PV System Load Estimation Worksheet

Average Current Noted at Supply meter:


Main Supply : Single Phase / Three Phase
Peak Current at Single Phase:
Peak Current at Three phase 1: 2: 3:
Total Load (Watt):
Total Watt Hours/Day:

Floor No / Room No Type Of Load Qty n


Peak Current IAvg P=VI n×PV Use
Name /Name IMax Amps ( Watts) Hrs /Day

Fans 4 100 100 400 10


Tube Lights 10 40 40 400 12
LED Lights 20 7 7 140 10
Computers 2 100 100 200 12
A.C 2 Ton 1 2000 2000 2000 12
A.C 1.5 Ton 2 1500 1500 3000 12
A.C 1.0 Ton 1 1000 1000 1000 12
Refrigerator 1 750 750 750 24
Freezer 1 750 750 750 24
et

Watt Hours /Day

4000
4800
1400
2400
24000
36000
12000
18000
18000
PV SURVEY FORM
Customer Detail:
1 Name
2 Address
3 Telephone Number
4 Point of contact for future communication
5 Email
Project Detail:
5 Site Usage?
(eg School, Domestic, Ind/Office Unit)
6 Number of floors
7 Number of Rooms on each floor
8 Age of property?
9 Available roof area (Sq Ft)
10 Shading/ Availability of Light
11 Feasibility of space for equipment
12 Space availability for Equipment(Sq Ft) i.e Batteries, Inverter etc
14 Length of Cable from panels to Inverter
15 Alternate Source of Power UPS / Generator
16 UPS
17 Company: SYSTEK (Pure Sinewave)
18 Power Rating:
19 DC Input Voltage:
20 AC Output Voltage:
21 Voltage of Each Battery:
22 Total Batteries:
23 Existing Load on UPS:
24 Battery Company:AGS
25 Battery Capacity (AH):
26 Battery Type (Flood or Sealed):
27 UPS Wiring Single / Double:
28 Wiring Inclusiv / Non Inclusiv
What needs to be done by customer before installation :
Only need installation on existing UPS.
What needs to be done by customer before installation :
Only need installation on existing UPS.
PV SURVEY FORM

Domestic

UPS
Generator
Company:
Single or Three Phase:
AC Output Voltage:
Power Rating:
Total Running Hours per Day:
Fuel Type:
Existing Load on Generator:
Mention the cost of daily used fuel
Monthly Fuel consumption in PKR.
Customer Name:
Signature: