Вы находитесь на странице: 1из 3

Best Practices –

Parameter Change
PROJECT : 2G & 3G BAU _MBNL
TYPE : Parameter Change
DATE: 20th June , 2016
BRIEF DESCRIPTION: T315 Counter for Improvement in PS
Retainibility.
SOLUTION ONE PAGER - TOOL Cross Pollination
Project Summary
Practice
Operator MBNL Region Project Statu Benef
s t
Region/Countr RWCE
y Timer Change for 3G
Service Area 2G/3G
NSN 3G RNC
Project 2G & 3G BAU
Driver Solution Overview

How was it done: How is it done now


 The idea was to improve poor performance of cells in  if timer T315 is set higher than 0, PS calls that suffer
the network at RNC level. from a RL Failure are not considered “dropped” till timer
T315 expires and the call could not be re-established by
the Cell Update Procedure.
 T314 is set higher than 0, Voice calls that suffer from a RL
Failure are not considered “dropped” till timer T314
expires and the call could not be reestablished by the Cell
Update Procedure.

Presentation in
Best Practise and Cross

Customer Value Realization

Time
Time Net Time Net Time
Number Of Number Of Consumed In Number Of
Consumed Saved total Saved Per
Markets sites Manual Deliveries
by Tool Activity Year
Process

Вам также может понравиться