chainage EXCAVATION pcc wall

length SIDE Top Bottom


(m) Height Area Quantity Height
from to Width Width
(m) (sqm) (cum) (m)
(m) (m)
0+000 0+500 500 1 0.625 0.8654 0.49 0.424 0.5
24922

length of lined drain 24921.5


excavation 10555.81
M 15 4833.525
pcc wall M-15 pcc raft M-15

width Area Quantity Height width Area Quantity


(m) (sqm) (cum) (m) (m) (sqm) (cum)

0.2654 0.1327 0.125 0.49 0.061


excavation M-15 PCC
OF PIPE CULVERTS
design length of side
chainage chute height width area height
(m) (m) (m²) qty (m³) (m)
widening
CULVERTS
CULVERTS
ADDITIONAL PIPE

208+390 5 1 1.05 2.3 2.415 12.075 0.15


5 12.075

length of chute (m) 765


excavation 1847.475
filter 275.4
M-15 263.925
M20 734.4
stone pitching 413.1
chute calculation at pipe culvert locations

M-15 PCC M-20 wall M-20 raft


height height
width (m) area (m²) qty (m³) (m) width (m) area (m²) qty (m³) (m) width (m) area (m²)
2.3 0.345 1.725 0.6 0.6 0.36 1.8 0.3 2 0.6
1.725 1.8
0 raft filter media stone apron
height width area height width area
qty (m³) (m) (m) (m²) qty (m³) (m) (m) (m²) qty (m³)
3 0.3 0.6 0.18 1.8 0.9 0.3 0.27 2.7
3 1.8 2.7
0.3 0.3

1.4

0.9 0.6

0.3
0.15

2.3
catchpit at pipe culvert locations w

excvation pcc M-15


additional

culverts
culvert location type of span height height
culvert
new
length( qty (m³)
pipe
(m) (m)
width (m) m)
183+720 Pipe 1/1.2 dia 0.5 1.5 1.8 1.35 0.15

excvation pcc M-15


culvert location type of span
box

culvert height length( qty (m³) height


(m) width (m) m) (m)
185+510 Box 2 0.5 2 2.13 2.13 0.15

total
excavation
pcc M-15
catchpit (M-20)
rubble masonary
pe culvert locations with slope potection works

pcc M-15 catchpit (M-20) rubble masonary

height height
qty (m³) (m) length( qty (m³) (m) length(
width (m) length(m) width (m) m) width (m) m)
1.95 1.8 0.5265 0.75 1.5 1.8 2.025 0.5 0.6 2.4

pcc M-15 catchpit (M-20) rubble masonary


height height
length(m) qty (m³) length( qty (m³) length(
width (m) (m) width (m) m) (m) width (m) m)
2.45 2.13 0.782775 0.75 2 2.13 3.195 0.5 0.6 2.73

total
206.55
119.76458
488.835 29.3301
110.16
masonary

qty (m³)

0.72

masonary

qty (m³)
0.819
stepped chute at pipe culvert locations with slope potecti

excvation
addition

widenin
culverts
al new

culvert type of span no. of steps


pipe

location culvert height


length( qty (m³)
&

g
(m)
width (m) m)
166+830 Pipe 1/1.2 dia 2 1 1 2 4

excvation
type of span no. of steps height length( qty (m³)
culvert
(m) width (m) m)
185+510 Box 2 2 1 2 2 8
1224

total
excavation
rcc wall (M-15)
stone apron (M-20)
guide wall (M-20)
cations with slope potection works

rcc wall stone apron guide walls


no. of
walls height height height
(m) qty (m³) (m) length( qty (m³) (m)
width (m) length(m) width (m) m)
3 0.3 0.3 2 0.54 0.3 1 2 0.6 1

rcc wall stone apron guide walls


no. of
height height height
walls length(m) qty (m³) length( qty (m³)
(m) width (m) (m) width (m) m) (m)
3 0.3 0.3 2 0.54 0.3 2 2 1.2 1
82.62 183.6

total
excavation 1224
rcc wall (M-15) 82.62
one apron (M-20) 183.6
uide wall (M-20) 302.94 steel 18.1764
guide walls

length( qty (m³)


width (m) m)
0.3 3.6 1.08

guide walls
length( qty (m³)
width (m) m)
0.3 6.6 1.98
302.94
Length Excavation Quantity M 10 PCC qty
(m) Width (m) Height (m) Area (m²) Qty (m³) Width (m) Height (m) Area (m²)
0 1.5 1.1 1.65 0 1.5 0.1 0.15
qty M 20 Raft qty M 20 Walls qty
Qty (m³) Width (m) Height (m) Area (m²) Qty (m³) Width (m) Height (m) Area (m²) Qty (m³)
0 1.3 0.15 0.195 0 0.2 1.2 0.24 0
0 0
M 25 Cover Slab qty
Width (m) Height (m) Area (m²) Qty (m³)
1.3 0.25 0.325 0
steel 0

0.25

0.6

0.15
0.1
1.3

0.2 0.2

1.1

1.5
chainage EXCAVATION
length No. of Top Bottom
SIDE locations Height Area
from to (m) Width Width
(m) (sqm)
(m) (m)
87+000 105+518 18518 1 926.9 0.625 0.8654 0.49 0.424
18518

length of lined drain


excavation
M 15
M 15 for chute
M 20 for chute
filter
pitching
TION pcc wall M-15 pcc raft M-15
length of
Quantity Height width Area Quantity Height width Area Quantity chute
(cum) (m) (m) (sqm) (cum) (m) (m) (sqm) (cum)

7843.53038 0.5 0.2654 0.1327 2457.339 0.125 0.49 0.061 1134.228 5


7843.53038 2457.34 1134.23

11180.3704
3591.5661
417.105
718.3475
834.21
834.21
excavation M-15 PCC M-20 wall
side height height height
width (m) area (m²) qty (m³) width (m) area (m²) qty (m³)
(m) (m) (m)

1 0.9 0.8 0.72 3336.84 0.15 0.6 0.09 417.105 0.2


3336.84 417.105
M-20 wall M-20 raft filter media
height height
width (m) area (m²) qty (m³) width (m) area (m²) qty (m³) width (m) area (m²)
(m) (m)

0.2 0.04 370.76 0.3 0.25 0.075 347.5875 0.3 0.6 0.18
370.76 347.588
media stone apron
height
qty (m³) (m) width (m) area (m²) qty (m³)

834.21 0.6 0.3 0.18 834.21


834.21 834.21 0.8654

0.1398

0.6

0.625
0.1256

0.5

0.125

0.49
summary for all drain works

excavation qty excavation 25014

m15 681
chute drain at HILL side m20 1453
filter 1110
m15 83
m20 303
chute drain at VALLEY side
steel 48
apron 1431

m15 120
manhole m20 489
rubble 110
mary for all drain works