REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Actual Route cause: - Process owner failed to review the evaluation of kalinga steel for year 2018-2019 &
2019-2020
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
As per the system requirement supplier evaluation Subhod & Yearly Re- 03.10.2019
to be made available as per the plan Mukund evaluation
On 03.10.2019 By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
Actual Route cause: - due to the failure of the spectro machine following heat microstructure analysis system
failed to evident and accordingly reaction plan was not maintained
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
As per the defined quality plan and preventive Mr. Prakash Each heat Analysis 03.10.2019
maintenance micro structure and analysis will be shirke
carried out &
Mr. Nitesh
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
THE ALLIED FOUNDERS PVT LTD. UDYAMBAG, BELGAUM. REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Calibration reports are not evident for the following Test equipments but calibrated on 23/08/2019
Based on visit reports of VERSATILE, 12 Test Equipment of sand testing equipments.
Actual Route cause: - In house calibration is been carried out by agency versatile but calibrated report was
delayed from agency
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
Agency versatile been communicated to send Mr. Prakash 10.10.2019 Calibration 10.10.2019
the reports calibrated for sand testing equipment Shirke report
&
Mr. Nitesh
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
THE ALLIED FOUNDERS PVT LTD. UDYAMBAG, BELGAUM. REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Actual Route cause: - Due to load fluctuation moisture machine got break down and following testing been
failed to carried out
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
Machine breakdown accordingly outsource Mr. Prakash 03.10.2019 Testing 10.10.2019
testing is planned to carried out Shirke
&
Mr. Nitesh
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
THE ALLIED FOUNDERS PVT LTD. UDYAMBAG, BELGAUM. REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Core Inspection System is not Effectively followed as per process control plan for core making AF-PCP-CM-01.
E.g.: 1. Core weight inspection is not evident as per AF-PCP-CM-01 for the items 3328 & 1963 date 23/09/2019.
2. Viscosity Testing reading not evident
Actual Route cause: - due to urgency process owner failed to evident the core weight and viscosity reading as
per system defined process control plan
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
As per the process control plan defined core Mr. Ravindra 03.10.2019 Recording 10.10.2019
weight and viscosity to be maintained Shingare
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
THE ALLIED FOUNDERS PVT LTD. UDYAMBAG, BELGAUM. REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Process Sheet is not evident for the part 426134 casing & this item under moulding Line-03,
06 nos moulding done on 28/09/19
Actual Route cause: - Due to urgent requirement process owner failed to prepare the process sheet for the
casing 426134
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
Any new component introduced in foundry Mr. Prakash 10.10.2019 Process 10.10.2019
process sheet to be made evident accordingly Shirke control sheet
Mr. Umesh
Kamble
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN
Visit our Website: - www.alliedfoundersindia.com Allied Founders © Copyright 2010
THE ALLIED FOUNDERS PVT LTD. UDYAMBAG, BELGAUM. REF NO AF-F-MR-07
REV NO 01
CORRECTIVE ACTION REPORT REV DATE 01-06-2010
PAGE 1 OF 1
Action Plan against IN-HOUSE rejection due to SF (sand fall) is not evident.
E.g.: In AUG19 major defects are sand fall
1630 Bracket – 20 nos rejected out of 120 nos due to SF (sand fall). On 26/08/2019,
reported through Fettling report AF-F-MR-07
Actual Route cause: - Process failed to communicate the inn house rejection and accordingly report was not
updated against the ejection qty 20 no’s
Corrective Actions
Completion
Action Taken By Whom When Remarks
Date
In house rejection happened accordingly action pa Mr. 03.10.2019 Rejection 10.10.2019
to be prepared for the rejection and made evident Ravindra report
Shingare
Mr.
Rajendra
Chougule
On ___________________ By : MR___________________
On ___________________ By MR/____________________
NC / CLOSED / OPEN