AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

1. AIM
This procedure concerns sequences of the erection of the ACC.The sequences are
shown with pictures.

2. RESPONSIBILITY AND SCOPE


The manufacturing/assembly management is responsible; quality management and
project management are concerned with applying this procedure.

3. METHOD AND PROCESS

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Frame pre-assembling on the ground

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Braced frame erection

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Braced frame erection

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Braced frame erection

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fully braced module erection

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fully braced module erection

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Completion of one street

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

• Under-structure
Agenda
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Octagonal structure lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Octagonal structure lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Octagonal structure lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Octagonal structure lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Octagonal structure fitting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan screen and fan bell fixing

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan deck plate installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan deck plate installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan deck plate installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Gearbox and motor installation on bridge

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Gearbox and motor installation on bridge

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Hub installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Hub installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Blade installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Blade installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Blade installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Lifting of fan drive and bridge

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Installation of the complete street

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Pre-assembly of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Pre-assembly of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Pre-assembly of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Lifting of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Lifting of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Lifting of A-frame

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Completion of one street

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate manifold

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate manifold installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate manifold installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle storage

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle unloading

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle on condensate manifold

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Bundle on condensate manifold

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Secondary bundle

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold lifting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold sliding saddle installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Manifold and bundle alignment

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Manifold and bundle alignment

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate manifold and bundle welding

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Manifold and bundle welding

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Steam manifold and bundle welding

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning ladder

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning ladder bottom rail support

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning ladder top rail support

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning ladder installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Link to platform

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -


Internal walkway grating

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Internal walkway, sheeting, grating

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct pieces

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct pieces

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct : riser departure

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct hot well

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct flash tank

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct rupture disk

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct vacuum breaker

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Main duct safety valve

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Connection of by-pass, balancing line

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Riser expansion bellow

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Pre-assembling of elbow with bellows

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Lifting of riser and bellows

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Riser installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Complete installation of risers

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall link to manifold

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall sheeting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall sheeting

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Wind wall sheeting completion

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate tank

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate tank structure

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate tank steel structure

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate tank dome installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Connection with balancing line

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Complete condensate tank

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Vacuum pump

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Vacuum pump installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Drain pump

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Drain pump installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning pump

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Cleaning pump installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate piping

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Condensate piping to deaerator dome

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Air take off piping

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -


Air take off piping

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

•Under-structure Agenda
•Fan deck
•Fan drive and bridge
•A-frame
•Manifold and bundle
•Duct and riser
•Wind wall
•Equipment
•Piping
•Various
PREPARED CONTROLLED APPROVED
Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Staircase pre-assembling

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Staircase escape ladder installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Fan angle pitching

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Maintenance hoist installation

Issued Date: 30.01.201


3Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Instrumentation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Doors installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

Doors installation

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.
AIR COOLED CONDENSER ERECTION PROCEDURE

Document Code:p.041 Issued Date:30.01.2013 Revision No:00 Revision Date: -

4. DISTRIBUTION
This procedure is available in OUTLOOK under Ortak Klasörler\\Tüm
Ortak Klasörler\\İngilizce\\ISO 9001:2008\\Procedures\Management.It is
handed out as a hard copy when it is impossible to reach this files on
computer.

PREPARED CONTROLLED APPROVED


Quality Management Representative

Issued Date: 30.01.2013


Documents in MS OUTLOOK are current and controlled. Printed copies are “UNCONTROLLED” documents.