• Project comprises of 55.

5 m high concrete
Dam, 7.70 Km long Hydel Channel, 2 Nos. Head
Regulators & 2 Nos. Power Houses of total 206
MW PH-I (3x33) + PH-II (3x33+1x8) capacity.
• Being constructed on River Ravi, 11 km
downstream of the existing Ranjit Sagar Dam
and 8 km upstream of Madhopur Headworks.
• It will provide a balancing reservoir to have
uniform water releases for UBDC Canal,
Kashmir canal off taking from Madhopur Head
Works and high level Ravi Canal (J&K) which
will off take from right side of this Project.
• It will ensure optimum power generation
during peaking hours from Ranjit Sagar Dam
Project.

10
• Dam along with 206 Power Project being constructed on land
with 1/3rd territory in Punjab & 2/3rd in J&K.
• Declared as “Project of National importance” by GoI in 2008.
• Construction work of this Project was taken up during May
1999.
• The work of Dam was started in April 2013 by Punjab Irrigation
Department .
• Civil Works of the dam partially executed by PID in 2013.
• E&M works awarded to BHEL on 29.01.14.
• REC sanctioned loan of Rs.1468 Cr. in 2014
• Work of Main Dam stopped by J&K Govt. on 30.8.2014.
• BHEL intimated to put on hold the mfg. of Equipment in 2014.
11
Design flood Discharge 21500 cumec (7,50,400 cusec)
Live Storage Capacity 9.74 million Cum
Maximum Height of Dam 55.50 m
Top Level of the Dam /Crest Level EL 407.50m / EL 380.00m
Pond Level Maximum / Minimum 404.50 m / 402.50m
Length of Overflow Section 415.00 m
No. of bays/ Size of Spillways Gates 22 bays of 12m x 7m size

No. of Units 7 Nos.


Power House-I 3 Units of 33 MW each

Power House-II 3 Units of 33 MW each & one no. 8 MW unit

Total generating capacity 206 MW


28.25 m/28.03 m for 33 MW Units & 24.95
Designed head
m for 8 MW unit
Type of turbine Vertical Kaplan
Annual Power generation 1048 MU 13
GENERATION
BENEFITS

IRRIGATION &
OTHER
BENEFITS

14
GENERATION BENEFITS
Cheaper Power of 1048 million units to be generated
annually from SKPP with 20% share to J&K

Quick availability of power & less synchronization time

Peak generation of RSD would increase from 275 MUs to


745 MUs with enhanced 20% share to J&K.

UBDC annual gen. would double due to regular water flow


from RSD resulting in financial benefit of Rs. 144 Cr. annually.

Power from SKPP would be cheaper than power


from thermal power plants, IPPs & Energy exchange
15
IRRIGATION & OTHER BENEFITS
It will enable INDIA to fully utilise the Ravi waters by
completely stopping the water flow to Pakistan.
Flood control in River Ravi
Benefit to J&K, Rajasthan, Punjab & Haryana on account of
agriculture production due to enhanced irrigation facility
Additional 1150 Cusecs water to J&K through Ravi
canal and irrigation benefits thereof.
J&K shall save Rs. 14 Cr. annually on a/c of charges being paid for
pumping arrangement as water will be available at lift stations through
kashmir canal with the commissioning of the project

Water from Madhopur headworks is also released in River Beas through


MB link canal which is further used for irrigation in Rajasthan & Punjab

Direct and indirect employment to local people of J&K and Punjab


during construction & after completion of the project. 16