Control of the UF system is achieved through an Operator controlled software selection, and SCADA system, which has the following modes of control:
AUTO
OFFLINE
The UF system has 4 modes of operation, namely,
1) Service
4) CIP Cleaning
The particular system shall be able to operate in accordance with the preset duty sequences automatically, e.g. service, backwash, shut-down
When the following conditions are met for its associated equipment:
1. All actuated/control valves and equipments are available
2. The system control interlocks are satisfied
When the system works under “AUTO” mode, it will be looped with operation “Service”—“Backwash”. When backwash is completed, the system will return to
Service mode and a new cyclic is initiated. The set point value of Service duration to activate a Backwash sequence can be altered anytime when the system
is running. The system will reject set point values of Service and Backwash, when the new set point is equal or less then current total operation time.
In AUTO mode, the opening and closing of valves as the UF switches from “Service” to “Backwash” will be auto. TMP and flows through UF will be monitored
and automatically adjusted by VFD through PLC.
All automatic valves are incorporated with limit switches. In the case when PLC does not receive feedback signal from the particular valve’s action for more
than 10 seconds, alarm will be initiated and operation sequence will be halted.
When the system is in “OFFLINE” mode, the Operator is able to manually “OPEN” or “CLOSE” any of the automatic actuated valves through the HMI
workstation.
The operator is to select at least 1feed pump and 1 backwash pump in HMI and then ensure the manual valves are in the correct position and all auto valves
are in “Closed” position before starting the system. Also make sure the instruments air available with sufficient pressure.
ABFV-705–Backwash
Pump-P 702 A /B
Caustic Dosing
Backwash Inlet
UF - Backwash
ABFV-703– UF
ABFV-702– UF
UF feed pump
bottom Outlet
Acid Dosing
ABFV-704–
P 701 A /B
permeate
drain
Steps Description Duration
Forward Flush –
1 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
Pump-P 702 A /B
Caustic Dosing
Backwash Inlet
UF - Backwash
ABFV-703– UF
ABFV-702– UF
UF feed pump
bottom Outlet
Acid Dosing
ABFV-704–
P 701 A /B
permeate
drain
Steps Description Duration
Forward Flush –
3 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
Forward Flush –
5 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
ABFV-705–Backwash
Pump-P 702 A /B
Caustic Dosing
Backwash Inlet
UF - Backwash
ABFV-703– UF
ABFV-702– UF
UF feed pump
bottom Outlet
Acid Dosing
ABFV-704–
P 701 A /B
permeate
drain
Steps Description Duration
Forward Flush –
1 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
Forward Flush –
5 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
NOTE: If feedback is not received from any of the auto valves during the backwash process, the sequence will halt and alarm will be triggered.
Operator is to investigate the causes e.g. signal cabling connection, valve connection, or manual forced open/close previously.
1.4 Operating Sequence Chart: Backwash 2nd CEB
ABFV-705–Backwash
Pump-P 702 A /B
Caustic Dosing
Backwash Inlet
UF - Backwash
ABFV-703– UF
ABFV-702– UF
UF feed pump
bottom Outlet
Acid Dosing
ABFV-704–
P 701 A /B
permeate
drain
Steps Description Duration
Forward Flush –
1 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
Forward Flush –
5 Bottom 10 sec O X X X O X ON OFF OFF OFF OFF
NOTE: If feedback is not received from any of the auto valves during the backwash process, the sequence will halt and alarm will be triggered.
Operator is to investigate the causes e.g. signal cabling connection, valve connection, or manual forced open/close previously.
Notes
1) All times and flow rates are estimated and adjustable during start-up, depending on required flux.
2) O = Valve Open; X = Valve Closed ; ON = Pump Running; OFF = Pump in OFF condition
4) CEB is envisaged once in 12 hours. During CEB Ist and IInd the flow will be be alternated once from
bottom and once from top.
6) The timings for the above steps is effective timing after valve opening.
7) CEB flow shall be set at half the backwash flow rate.
8) During CEB , free chlorine @ 200mg/l in the form of Sodium Hypochlorite shall be injected along with
Sodium Hydroxide. The dosage of Sodium Hydroxide shall be such
RO START STAGE-1
RO Feed ORP HI
Fault Conditions:
1 ORP-801 OPR Dumping RO System ABFV-801 Dump Valve has to open if ORP Value PLC Control
exceeds 1000mV
2 RO System ABFV-802 1. When High pressure pump starts after PLC Control
30 seconds the valve has to be closed.
2. During RO shut down, after high
pressure pump stops, the valve has to
be open for 30 seconds for flushing.