DESIGN INFORMATION – STORMWATER SYSTEM

Project: Date:

Client:
Type of Design Engineer:
Structur
e:

Design
No. Descriptions Remarks
Parameters

A. Design Guidelines For Stormwater System Manual Saliran Mesra Alam


(MaSMA)

B. Existing Site Condition

B.1 Discharge point


B.2 Landuse
B.3 Contour

C. Flow

C.1 Before development, Q-pre (m3/s)


C.2 After development, Q-post (m3/s)
C.3 Permissible site discharge, PSD(m3/s)
C.4 Site Storage Requirement, SSR (m3)

D. Detention

D.1 OSD (On Site Detention) Capacity


D.2 Type ( below/above ground)
D.3 Area
D.4 Material

E. Gross Polutant Trap (GPT)

E.1 Flow 3 months ARI


E.2 Type
E.3 Area
E.4 Material

F. Open Drain

F.1 Type

F.2 Slope

G. Culvert

G.1 Type
G.2 Slope

1 Rev 05
ACE/TECHNICAL/DISS*

Design
No. Descriptions Remarks
Parameters

I. Submission

I.1 Submission level Jabatan Pengairan Dan


Saliran
J. Contribution

J.1 Constribution fees (RM) Determine by local


Authority
K. Approval Validity

K.1 Approval Validity (yeras)

L. Design Software
Manual Cal. /
MIDUSS ‘98

APPENDIX A

2 Rev 05
ACE/TECHNICAL/DISS*

NO. Flows Formula

Qy = C. yIt A (per.14.7)
360
1 Q-pre dev.

Qy = C. yIt A (per.14.7)
Q-post dev.
2 360

a  a 2  4b (per.19.1)
PSD 
3 PSD 2

SSR  0.06t d  Qd  c  d  (per.19.2)


4 SSR

3 Rev 05