Comments on Draft soil and Material Investigation , Pavement and Geotechnical Report Page 1
Core Consulting Engineers Adishehu-dela-samre design Build Road Project
From the total of 74km(1 sample per 1km) sub grade and
Section 3.2.3 pavement design segment 22km(1 sample per 1km) length does
not have test result for sub grade design CBR, especially in some
(Table 3-4, 3-5)
areas more than 5km continual length along design section,
(On page 25,26 and 27,28)
California Bearing ratio (CBR) test for sub grade homogeneous
segment selection does not have conducted test result. In
addition 11km(1 sample per 1km) sub grade CBR test result
conducted by external laboratory you did modification or are not
similar to the actual report for the seek of sub grade CBR design
as well as pavement thickness determination.
As per your report, the data that used for sub grade CBR design
only 56% of the design input represent the design section from
the overall design segment. We advise to incorporate necessary
sufficient deign input as per the actual or external laboratory test
report and section that did not included in the sub grade CBR
design analysis in the final report. Unless otherwise you are
expected to clarify as per the signed ERA Design manual 2013
and Employer’s requirement.
Comments on Draft soil and Material Investigation , Pavement and Geotechnical Report Page 2
Core Consulting Engineers Adishehu-dela-samre design Build Road Project
The entire sub grade soil tests which used for sub grade
classes investigation and pavement materials type and
thickness design conducted through an external
laboratory (Best Consulting Engineers plc). However ,
Comments on Draft soil and Material Investigation , Pavement and Geotechnical Report Page 3
Core Consulting Engineers Adishehu-dela-samre design Build Road Project
Comments on Draft soil and Material Investigation , Pavement and Geotechnical Report Page 4
Core Consulting Engineers Adishehu-dela-samre design Build Road Project
Section 3.6.1( page 35 In the report, table 3-10 and table 3-12, you are proposed
)and construction material sources for embankment fill and
Section 3.6.2 (page 37) gravel sub base construction. These two different
construction works almost share the same sources. How do
you manage quality and quantity of these same material
sources for different construction works?
Comments on Draft soil and Material Investigation , Pavement and Geotechnical Report Page 5