ?
v_ dfn ;fdfgsf] df]nM
u_ d]l;g cf}hf/ jxfnM
#_ hg>dbfg 252855.11
ª_ s/ 1.5 k|ltzt
r_ s/0.01k|ltzt
%_ w/f}^L - 5 k|ltzt_ M ? 60691.09
h_ Eof^ - 13 k|ltzt_ : ?
v"b lbg" kg]{M ? 1153130.80 cIf/]kL ?M
k]z ug]{sf] ;xLM hf¤r ug]{sf] ;xLM k|dfl)ft ug]{sf] ;xLM
bhf{M bhf{M bhf{M
hDdf ?===================================== cIf/]kL ?====================== sf] r]s g+===== af^
a"dmLlnPsf] % egL ;xL ug]{ p=;sf] ;xLM
35 / 1

ufpF sfo{kflnsfsf] sfof{no


t]tl/of,df]/Ë
sfo{ ;DkGg k|ltj]bg
sfof{nosf] gfd गलमथलनि रलउउँपलकलकल d=n]=k=kmf=g+= 176
sfdsf] gfd M #l^ ePsf] k|ltzt #REF!
O{li^d]^sf] sÚn c° M 4235559.00 sfd zÚ"? ePsf] ldlt 2075.02.01
vr{ ePsf] sÚn c° M #REF! sfd ;DkGg ugÚ{ kg{] ldlt 2075.03.14
O{li^d]^ eGbf #^L a(L M #REF! sfd ;DkGg ePsf] ldlt M 2075.03.14
O{li^d]^ adf]lhdsf] vÚb ePsf] sfd km/s
s|=;+= sfdsf] ljj/)F OsfO{ s}lkmot
kl/df)F b/ hDdf kl/df)F b/ hDdf kl/df)F b/ hDdf

Earthwork excavation in soft soil by घ.कम. #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 machine
जममल #REF! #REF! #REF!
a(L ePdf (+) #^L ePdf (-) lrGx cl°t ug]{
O{li^deGbf a(L vr{ ePsf] dÚVo sf/)f
":jLs[t l*hfO{g :k]l;lkms];g adf]lhd sfd ePsf] % egL
of]hgf k|dÚv k|dfl)ft ug{] sfof{no k|dÚv

Prepared By Checked By Approved By


BDA ENGINEERING CONSULTANCY AND CONSTRUCTIO PVT.LTD.
Tetariya Morang
आयलोजनिलकलो निलम : सकजललो मलरर्ग कनिमलर्गण गलवमल
सथलनि : गलमथलनि ०१

Measurent
S.N. Discription Nos. Unit Rate Total Remark
Length Bredth Height Quantity
Earthwork excavation in soft soil by
1
machine 2 1130.00 0.90 0.80 1627.20
2 800.00 0.90 0.80 1152.00
2 7.50 1.00 1.00 15.00
2794.20 m3 85.00 237507.00

2 300 mm NP3 hume pipe supply work


6.00 6.00 nos 11500.00 69000.00
Subgrade dressing works with prper
3
levelling
1.00 800.00 5.50 4400.00
4400.00 Sqm 7.50 33000.00

Ordinary Soil Filling Works with


4
transportation
From Measurement sheet 5529.13 Cum 400.00 2211652.00

sub grade preparation compaction by roller,


5 grader water browser with not more than 20
cm as per specification all complete
1.00 1130.00 5.50 6215.00
6215.00 Sqm 35.00 217525.00

6
Preparation of sub base by supplying RBM
gravel with complete rolling grading and
wataring as per specification
1 1130.00 3.75 0.15 635.63
635.63 Cum 2200.00 1398375.00
7
Hume Pipe transportation including fitting
1 1.00 job L/s 10000.00
8 Surveying and levelling of site to find
proper levevelled design 1 1.00 P/S 50000.00
9 Information Board 1 1.00 job P/S 8500.00
Total Estimated Cost 4,235,559.00
Rate Analysis
Construction of Sub-base with watering and Rolling- One Cum DoR-12.01
Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.005 750.00 3.75 Gravel 63mm down Cum 1.280 1210.46 1549.39
Unskilled Labour 0.040 535.00 21.40 Water Browser hour 0.038 932.25 35.43
Collection tipping 0.00 Roller Hour 0.022 1864.50 41.02
Grader Hour 0.022 2548.15 56.06
Diesel Liter 0.792 95.50 75.64
Loader hour 0.011 1864.50 20.51
Royaltee cum 1.280 105.00 134.40
nikasi cum 1.280 50.00 64.00
25.15 1976.45
Sub-Total 2001.60
Quiality tests @10% 0.00
Total 2001.60
Overhead 15% 0.00
Rate per Cum 2001.60

sub grade preparation compaction by roller, grader water browser with not more than 20 cm as per
DOR 10.1,10.3
specification all complete

Labour Material and Equipment


Category MD Rate Amount Type Unit Quantity Rate Amount
Skilled labour 0.010 750.00 7.50 Roller Hour 0.017 1864.50 31.70
Unskilled Labour 0.100 535.00 53.50 Grader Hour 0.010 2548.15 25.48
Diesel Liter 0.122 95.50 11.65
water Liter 100.00 0.20 20.00
61.00 88.83
Sub-Total 149.83
Quiality tests @10% 14.98
Sub-Total 164.81
Overhead 15%
Total per cum 164.81
Rate per sqm avg 20cm 32.96

Subgrade dressing works with prper levelling- One Sqm.


Labour Material and Equipment
Category MD Rate Amount Type Unit Quantity Rate Amount
Unskilled Labour 0.010 535.00 5.35
5.35 0.00
Sub-Total 5.35
Total 5.35
GramThan Goun Palika
Office of the Gramthan Rural municipality
Tetariya , morang
Nepal
Mesurement Sheet

Name Of Project : आशलरलम मलझझकलो घर दमक ख दककनिन थलर समम पपव र्ग बघपव ल टलोल जलनिम सडक ममर्गत तथल गलबमल

SN Chainage Nos Length Breadth Height Quantity Unit Remarks


1 0+000 At 0 chainage 1.00 0.00 3.75 0.12 0.00
2 000+030 1.00 30.00 3.80 0.11 12.54
3 030+060 1.00 30.00 3.90 0.10 11.70
4 060+090 1.00 30.00 3.80 0.12 13.68
5 090+120 1.00 30.00 3.80 0.12 13.68
6 120+124 1.00 4.00 3.75 0.10 1.50
TOTAL 53.10 Cum
Government of Nepal
Ministry of Federal Affairs and Local Development
Office of District Co-ordination Committee
District Technical Office
Morang, Biratnagar
Project : Construction of Premix Carpeting And Hume pipe culvert Katahari - 7 Jamungachhi
North Sudama Chowk East Morang
Location: Katahari
Contract NO: DDC/MOR/NSP/w/ncb - 44 ( 2073/074 )
BOQ Total Cost Of Previous Total Cost Of Current
Total Cost upto this Bill Balance Remarks
Item Description Unit Quantity Bill Bill
Rate Amount
Quantity Amount Quantity Amount Quantity Amount Quantity Amount
1 #REF! m3 1.80 300.00 540.00 12.54 3762.00 2794.20 540.00 -2781.66 3222.00 10.74 3222.00
2 #REF! m2 7.13 1500.00 10695.00 1.50 10695.00 #REF! 10687.50 #REF! 7.50 -5.63 0.00
3 #REF! m3 0.38 11000.00 4180.00 #REF! 4180.00 0.38 4145.63 #REF! 34.37 #REF! 0.00
4 #REF! m3 2.76 14000.00 38640.00 #REF! #REF! #REF! 28801.14 #REF! 0.00 #REF! #REF!
5 #REF! no 3.00 16000.00 48000.00 #REF! #REF! #REF! 48000.00 #REF! #REF! #REF! #REF!
6 #REF! m2 10.18 300.00 3054.00 #REF! #REF! #REF! 2213.40 #REF! #REF! #REF! #REF!
7 #REF! job 1.00 10000.00 10000.00 #REF! #REF! #REF! 10000.00 #REF! #REF! #REF! #REF!
8 Discription m3 172.35 700.00 120645.00 #REF! #REF! 20.40 14280.00 #REF! #REF! #REF! #REF!
9 #REF! m2 2345.00 15.00 35175.00 #REF! #REF! 2680.00 40200.00 #REF! -1425.00 #REF! #REF!
10 #REF! m3 293.13 2000.00 586260.00 #REF! #REF! 335.00 670000.00 #REF! #REF! #REF! #REF!
11 #REF! m3 234.50 2200.00 515900.00 #REF! #REF! 268.00 589600.00 #REF! #REF! #REF! #REF!
12 #REF! m2 2345.00 120.00 281400.00 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF!
13 #REF! m2 2345.00 110.00 257950.00 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF!
14 #REF! m3 46.90 15000.00 703500.00 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF!
15 #REF! job 1.00 10000.00 10000.00 #REF! #REF! 0.00 0.00 #REF! #REF! #REF! #REF!
16 #REF! job 1.00 10000.00 10000.00 #REF! #REF! 1.00 10000.00 #REF! #REF! #REF! #REF!
Sub Total Amount Nrs 2635939.00 #REF! 1428467.67 #REF! #REF!
13 % VAT 342672.07 #REF! 185700.80 #REF! #REF!
Grand Total Amount Nrs 2978611.07 #REF! 1614168.47 #REF! #REF!
s.n. Excavation and dispodal of slides manually haulage distence upto 50m
1 9.11/905

unskilled 0.50 480.00 240.00


soft soil

3 % T&P 7.20
247.20 per m3
u|fdyfg ufpFkflnsf
ufpF sfo{kflnsfsf] sfof{no
t]tl/of,df]/Ë
b/ ljZn]if0f @)&$.)&%
pkef]Stf ;ldltjf6 sfd u/fp+bf lgdf{0f ;fdfu|L sf] lgDg b/df VAT ;dfj]z u/Lo]sf] 5 .

Providing and Placing plum concrete with 60% m 15/40 concreate 40% boulder /stone

Labour Meterail and Equipment


Category MD Rate Amount Type unit Quantity
skilied 0.30 750.00 225.00 cement kg 185.00
unskilied 535.00
2140.00
4.00 agg. 20-.40mm cum 0.156
agg. 10-20mm cum 0.072
agg. 5-10mm cum 0.299
sand cum 0.299
Boulder/stone cum 0.440
Total Per m3 2365.00

!@ ;fdfGo df6f]n] kfgL g5l/sg k'g]{ sfd


@ -@%_v b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf]

b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd
PsfO{
>lds Hofld 0.25 hjfg 535.00 133.75
lgdf{0f ;fdu|L df6f] 1.00 3=dL= 494.76 494.76
jf:tljs b//]6
b/ k|lt 3=dL=sf] Eof6,!# Ü - lgdf{0f
?= 628.51 k}= hDdf b/ /]6
o

%
j]z u/Lo]sf] 5 .

er /stone
dor 24.14.01.b
l and Equipment
Rate Amount
19.21 3553.85

1860.46 290.23
2010.46 144.75
1910.46 571.23
1070.61 320.11
#VALUE! #VALUE!
#VALUE!
per m3 #VALUE!

k|To]s ;|
f]t
;fwgsf]
hDdf
133.75
494.76
628.51
0.00
628.51
Gramthan Rural municipality
Office of the Gramthan Rural municipality
Tetariya , morang
Nepal

First Running Bill


आयलोजनिलकलो निलम : सकजललो मलरर्ग कनिमलर्गण गलवमल कमकत : 2076.02.05
सथलनि : गलमथलनि ०१ कशरर्गक :
रकम : 2,500,000.00

Measurent
S.N. Discription Nos. Unit Rate Total Remark
Length Bredth Height Quantity
Earthwork excavation in soft soil by
1
machine 2 1130.00 0.90 0.80 1627.20
2 800.00 0.90 0.80 1152.00
2 7.50 1.00 1.00 15.00
2794.20 m3 79.10 221021.22 DR

Subgrade dressing works with prper


2
levelling
1.00 800.00 5.50 4400.00
4400.00 Sqm 5.35 23540.00

Ordinary Soil Filling Works with


3
transportation
1.00 1130.00 5.50 0.25 1553.75
1.00 800.00 5.50 0.20 880.00
2433.75 Cum 394.76 960753.23

sub grade preparation compaction by


roller, grader water browser with not more
4
than 20 cm as per specification all
complete 1.00 1130.00 5.50 6215.00
6215.00 Sqm 32.96 204862.56

5 Surveying and levelling of site to find


proper levevelled design 1 1.00 P/S 50000.00
6 Information Board 1 1.00 job P/S 6500.00 DR
Total Cost 1,466,677.00
Project Name : Initial Survey Report
Location : Gramthan 01 , Sajilo Marg
SN
Chainage Length Breadth BS Middle FS RL DL Depth Area Avg Area Quantity
Middle

BM1 0.540 – 100.00

1 0+000 0 5.5 1.879 -1.339 98.661 98.661 0.000 0.000

2 0+015 15.00 5.5 1.914 -0.035 98.626 98.676 0.050 0.270 0.135 2.020

3 0+030 15 5.5 1.63 0.284 98.910 98.714 -0.197 -1.080 -0.405 -6.070

4 0+045 15 5.5 1.669 -0.039 98.871 98.751 -0.120 -0.660 -0.870 -13.050

5 CP 0 5.5 1.45 1.642 0.027 98.898 98.751 -0.147 -0.800 -0.730 0.000

6 0+060 15 5.5 1.514 -0.064 98.834 98.789 -0.046 -0.250 -0.525 -7.870

7 0+075 15 5.5 1.389 0.125 98.959 98.826 -0.133 -0.730 -0.490 -7.350

8 0+090 15 5.5 1.202 0.187 99.146 98.864 -0.283 -1.550 -1.140 -17.100

9 0+105 15 5.5 1.101 0.101 99.247 98.901 -0.346 -1.900 -1.725 -25.870

10 CP 0 5.5 1.558 1.011 0.09 99.337 98.901 -0.436 -2.390 -2.145 0.000

11 0+120 15 5.5 1.61 -0.052 99.285 98.939 -0.347 -1.900 -2.145 -32.170

12 0+135 15 5.5 1.62 -0.01 99.275 98.976 -0.299 -1.640 -1.770 -26.550

13 0+150 15 5.5 3.338 -1.718 97.557 99.014 1.456 8.010 3.185 47.770

14 0+160 10 5.5 4.23 -0.892 96.665 99.039 2.373 13.050 10.530 105.300

15 0+170 10 5.5 4.31 -0.08 96.585 99.064 2.478 13.630 13.340 133.400

16 0+180 10 5.5 3.853 0.457 97.042 99.089 2.046 11.250 12.440 124.400

17 0+190 10 5.5 1.858 1.995 99.037 99.114 0.076 0.420 5.835 58.350

18 CP 0 5.5 1.79 1.779 0.079 99.116 99.114 -0.003 -0.010 0.205 0.000

19 0+205 15 5.5 1.801 -0.011 99.105 99.151 0.046 0.250 0.120 1.800

20 0+220 15 5.5 1.84 -0.039 99.066 99.189 0.122 0.670 0.460 6.900

21 0+240 20 5.5 1.79 0.050 99.116 99.239 0.122 0.670 0.670 13.400

22 0+260 20 5.5 1.925 -0.135 98.981 99.289 0.307 1.690 1.180 23.600

23 0+280 20 5.5 1.901 0.024 99.005 99.339 0.333 1.830 1.760 35.200

24 CP 0 5.5 1.121 1.72 0.181 99.186 99.339 0.152 0.830 1.330 0.000

25 0+300 20 5.5 1.089 0.032 99.218 99.389 0.170 0.930 0.880 17.600

26 0+320 20 5.5 1.431 -0.342 98.876 99.439 0.562 3.090 2.010 40.200

27 0+340 20 5.5 1.786 -0.355 98.521 99.489 0.967 5.320 4.205 84.100

28 0+355 15 5.5 1.809 -0.023 98.498 99.526 1.028 5.650 5.485 82.270

29 0+375 20 5.5 1.779 0.03 98.528 99.576 1.048 5.760 5.705 114.100

30 CP 0 5.5 1.74 1.509 0.27 98.798 99.576 0.778 4.270 5.015 0.000

31 0+410 35 5.5 2.132 -0.392 98.406 99.664 1.257 6.910 5.590 195.650

32 0+430 20 5.5 2.284 -0.152 98.254 99.714 1.459 8.020 7.465 149.300

33 0+450 20 5.5 2.084 0.2 98.454 99.764 1.309 7.200 7.610 152.200

34 0+470 20 5.5 2.107 -0.023 98.431 99.814 1.382 7.600 7.400 148.000

35 0+490 20 5.5 2.038 0.069 98.500 99.864 1.363 7.490 7.545 150.900

36 CP 0 5.5 2.374 2.215 -0.177 98.323 99.864 1.540 8.470 7.980 0.000

37 0+510 20 5.5 2.32 0.054 98.377 99.914 1.536 8.450 8.460 169.200

38 0+530 20 5.5 2.269 0.051 98.428 99.964 1.535 8.440 8.445 168.900
Project Name : Initial Survey Report
Location : Gramthan 01 , Sajilo Marg
39 0+550 20 5.5 2.655 -0.386 98.042 100.014 1.971 10.840 9.640 192.800

40 0+570 20 5.5 1.872 0.783 98.825 100.064 1.238 6.810 8.825 176.500

41 CP 0 5.5 1.912 1.828 0.044 98.869 100.064 1.194 6.560 6.685 0.000

42 0+590 20 5.5 1.845 0.067 98.936 100.114 1.177 6.470 6.515 130.300

43 0+610 20 5.5 1.501 0.344 99.280 100.164 0.883 4.850 5.660 113.200

44 0+630 20 5.5 1.398 0.103 99.383 100.214 0.830 4.560 4.705 94.100

45 0+650 20 5.5 1.27 0.128 99.511 100.264 0.752 4.130 4.345 86.900

46 CP 0 5.5 1.432 1.27 0 99.511 100.264 0.752 4.130 4.130 0.000

47 0+670 20 5.5 1.53 -0.098 99.413 100.314 0.900 4.950 4.540 90.800

48 0+690 20 5.5 1.615 -0.085 99.328 100.364 1.035 5.690 5.320 106.400

49 0+710 20 5.5 1.279 0.336 99.664 100.414 0.749 4.120 4.905 98.100

50 0+730 20 5.5 1.265 0.014 99.678 100.464 0.785 4.320 4.220 84.400

51 0+750 20 5.5 1.305 -0.04 99.638 100.514 0.875 4.810 4.565 91.300

52 CP 0 5.5 1.331 1.38 -0.075 99.563 100.514 0.950 5.220 5.015 0.000

53 0+770 20 5.5 1.346 -0.015 99.548 100.564 1.015 5.580 5.400 108.000

54 0+790 20 5.5 1.415 -0.069 99.479 100.614 1.134 6.230 5.905 118.100

55 0+810 20 5.5 1.398 0.017 99.496 100.664 1.167 6.420 6.325 126.500

56 CP 0 5.5 1.412 1.362 0.036 99.532 100.664 1.131 6.220 6.320 0.000

57 0+830 20 5.5 1.519 -0.107 99.425 100.714 1.288 7.080 6.650 133.000

58 0+850 20 5.5 1.535 -0.016 99.409 100.764 1.354 7.440 7.260 145.200

59 0+870 20 5.5 1.599 -0.064 99.345 100.814 1.468 8.070 7.755 155.100

60 0+890 20 5.5 1.005 0.594 99.939 100.864 0.924 5.080 6.575 131.500

61 0+910 20 5.5 0.908 0.097 100.036 100.914 0.877 4.820 4.950 99.000

62 CP 0 5.5 1.56 0.837 0.071 100.107 100.914 0.806 4.430 4.625 0.000

63 0+930 20 5.5 1.54 0.02 100.127 100.964 0.836 4.600 4.515 90.300

64 0+950 20 5.5 1.569 -0.029 100.098 101.014 0.915 5.030 4.815 96.300

65 0+970 20 5.5 1.495 0.074 100.172 101.064 0.891 4.900 4.965 99.300

66 0+990 20 5.5 1.31 0.185 100.357 101.114 0.756 4.160 4.530 90.600

67 CP 0 5.5 1.447 1.376 -0.066 100.291 101.114 0.822 4.520 4.340 0.000

68 1+010 20 5.5 1.501 -0.054 100.237 101.164 0.926 5.090 4.805 96.100

69 1+030 20 5.5 1.5 0.001 100.238 101.214 0.975 5.360 5.225 104.500

70 1+050 20 5.5 1.499 0.001 100.239 101.264 1.024 5.630 5.495 109.900

71 CP 0 5.5 1.471 1.492 0.007 100.246 101.264 1.017 5.590 5.610 0.000

72 1+070 20 5.5 1.482 -0.011 100.235 101.314 1.078 5.930 5.760 115.200

73 1+090 20 5.5 1.512 -0.03 100.205 101.364 1.158 6.370 6.150 123.000

74 1+110 20 5.5 3.263 -1.751 98.454 101.414 2.959 16.270 11.320 226.400

75 1+130 20 5.5 1.074 2.189 100.643 101.464 0.820 4.510 10.390 207.800

Total Filling Quantity 5529.130


Gramthan Rural municipality
Office of the Gramthan Rural municipality
Tetariya , morang
Nepal

Details of Estimate & Abstract of Cost


आयलोजनिलकलो निलम : सकजललो मलरर्ग कनिमलर्गण गलवमल कमकत : 2076.01.11
सथलनि : गलमथलनि ०१ कशरर्गक :
रकम : 2,500,000.00

Measurent
S.N. Discription Nos. Unit Rate Total Remark
Length Bredth Height Quantity
Earthwork excavation in soft soil by
1
machine 2 1130.00 0.90 0.80 1627.20
2 900.00 0.90 0.80 1296.00
2 7.50 1.00 1.00 15.00
2938.20 m3 79.10 232411.62 DR

2 300 mm NP3 hume pipe supply work


9.00 9.00 nos 10565.50 95089.50 DR
Subgrade dressing works with prper
3
levelling
1.00 900.00 5.50 4950.00
4950.00 Sqm 5.35 26482.50

Ordinary Soil Filling Works with


4
transportation
1.00 1130.00 5.50 0.30 1864.50
1.00 900.00 5.50 0.20 990.00
2854.50 Cum 394.76 1126849.56

sub grade preparation compaction by roller,


5 grader water browser with not more than 20
cm as per specification all complete
1.00 1000.00 5.50 5500.00
5500.00 Sqm 32.96 181294.30

6
Preparation of sub base by supplying RBM
gravel with complete rolling grading and
wataring as per specification
1 1000.00 3.75 0.15 562.50
562.50 Cum 2001.60 1125900.00
7
Hume Pipe transportation including fitting
1 1.00 job L/s 5000.00
8 Surveying and levelling of site to find
proper levevelled design 1 1.00 P/S 50000.00
9 Information Board 1 1.00 job P/S 6500.00 DR
Total Estimated Cost 2,849,527.48
Allocated Budget 2,500,000.00
3 % contingency 75,000.00
Allocated Budget without contingency 2,425,000.00
Public Participation 424,527.48 14.90%
u|fdyfg ufpFkflnsf
ufpF sfo{kflnsfsf] sfof{no
t]tl/of,df]/Ë
dÚNof°g kmf/d

of]hgfsf] gfdM सकजललो मलरर्ग कनिमलर्गण गलवमल


of]hgf :ynM गलमथलनि ०१
p=; sf] gfdM
sfof{b]z ldltM 2076.01.11
sfd ;DkGg ug"{ kg]{ ldltM 2076.03.15
cWofjlws ePsf] sfd cl#Nnf] landf r(]sf]
s|=;+= sfdsf] ljj/)F OsfO{
kl/df)F b/ /sd kl/df)F

1 Earthwork excavation in soft soil by Cum 2794.20 79.10 221021.22 2794.20


machine

Nos 9.00 10565.50 95089.50 0.00


300 mm NP3 hume pipe supply work

2 Subgrade dressing works with prper Sqm 4400.00 5.35 23540.00 4400.00
levelling

3 Ordinary Soil Filling Works with Cum 2433.75 394.76 960753.23 2433.75
transportation

sub grade preparation compaction


4 by roller, grader water browser with Sqm 6215.00 32.96 204862.55 6215.00
not more than 20 cm as per
specification all complete

Preparation of sub base by supplying


RBM gravel with complete rolling Cum 562.50 2001.60 1125900.00 0.00
grading and wataring as per
specification
Hume Pipe transportation including Job 1.00 L/s 5000.00 0.00
fitting

5 Surveying and levelling of site to Job 1.00 P/S 50000.00 1.00


find proper levevelled design
6 Information Board Job 1.00 P/S 6500.00 1.00
जममल 2692666.50
उ.स. कलो सकह :
of] lan adf]lhdsf] hDdf ? 1225989.50
clwNnf] lanaf^ e'QmfgL ePsf] ? 0.00
af¤sL lbg" kg]{ ?M 1225989.50
s_ k]ZsLM ?
v_ dfn ;fdfgsf] df]nM
u_ d]l;g cf}hf/ jxfnM
#_ hg>dbfg 211360.59
ª_ s/ 1.5 k|ltzt
r_ s/0.01k|ltzt
%_ w/f}^L - 5 k|ltzt_ M ? 60691.09
h_ Eof^ - 13 k|ltzt_ : ?
v"b lbg" kg]{M ?953937.82 cIf/]kL ?M
k]z ug]{sf] ;xLM hf¤r ug]{sf] ;xLM
bhf{M bhf{M
hDdf ?====================================cIf/]kL ?===================
a"dmLlnPsf] % egL ;xL ug]{ p=;sf] ;xLM
fpFkflnsf
sfsf] sfof{no
,df]/Ë
g kmf/d

d=n]=k=kmf=g+= 168

e'QmfgL e}r/ g+=M


e'QmfgL ldltM
gfkL lstfasf] k[i& ;+VofM
cl#Nnf] landf r(]sf] xfn ePsf]
s}lkmot
b/ /sd kl/df)F b/ /sd

79.10 221021.22 0.00 79.10 0.00

10565.50 0.00 9.00 10565.50 95089.50

5.35 23540.00 0.00 5.35 0.00

394.76 960753.23 0.00 394.76 0.00

32.96 204862.55 0.00 32.96 0.00

2001.60 0.00 562.50 2001.60 1125900.00

L/s 0.00 1.00 L/s 5000.00

P/S 50000.00 0.00 P/S 0.00

P/S 6500.00 0.00 P/S 0.00


1466677.00 1225989.50