5 m high concrete
Dam, 7.70 Km long Hydel Channel, 2 Nos. Head
Regulators & 2 Nos. Power Houses of total 206
MW PH-I (3x33) + PH-II (3x33+1x8) capacity.
• Being constructed on River Ravi, 11 km
downstream of the existing Ranjit Sagar Dam
and 8 km upstream of Madhopur Headworks.
• It will provide a balancing reservoir to have
uniform water releases for UBDC Canal,
Kashmir canal off taking from Madhopur Head
Works and high level Ravi Canal (J&K) which
will off take from right side of this Project.
• It will ensure optimum power generation
during peaking hours from Ranjit Sagar Dam
Project.
10
• Dam along with 206 Power Project being constructed on land
with 1/3rd territory in Punjab & 2/3rd in J&K.
• Declared as “Project of National importance” by GoI in 2008.
• Construction work of this Project was taken up during May
1999.
• The work of Dam was started in April 2013 by Punjab Irrigation
Department .
• Civil Works of the dam partially executed by PID in 2013.
• E&M works awarded to BHEL on 29.01.14.
• REC sanctioned loan of Rs.1468 Cr. in 2014
• Work of Main Dam stopped by J&K Govt. on 30.8.2014.
• BHEL intimated to put on hold the mfg. of Equipment in 2014.
11
Design flood Discharge 21500 cumec (7,50,400 cusec)
Live Storage Capacity 9.74 million Cum
Maximum Height of Dam 55.50 m
Top Level of the Dam /Crest Level EL 407.50m / EL 380.00m
Pond Level Maximum / Minimum 404.50 m / 402.50m
Length of Overflow Section 415.00 m
No. of bays/ Size of Spillways Gates 22 bays of 12m x 7m size
IRRIGATION &
OTHER
BENEFITS
14
GENERATION BENEFITS
Cheaper Power of 1048 million units to be generated
annually from SKPP with 20% share to J&K