1. AIM
This procedure concerns sequences of the erection of the ACC.The sequences are
shown with pictures.
Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
• Under-structure
Agenda
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
Hub installation
Hub installation
Blade installation
Blade installation
Blade installation
Agenda
• Under-structure
• Fan deck
• Fan drive
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
Pre-assembly of A-frame
Pre-assembly of A-frame
Pre-assembly of A-frame
Lifting of A-frame
Lifting of A-frame
Lifting of A-frame
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
Condensate manifold
Bundle storage
Bundle unloading
Bundle lifting
Bundle lifting
Secondary bundle
Cleaning ladder
Link to platform
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
Riser installation
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
Condensate tank
Vacuum pump
Drain pump
Cleaning pump
Agenda
• Under-structure
• Fan deck
• Fan drive and bridge
• A-frame
• Manifold and bundle
• Duct and riser
• Wind wall
• Equipment
• Piping
• Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
Condensate piping
•Under-structure Agenda
•Fan deck
•Fan drive and bridge
•A-frame
•Manifold and bundle
•Duct and riser
•Wind wall
•Equipment
•Piping
•Various
PREPARED CONTROLLED APPROVED
Quality Management Representative
Staircase pre-assembling
Instrumentation
Doors installation
Doors installation
4. DISTRIBUTION
This procedure is available in OUTLOOK under Ortak Klasörler\\Tüm
Ortak Klasörler\\İngilizce\\ISO 9001:2008\\Procedures\Management.It is
handed out as a hard copy when it is impossible to reach this files on
computer.