Вы находитесь на странице: 1из 10

SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.

00 30-Jun-16
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Conventional & Sulfur Extended Asphalt Paving SATIP-Q-006-02 15-Nov-17 MAH-SA-RFI-C-
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSION 10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Aggregate Subbase and Base Course


Contractor - "RH" of Documents and "H" for Material Sampling and Testing.
1.1 Materials Sampling, Testing & Review SAIC-Q-1035 SAIC-Q-1035 RH/H RH/W SAUDI ARAMCO - "RH" of Documents and "W" for Material Sampling and Testing.
of Test Reports
Raw Materials Sampling, Testing and Contractor - "RH" of Documents and "H" for Material Sampling and Testing.
1.2
Asphalt Mix Design Review
SAIC-Q-1036 SAIC-Q-1036 RH/H RH/W SAUDI ARAMCO - "RH" of Documents and "W" for Material Sampling and Testing.
2.0 RECEIVING INSPECTION
Subbase and Aggregate Base Course SAUDI ARAMCO - Witness delivery of subbase and aggregate base materials for
2.1
Material Receiving Inspection
SAIC-Q-1037 SAIC-Q-1037 W S the first 2 delivery days, and once every 3 delivery days thereafter.
3.0 INSTALLATION
Grades, Elevation and Surface
3.1
Preparation Inspection
SAIC-Q-1039 SAIC-Q-1039 W W
Foamed Asphalt Stabilization
3.2 Refer to SATIP-Q-006-03 for Foamed Asphalt Stabilization
Inspection (If Required)
Placement and Compaction of
3.3 Subbase and Aggregate Base Course SAIC-Q-1040 SAIC-Q-1040 W S
Inspection
3.4 Compaction Testing SAIC-A-1005 SAIC-A-1005 W W
Prime Coating and Tack Coating
3.5
Inspection
SAIC-Q-1041 SAIC-Q-1041 H W
Conventional Asphalt & Sulfur
Contractor - "H" for Material Sampling and Testing.
3.6 Extended Asphalt Concrete Receiving, SAIC-Q-1061 SAIC-Q-1061 H W SAUDI ARAMCO - "W" for Material Sampling and Testing .
Placement and Testing Inspection

Contractor - "H" for Material Sampling and Testing.


3.7 Asphalt Core Density Testing SAIC-Q-1043 SAIC-Q-1043 H W SAUDI ARAMCO - "W" for Material Sampling and Testing .

3.8 Asphalt Paving Final Inspection SAIC-Q-1044 SAIC-Q-1044 W W


4.0 PRE-COMMISSIONING
4.1 N/A

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco
1 participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

3 Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016) Rev. 2016.06.00 30-Jun-16
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
Conventional & Sulfur Extended Asphalt Paving SATIP-Q-006-02 15-Nov-17 MAH-SA-RFI-C-
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

HAWIYAH AND HARADH DEVELOPMENT SATELLITE GAS COMPRESSION 10 - 01996 / 0007 MOFARREH AL-HARBI & PARTNERS
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection/Test
SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 15-Nov-2017 - REV. 2016.06.00 (Standards Cutoff -June 30, 2016)

Saudi Aramco: Company General Use


Rev. 2016.06.00

###

Saudi Aramco: Company General Use


30-Jun-16

Saudi Aramco: Company General Use


### ###

Saudi Aramco: Company General Use