Академический Документы
Профессиональный Документы
Культура Документы
Mainly most of the Projects are done on LSTK (Lump Sum Turn Key) Basis by
the engineering firms.
Projects
- STP : Sewage Treatment Plants
- WWTP : Waste Water Treatment Plants
- Effluent Treatment Plants
- Also Environmental related Projects
Departments
- Project Management / Business Development
- Process Design
- Piping design
- Pressure Vessels, Machinery, and Packages
- Civil, Structure
- Electrical
- Instrumentation / process control
- Procurement
Project Phases
1 – Proposal
2 – Basic Engineering
3 – Detail Engineering
4 – Construction
5– Commissionin
PIPING DEPARTMENT
-PIPING DESIGN
- Design group
- Material group
Design Group
Based on Equipment Layout / Plot Plan from Process Department / Layout group 3D
Equipment
Model is prepared.
Then comes the piping study i.e. routing of lines based on P&IDs.
Piping routing shall be done to take care of instruments details, process, operation,
maintenance and safety views.
Isometrics with bill of material, with piping support details, consolidated bill of material etc
are generated from 3D model.
Piping General arrangement drawings also can be generated from this model.
Material Group
Basic material for piping like CS, AS and SS , ferrous, nonferrous etc will be based on the
fluid handled, corrosive / non corrosive., temperature and pressure of the fluid etc.
Then piping material specifications will be prepared, defining all piping components,
(material standard, dimension standard) based on IS, BS, DIN, ISO, ANSI standards.
Procurement (technical) of all piping items is the main activity of Material group.