Академический Документы
Профессиональный Документы
Культура Документы
Likelihood Consequence
Activity Risk Event (if risk is Severity Risk Factor Mitigation Contingency Responsible
(L) encountered)
3. Disposal of Failed disposal, thru H Failure/Delayed the H H Review and updating of the Immediate conduct Regional
obsolete/ public auction Re to fleeting DPWH Basic Highway of Root Cause Disposal
uneconomical/ proceeding, due to Program Maintenance Equipment Analysis of the Public Committee
unserviceable non-participation Refleeting Program Auction
equipment auctioneers
Low Equipment Annual Nationwide Disposal Re-schedule of public
Utilization Plan and Schedule foe auction
Implementation in the following
year