Вы находитесь на странице: 1из 4

INSPECTION & TEST PLAN (ITP) For Drainage works

Design, Construction, Completion and


Abu Dhabi General Services company PJSC
Employer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
PMC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
Engineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
Contractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

PRE CONSTRUCTION ACTIVITY

Project Project Doc Submittal


1 Submittal of Design & Method Statement Once Doc Submittal P R R,A
specification specification Ref… Review

Project Doc Submittal


2 Approval of Working Schedule Once Sub-contractor specification Doc Submittal P R R,A
Ref… Review

Project Project Doc Submittal


3 Approval of Layout & Detail Drawing Once Doc Submittal P R R,A
specification specification Ref… Review

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
Employer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
PMC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
Engineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
Contractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification /
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

Material
Project Project Material
4 Approval of Materials once Submittal & P R R,A
specification specification Ref… Submittal Review
Samples

Working platform/area availability & compliance Project Project


5 all _ Visual Inspection P P,W W
with drawings specification specification Ref…

CONSTRUCTION ACTIVITY

Work sequences and fixing of the Fiberglass rigid Project Project


1 All _ Visual Inspection P P,H W
rolls specification specification Ref…

Shop Drawings
Project
2 Work sequences and fixing of the Foster 30-36 All & Project WIR Visual Inspection P W H,A
specification specification Ref…

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
mployer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
MC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
ngineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
ontractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification / Completion D
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

PRE CONSTRUCTION ACTIVITY

Project Project Doc Submittal


1 Submittal of Design & Method Statement Once Doc Submittal P R R,A
specification specification Ref… Review

Project Doc Submittal


2 Approval of Working Schedule Once Sub-contractor specification Doc Submittal P R R,A
Ref… Review

Project Project Doc Submittal


3 Approval of Layout & Detail Drawing Once Doc Submittal P R R,A
specification specification Ref… Review

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17
INSPECTION & TEST PLAN (ITP) For Drainage works
Design, Construction, Completion and
Abu Dhabi General Services company PJSC
mployer MUSANADA Project Maintenance of Court at Madinate Zayed, Prepared By QA/QC Engineer
AL Dhafra Region.
MC N/A Discipline Construction of Road Works Reviewed By Project Manager
Consolidated consultants llc ITP Ref. No. MZC-00SIT-AL-NIM-MEC-ITP 0014-00-Rev.00 Approved By Project Manager
ngineer
National innovotive general maintenance llc Date October 20, 2019 Page No. Page 1 of 1
ontractor
Works Location (This ITP reflects status of testing/ inspection in the following area/ zone within the Project)

Responsibility1
Frequency of Applicable
Acceptance Control Data / Inspection Contractor Engineer Third Party
SN Inspection / Test to be carried out Test / Specification / Completion D
Criteria Forms Method
Inspection Standard
Subcontractor Main Contractor

Material
Project Project Material
4 Approval of Materials once Submittal & P R R,A
specification specification Ref… Submittal Review
Samples

Working platform/area availability & compliance Project Project


5 all _ Visual Inspection P P,W W
with drawings specification specification Ref…

ONSTRUCTION ACTIVITY

Work sequences and fixing of the Fiberglass rigid Project Project


1 All _ Visual Inspection P P,H W
rolls specification specification Ref…

Shop Drawings
Project
2 Work sequences and fixing of the Foster 30-36 All & Project WIR Visual Inspection P W H,A
specification specification Ref…

Note (1): H: Hold Point, W: Witness, R: Review, S: Surveilance, Form. Ref.TMT131, Rev-1, Date : 09-Feb-17