29. 11.2010.
Mr. S.M.J. Bandara
Project Director
Tsunami Rehabilitation Project
Ministry Of Higher education, 18, Ward Place , Colombo 7'
Tsunami Rehabilitation Project- Hostel Building for Medical Student of University of Jaff
SUBJECT: LIST OF DEFECTS -(CIVIL WORKS) AS AT 26th NOVEMBER 2010.
As agreed in the Progress Review Meeting held on 22nd November 2010, we are herewith
forwarding the List of Defects in Civil Works of the Four Building Towers and Sewer
Treatment Plant of the above project after jointly examining the work .
Please note that the following representatives from the respective institutions checked the
civil work carried out by the contractor, Euroville Engineers and Constructors (Pvt) Limited
of Jaffna and agreed that the rectification of the defects which have been listed in the
annnex is a responsibilty of the contractor.
As the inspection team did not comprise members with the knowledge and experience
over the electrical and mechanical engineering fields, defects of electrical/mechanical
works in the Buildings or Sewer Treatment Plant were not notified. Therefore,latest
electrical /mechanical defect list issued by us could be consider asacceptable.
Yours faithfully,
CECNTRAL ENGINEERING CONSULTANCY BUREAU
R.M.W. Ratnayake
Deputy General Manager (EPC-Jaffna)
CC: 1. Mr. M.Ramadasan, Managingirector, Euroville Engineers and Constructors (Pvt)
Limited.- for rectifying the defects
2. Works Engineer, University of Jaffna.
Tsunami Rehabilitation Project- Hostel Building for Medical Student of University of Jaff
1. It can be observed that Baffle plates, at the entrance in inclined position of Type A
and type B were not properly fixed as per the drawings.
2. Cover provided for the grit chamber with heavy concrete plates are not suitable as
daily cleaning is necessary.
Above three items could be identified in civil works. However,a proper inspection will be
done during the comissioning of plant and any defects in the plant will be notified later. It
will be carried out by mechanical and electrical engineers jointly.
DETECTS (CIVIL WORKS) IN PHASE 1 WORKS - TOWER B & TOWER C
1. Door locks provided to toilets and Bathrooms cannot be opened with the given keys.
After pressing the lock from the toilet inside doors can be closed and then from
outside cannot be open with the key. Under this condition Inspection Team is in the
view that the locks shall be replaced with proper ones.
4. Glass of the EXIT door is missing. Contractor has to supply and fix it.
I hereby accept that that above defcts in civil works could be found in the work and I agree
to rectify them all before the date 15.12.2010.