1.4
0.9 0.6
0.3
0.15
2.3
catchpit at pipe culvert locations w
culverts
culvert location type of span height height
culvert
new
length( qty (m³)
pipe
(m) (m)
width (m) m)
183+720 Pipe 1/1.2 dia 0.5 1.5 1.8 1.35 0.15
total
excavation
pcc M-15
catchpit (M-20)
rubble masonary
pe culvert locations with slope potection works
height height
qty (m³) (m) length( qty (m³) (m) length(
width (m) length(m) width (m) m) width (m) m)
1.95 1.8 0.5265 0.75 1.5 1.8 2.025 0.5 0.6 2.4
total
206.55
119.76458
488.835 29.3301
110.16
masonary
qty (m³)
0.72
masonary
qty (m³)
0.819
stepped chute at pipe culvert locations with slope potecti
excvation
addition
widenin
culverts
al new
g
(m)
width (m) m)
166+830 Pipe 1/1.2 dia 2 1 1 2 4
excvation
type of span no. of steps height length( qty (m³)
culvert
(m) width (m) m)
185+510 Box 2 2 1 2 2 8
1224
total
excavation
rcc wall (M-15)
stone apron (M-20)
guide wall (M-20)
cations with slope potection works
total
excavation 1224
rcc wall (M-15) 82.62
one apron (M-20) 183.6
uide wall (M-20) 302.94 steel 18.1764
guide walls
guide walls
length( qty (m³)
width (m) m)
0.3 6.6 1.98
302.94
Length Excavation Quantity M 10 PCC qty
(m) Width (m) Height (m) Area (m²) Qty (m³) Width (m) Height (m) Area (m²)
0 1.5 1.1 1.65 0 1.5 0.1 0.15
qty M 20 Raft qty M 20 Walls qty
Qty (m³) Width (m) Height (m) Area (m²) Qty (m³) Width (m) Height (m) Area (m²) Qty (m³)
0 1.3 0.15 0.195 0 0.2 1.2 0.24 0
0 0
M 25 Cover Slab qty
Width (m) Height (m) Area (m²) Qty (m³)
1.3 0.25 0.325 0
steel 0
0.25
0.6
0.15
0.1
1.3
0.2 0.2
1.1
1.5
chainage EXCAVATION
length No. of Top Bottom
SIDE locations Height Area
from to (m) Width Width
(m) (sqm)
(m) (m)
87+000 105+518 18518 1 926.9 0.625 0.8654 0.49 0.424
18518
11180.3704
3591.5661
417.105
718.3475
834.21
834.21
excavation M-15 PCC M-20 wall
side height height height
width (m) area (m²) qty (m³) width (m) area (m²) qty (m³)
(m) (m) (m)
0.2 0.04 370.76 0.3 0.25 0.075 347.5875 0.3 0.6 0.18
370.76 347.588
media stone apron
height
qty (m³) (m) width (m) area (m²) qty (m³)
0.1398
0.6
0.625
0.1256
0.5
0.125
0.49
summary for all drain works
m15 681
chute drain at HILL side m20 1453
filter 1110
m15 83
m20 303
chute drain at VALLEY side
steel 48
apron 1431
m15 120
manhole m20 489
rubble 110
mary for all drain works