Project Title: YGP RELIEF STUDY RECOMMENDATIONS Proj. No.

: 019640001
Client: KINDER MORGAN Doc. No.: 019640001-AE-CA-PE0006
Facility: YATES GAS PLANT File Loc.: 019640001.600.900
Unit: MOL SIEVE DEHYDRATION Rev. No.: A Date: 09Apr18
Location: IRAAN, TX Initiated By: VC Date: 26Feb19
Checked By: BG Date: 09Apr18
Apprv'd By: CC Date: 09Apr18

RECOMMENDATION
PSV No.: PSV-01.115

Service: LEAN/RICH DG4 EXCHANGER

Protected Equipment: HT-01.110 TUBE SIDE

P&ID: YGP-01-4103

1. PSV
Recommended Existing
Replacement required Type: Balanced Conventional
Size: 3" x 4" 1" x 1"
No change Set point: 150 psig 220 psig
Orifice Designation: K C
Orifice Area: 1.838 in2 0.126 in2

NOTES
1. Existing PSV-01.115 does not provide enough relief capacity for the Fire-Wetted scenario. New PSV is needed, inlet line size to be 3" and outlet to be 4".
2. API Orifice area and Kd used in calculations.
3. Set point changed to 150 psig due to system adjustment in order to accomplish relieve requirements in DGA 4 regenerator PV-01.105.
4.
5.

2. INLET PIPE

Replacement required Diameter: 3"


Sch: STD
No change

NOTES
1. Segment of 1" must change to 3" to meet new PSV requirements.
2. Inlet pressure drop meets 3% rule.
3.
4.
5.

3. OUTLET PIPE

Replacement required Diameter: 4"


Sch: STD
No change

NOTES
1. Outlet piping to be modifed based on new PSV.
2.
3.
4.
5.

4. OTHER

Instrument Change TAG:


P&ID:
Relocate PSV P&ID Redlined: asfsadf

NOTES
1.
2.
3.
4.
5.

Printed at 1:38 PM on 8/1/2019


Project Title: YGP RELIEF STUDY Proj. No.: 019640001
RECOMMENDATIONS Doc. No.: 019640001-AE-CA-PE0006
Client: KINDER MORGAN File Loc.: 019640001.600.900
Facility: YATES GAS PLANT Rev. No.: A Date: 09Apr19
Unit: MOL SIEVE DEHYDRATION Initiated By: VC Date: 26Feb19
Location: IRAAN, TX Checked By: BG Date: 09Apr19
Apprv'd By: CC Date: 09Apr19
PSV-01.115 Backpressure Output

Notes:
1. All values generated by Aspen flare system analyzer V10
2. In order to meet backpressure requirement, pipe diameter and the valve size was changed
Project Title: YGP RELIEF STUDY RECOMMENDATIONS Proj. No.: 019640001
Client: KINDER MORGAN Doc. No.: 019640001-AE-CA-PE0006
Facility: YATES GAS PLANT File Loc.: 019640001.600.900
Unit: MOL SIEVE DEHYDRATION Rev. No.: A Date: 09Apr19
Location: IRAAN, TX Initiated By: VC Date: 26Feb19
Checked By: BG Date: 09Apr19
Apprv'd By: CC Date: 09Apr19
PSV-01.115 Backpressure Output

Internal Equivalent Mass Rated Mass Static Pressure Static Source Upstream Upstream Upstream Upstream Downstream Downstream Downstream Downstream
Fittings Length Length Upstream Downstream Flow
Name Diameter Length Flow Flow Drop Back Pressure Static Pressure Temperature Velocity Rho V2 Static Pressure Temperature Velocity Rho V2
(K X D /Ft) (ft) Mach No. Mach No. Regime
(in) (ft) (lb/hr) (lb/hr) (psi) (psig) (psig) (F) (ft/s) (lb/ft/s2) (psig) (F) (ft/s) (lb/ft/s2)

2"-D-110-C2D (01) 4.026 13.19 9.39 3.8 4957 6063 0.12518 55.35084 479.25 88.19 0.064 1680 55.22567 479.25 88.349 0.064 1683 Single Phase/Single Phase
2"-D-110-C2D (02) 4.026 23.71 19.71 4 4957 6063 0.22567 55.22567 479.25 88.349 0.064 1683 55 479.25 88.638 0.064 1689 Single Phase/Single Phase
1"-D-110-C2D 4.026 30.76 27.01 3.75 4957 6063 0.29116 55.6373 55.642 479.25 87.822 0.064 1673 55.35084 479.25 88.19 0.064 1680 Single Phase/Single Phase

Notes:
1. All values generated by Aspen flare system analyzer V10
2. It is recommended to change all lines to 4" due to new PSV backpressure requirement.
Project Title: YGP RELIEF STUDY RECOMMENDATIONS Proj. No.: 019640001
Client: KINDER MORGAN Doc. No.: 019640001-AE-CA-PE0006
Facility: YATES GAS PLANT File Loc.: 019640001.600.900
Unit: MOL SIEVE DEHYDRATION Rev. No.: A Date: 09Apr19
Location: IRAAN, TX Initiated By: VC Date: 26Feb19
Checked By: BG Date: 09Apr19
Apprv'd By: CC Date: 09Apr19
PSV-01.115 Backpressure Output

Notes:
1. All values generated by Aspen flare system analyzer V10
2. It is recommended to change all lines to 4" due to new PSV backpressure requirement.