AGENDA
6 - 6:30 p.m. Visit information stations and speak one-on-one with
project representatives
75th Ave.
67th Ave.
59th Ave.
51st Ave.
43rd Ave.
SR
17
51 LEGEND
Roosevelt 10 SR 202L Alignment
South Mountain Freeway
Van Buren
Interchange Locations
UPRR I-10 Papago Downtown 10
Phoenix Gila River Indian Community
Buckeye Rd. Segment
nal
RID Ca 17
Lower Buckeye Rd.
Elwood
Broadway Rd. 10
Salt River
Elliot Rd.
202
17th Ave.
Desert
Foothills
Pkwy.
24th St.
32nd St.
40th St.
Utility Relocation
Construction Phase*
* Notes:
1. Preliminary Schedule � Subject to Change.
2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations
within each construction segment during the construction phase.
Noise
Right-of-Way