3. CON
5 checks
Check Billing documents- Adjustment doc should not be there- send to billing
Check installation for billing periods- it should not have any problem
While order completion BP will be displayed then enter the details as pequired.
NFT_EMP06(100 units), NFT_EMP07(125 units), NFT_EMP08(155 units) (for board employee no of units)
value-1,2 says how many times to apply concession
6. To set PLEC
Already disconnected
Then create move-in EC50E using premise and ca then enter (or press move-in)
Open meter in "IQ02" open "class overview" set meter owner – customer
SBM tariff and holiday file need to be copy and Replace in the “analogics1” folder on C drive for
each system used to download the SBM data time to time.
Date and time need to be checked on each SBM before the start of billing.
SBM need to uploaded regularly on local PC, once the file is uploaded at local PC immediately
same need to be uploaded at “Epayment.pspcl.in” otherwise upload data will not be available In
SAP system.
Latest version of SBM /PC should be installed on SBM/PC, Presently 6.02 is SBM version and 2.00
PC version.
Meter reading of SP,MS,GC and Temp need to be taken through SBM only, Bill generated
through SBM need not to be given consumer. Meter reading of these category need to be
uploaded on local PC(same process for GSC/GT). Uploaded file need to be uploaded on
Epayment.pspcl.in link immediately after PC upload. Screenshot given bellow
Name :-Er. Baljeet AE
Email:-ae.it1.mbc@gmail.com
Ph No :-9646119089
In some cases billing is not done in SAP system due to meter digit difference(i.e reading
available is 5 digit but digit maintained in SAP system is 4 meter digit need to be corrected in SAP
with verification from meter site.
In case of meter registers are incorrect in Sap system same need to be correct in SAP through
EG42 as billing of above 50Kw(DS/NRS is KVAH based)
MF
Ratio of Meter/CT PT/LT CT, Primarily/Secondary voltage need to be checked and correction
need to be done in SAP
Over All Multiplier = Meter multiplier * ( Line CT ratio/Meter CT ratio )*(Line PT ratio/Meter PT
ratio )
T code – ZUNBLD
T code – ZDM_CDCONS
T code – ZDM_CONS_VAR
T code – ZDM_SEASON_STATUS
T code – ZDM_SO_OPEN
T code – ZMRN
T code- ZBILLSUM
T code- ZBILLED
5. How to extract report for 3rd party (Forbes, BPM & Internet) payments from SAP?
The procedure for the same is available in User Manual uploaded to PSPCL website under
IT Newsletter link “Manual FI-4”.