Joint Director (S)
Ministry of Environment and Forests
North Eastern Regional Office Email: moefenv13shil@gmail.com
Law-U-Sib, Lumbatngen Fax: 0364-2536041
Near MTC Workshop, Shillong-793 021
Subject: Six monthly BC compliance reports for the period from 1st October,2014
to 3st March, 2015 on the status of compliance of the stipulated EC conditions.
EC No: F. No. J-11011/877/2007-1A II (1) dated 3 August, 2012.
Block: Exploratory Drilling in MZ-ONN-2004/1, in the districts of Aizawl, Lunglei,
‘Mamit and Serchhip in the state of Mozoram by M/s Oil India Limited.
Well name: MZ#3.
SI. No. | Condition —]_ Compliance status
‘A, Specific conditions: -
a As proposed, only 6 nos. exploratory wells shell | Agreed to comply
bbe drilled. No additional wells shall be drilled
without prior permission this Ministry.
As proposed, “no driling of well and any Agreed to comply
construction worl shall be carvied out in forest
land
[Till Gas produced during testing shall be fared with Flare booms are
appropriate flaring booms. The flare eystem provided for flaring ens
shall be designed as per good oil field practices | during testing as per
| OISD guidelines. The stack height shall be | OISD guidelines. All
| provided as per the regulatory requirements and OISD/CPCB/ MoEF
| Lemissions from stacks will mect the guidelines followed
MOEF/CPCB guidetines |
‘Ambient air quality shall be monitored near the | Ambient air quality of
closest human settlements as per the National |the Nearby area
Ambient Air Quality Emission Standards (NAAQ) | monitored as per NAAQ
issued by the Ministry vide GSR No. 826(B) emission standards.
dated 16th November'2009 for PM10,PM2.5, (Test report enclosed)
| 802, NOx, CO,CH4,HC, non-methane HC ete,
Mercury shall be analysed in air, water and drill Complied
cuttings twice during drilling period (Test report enclosed)jw
‘Approach road shall be made pucca to minimise
generation of suspended dust.
Complied
way
‘The Company shall make the arrangement for
control of noise from the drilling activity
Acoustic enclosures to the DG sets and proper
stack height shall be provided as per the CPCB.
guidelines,
Noise barriers are
constructed for
reduction of Noise Level.
Noise levels. are
monitored at suitable
period. DG sets are
provided with stack
heights. People working
near the sets. are
provided with ear muffs.
wit)
Total fresh water requirement from ground
water source shall not exceed 25 m3/day/well
and prior permission shall be obtained from the
‘concerned agency.
Fresh water
requirement being met
by tanker supply.
‘The company shall construct the garland drain
all around the drilling site to prevent runoff of |
any oil containing waste into the nearby water
bodies. |
Separate drainage system shall be created for oil |
contaminated and non-oil contaminated,
Effluent shall be properly treated and treated
‘waste water shall confirm to CPCB standards,
Good sanitation facility shall be provided at the
drill site. Domestic sewage shall be disposed-off |
through septic tank/ soak pit.
Constructed the garland
drains all around the
drilling sites.
Effluent water is being
reused/re-cycled after
treatment with mobile
ETP,
Complied
Drilling wastewater including drill cuttings wash
water shall be collected in disposal pit lined with,
HDPE lining evaporated or treated and shall
comply with the notified standards for on-shore
disposal. The membership of common TSDF
shall be obtained for the disposal of drill
cuttings and hazardous waste. Otherwise,
secured land fill shall be created at the site as
per the design approved by the CPCB and obtain
authorisation from the SPCB. Copy of the
authorisation or membership of TSDF shall be
submitted to Ministry's Regional Office at
Shillong,
Drilling waste water and
drill cuttings wash
water are collected in
HDPE lined waste pit
and left for solar
‘evaporation,
Waste Water collected in
the Effluent Pit is
treated with ETP and
Tested.
(Test reports are
submitted to Mizoram
State Pollution Control
Board-Test report
enclosed)
Oil spillage prevention and mitigation scheme
shall. be prepared. In case of oil
spillage/contamination, action plan shall be
prepared to clean the site by adopting proven
technology. The recyclable waste (oil sludge) and.
‘Spent oil disposed-off to
the ‘Authorised |
recyclers.
2‘spent oil shall be disposed of to the authorised |
recyclers.
The company shall comply with the guidclincs | Complied.
for disposal of solid waste, drill cutting and | (Barite test report for
drilling fluids for onshore’ drilling operation | Mereuryé cadmium
notified vide GSR, 546(E) dated 30th August, | enclosed).
2005.
‘eiv)
The Company shall take necessary measures to | Fire fighting equipment
prevent fire hazards, containing ol spill and soil| provided as per
remediation as needed. Possibility of using| OISD-189.
ground flare shall be explored. At place of| Flaring will
ground flaring, the overhead flaring stack with | through
be done
flare stack
knockout drums shall be installed to minimize | during testing for brief|
‘gaseous emissions during operation. period only.
‘The Company shall develop @ contingency plan|No HjS is expected in
for HaS release including all necessary aspects | the field. Portable HS
from evacuation to resumption of normal) gas
detectors
operations. The workers should be provided with | provided for monitoring,
personal H2S detectors in locations of high risk
of exposure along with self-containing breathing
apparatus,
The company shall carry out long term/| Subsidence study not
subsidence study by collecting baseline data| done.
before initiating drilling operation till the project
lasts. The data so collected shall be submitted
six monthly to the Ministry and its Regional |
Office at Shillong.
oi
Blow Out Preventer (BOP) system shall be | BOP’s are installed.
installed to prevent well blowouts during drilling |
operations,
Blow Out Prevention measures during drilling |
shall focus on maintaining well bore hydrostatic |
pressure by proper pre-well planning and
Grilling fluid logging etc
(wit,
Emergency Response Plai
on the guidelines prepared by OISD, DGMS, and| Response Plan
Govt. of India.
prepared.
(ERP) shall be based | Onsite Bmergency
‘The company shall take measures after [In the
completion of drilling process by well plugging | economic
event of
quantity
of
and secured enclosures, decommissioning of rig | hydrocarbon is found,
upon abandonment of the well and drilling site | wells will be abandoned
shall be restored the area in original con
In the event that no economic quantity of
hydrocarbon is found 2 full abandonment plan
shall be implemented for the drilling site in
accordance with applicable Indian Petroleum
Regulations. Remote monitoring of the site shall
nn. | as per applicable norms.
3‘be done.
‘Occupational health surveillance of the workers | Periodic medical }
shall be carried out as per the prevailing Acts | examination (PMB) is,
and Rules. done as per norms,
va In case the commercial viability of the project is|In case commercial
established, the company shall prepare a| viability Established, |
detailed plan for development of oil and gas|the company — will
fields for the above block and obtain fresh | prepare a detailed
clearance from the Ministry. development plan and
apply for fresh clearance
| from the Ministry.
cea
[Restoration of the project site shall be carried [Restoration of the site
‘out satisfactorily and report shall be sent to the| shall be done as per
Ministry's Regional Office at Shillong, norms.
ea
Gea)
Gn)
cen)
Gov
Oil content in the drill cuttings shall be| Oil content in the drill
monitored by some authorised agency and|cuttings is being) |
report shall be sent to the Ministry’s Regional | monitored by third
Office at Shillong, party authorised agency
(ETP test report
{oo ___ enclosed).
Under corporate social responsibility (CSR), [OIL providing adequate
sufficient provision shall be made for health |funds under CSR
improvement, education, water and electricity | scheme.
| supply etc. in and around the project.
‘Ail diesel and Tubricant Storage tanks shall be | Complied. a i
bbunded. |
Company shall_have own Bavironment | HSB setup is functional
Management Cell having qualified persons with | in the company to carry
proper background “out these functions.
|
[Ail the commitment made regarding letucs | Shall be implemented]
raised during the public hearing/consultation |
meeting held on 18% August, 2011, 23° August, |
3011, 25% August, 2011 and 30% August 2011 |
for Serehhip, Aizawl, Momit and Aizawl districts |
shall be satisfactorily implemented
(ex
Company shall_prepare and circulate the | Being circulated:
environmental policy.
(exis)
at the drill site/ project site.
‘Company shall prepare operating manual in| MoBF approved BIA
respect of all activities. It shall cover all safety & | reports are available. |
environment related issues and system. | Environmental |
Measures to be taken for protection. One set of | protection measures
environmental manual shall be made available | suggested in the report
___are being adhered,
4‘Awareness shall be created at each level of the
management. All the schedules and results of
environmental monitoring shall be available at,
| the project site office.
(oon) BAIT site shall be at least S0Om away Wom the | Complied
| school.
(ead) All personnel including those from the | Being complied
contractors shall be trained and made fully
aware of the hazards, risks and controls in
place.
B. General Conditions
fj The project authorities must strictly adhere to | The observations raised
the stipulations made by the Mizoram Pollution |by the _ statutory
Control Board (MPCB), State Government and | authorities like MPCB,
any other statutory authority. DOMS, OSD are|
compiled as and when| |
raised. |
(i) | No further expansion or modification in the | Drilling activities are
project shall be carried out without prior | conducted as per the
approval of the Ministry of Environment &| approval received from
Forests, In case of deviations or alternations in | MoEF.
the project proposal from those submitted to
this Ministry for clearance, a fresh reference
shall be made to the Ministry to assess the
adequacy of conditions imposed and to add.
additional environmental protection measures
required, if any. |
(ii) The project authorities must strictly comply with | Drilling operations are
the rules and regulations under Manufacture, carried out as per
storage and import of hazardous chemicals DOMS, OMR-1984 and
Rules, 2000 as amended subsequently. Prior OISD standards. |
approvals from Chief Inspectorate of Factories,
Chief Controller of Explosives, Fire Salty’
Inspectorate etc., must be obtained, wherever
applicable. |
“The overall noise levels in and around the plant | Noise level being
area shall be kept well within the standards by | monitored (Test report
providing noise control measures including | enclosed).
acoustic hoods, silencers, enclosures, etc., on all | Acoustic barriers are
sources of noise generation. The ambient noise | provided for the gen sets
levels shall conform to the standards prescribed | to minimise the noise
under EPA Rules, 1989 viz. 75 dBA (day time) | levels with in specified
and 70 dBA (night time). limits. Ear muffs
a provided for the persons
5working near the
gensets. The ambient
noise levels are being
monitored regulatly.
A separate Environmental Management Cell | Complied.
equipped with full-fledged laboratory facilities
must be set up to carry out the environmental
‘management and monitoring functions.
(ei) A copy of the clearance letter shall be sent by | Complied
the proponent to the concerned panchayat, Zila
Parishad/ Municipal Corporation, Urban Local
Body and the local NGO, if any from whom
suggestions/representations, if any, were
received while processing ‘the proposal. The
| clearance shall also be put on the web site of the
‘company by the proponent.
(wil)_| The project proponent shall upload the status of | Being complied
compliance of stipulated environment clearance
conditions, including the results of the
monitored data on their web site and shall
update the same periodically. It shall
simultancously be sent to the Regional Office of
the MOEF, the respective Zonal Office of CPCB.
and the MPCB. The criteria pollutant levels
namely, PMio, SO2, NOx, HC (Methane & non.
methane), VOCs (ambient levels as well as stack,
emissions) or critical sectorial parameters
indicated for the projects shall be monitored and
displayed at a convenient location near the main
gate of the company in the public domain,
(vill) |The project proponent shall also submit six) Being complied
monthly compliance reports on the status of the |
compliance of the stipulated environmental |
conditions including the results of the monitored
data (both in hard copies as well as by e-mail) to
the Regional Office of MOEF, the respective
zonal of CPCB and the MPCB. The Regional
Office of this Ministry/CPCB/MPCB shall
monitor the stipulated conditions,
(i) | The environmental statement for each financial | Submitted
year ending ist March in the form-V is
mandated to be submitied by the project
proponent to the concerned state pollution
Control board as prescribed under the
Environment (protection) Rules 1986 as
amended subsequently shall also be put on the |
6fi
web site of the company along with the status of
compliance of environmental conditions and
shall also be sent to the respective regional
offices of the MOEF by email
The Project Proponent shall inform the public
that the project has been accorded
environmental clearance by the Ministry and
copies of the clearance letter are available with
the MPCB and may also be seen at Website of
the Ministry and Forests at
http: /www.envfor.nic.in. This shall be advertised,
within seven days of the issuc of this letter at
least two local newspapers that are widely
circulated in the region of which one shall be in
the vernacular language of the locality
concerned and a copy of the same shall be
forwarded to the Regional office. Company policy
and other relevant information being displayed
in front of each locations. Details of the
environmental clearance are published in the
local newspapers.
Details of the
environmental clearance
are published in the
local newspapers,
TR) | The Project Authorities shall inform the Regional
Office as well as the Ministry, the date of
financial closure and final approval of the
project by the concerned authorities and the
date of commencing the land development work.
All the project details
are provided to the
statutory authorities.
Project Details:
(EC obtained on
3/08/2012.
(iConsent to establish
(fom = MPCB) 3
October, 2012{Ref.
No. H
88088 /Poltn/9(162)/
2011-MPCB/ 112-114
dated Aizawl the 31
October, 2012}.
(Gi) Land" development
work started in
November,2012
(Work Order issue
date 01.11.2012)
(iv) Consent co Operate
obiained on 2nd
July,2014
(Ref. No.
BOBS /Poltn/9(162)
12011-MPCB/149-
150 dated 2%
July,2014} _|[
(b) Use of diesel base mud is prohibited. Only|Only water based mud
GSR 546(E) dt. 30th August, 2005. Disposal of Drill Cutting and Drilling
Fluids for On-shore Installations:
Ta) | Drill Cuttings (DC) originating from on-shore or | Only WBM used. Mud is,
locations close to shore line and separated recycled and reused.
from Water Base Mud (WBM) should be Cuttings and un used
properly washed and unusable drilling fluids mud is washed and
(DF) such as WBM, Oil Base Mud (OBM), and collected in impervious
‘Synthetic Base Mud (SBM) should be disposed |HDFE lined pit in the
of in a well-designed pit lined with impervious | drill site designed as per
liner located off-site or on-site. The disposal pit | specifications.
should be provided additionally with leachate
collection system. Design aspects of the
impervious waste disposal pit; capping of
Gisposal pit should be informed by the oil
industry to State Pollution Control Board
(SPCB) at the time of obtaining consent.
WBM should be used for on-shore oil drilling | (WEM) is used
operations,
Te [im ease of any probiem due to geological | Only water based mud’
formation for drilling, low toxicity OBM having | (WBM) is used
aromatic content<1% should be used. If the
operators intend to use such
OBM to mitigate specific hole problem/ SBM it
should be intimated to Ministry of
Environment and Forests/State Pollution
Control Board.
(@) [The chemical additives used for _ the | All additives used in the
preparation of DF should have low toxicity i.c. | mud are having 96 hrs.
96 hr. LC50 > 30,000 mg/l as per mysid|LCso value > 30000
toxicity or toxicity test conducted on locally | me/|,
available sensitive sea species. The chemicals (Toxieity test report
used (mainly organic constituents) should be | enclosed)
biodegradable. |
“fe DC separated from OBM after washing should Only water based mud]
have oil content at < 10 gm/kg for disposal into | (WBM) is used.
disposal pit
(@ |The waste pit after it is filled up shall be | Will be complied.
covered with impervious liner, over which, a
thick layer of native soil with proper top slope
| is provided,
(@ | Low toxicity OBM should be made available at | OBM not used
installation during drilling operation.{ay | Dring wastewater Inclading DC wash water | Complied
should. be collected inthe disposal pit
evaporated or treated and should comply with
the notified standards for
cw
| contain Hg>1 mg/kg & Ca> 3mg/ke. | Cde3me/1
Hg<1mg/L
L (Test report enclosed)
ashore disposal.
Barite used in preparation of DF shall not Barites used contains
and
(@ Total material acquired for preparation of drill | After completion
site. must be restored after completion of drilling all the material
Grilling operation leaving no waste material at | is removed from the site
of
site, SPCB should be informed about the/and site is restored |
restoration work, back,
(kd) [In case, environmentally acceptable methods | Will be complied.
for disposal of drill waste such as (a) injection,
to a formation through casing annuals, if
conditions allow (b) land farming at suitable
location (c) bio-remediation (d) incineration or
(c) solidification can be considered, in such
cases oil industry is required to submit
proposal to Ministry of Environment and
Forests/State Pollution Control Board
____| tMoBF/SPCB) for approval.
STATUS OF OTHER DRILLING LOCATIONS
Tocation_| Present Status Remarks 7
Loc. MzZ- 8 | Civil Pinth Rig foundation work completed.
preparation
works completed
Toc. MZ-2|Givil jobs for) Civil works for approach road & plinth |
approach road &| preparation are in progress.
plinth are in
progress.
Toc. MZ-1 | Civil Plinth Rig
preparation completed.
works completed
Tos MZ} Preparatory | ~ Gril Survey completed
4/3 | process for Land
‘requisition
‘The above is for your kind information, please
‘Thanking you,
Foundation Construction |Yours faithfully
OIL INDIA LIMITED
~~
US
(BY Reddy)
Head-NEF Project,
For Executive Director (E&D)
For RESIDENT CHIEF EXECUTIVE
ce:
1, Director, Monitoring Cell, MoRF, Paryavaran Bhawan, CGO Complex, Lodhi
Road, New Delhi-110 003.
2, Zonal Office, Central Pollution Control Board, “TUM-SIR’, Lower Motinagar,
Near Fire Brigade Head Quarter, Shillong-793 014.
3. Chairman, Mizoram State Pollution Control Board, Silver House,
‘Tuikhuabtlang, Aizawl-796 001, Mizoram.
4, Principal Chief Conservator of Forests, Department of Environment and
Forests, Tuilhhuahtlang, Aizawl-796 001, Mizoram
(Bu Reddy)
Head-NEF Project,
For Executive Director (E&D)
For RESIDENT CHIEF EXECUTIVE