~140,000
$ 40 billion
In revenue
employees (2014)
Present Formed
in in
+100 1988
countries merger of Swiss (BBC, 1891)
and Swedish (ASEA, 1883)
engineering companies
@ABB group
March 23, 2015 | Slide 2
Power and productivity for a better world
ABB’s vision
© ABB Group
March 23, 2015
How ABB is organized
Five global divisions
@ABB group
March 23, 2015 | Slide 4
ABB in Italy
Key facts
Headquarters
• Based in Milan, Italy
• Permanent Employees:
6,308 in 2014
• Orders 2014: $3 Billion
• Revenues 2014: $2.9 SOX
Billion Internal Control Process in Certifications
compliance with
Sarbanes-Oxley Act – SOX • Quality: ISO 9001
• Safety: OHSAS 18001
• EMS: ISO 14001
@ABB group
March 23, 2015 | Slide 5
EPC Unit
HSE Commitment and Performances
HSE performances
LTIF TRIR
(Lost time Injury Frequency per million man‐hours) (Total Recordable Incidence Rate)
2014 2013 2012 2011 2010 2014 2013 2012 2011 2010
ABB
0,15 0,27 0,33 0,7 0,18 1,22 1,21 1,5 2,79 0,92
LBU IS EPC
OGP
International Association n.a. 0,45 0,48 0,43 0,42 n.a. 1,6 1,74 1,76 1,68
of O&G
@ABB group
March 23, 2015 | Slide 6
The way we work
EPC Safety Awards
@ABB group
March 23, 2015 | Slide 7
The way we work
EPC Safety Awards
SNCP- Condensate Stabilization Plant – 3,000,000 safe man-hours TL4 Project – 6.000.000 safe man-hours
El Merk Project - 3.000.000 safe man-hours Sawan Project – 2.000.000 safe man-hours Power Generation Barge no. 8 - 500.000 safe man-hours
@ABB group
March 23, 2015 | Slide 8
LBU OGC EPC
Our organization
Contract
Administration
SARPI *
Project
Directors
@ABB group
March 23, 2015 | Slide 9
LBU OGC EPC
Engineering
Engineering
Project
Engineers
@ABB group
March 23, 2015 | Slide 10
LBU OGC EPC
Operations
Operations
Project Secretaries
Coordination
@ABB group
March 23, 2015 | Slide 11
LBU OGC EPC
Sales & Proposal
Strategic
Marketing Sales Assistant
@ABB group
March 23, 2015 | Slide 11
EPC Unit
Locations and projects
Companies: Engineering: Branches:
Italy Italy Abu Dhabi UAE
Algeria Algeria (civil eng) Algeria
Nigeria Brazil
Congo
Chile
Iraq
Kuwait
Libya
Malta
Mexico
Oman
Tunisa
@ABB group
March 23, 2015 | Slide 13
EPC Unit
Our focus & capabilities
The EPC Unit, builds Medium size EPC Projects in the Oil
and Gas Industry, with core competence for the Mid-stream
plants, coupled with high specialization for the up-stream and
power generation facilities.
The reliability of a major international group, combined with
the flexibility of a lean organization: a perfect match for
adequately serving medium size projects across the world
@ABB group
March 23, 2015 | Slide 14
EPC Unit
Activities performed and skills
@ABB group
March 23, 2015 | Slide 15
EPC Unit
Turn-key Plants
@ABB group
March 23, 2015 | Slide 16
EPC Unit
Core activities: Midstream
@ABB group
March 23, 2015 | Slide 17
EPC Plants
Major recent references: Midstream
Duration: 6 months
Scope of Work: Front End Engineering Design
@ABB group
March 23, 2015 | Slide 18
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 19
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 20
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 21
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 22
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 23
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 24
EPC Plants
Major recent references: Midstream
@ABB group
March 23, 2015 | Slide 25
EPC Plants
Strong competence: Upstream
@ABB group
March 23, 2015 | Slide 26
EPC Plants
Major recent references: Upstream
@ABB group
March 23, 2015 | Slide 27
EPC Plants
Major recent references: Upstream
@ABB group
March 23, 2015 | Slide 28
EPC Plants
Major recent references: Upstream
@ABB group
March 23, 2015 | Slide 29
EPC Plants
Major recent references: Upstream
PB-KU-H Platform
Client /Country: Pemex E&P/ Mexico
Realization of the PB-KU-H Production Platform - 100.000
BBLD oil and 90 MMscfd gas
Duration: 2005 ÷ 2009
Scope of Work: Engineering, Procurement and Supply, and
Commissioning of process packages
@ABB group
March 23, 2015 | Slide 30
EPC Plants
Major recent references: Upstream
@ABB group
March 23, 2015 | Slide 31
EPC Plants
Major recent references: Upstream
@ABB group
March 23, 2015 | Slide 32
EPC Plants
Proven expertise: Power Plants
@ABB group
March 23, 2015 | Slide 33
EPC Plants
Major recent references: Power
@ABB group
March 23, 2015 | Slide 34
EPC Plants
Major recent references: Power
@ABB group
March 23, 2015 | Slide 35
EPC Plants
Downstream
@ABB group
March 23, 2015 | Slide 36
EPC Plants
Major recent references: Downstream
@ABB group
March 23, 2015 | Slide 37
Reference List
Last 15 years
@ABB group
March 23, 2015 | Slide 38
EPC Plants
Reference list
E P C
FEED (Front End Engineering Design) related to the
Hassi revamping and upgrading of the existing gathering system Front End Engineering
Algeria FEED Satellite Units Sonatrach X 2015 2015 FEED
Messaoud and related facilities to increase field production, relevant to Design
Satellite Units South at Hassi Messaoud.
@ABB group
March 23, 2015 | Slide 39
EPC Plants
Reference list
E P C
Engineering, Procurement,
Saih Nihayda EPC for a Condensate stabilization plant 4,500 m3/d to Construction, Installation,
Saih Nihayda Condensate secure availability of gas in case the existing Saih Rawl Petroleum Commissioning and Start-
Oman X X X 2012 2014 LSTK
Site Stabilization Plant Condensate Process Plant is out of operation including gas Development Oman up plus 6 months
(SNCP) compression assistance to Operation and
Maintenance
Installation and electrical connection of a new water
injection train (booster and main injection pumps, sand
EPIC for the second filters), at the M’Boundi Oil Field to increase the onshore Engineering, Procurement,
Congo M'Boundi water injection train at Water Treatment and Injection System of M’Boundi Oil Eni Congo SA Construction & Construction X X X 2012 2014 LSTK
M’Boundi Plant in order to meet the new design water injection Supervision
flowrate requirements of 240 kBWPD.
Engineering, Procurement,
New power plant 2x26 MW gas turbine generators ((rising
Basra (Khor Al New Power Plant at Construction,
Iraq to 150MW in subsequent phase), to increase the reliability Shell Gas Iraq B.V. X X X 2012 2014 LSTK
Zubair fiedl) Khor Al Zubair (KAZ) Commissioning and Start-
of electrical feeder of existing KAZ NGL/LPG plant.
Up
Engineering, Procurement,
EPC for Gas Treatment plant 3 MMSCMD with dehydration
PW1 Gas Compression Construction, Transport,
Congo M'Boundi and a new gas compression station to deliver the gas to the ENI Congo SA X X X 2011 2014 LSTK
and Treatment Plant Installation and
CEC and CED power plants in Djeno.
Commissioning
Engineering, Procurement,
EPC for new pipeline 30" - 123 Km for a capacity of 315
New Crude Transit Line Kuwait Oil Company Construction, Transport,
Kuwait Kuwait mbopd with intermediate valve/gathering stations and X X X 2010 2014 LSTK
(TL-4) (KSC) Installation and
relevant utilities
Commissioning
Gas flaring recovering
and re-instrumentation Engineering, procurement,
Haoud New gas compression trains (no.3) and reinstrumentation at
Algeria of the production Sonatrach Construction, X X X 2009 2014 LSTK
Berkaoui Haoud Berkaoui, Guelalla and Benkhala
centers in the Haoud commissioning and Start-up
Berkaoui Region
@ABB group
March 23, 2015 | Slide 40
EPC Plants
Reference list
E P C
South-East of No.120 well sites, No.10 Field Gathering Stations, No.6 Gas Groupement Berkine Engineering, procurement,
El Merk Project – Lot
Algeria Hassi Distribution Manifolds. 900 km of flowlines and trunklines (Anadarko/ Construction, X X X 2009 2014 LSTK
3&4 – Offsites Facilites
Messaoud Water treatment units. Utilities. Sonatrach) commissioning and start-up
Integrated Power Plant Power generation plant open cycle 320 MW (2 x 166 MW Engineering, Procurement
Congo Djeno ENI Congo S.A. X X X 2008 2010 LSTK
- work package 5 Gas Turbine Generators) and Construction
SQM - (Sociedad
Coya Sur – KNO3 Potassium Nitrate Crystallization Plant. Production capacity Engineering, Procurement
Chile Coya Sur Química y Minera de X X X 2007 2010 LSTK
Crystallization Plant 48,000 kg/h and Construction
Chile S.A.)
@ABB group
March 23, 2015 | Slide 41
EPC Plants
Reference list
E P C
Tin Fouye
Tabankort, TFT compressor station No. 2 x 25 MW turbo compressors + No. 5 x 25 MW turbo Engineering, Procurement,
Rhourde along GR1/GR2 gas compressor, utilities, dwelling facilities, tie-ins with the Fabrication, Commissioning
Algeria Sonatrach TRC X X X 2004 2007 LSTK
Nouss, Zina, pipeline and upgrading existing departure and arrival terminals of GR1/GR2 48” & Start-up services
Ouargla and of four existing stations gas pipeline
Hassi R’Mel
Engineering, Procurement,
- No. 4 x 30 MWe jet derivative turbo generators
Fabrication,
Kashagan Kashagan Field Power - No. 1 steel barge dimensions: 95 L x 16 W x 5 H meters
Kazakhstan Agip KCO Commissioning and X X X 2004 2007 LSTK
Field Generation Barge - HV and MV switchboards and relevant control system
Start-up services
- No. 3 diesel generators 2.5 MW/each
@ABB group
March 23, 2015 | Slide 42
EPC Plants
Reference list
E P C
Engineering, procurement,
Realization of no. 2 oily water treatment plants with a
Oily water treatment fabrication and construction,
Algeria Hassi R'Mel capacity of 500 m3/d including filtering, de-oiling, desalting Sonatrach X X X 2003 2005 LSTK
plants commissioning & start-up
and water conditioning units and gathering lines
Engineering, procurement
and project support services
Expansion of the
Expansion of the CPF from 30,000 BOPD to 45,000 BOPD Agip Oil Ecuador including project
Ecuador Villano capacity of Villano X X X 2001 2003 EPCM LS
and addition of water separation and injection facilities B.V. management, construction
producing facilities
supervision, commissioning
and start-up
@ABB group
March 23, 2015 | Slide 43
EPC Plants
Reference list
E P C
Engineering, procurement,
No. 1 Mobile Production construction, transport,
Nigeria Santa Barbara 30,000 bpd SPDC X X X 1998 2001 LSTK
Facilities installation, commissioning
and start-up
Engineering, procurement,
N-NLG Gas supply Upgrade and retrofit of existing gas plant from 80 up to 250
Nigeria Obiafu Obrikom NAOC construction, commissioning X X X 1998 2001 LSTK
project Msfcd
and start-up
@ABB group
March 23, 2015 | Slide 44