Академический Документы
Профессиональный Документы
Культура Документы
(just a thought: can ask for date for which total cost is estimated, can be
backdated. )
1. Compound wall
2. Concrete
3. Dado/wall tilting
4. Door frames
5. Doors
6. External plaster
7. External plumbing/drainage line
8. Flooring
9. Gypsum/POP plaster (punning)
10. Internal plaster
11. Kerbing and paver
12. Kitchen otta
13. Masonry
14. Painting
15. Plain cement concrete (PCC)
16. Roofing
17. Site preparation-tempoeary fencing
18. Skirting
19. Staircase risers
20. Staircase treads
21. Wash basin counters
22. Water proofing
23. Window jambs
24. Window sills
If 2 is selected: choice
If 3 is selected: choice
If 4 is selected: choice
If 5 is selected: choice
1. flush doors
2. moulded doors
3. PVC/FRP doors
If 6 is selected: choice
If 7 is selected: choice
1. Inspection chambers
2. Road side open gutter for rain water
3. Underground RCC pipe line
If 8 is selected: choice
If 9 is selected, choice:
If 10 is selected, choice
If 11: choose
1. Kerbing work
2. Paving block flooring
If 12 ; choose
If 13 is selected:
If 14 is selected:
1. External painting
2. Internal painting
If 15:
1. 3” thick PCC
2. 4” thick PCC
3. 6” thick PCC
4. PCC on volume basis
If 16:
1. Tile roofing
2. …
If 17:
If 18:
If 19:
1. 3’ wide staircase
2. 4’ wide staircase
3. 5’ wide staircase
If 20:
1. 3’ wide staircase
2. 4’ wide staircase
3. 5’ wide staircase
If 21:
1. for semi recessed wash basins
2. …
If 22:
If 23:
1. 3” jabs
2. 8” jabs
If 24:
1. 3” sills
2. 8” sills
After third input: each selection will have 4th input with following options with
headings for inputs as Work item
1.1.1
1.2.1.1
1.2.1.2
1.2.1.3