DESCRIPTION UNIT QTY RATE AMOUNT(N)
NO.
A Provide , furnish and maintain office Prov. Sum
accommodation for Engineer’s Representative
2,000,000.00
B Provide Operational equipment/tools, labour and Prov. Sum
assistance as may be required by the Engineer’s
Representative.
1,000,000.00
C Provide, furnish and maintain living Prov. Sum
accommodation for Engineer’s
Representative/Supervisory Staff
200,000.00
E Allow for the cost of stationery, office equipment, Prov. Sum
computer set and accessories required by
Engineer’s Representative.
200,000.00
F Allow for payment of staff wages to Daily Rated Prov. Sum
Project Staff of the Engineer’s Representative and
Zonal Road Surveillance Team
500,000.00
G Allow for the running cost and maintenance of Prov. Sum
project vehicles or motor boats for the Engineer’s
Representative or supervisory staff as directed.
300,000.00
H Allow for the removal and relocation of existing Prov. Sum
installations for electricity, telephone, water supply
and other utilities.
100,000.00
J Allow for the provision of road furniture, Prov. Sum
including lane marking as directed
542,601.50
ITEM AMOUNT
DESCRIPTION OF WORK QUANTITY UNIT RATE
NO. N K
ITEM AMOUNT
DESCRIPTION OF WORK QUANTITY UNIT RATE (#)
NO. N K
Demolish and cart to spoil failed pipe culverts including
3.01 - M - -
headwalls, wingwalls and aprons as directed.
ITEM AMOUNT
DESCRIPTION OF WORK QUANTITY UNIT RATE (#)
NO. N K
Provide and spread first coat surface dressing using S125 cutback
4.05 - M2 - -
bitumen at the rate of 1.3 litres/m2 and 18mm chipping
ITEM AMOUNT
DESCRIPTION OF WORK QUANTITY UNIT RATE (#)
NO. N K
GENERAL SUMMARY
ITEM
NO. DESCRIPTION AMOUNT (N)
5 BRIDGE WORKS
SUB TOTAL
ADD 5% VAT
GRAND TOTAL