PO No 140524-P-100
Document
Site Acceptance Test
Name
Document No HPS-PR 247-SAT Rev 0
Reference 02922 Rev B
Drawing No 02923 Rev B
TABLE OF CONTENT
4.3 RETESTS............................................................................................................ 22
4.4 FINAL APPROVAL ............................................................................................. 23
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 4 of 23
1.0 APPROVAL
Signatures on this page indicate that this document has been reviewed, checked and
approved by the concerned persons. It shall be signed and dated as shown below.
Exergy, LLC
Project Engineer
Project Manager
Bayer
Engineering
Validation
QA
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 5 of 23
2.1 Introduction
Point of Use cooler is specially designed for cooling of PW/WFI water in loop at
required temperature. It contains Sanitary Type Double Tube Sheet Heat Exchangers,
which reduces PW Water temperature from 65 Deg. C to 30 Deg. C at maximum flow
rate of 5 GPM. Chilled Water at the inlet of Heat Exchanger is required at
Temperature of 5.5 Deg. C at a flow rate of 8.6 GPM.
The SAT shall show that the Point of Use Cooler is manufactured and operates in
accordance with the design specifications, functional logics and operating
Instructions.
The SAT is divided into three test sections:
2.2 Abbreviations
SAT Site Acceptance Test
MOC Material of Construction
TC Tri Clover
Ra Average Roughness
NLT Not Less Than
The purpose of the SAT is to test, inspect and show that the Point of Use Cooler is
installed correctly according to mechanical and electrical specifications, that
components are marked and located according to the valid P & ID and that the
system works according to the Functional Logics.
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 6 of 23
The tester shall first read this SAT Plan section, then perform the tests and finally fill in
the Report in the end of this document. The performance of the specific Factory
Acceptance Tests is described for each test in the test sheets.
2.6.1 Responsibilities
The person who performs the tests (Tester) is responsible for the execution of the
tests. The tester confirms with his/her initials that the test is performed correctly.
A second person, (Witness) checks if the test was correctly performed and that the
result was in accordance with the acceptance criteria and if not, that a deviation
report is filled in.
Deviations are recorded and traceable. Fields in a test, which is not filled out, shall be
clearly marked as N/A (not applicable)
Attachments such as Drawing and MOC check lists shall be marked with the name of
the SAT test and date and initials of the tester. This shall be written on all attached
page
When the SAT is performed and completed, all documents associated with the SAT
shall be reviewed for correctness and completeness before the SAT Report section is
filled in.
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 7 of 23
Name of Test
Test procedure
Acceptance criteria
1)
Pass /Fail + Deviation no
2)
Comment
3)
Tester, Date / Initials
4)
Witness, Date /initials
5)
For a description of the different sections of each test script please see below:
1) The acceptance criteria are specified in this square and if values are to be recorded there
will also be an “Actual value” result table provided. The tester shall Fill in the actual value
observed and then indicate a “Pass” or “Fail”. in the square provided.
2) If the acceptance criteria are fulfilled, “Pass” is written in the square. If not, “Fail” and
deviation number(s) are written, and a deviation report is filled in. (See deviation Report)
3) Comment: This field is used to provide additional information on how the test was
executed, any anomalies identified, additional explanatory information and additional
details if required to explain what occurred in a particular deviation, the tester should
include the Date of the execution of the test / inspection and initials of the tester.
4) The witness should include the date of the execution of the test /inspection and initials of
witness.
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 8 of 23
A Deviation report regarding SAT is filled in, if the result of a test is not according to
the acceptance criteria. It could be necessary, to write more than one deviation report
per test. In this case all deviation numbers have to be filled in the test sheet.
The acceptance criteria for each Site Acceptance Test are specified in the test sheets.
The result of the SAT will be concluded in the SAT Report section.
Client Name Bayer
Project POINT OF USE COOLER
Document Name Site Acceptance Test ( SAT )
Document No. HPS-PR 247-SAT Rev No - 0
Issue Date October 31, 2014 Page 9 of 23
3.0 Tests
XXXXXXXXX
XXXXXXXXX
Exergy LLC
Exergy LLC
Attachments to this Site acceptance test (To be filled in on the day for SAT start)
Name of test
Test procedure
Check if the retests specified in the FAT Report are performed, and signed in the FAT test sheets.
If not, perform those tests now and write “Pass” or “Fail” for the corresponding test in the FAT
document.
All the deviations should be closed before start of SAT.
Acceptance criteria
Comment
Name of test
Test procedure
Check that the Point of Use Cooler is built according to the P & ID and that all
equipment/components are marked with the correct Tag Numbers as shown on the P & ID.
Write, “Pass” at the valve /instrument /component on the P & ID if both criteria are fulfilled. If not
write “Fail” and the deviation number on the drawing.
Corrections shall be written with an archive safe pen on the P & ID.
The tester, witness shall Sign & date the P & ID marked up for this test.
P & ID
Acceptance criteria
All valves, instruments and components shall be located according to the P & ID and be marked
with the correct Tag Number.
Comment
Name of test
Test procedure
Check that the Control panel is built according to the circuit diagram and that the items are marked
with the correct ferrule / tag numbers.
Write “Pass” at the valve/instrument /component on the circuit diagrams if both criteria are
fulfilled. If not, write “Fail” and the deviation number in the drawing.
Attach the circuit diagram used to verify the actual system (Electrical connections, Wiring) showing
the verification results to his document.
Circuit Diagram
Acceptance criteria
All the items shall be located according to the circuit and be marked with the correct Ferrule/Tag
numbers.
Comment
Name of test
Test procedure
Check that Valves, Instruments and Components installed are in accordance with their description
and specification as mentioned in the List /design qualification.
Write, “Pass” at the Valve /Instrument /Component in the list, if the item is in compliance with the
specifications. If not write “Fail” and the deviation number in the list.
Corrections shall be written with an archive safe pen in the component list.
The Tester, Witness shall Sign & date in the bottom of each page of the marked up component list.
Acceptance criteria
All Valves, Instruments and Components shall be in the accordance with their description and
specifications in the Component List /Design Qualification.
Comment
Name of test
Test procedure
Check that test certificates / Test Reports for components/ piping /fittings, and other Inspection
/test Reports are available as per the component list.
Write, “Pass” at the Valve /Instrument /Component in the list, if the required certificate is present.
If not write “Fail” and the deviation number.
Sign & date in the bottom of each page.
Acceptance criteria
Comment
Name of test
Test procedure
Check that Instruments/Component manual are present for instruments from the supplier as per
the component list.
Write, “Pass” at the Instrument /Component in the list, if the required certificate is present. If not
write “Fail” and the deviation number.
Sign & date in the bottom of each page.
Acceptance criteria
Comment
Name of test
Test procedure
Test Procedure should be as per the Interlock and Alarm list of Design qualification, to challenge
each & every alarm provided in the system.
Acceptance criteria
Comment
Name of test
Test procedure
Test Procedure should be to check each & every Digital & Analogue Input & Output of PLC, as per
the I/O List mentioned in design qualification.
I/O List
Acceptance criteria
Comment
Name of test
Test procedure
Put the Point of Use Cooler into “Operation mode” by drawing product water from any one user
point.
During operation, the operating pressure is maintained for product water circuit as well as cooling
water circuit.
N/A
Acceptance criteria
Comment
Name of test
Test procedure
Operate the Point of Use Cooler by drawing water from any sampling point.
Fill in the log sheet and note the flow & temperature of product water exiting from
sampling point.
Acceptance criteria
Flow and temperature of product water exiting from sampling point shall meet the required
parameters mentioned in design qualification.
Comment
4.2 Deviations
Deviation summary
Deviation list:
4.3 Retests
All tests that for some reason were not executed shall be performed after completion.
To be signed by the SAT participants. If the customer has chosen not to attend the SAT,
HYDROPURE SYSTEMS will decide about the project handover.
EXERGY LLC
EXERGY LLC
CUSTOMER
CUSTOMER