Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Demolishing Work

Demolish and remove the existing different house with total


builtup area of 401.56 m2 made of HCB wall, roughly finished
concrete or cement screed floor, CIS sheet roof cover and made
the area clear for the construction of the new building. Further
more all the existing water line, electric line, tele line, data and
cctv line could be removed and relocated by the contractor. The
1.01 contractor should visit the site before quote the price. Ls 1.00 500,000.00
Ditto as item no 1.01, but the wall is made of MUD with total
1.02 builtup area of 346.5 m2. Ls 1.00 500,000.00
Ditto as item no 1.01, but the wall is made of flat metal sheet
1.03 with total builtup area of 35 m2. Ls 1.00 500,000.00
Demolish and remove the existing septic tank where the top and
bottom slab is made of concrete and the wall is made of concrete
shear wall and made the area clear for the construction of the
new building. The contractor should visit the site before quote
1.04 the price. Ls 1.00 500,000.00

Total Carried to Summery

A. Substructure
1.0 Excavation and Earth Works

1.01 Clearing of Ordinary Soil, Root and a made up Ground of the


site to an average depth of 20 cm from natural ground level m2 1,312.00 14.00

1.02 Bulk excavation in an ordinary soil to a depth not exceeding


150 cm from Cleared Level m3 1,968.00 40.00

1.03 Ditto item No. 1.02 but exceeding 150 cm But not exceeding 300
cm from Cleared Level m3 1,968.00 48.00

1.04 Ditto item No. 1.02 an ordinary soil but exceeding 300 cm but
not exceeding 450 cm from cleared level m3 1,574.40 69.00
1.05 Pit Excavation in an ordinary soil to a depth not exceeding
150cm from Reduced Ground Level. m3 610.38 81.00
1.06 Ditto item No. 1.05 but exceeding 150 cm But not exceeding 300
cm from Cleared Level m3 305.19 100.00
1.07
Trench Excavation in ordinary soil to the depth of 1500cm m3 218.49 50.00
Selected granular material fill from quarry and well compacted
1.08 with 10-16 ton roller in layers of not exceeding 20 cm thick
untill compaction attaining 98 % dry density.
a) around Footing and forunation wall m3 767.32 550.00
b) under hardcore m3 858.40 550.00

Page 1 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Load and cart away surplus excavated material to a suitable


1.09 damping area allowed by the municipality not more than 10km
from the site. m3 6,906.86 200.00

Basaltic or equivalent stone hard core well rammed and


1.10 consolidated and blinded with crushed stone to a finished
thickness of 25 cm. m2 942.34 300.00

Total Carried To Summary

2.0 Masonary Work

2.01 50cm thick stone masonry foundation wall bedded in cement


sand mortar (1:3) below NGL m3 112.89 2,800.00

Total Carried To Summary

3.0 Concrete Work

3.01 50mm thick lean concrete in class C-5 with minimum cement
content of 150kg/m3 under:
(a) under footing pad m2 322.21 79.00
(b) under Basement and Ground floor Beam m2 155.66 79.00
(c) Under Masonary Wall m2 94.35 79.00
(d) Above Hard Core m2 964.84 79.00
(e) Under staircase m2 30.10 79.00
(f) Under Ramp m2 140.34 79.00

Reinforced concrete class in C-30 cast in to form works and


vibrated around rod reinforcement bars (form work and
3.02 reinforcement bars are measured separately) the type of cement
to be ordinary Portland cementof 400kg/m3 .Unit Price Shall
include all the necessary chemicals used to attain the required
Concrete grade.
(a) For Footing pads m3 201.07 3,100.00
(b) For Foundation and Basement Columns m3 46.44 3,100.00
(c) For Lift shaft m3 14.19 3,100.00
(d) For basement Shear wall and voult room m3 86.55 3,100.00

Reinforced concrete class in C-25 Cast in to form works and


vibrated around rod reinforcement bars (form work and
3.03 reinforcement bars are measured separately) the type of cement
to be ordinary Portland cement of 360kg/m3.Unit Price Shall
include all the necessary chemicals used to attain the required
Concrete grade.
(a) For Basement and ground floor beams m3 74.92 3,000.00
(b) For 15cm thick basement floor slab m3
149.00 3,000.00
(c) For 20cm thick suspended ground floor slab m3 154.91 3,000.00

Page 2 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


(d) For Stair Case and landing m3
19.13 3,000.00
(e) For Ramp m3 17.26 3,000.00

Provide ,cut and fix in yellow timber and steel formwork that
3.04 should be strong to resist the pressure of fresh concrete.
Formworks for reuse shall be cleaned, oiled & stacked. Price
includes placing in position, fixing and dismantling for :
(a) Footing pads m2 269.49 330.00
(b) Foundation and Basement Columns m2 350.59 330.00
(c) Basement and ground floor beams m2 550.35 330.00
(d) For suspended ground floor slab m2 774.55 330.00
(e) For basement Shear wall and voult room m2 1,273.49 330.00
(f) Stair Case m2 90.78 330.00
(g) Lift shaft m2 62.63 330.00
(h) For Ramp m2 62.23 330.00

3.05 Provide and Fix S-400 Mild steel reinforcement bars according
to structural drawings. Price Includes Cutting, Bending, Placing
in position and tying wires and concrete spacers.
(a) Dia 6 mm plain bar Kg
(b) Dia 8 mm deformed bar Kg 20,007.15 70.00
(c) Dia 10mm deformed bar Kg 8,116.71 70.00
(d) Dia 12mm deformed bar Kg 5,002.55 70.00
(e) Dia 14mm deformed bar Kg 11,008.95 70.00
(f) Dia 16mm deformed bar Kg 7,816.41 70.00
(g) Dia 20 mm deformed bar Kg 1,520.02 70.00
(h) Dia 24 mm deformed bar Kg 70.00

3.06 Supply and Fix 10x150mm Styrofoam or Equivalent expansion


joint filler between beam and Slab ml 718.60 100.00

Total Carried To Summary

B. SUPER STRUCTURE

1. Concrete Work

Reinforced concrete class in C-30 cast in to form works and


vibrated around rod reinforcement bars (form work and
1.01 reinforcement bars are measured separately) the type of cement
to be ordinary Portland cementof 400kg/m3 .Unit Price Shall
include all the necessary chemicals used to attain the required
Concrete grade.
(a) For Elevation Column m3 92.75 3,300.00
(b) For lift shaft m3 98.41 3,300.00
(b) For Voult Room m3 19.34 3,300.00

Page 3 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Reinforced concrete class in C-25 cast in to form works and


vibrated around rod reinforcement bars (form work and
1.02 reinforcement bars are measured separately) the type of cement
to be ordinary Portland cementof 360kg/m3 .Unit Price Shall
include all the necessary chemicals used to attain the required
Concrete grade.
(a) In suspended floor and roof beam m3 289.38 3,300.00
(b) In Suspended Floor solid Slab m3 91.80 3,300.00
(c) In Ribbed Floor Slab with 24cm thick ribbed block
type class-C with 28 days minimum crushing strength of
18kg/cm2, ( ribs at 400mm c/c and the top finish with 60mm
Reinforced Concrete ) m2 2,637.75 3,300.00
(d) In Ribbed Floor Slab with 18cm thick ribbed block for wet
areaሰ type class-C with 28 days minimum crushing strength of
18kg/cm2, ( ribs at 400mm c/c and the top finish with 120mm
Reinforced Concrete) m2 449.40 3,300.00
(e) In stair case m3 37.48 3,300.00
(f) In Façade Wall m3 52.75 3,300.00

1.03 Provide ,cut and fix in yellow timber or steel formwork that
should be strong to resist the pressure of fresh concret.Price
includes placing in position, fixing and dismantling for :
(a) Elevation column m2 958.72 350.00
(b) floor and roof beam m2 1,412.44 350.00
(c) Suspended floor slab m2 3,624.75 350.00
(d) Stair case m2 241.86 350.00
(e) lift shaft m2 498.90 350.00
(f) In Façade m2 424.48 350.00
(g) Voult Room m2 95.83 350.00

1.04 Provide and Fix S-400 Mild steel reinforcement bars according
to structural drawings. Price Includes Cutting, Bending, Placing
in position and tying wires and concrete spacers.
(a) Dia 6 mm plain bar Kg 14,212.39 71.00
(b) Dia 8 mm deformed bar Kg 16,632.96 71.00
(c) Dia 10mm deformed bar Kg 43,158.24 71.00
(d) Dia 12mm deformed bar Kg 3,293.24 71.00
(e) Dia 14mm deformed bar Kg 13,849.57 71.00
(f) Dia 16mm deformed bar Kg 28,028.78 71.00
(g) Dia 20 mm deformed bar Kg 13,934.04 71.00
(h) Dia 24 mm deformed bar Kg

Total Carried to Summary

2.0 Block Work

Page 4 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Walls shall be constructed from class 'C' hollow concrete blocks


of minimum compressive strength should be 18kg/cm2. The
blocks shall be selected for their consistency in dimension,
Shape, angles and strength.The Blocks should also be free from
cracks or any other defects and the surface characteristic of the
blocks shall be in such a way that good key for plaster is
obtained. Samples and test results shall be submitted for
approval by the Engineer before any blocks are delivered or used
in the construction of the works.

Supply and Construct 20cm thick HCB wall, embedded in


2.01 cement-sand mortar of 1:3 mix ratio. Both Sides left for
plastering m2 3,341.81 380.00
2.02 Ditto but 150mm thick HCB walls. m2 141.92 350.00
2.03 Ditto but 100mm thick HCB walls. m2 58.21 320.00

Total Carried to Summary

3.0 ROOFING AND WATER PROOFING

Supply and fix Ega 500, 0.5mm thick or equivalent roof cover
3.01 fixed on steel purlin. Roof mesured horizontal projection (with
out addition for slopes & laps). Truss and purlin measured
separately else were. m2 619.75 500.00
3.02
Flashing with G 28 flat metal sheet with dev. Length of 50cm ml 159.10 250.00
3.03
Copping with G 28 flat metal sheet with dev. Length of 50cm ml 23.85 250.00

DAMP PROOF WORK

Supply and install Damp Proofing work with 4mm thick mineral
finish membrane and single layer wall of brick wall for
3.04 protection all around the reinforced concrete shear wall. (price
shall include clearing shear wall and any related civil work).The
sand for bitumen damp proof course shall comply with the
requirements of BS 1289. m2 385.94 500.00

SPECIAL CHARACTERISTICS

Surface Preparation: Concrete surface must be clean and free of


dirt, films, coatings or other foreign matter. All surface
imperfections and protrusions are to be removed and repaired.
Structurally unsound and friable concrete must be removed and
repaired.

Page 5 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Responsibility: the contractor should provide the approved


product on site; store it properly in original unopened packing in
dry condition and away from sunlight and scorching heat. In
addition the application should be made with professionals
trained in the preparation, mixing and application.

Testing: Pond testing for atleast 24 hours should be done after


the contructor has acomplished the water proffing work. The
surface should be re-treated if leakage observed; and the test
should be done on the repaired surface.

Brush and blow out dirt, dust laitance, scrapings and all other
3.05 loose materials until the reinforced concrete slab is fully
exposed. Place average 8cm thick light weight concrete attaining
2% slope over roof slab. The light weight concrete should be
allowed to cure thoroughly to attain maximum shrinkage. m2 559.30 2,500.00

30mm thick smooth finished cement sand screed laid on top of


3.06 light weight concrete and gutter in mortar mix (1:3) with proper
slop towards down pipe m2 559.30 75.00

Apply 4mm thick sand finish or equivalent water proofing


material applied to the cement sand screed for roof slab in a
3.07 strict accordance with a manufacturers' instructions. Issuing a
warranty for 10 years from the company for the proposed work is
mandatory. Damp proofing material type should be selected &
approved by the engineers. m2 559.30 500.00

Total Carried to Summary

4.0 CARPENTRY AND JOINERY

CEILING WORK

The contractor shall, when pricing this bill ,take into


consideration and allow for the costs or expenses of all
requirements stipulated in the preambles drawings and technical
specifications of the contract and Manufacturer.

Supply and install Acoustic ceiling tiles or equivalent with


4.01 square edge Pelican Econogrid pre-painted white exposed tee
grid system including fire safety punch outs. Main tees
suspended by means of 19 x 0.5mm GMS strap (or 2.5 wires)
hangers at 1200mm centres and all the neccessary accosories to
complete the work as per the manufacturer details. m2 620.00 600.00

Page 6 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and install of Patterned PVC laminated gypsum board


ceiling tiles, with aluminum foil on back face for water
4.02 resistance, with prepainted galvanized ceiling grids and
accessories, including cross, main runner, and wall angle,
suspended by expansion bolt and galvanized wire and all the
neccessary accosories to copmlete the workas per the
manufacturer details.. m2 342.00 600.00
Note: wood works include painting, varnishing, polishing, oiling
& the like.

Fire rated door

Supply and fix fire rated door 50mm thick constructed from fire
4.03 proof board of glass magnesium board of 18mm on treated solid
wood, with 25mm halite fire proof insulation fill, 3mm fire proof
veneer layer and finished, with inturmescent strip seal, with fiber
mesh glass vision panel. Rated 30minutesand 34db sound
insulation as per the manufacturer instruction
D6 Size = 900 x 2100 mm Pcs 5.00 7,000.00

Total CarriedTo Summary

5.0 Aluminium and Metal Works

Doors and windows made of Aluminum silver metallic tubular


profile frames ALLCO-5 or equivalent,2mm thick average weight
1000 gm/ml, door kick plate 1500 gm/ml, partly covered with
aluminum sheet and all glass thikness and types are according to
the detail drawing. Complete work include all the necessary
iron mongery, ASSA or equivalent type of cylindrical lock, door
stopper, etc and all accessories to complete the work. All
aluminum windows and doors type shall be in accordance with
the technical specification requirement, Architect's preference
and approval
All works shall be as per the Architectural detail drawings and
all other necessary accessories needed to complete the works
without any defect.

A. Aluminium Works
5.01 Window

W-1 size = 11350 x 2100 Pcs 1.00


W-2 size = 2800 x 2100 Pcs 1.00

W-3 siez = 4900 x 2100 Pcs 1.00

Page 7 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

W-5 size = 13150 x 2100 Pcs 1.00

W-6 size = 6800 x 2100 Pcs 1.00

W-7 size = 9800 x 2100 Pcs 3.00

W-8 size = 27200 x 2100 Pcs 1.00

W-9 size = 11560 x 2100 Pcs 1.00


W-10 size = 2500 x 2100 Pcs 1.00

W-11 size = 25800 x 2100 Pcs 1.00

W-12 size = 12200 x 2100 Pcs 1.00

W-13 size = 14800 x 2100 Pcs 1.00

W-14 size = 4100 x 2800 Pcs 1.00

TW-1 size = 2800 x 1000 Pcs 1.00

TW-2 size = 6100 x 1000 Pcs 1.00

TW-3 size = 6300 x 1000 Pcs 1.00

TW-4 size = 4600 x 1000 Pcs 1.00

TW-5 size = 5600 x 1000 Pcs 1.00

TW-6 size = 6100 x 1000 Pcs 5.00

TW-7 size = 3750 x 1000 Pcs 1.00

5.02 Doors

D1 Size = 2100 x 2100 mm Pcs 100.00


D2 Size = 2100 x 700 mm Pcs 50.00
D4 Size = 2100 x 1000 mm Pcs 37.00
D4 Size = 2100 x 1500 mm Pcs 10.00

Supply and install structural Curtain wall in extruded 6060(UNI,


5.03 9006/01) Aluminium alloy,T5 state, suitable for anodic oxidation
or painting. The grid is mullion-and-transom type,with minimum
tubolar section, (50x100)mm. The façade is devided into two
zones, spandrel and vision. The Spandrel zone includes:

- Skirting on floor level in aluminium sheet or axtruded profile

Page 8 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


- Melamine chips wood,18mm thick to cover the structure from
1m up to the floor level
- steel sheet corner to fix on the slab, for water and sound proof
protection
- Insulating panel in rook wool, 40mm thick
- Single Glazing on the external side, with a 6-mm thick non
reflective tinted glass,Novable or equivalent.
The vision zone includes
- Window opening outwards, without frame visible from outside
at the rate of 50% and drawing shall be prepared by the
contractor and approved by the Engineer shall be granted prior
to installation.
All works shall be as per the Architectural detail drawing. Price
includes all other necessary accessories needed to complete the
works without any defect.

CW1 Size = 7560 x 4350 mm m2 32.89


CW2 Size = 5800 x 4200 mm m2 24.36
CW3 Size = 11800 x 4200 mm m2 49.56
CW4 Size = 6000 x 2550 mm m2 15.30
CW5 Size = 5340 x 7500 mm m2 40.05
CW6 Size = 7250 x 900 mm m2 65.25
CW7 Size = 9630 x 3000 mm m2 28.89
CW8 Size = 3630 x 4200 mm m2 15.25
CW9 Size = 8770 x 4200 mm m2 36.83
CW10 Size = 11400 x 4200 mm m2 47.88
CW11 Size = 9500 x 3300 mm m2 31.35
CW12 Size = 1050 x 20420 mm m2 21.44
CW13 Size = 1300 x 12900 mm m2 16.77
CW14 Size = 900 x 12900 mm m2 11.61

Supply and fix hand rail for stair case in Ø40mm CHS at the
top, 40x 40 x 2.5mm thick vertical member every other two
steps fixed to concrete stair and 3 x 25 x25 x 2.5mm thick
5.04 horizontal rail member. All works shall be executed including
plate and bolt based on the detailed drawings . Price shall
include paint and all the necessary works needed to complete the
work. Colors and all works there to are subject to the approval
of the Engineer. ml 104.00

Supply and fix fully glaized aluminum partition wall including


door opening, as per supplier's specifications and detail
5.05
drawings and Engineer's approval. The aluminum tubular
profile frame shall be approved by the Engineer. Price includes
Italian type approved lock, hinges, 5mm thick clear glass and
other hardware and iron mongery. m2 1,965.09

Page 9 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and Fix Aluminium Sky light made of Structural frame


5.06 and heat proof double structural glazing with water proof joints.
Detail for all electrical appliances and fixing should follow the
manufacturers instruction and as per the detail drawing. Price
includes all the necessary accessories required. m2 65.00

5.07 Supply and Fix Aluminium Luvers made of 2mm thick Aluminium
frames as per the detail drawing. Unit price shall inlude all
accessories and connecting pieces to complete the work. m2 202.30

B. Metal Works

Supply and fix in position metal Window, door and partition wall
5.08 made with 38x1.5mm LTZ steel profile. Price includes best
quality cylindrical lock, kicking plate, hinges, one coat of anti-
rust and two coats of synthetic paint., 4mm clear glass and all
necessary accessories to complete the workas. All work shall be
in accorance with the Architectural detail drawing and approval.

A - Doors
D1 size 1800 x 2100 mm No 4.00

Supply, assemble & erect steel structure in accordance with


5.09 structural drawing. Price includes one coat of anti-rust & two
coats of synthetic enamel paint.
5.09.1 RHS truss
a) upper & lower chord, diagonal and vertical member
size 50x50x3mm Kg 1,694.48
size 40x40x3mm Kg 612.84

5.09.2 Lattice purlin and steel stair


size 40x40x2.5mm Kg 5,298.23

5.09.3 Metal Plate


size 500x250x3mm plate Pcs 58.00
size 200x200x2.5 mm plate Pcs 16.00

5.09.4 Checkered Plate for steel stair

Size 1300x300x40mm and the thicness of the steel shall be 4 mm. Pcs 11.00

5.09.5 Angle iron


size 25x25x4mm, length 40mm Pcs 102.00

5.09.6 Bolt with nut

Page 10 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

a) Dia 16mm J-bolt Dev. Length=270mmwith washer and nut Pcs 116.00

b) Dia 16mm J-bolt Dev. Length=30mmwith washer and nut Pcs 16.00
c) Dia 12mm purlin to truss connection bolt Dev.
Length=100mm Pcs 102.00

Supply and fix corner protection on exposed RC exposed column


5.10 edges, made specifically for this purpose with metal sheet with
mim. thickness of 1.2mm, centrally bent for corner and the side
flanges are perforated as mesh to be imbedded in cement mortar
(1:3) plaster up to a hight of 2 meters and to be further finished.
The sample shall be approved before installation. pcs 387.00

Sundry Item
(Provisional Item)

Supply and fix Vault Room windows and doors. Price shall
include all the necessary accosseries and material needed to
5.11 complete the works including lock (digital, manual or
combination), hinge, handles and any system for door and
windows.
Windodw size 1000 * 1200mm
Door size 1350 * 2350mm Ls 2.00

Total Carried to Summary

6.0 Finishing Works


PLASTERING

Supply and apply two coats of plaster in cement-sand mortar to


6.01 every internal wallsurface, columns, beams, lift walls, shear
wall. Mix ratio shall be 1:3. Price shall include preparing the
background for plastering by hacking, nicking out joints
chiseling smooth surfaces to roughen them, etc. m2 6,543.92 165.00
6.02 Ditto but to the external wall, exposed beam and column
surface . m2 2,439.67 165.00
6.03 Ditto but to the Concrete slab Ceiling. m2 3,546.15 165.00
6.04 Ditto but to the stair soffit. m2 225.38 165.00
6.05 Supply and apply grooving for internal handrail as per the
drawing m2 253.17 165.00
Supply and Apply third coats of plastering in cement mortar .
6.06 Price shall include pre-clearing and preparation of the surface
to receive paint.
a) To external Wall m2 2,439.67 85.00

Page 11 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply & apply approved gypsum plaster with a minimum


6.07 thickness of 3mm over the 2nd coat plastered surface of internal
wall surface, columns, beams, lifts and shear wall . Work & cost
includes preparing the surfaces, preparing every working
materials etc. Application shall be done after well cured the
plastered surface and as per the instruction of engineers . m2 6,543.92 50.00
6.08 Ditto but to the Concrete slab Ceiling. m2 3,546.15 50.00
6.09 Ditto but to the stair soffit. m2 253.17 50.00

FLOOR & WALL FINISHES


Supply and lay polished, chamfered & epoxy treated or
6.1 equivalent type Marble tile.The price shall include Mapei,
Cercol, Keracol or equivalent filler and adhesive
a) For thread (champhered & grooved at the bottom of front
edge).
size ( 40 x 3)cm. ml 59.10
size ( 30 x 3)cm. ml 544.88
b) For riser.
size ( 15 x2)cm. ml 603.98
c) For floor and landing tile 40 X 40 X 2 cm thick. m2 91.60
d) Skirting for the stair
size (15×2)cm ml 94.20
e) Skirting for the landing and floor
size (10×2)cm ml 279.20
f) For throated,weathered, champhered & grooved door
Threshold
size ( 25 x 3)cm. ml 283.98
g) For Throated, weathered, champhered & grooved Marble
window sill
size ( 28 x 3)cm. ml 227.51
h) For Throated, weathered, champhered & grooved Marble
copping
size ( 287 x 3)cm. ml 290.35
i) For Throated, weathered, champhered & grooved Marble
copping
size ( 25 x 3)cm. ml 140.65

Supply and fix approved quality Polished non slipery Porcelain


floor tile lay over the pre finished screed surface . The tile shall
6.11 be 60 x 60 x 1cm. work & cost includes Max Fix or equivalent
cement adhesive & water proof joint filler or equivalent.
Pattern, colour & cement adhesive shall be approved by
engineer. m2 3,867.81

Page 12 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and fix approved quality Polished Porcelain skirting on


6.12 plastered wall by means of Max Fix or equivalent cement
adhesive .Price shall include cement sand mortar (1:3) ratio
backing, The skirting shall be champhered top one edge. Size 10
x 1cm ml 1,117.60

Supply and fix approved quality RAK or Equvalent non slipery


6.13 Ceramic floor tiles Price shall include cement sand mortar
(1:3) ratio backing, adhesive with Max Fix or equivalent &
grouting with water proof joint filler.The consultant must
approve the size, pattern,color & texture of the tiles. m2 330.85

Supply and fix approved quality RAK or Equvalent Ceramic


6.14 skirting stuck to wall with cement -sand mortar ratio1:3 on to
wall surface for Ceramic floor. ml 46.85

Provide 50mm thick smooth finished cement & sand screed finish
6.15 with mix ratio of 1:3 . Application carried with the inspection of
engineer. m2 729.11

Provide a 47mm thick cement & sand screed finish with mix ratio
6.16 of 1:3 & 1:1 to easily accept Vinyle floor tile. Application
carried with the inspection of engineer. m2 305.20

Supply and fix approved imported 3mm thick plastic floor tile
6.17 colour, pattern and special adhesive glue shall be approved by
the engineer. m2 305.20

Supply and fix 10cm high PVC skirting. Price shall include all
6.18 the necessary works needed to complete
the work. ml 419.10

Supply and fix high quality pressurized laminated board (HPL)


6.19 partition wall should be completely moisture proof, highly
scratch-and-impact-resistant, colorfast, chemical resistant easy
to clean and should not require any special maintenance.
Colors and all works are subject to the approval of the Engineer. m2 278.46

Supply and fix 100mm thick gypsum board partition wall


including door opening, as per supplier's specifications and
6.20
detail drawings and Engineer's approval. The board has to be
high bond strength, water proof and fire resistant a minimum of 3
hours. m2 1,046.85

Supply and fix approved quality RAK or Equvalent Ceramic


6.21 wall tiles Price shall include cement sand mortar (1:3) ratio
backing, adhesive with Max Fix or equivalent & grouting with
water proof joint filler.The consultant must approve the size,
pattern,color & texture of the tiles. m2 638.10

Page 13 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and fix approved quality Granite wall tile lay over the pre
finished plastered surface .work & cost includes Max Fix or
6.22 equivalent cement adhesive & water proof joint filler or
equivalent. Pattern, colour & cement adhesive shall be approved
by engineer. (for lift wall) m2 52.47

6.23 Civil works around the building

Supply and lay approved type 45x45x3.8cm colored concrete


6.23.1 paving tile laid on well compacted and levelled 10cm thick red
ash with 2% slope to the open ditch and finally pointed with
cement mortar (1:4) around the building m2 138.00

Provide green areas where specified on the site plan drawings.


Plant shall be set in position in the of holes and holes back filled
6.23.2 around the roots. The top layer shall be fine graded using
suitable top soil obtained from site or imported from appropriate
location. All plants and grass shall be protected by erecting
temporary fences, signs and other protection as needed to
prevent trampling. Price shall include all the necessary works. m2 132.40

Total Carried To Summary

7.0. Painting

The specification of the manufacturer approved by the Engineer


shall govern for selection of paint materials and coatings. The
products specified hereunder shall be obtained only from
manufacturers approved by the Engineer.All paint materials shall
generally be obtained from approved suppliers only. Surface
sealers, primers and under coats shall generally be in
accordance with the paint manufacturer's recommendation.
Paint strippers, abrasive papers, cleaning agents, etching
solution and fillers shall be as recommended by the paint
manufacturer.

7.01 Apply three coats of plastic emulsion paint to internal wall


surfaces, columns, beams, lifts and shear walls m2 6,543.92
7.02 Ditto but for concrete ceiling surface . m2 3,546.15
7.03 Ditto but for soffit of the stair case. m2 253.17

7.04
Ditto but Synthetic Paint above ceramic wall cladding in toiltes m2 142.96
Apply three coats of Granite paint on external wall surfaces,
7.05 columns and beams. Color and texture shall be approved by the
Engineer m2 2,439.67

Page 14 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


Total Carried To Summary

8. SANITERY INSTALLATION

8.1 SANITARY EQUIPMENT (FIXTURES)

All fixtures which differs from that specified below is subject to


the Engineer's approval, based on samples, catalogues and
brochures presented by the Contractor. Unit Price shall include
all the necessary fixing brackets or hooks and all the necessary
assistance civil works such as chiseling of walls,floors, beams
and etc…

ALL FIXTURES SHOULD BE APPROVED EUROPEAN


BRAND

Supply and fix golden dragon or Equivalent, above counter hand


wash basins made of white glazed vitreious china as per BS3402
Standard. The price includes REMER/JAQUAR or Equivalent
chrome plated cold and hot water tap, granite base stand with
RHS horizontal support as shown in the drawing,complete with
mixing battery plug, chrome plated chain holder, P-smell trap
with connection pipe, fittings, all other necessary fittings etc.
complete in all respects.accessories. Flexible hose to be REMER
or Equivalent to be Vinyle coated and should be capable of
resisting pressure of 4 bar. P-smell trap should be brass chrome
8.1.1 plated with 50mm height of water seal and trap.
Size :- 570 x 470 x 185 mm No 36

Supply and fix olden dragon or Equivalent, white glazed vitreous


china as per BS3402 Standard floor mounting type (European
style) P/S trap water closet with solid white plastic seat and lid,
chrome plated brass hinges and rubber buffers with white
vitreous china 3/6 dual flush coupled cistern including required
fittings, accessories etc. complete in all respects. Flexible hose to
be REMER/JAQUAR or Equivalent to be Vinyle coated and
8.1.2 should be capable of resisting pressure of 4 bar. No 46

Supply and fix PHELEXICARE or Equivalent Vanity type hand


wash basin unit designed to assist disabled people and those
with limited reach. The vanity top is to be designed with the bowl
8.1.3 area as close as possible to the user.

Vanity Top

Page 15 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


The Vaity top is to be made from water-resistant granite topping.
The front apron to have a depth of only 100mm to allow for free
access for knees.
Vanity Top size :535 x 700mm

Basin

hand wash basin to be white vitreous china with apron front of


100mmand can be fitted to the right side of the vanity.
Basin size :510 x 455mm

Fixing Brackets
Fitted to the underside of the basin with toggle bolts and screwed
to the undeside of the work top

Accessories

Tap has to be provided separetly for cold and hot water, model
should be REMER/JAQUAR or Equivalent chrome plated cold
and hot water tap, Complete with mixing battery plug, chrome
plated chain holder, P-smell trap with connection pipe and with
all other hose to be REMER/JAQUAR or Equivalent, necessary
accessories. Flexible hose of Length 60cm to be Vinyle coated
and should be capable of resisting pressure of 4 bar. P-smell trap
should be brass chrome plated with 50mm height of water seal
and trap. Colour of the topping to be decided by the Architect.
Granite

Supply and fix PENTLAND or equivalent Close-coupled white


vitreaous china water closet unit designed to assist disabled
people and those with limited reach. The unit has to be
integrated with close-coupled low-flush 7.5litre capacity cistern.
The unit should be suitable for transfer from a wheel chair.
Flexible hose to be REMER/JAQUAR or Equivalent, Length
60cm to be Vinyle coated and should be capable of resisting
pressure of 4 bar. P-smell trap should be brass chrome plated
with 50mm height of water seal and trap. No 18

Supply and fix R.A.K. or Equivalent white glazed vitreous china


wall mounting type toilet paper holder with chrome plated
8.1.4 fastening screws and other accessories. No 64

Supply and fix 6mm thick crystal glass mirrors for hand wash
basins with copper back protection, including chrome plated
brass mirror frames with chrome plated screws and etc... for
8.1.5 hand wash basins.
Size :- 600 x 500 mm No 36

Page 16 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and install urinals made of acrylic, unit price shall


8.1.6 include all accessories neccessary for complete installation.
Size: 457x653x659 mm No 24

Supply and fix TEKA or Equivalent, 1.2mm GRADE 304


approved standard stainless steel kitchen sink of Double bowl
complete with chrome plated REMER/JAQUAR or Equivalent
cold and hot water mixing battery (chrome plated faucet), plastic
Bell type smell trap, plug, chain holder, drain pipe, mixing
faucet, etc; and all other accessories.Flexible hose to be
REMER/JAQUAR or Equivalent to be Vinyle coated and should
8.1.7 be capable of resisting pressure of 4 bar.
Size: 1500 x 600 mm No 1

supply and fix super aqua or equivalent water heater including


8.1.8 all assstance fittings and civil works.
capacity : 80 Lit No 1

Supply and fix NAFFCO or equivalent recessed wall mounted


fire hydrant hose reels as per BS EN671-1. Complete with dia.
40 mm and 25 meters necessary accessories. Cabinet shall be
factory made 1.2mm thick pretreated electro galvanized steel
sheet, painted with electrostatic powder coating and oven backed
at min.180 degree cent with easily openable glass door of size
shall beabout 900 x 600 x 250mm /approximate.size/. Price shall
include angle valve,pressure reducer & fire extinguisher 6kg
8.1.9 weight ABC Chemical powder in side cabinet. No 5

Fire hydrant water supply pipes shall be medium gauge


galvanized steel and be fixed to slabs, walls,beams or etc…with
metal straps or similar material. Unit price shall include all
assistance civil works and necessary fittings such as T,
instruction and according to where shown on the drawing. All
water pipes shall be tested two times the working pressure or 50
meters head, which ever is greater at the expense of the
8.1.10 contractor.
Dia. 40 mm ml 24
Dia. 50 mm ml 12
Dia. 65 mm ml 36

Page 17 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and fix floor drains made of uPVC circular box of


approved quality for grey water with 4- side openings, complete
with P-smell trap, treaded drain/clean bottom outlet, approved
standard plastic or stainless steel cover and all other necessary
8.1.11 fittings and accessories
Size:- Dia. 75/75/75/110 mm No 24

Supply and fix approved quality floor clean outs as where shown
on the drawing. Price shall include all the necessary connecting
8.1.12 pieces.
Compatible with Dia. 110 mm No 12

supply and installs complete fountain system including


recirculation pumps and assocated pipe works and fittings in the
ground floor as shown in the layout and section detail design
drawing. Price shall include all assicistance civil works
8.1.13 including specified finishing metrials and water proofing works. No 1

supply and install water taps and necessary fittings for prayer
zones of the building as shown in the building design sanitary
8.1.14 drawing. No 10

8.2 WATER SUPPLY PIPES AND FITTINGS

Cold water pipes shall be PolypropyleneRandom Co-polymer


resins (PP Type 3 rawmaterial) PPR pipes for cold water , and
be fixed to slabs, walls, beams or etc…with metal straps or
similar material. Unit price shall include all assistance civil
works and necessary fittings such as T, bends etc. according to
where shown on the drawing.

The Pipes and fittings shall conform to BS3505and/or DIN8062


or equivalent Unit price shall include, cleaning and disinfection
of the pipes with liquid Chlorine and all the necessary assistance
to the installation works.

Flushing, disinfecting and testing and commissioning of water


supply system. Flushing has to be done to clean the pipeline from
debris and silts. Disinfecting has to be done with liquid chlorin
8-10ppm. All water pipes shall be tested with pressure of
10kg/cm (10bar).

Supply and install Polypropylene Random Co-polymer resins


(PP Type 3 raw material) PPR PN-20 to internal cold water
distribution system as shown on the drawing. Complete with all
the necessary fittings and accessories. All diameters specified
8.2.1 here are internal (Nominal) diameters.

Page 18 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


Dia. 20 mm ml 165
Dia. 25 mm ml 78
Dia. 32 mm ml 112
Dia. 40 mm ml 64
Dia. 50 mm ml 108

Supply and fix 15mm dia chrome plated brass quarter turn angle
valves with chrome plated copper connecting pipe, union nut and
chrome plated brass wall flanges, and accessories complete in
all respects. The Angle valve should be capable resisting of PN-
8.2.2 10 before hand wash basins, water closets and other fixtures. No 174

Supply and fix PPR service valves of approved standard, capable


of resisting PN-10 on internal branch and pipe inlet to toilet,
kitchen, bath room,etc; of the following size and as where shown
on the drawing. The gate valves should be compatible with PPR
pipe on internal and external branch pipes, at inlet points to the
8.2.3 building,
Dia. 25 mm No 1
Dia. 32 mm No 12
Dia. 50 mm No 4

8.3 WASTE, VENT AND RAIN WATER PIPES AND


ACCESSORIES

All domestic waste, vent and storm water pipe linesshall be


comply to BS 459, BS 4660, BS 5481, DIN 8062 as appropriate,
using double ring seals and gaskets complying with BS 2394
uPVC, PN-6 pipesand shall be provided with a minimum slope
asstated in the drawing. Pipes and necessary fittings shall be
standard quality and be free from damage during storage,
construction and etc. Unit price shall include all the necessary
assistance civil works, suchas excavation cartaway, fixing or
hanging to walls,beams or slabs. etc., necessary fittings such
asbends, Y, etc. Storm water uPVC, PN-6 pipes shall resist the
external temperature and the quality shallmeet the purpose.

Flushing and testing of waste water system.Flushing has to be


done to clean the pipe line fromdebris and silts. All waste water
Pipe shall betested by water pressure of 1.5 meters head for
minimum of Two Hours.

Page 19 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Providing, laying and jointing of internal uPVC PN-6 waste


pipes with all uPVC pipe fittings including jointing with solvent
cement joints and testing of joints etc. according to where shown
on the drawings. Complete with all the necessary fittings.
Provide cleaning detail for all waste water riser pipes as per the
8.3.1 detail drawing.
Dia. 50 mm, Outer diameter ml 24
Dia. 75 mm, Outer diameter ml 48
Dia. 110 mm, Outer diameter ml 44
Dia. 125 mm, Outer diameter ml 18
Dia. 160 mm, Outer diameter ml 78

8.3.2 Vent caps made of uPVC, PN-6 complete with all accessories.
Dia. 75 mm No. 2
Dia. 110mm, for septic tank No. 3

8.4 WATER PROFFING WORK

SPECIAL CHARACTERSTICS

Surface Preparation: Concrete surface must be clean and free of


dirt, films, coatings or other foreign matter. All surface
imperfections and protrusions are to be removed and repaired.
Structurally unsound and friable concrete must be removed and
repaired.

Responsibility: the contractor should provide the approved


product on site; store it properly in original unopened packing in
dry condition and away from sunlight and scorching heat. In
addition the application should be made with professionals
trained in the preparation, mixing and application.

Testing: Pond testing for atleast 24 hours should be done after


the contructor has acomplished the water proffing work. The
surface should be re-treated if leakage observed; and the test
should be done on the repaired surface.

Supply and coat SIKA or Equivalent Cementitious Water proffing


as per manufacturers instruction for all wet areas, toilets kichen,
etc as per Engineer's instruction. The contractor must consider
the work as complete set and provide appropriate measures for
the connection b/n pipes and concrete slab. After the completion
of the work the contractor should do ponding test using water at
8.4.1 level of 20cm from floor finish level for at least 24 hours. m2 410

Page 20 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Supply and install TESTUDO or Equivalent, 4mm thick bitumen


plastometric water proofing, manufactured from a rich mixture
of bitumen and selected polymer blended together to obtain
excellent heat and UV resistant membrane type water proofing as
per manufacturers instruction and Engineer's instruction on all
8.4.2 suspended exposed slabs, terraces, etc. m2 418

Supply and install SIKA or Equivalent 4mm thick membrane type


water proffing as per manufacturers instruction under basement
floor slab on 75mm thick cement screed (mix ratio 1:3)above and
below as shown on the drawing. Price includes 75mm thick
8.4.3 cement screed and all incidental work thereto. m2 1060

8.5 Pumps
8.5.1 Domestic Pumps(cold water)

Supply, fix ,test and commission groundfoss or Equivalent


approved quality Electric driven booster centrifugal domestic
water pump with Cast iron impeller, as per the manufacturer's
instruction, technical specification and drawing shown. Price
shall include:
20 cm thick double reinforced with dia. 12/100 mm reinforced
concrete seat
Bronze gate valve on suction pipe, Diam. 65 mm
Dual plate WAFER type cast iron non - return valve
Diam. 50mm of Approved standard rated to PN-20, with bolts,
nuts, 3mm thick gasket and matching flanges.

Water level indicator for low and high water level in the water
storage for pumps including float type probes, wiring cable,
conduit and making connection to pump panel complete in all
respects and making system functional, cutting and making
good.

Dry running protection with cable, conduit and fixing


arrangement Sensor with panel manual and automatic change-
over and sequancer suitable for the two pumps. supply, fix, test
and commission dial type pressure gauage with isolation cork
and chrome plated copper pipe. Calibration to be 0 - 10 Bar.
Water hammer Arrestor ( Air Vessel) of 64liter capacity made of
mild steel, two coats of red enameled paint over primer outside
and two coats of Epoxy coating inside, and test pressure of 10
Bar.
Two Pumps: ( Duty and Stand-by)
Capacity : Discharge = 3.5 liters/second
Total head = 35 meters
Estimated power = 2.2 Kw
Efficiency >70%
NPSH >1.5m

Page 21 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

- Control Panel (IP 55) to IEE Regulations incorporating the


following:

Indicators for - Power on, Pump tripped, High pressure, Low


pressure, Low water Hand (off), Lack of water and Auto selector
switch for each pump including all the necessary accessories. Set 1

8.5.2 FIRE PUMPS

Install NAFFCO or Equivalent automatic pumps with flanged


connection and mechanical seal for fire fighting system
according to the drawing shown and as per the manufacturer's
instruction. The automatic fire hydrant pump system shall
include:-
- One electic pump with all control valves
- One diesel pump with all control valves
- One jocky pump with all control valves
-Manifolds [suction and delivery side]
-Pressure switches
- Cylinderical diaphram pressure vesseles

Electric Driven Pump (1 Pc)


Capacity:- Discharge = 8.0 liter/sec
Total head = 46 meters
Estimated power = 6.0 kw
NPSH > 1.5 m
Efficiency > 70%

Diesel Driven Pump (1 Pc)


Capacity:- Discharge = 8.0 liter/sec
Total head = 46 meters
Estimated power = 6.0 kw
NPSH > 1.5 m
Efficiency > 70%

Jocky pump (1Pc)


Capacity:- Discharge = 2.0 liter/sec
Total head = 46 meters
Estimated power = 2.0 kw
NPSH > 1.5 m
Efficiency > 70% Set 1

8.6 SITE WORK

SITE WATER SUPPLY PIPES

Page 22 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Cold water pipes shall be High Density Polyethylene (HDPE),


PN-10 pipes, and be laid in trench as shown in the sanitary site
drawing. Provide 100mm thick sand bedding material rammed
and tamped and 150mm thick approved material to cover the
pipe all as per the typical trench section and detail.necessary
fittings such as T, bends etc. according to where shown on the
drawing. All water pipes shall be tested two times the working
pressure or 160 meters head, which ever is greater at the expense
of the contractor.
dia 20 mm 60
dia 32 mm 18
dia 50 mm 19
dia 63 mm 25
dia 75 mm 30

Construct manholes on a waste water drainage systems as where


shown on the drawing on 150mm thick reinforced concrete
bottom slab in dia.10c.c150mm both ways and 120mm thick
reinforced cover slab in dia.10c.c150 mm both ways. Price shall
8.6.1 include all assistance civil works and handle.
a) Internal size: 60x60 cm, with Double brick wall, 25cm width
average depth = 1500 mm No 9

Construct septic tank out of reinforced concrete as per the detail


drawing. Price shall include excavation, cart away and all civil
8.6.2 works as shown on the detailed drawing .
Capacity 80m3 No 1

8.7 SUB SOIL DRAINAGE SYSTEM

Supply and lay purpose made uPVC, PN-6 Factory slotted


plastic pipe to BS 1194:1969 for sub soil drainage system
around the building according to where shown on the basement
8.7.1 floor plan and detail drawing .
Unit price shall include:
filling and spreading of coarse gravel, fine gravel, sand and
selected backfill to an average depth of 4 meters and average
width of 0.8 meter.
covering of geosynthetics around the gravel pack (200g)
TESTIDO or equivalent membrene water proofing, 4mm thick
coating in accordance with the drawing.

Up right position of single brick wall to protect the membrane


water proofing, including all civil assistance works and screed
work in accordance with the detail drawing.
- well compacted clay soil on the top

Page 23 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


- All other necessary connecting pieces and civil assistance
works.
Dia. 160 mm ml 142

Supply and lay rodding or cleaning eye of uPVC, PN-4 on the


sub soil drainage system as where shown on the drawings.
Provide plug or screw tube plastic cap on top to external ground
8.7.2 level.
Dia. 160 mm No 7

Construct catch pit sump as per the detail drawing. The


reinforced catch pit should be externally protected with 4mm
thick TESTUDO or Equivalent water proofing membrane and the
internal part should be water proofed using semi elastic
cementitious water proofing; all as per manufacturers
8.7.3 instruction and recommendation. No 1

8.7.4 Dewatering pump

Supply,fix,test and commission approved quality centrifugal


domestic water pumps as per the manufacturer's instruction,
technical specification and drawing shown.Price shall include
all the necessary valves(one-way and stop valves) level switch to
protect dry-running. (one stand-by)
Capacity : Discharge = 3 liters/second
Total head = 8 meters
Estimated power = 0.75 Kw
Efficiency > 70%

- Control Panel (IP 55) to IEE Regulations incorporating the


following:

Indicators for - Power on, Pump tripped, High pressure, Low


pressure, Low water Hand (off), Lack of water and Auto selector
switch for each pump including all the necessary accessories. Set 1

Supply & lay grill covered ditch with a minimum slope of 2% or


natural ground slope which ever is greater ,on and including a
firm beding of red ash 50mm thick below. grilling cover shall be
done as stated in thed design drawing. The joints shall be
grouted in cements and mortar of (1:3)ratio. Price shall include
15cm thick stone masonry shoulder and all the necessary
8.7.5 earthworks and strainer with elbow. size shall be 25x40cm ml 5.4

Page 24 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

construct open ditch with a minimum slope of 0.5% or natural


ground slope which ever is greater ,on and including a firm
beding of red ash 50mm thick below. The joints shall be grouted
in cements and mortar of (1:3)ratio. Price shall include 15cm
thick stone masonry shoulder and all the necessary earthworks.
8.7.6 size shall be: 30x30cm ml 66

Supply & lay grill covered ditch with a minimum slope of 0.5%
or natural ground slope which ever is greater ,on and including
a firm beding of red ash 50mm thick below. grilling cover shall
be done as stated in thed design drawing. The joints shall be
grouted in cements and mortar of (1:3)ratio. Price shall include
15cm thick stone masonry shoulder and all the necessary
8.7.7 earthworks and strainer with elbow. size shall be 30x30 cm ml 46

Supply and install ECOGUSS or equivalent parking drain floor


gullys out of enameled cast iron on basement car parking as
8.7.6 shown in the design drawing. Size 300x300mm no 12

Providing, laying and jointing of internal uPVC PN-4 subsurface


drainge pipes with all uPVC pipe fittings including jointing with
solvent cement joints and testing of joints etc. according to where
shown on the drawings. Complete with all the necessary fittings.
Provide cleaning detail for all waste water riser pipes as per the
8.7.8 detail drawing.
Dia. 75 mm, Outer diameter ml 12
Dia. 110 mm, Outer diameter ml 84

8.8 GROUND LEVEL WATER TANK

8.8.1 Domestic water storage tank


Supply and install Glass Reinforced Plastic (GRP) or Equivalent
water tanks on basement floor and stanby on ground as where
shown on the drawing.
Accessories
- Dia. 50 mm strainers with foot valve
- Dia. 50 mm HDPE drain and over flow pipe nearest storm
drain manhole (P.Q.)
- Bronze Gate valve on drain pipe, dia. 50mm
- Dia. 100 mm vent pipe with cap
- Dia. 50 mm float valve
- Dia. 50 mm Bronze gate valve on inlet pipe
- Automatic level switch to be connected to domestic pumps to
avoid (protect) dry running.

Page 25 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

- Dia. 50mm HDPE connection pipe with Bronze gate valve.

Size:- 10m3 capacity No 1

8.8.2 Fire water storage tank


Supply and install Glass Reinforced Plastic (GRP) or Equivalent
water tanks on basement floor and stanby on ground as where
shown on the drawing.
Accessories
- Dia. 50 mm strainers with foot valve
- Dia. 50 mm HDPE drain and over flow pipe nearest storm
drain manhole (P.Q.)
- Bronze Gate valve on drain pipe, dia. 50mm
- Dia. 100 mm vent pipe with cap
- Dia. 50 mm float valve
- Dia. 50 mm Bronze gate valve on inlet pipe
- Automatic level switch to be connected to domestic pumps to
avoid (protect) dry running.

- Dia. 50mm HDPE connection pipe with Bronze gate valve.

Size:- 10m3 capacity No 1

ROOF ELEVATED WATER TANK


Supply and install Fiber Glass or Equivalent water tanks on stair
8.8.3 roof floor slab as where shown on the drawing.
Accessories
- Dia. 50 mm strainers with foot valve
- Dia. 50 mm HDPE drain and over flow pipe nearest storm
drain downpipe (P.Q.)
- Bronze Gate valve on drain pipe, dia. 32mm
- Dia. 100 mm vent pipe with cap
- Dia. 50 mm float valve
- Dia. 32 mm Bronze gate valve on inlet pipe
- Automatic level switch to be connected to domestic pumps to
avoid (protect) dry running.

- Dia. 32mm PPR connection pipe with Bronze gate valve.

Size:- 3m3 capacity No 2

Total Carried To Summary

9. ELECTRICAL INSTALLATION

Page 26 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


9.1 Distribution boards

Floor standing Main Distribution board MDB-Bank with


lockable door,Steel enclosure,Earthing lead, connectors, labled
and all necessary accessories consisting of :(all circuit breakers
9.1.1 are to be of type Legrand ,ABB or approved equivalent)
1 pc main MCCB of 200A/3ph
2 pc ACB of 63A/3ph
3 pcs ACB of 50A/3ph
1 pcs ACB of 32A/3ph
1 pc voltmeter (0-500V) with selector switch
3 pcs ammeter (0-500A) with transformer
1 pc Frequency meter
and complete with bus bar system of 300A/3Ph+N+E
and 25% reserve space. PCs 1

Flush mounted Distribution board SDB-4F with lockable


door,Steel enclosure,Earthing lead, connectors, labled and all
necessary accessories consisting of :(all circuit breakers are to
9.1.2 be of type Legrand , ABB or approved equivalent)
1 pc ACB of 63A/3ph
1 pcs ACB of 50A/3ph
13 pcs ACB of 16A/1ph
15 pcs ACB of 10A 1ph
3 pcs contactors of 10A/1ph, 220V for LCP
and complete with bus bar system of 80A/3Ph+N+E
and 25% reserve space. PCs 1
Ditto as 9.1.2 above but for SDB-3F, SDB-2F, SDB-1F and
9.1.3 consisting of :
1 pc ACB of 50A/3ph
15 pcs ACB of 16A/1ph
16 pcs ACB of 10A 1ph
5pcs contactors of 10A/1ph, 220V for LCP
and complete with bus bar system of 63A/3Ph+N+E
and 25% reserve space. PCs 3
9.1.4 Ditto as 9.1.2 above but for SDB-GF and consisting of :
1 pc ACB of 63A 3ph
4 pcs ACB of 25A/1ph
10 pcs ACB of 16A/1ph
16 pcs ACB of 10A 1ph
and complete with bus bar system of 50A/3Ph+N+E
and 25% reserve space. PCs 1

9.1.5 Ditto as 9.1.2 above but for SDB-base and consisting of :


1 pc ACB of 32A 3ph

Page 27 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


4 pcs ACB of 25A/1ph
4 pcs ACB of 16A/1ph
11 pcs ACB of 10A 1ph
and complete with bus bar system of 50A/3Ph+N+E
and 25% reserve space. PCs 1
9.2 Light points

Light points in rigid thermoplastic conduit of diameter 16mm fed


by pvc sheathed pvc insulated conductor of 2x2.5mm2 (wire to
9.2.1 be of ethiopian plastic or approved equivalent) PCs 880
9.3 Switches and Light control panels (LCP)
LEGRAND, SUNO, or equivalent with appropriate cover plate &
scattola. It has to be recessed or approved
9.3.1 Single(774001+774041) PCs 43
9.3.2 Double(774005+774041) Pcs 45
9.3.3 Two-Way(774006+774041) Pcs 210
9.3.4 Triple pole switch Pcs 8
9.3.5 Light Control Panel (LCP)

Factory assembled surface mounted metal enclousures IP 34


light control pannel , with lockable door including DIN rail
mounted terminal blocks, cover all fixing and end brackets,
marking tags all fixing and connection accessories,complete and
consisting of:-

4pcs spring return miniture push button with LED pilot light to
be fixed on the front of the enclosure.4 pcs DIN rail mounted
terminal blocks with end brackets and . marking tags all
complete.
PCs 5

2x1.5sq.mm PVC sheathed and PVC insulated lighting control


cable inside PVC conduit of approved size from Push buttons
inside light control panels to contactros in distribution boards. ML 100
9.4 Socket/power outlet points
General purpose socket outlet points in rigid thermoplastic
conduit of diameter 16mm fed by pvc sheathed pvc insulated
conductor of 3x2.5mm2 (wire to be of ethiopian plastic or
9.4.1 approved equivalent) PCs 344

power outlet points for kitchen equipment fed through 3x4


9.4.2 sq.mm cable in rigid thermoplastic conduits of dia.19mm PCs 4

power outlet points for pump equipment fed through 3x6


9.4.3 sq.mm cable in rigid thermoplastic conduits of dia.21mm PCs 2
power outlet point for LIFT equipment fed through 5x16 sq.mm
9.4.4 cable in rigid thermoplastic conduits of dia.50 mm PCs 1
9.5 Socket outlets & Boxes

Page 28 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


9.5.1 Socket outlet LEGRAND SUNO 774023 16A/1ph PCs 344
9.5.2 Power outletboxes of 25A/1ph PCs 6
9.5.3 Power outletboxes of 50A/3ph PCs 1
9.6 Telephone/Data system

RJ 45, 8 contact data socket out let points to for flush mounting
in thermoplastic conduit of 19mm with appropriate type junction
box fed by standard (CAT 6 UTP data cable) for 10/100 base
internet with RJ 45 connector plug to be fixed on patch pannel
data transfer rate of min.100Mbs and the necessary accessories
9.6.1 to make the system complete. PCs 165
9.6.2 Flush mounted Data outlets RJ45 type
Legrand Suno774072+774041 PCs 165
9.6.3 Data Cables patch pannel

2psc 24 ports 1U Cat 6A , RJ 45 8 contact Patch panel ,in fixed


standard 4U pivoting cabinet swing 19" steel enclosure with
transparent and lockable door, with corresponding power supply
unit of 8pcs scuko type socket out lets with power plug and
standard pivoting cabinet with rack for wall mounting , knock-
out holes for cable entrance and conduit connection, ventilation
ports , standard patch cords (3meters)and 25% reserve space for
hubs and switches, including screen label holder with all
necessary accessories PCs 5
9.6.4 Telephone Terminal box 250x200x100mm for TDF PCs 5
9.6.5 20 pair Telephone Back bone cable Ml 100
9.6.6 Telephone Terminal box 250x200x100mm for TDF & PP PCs 5
9.6.7 Telephone and Data pull box box 200x150x100mm PCs 15
9.7 Light Fitting With lamp
9.7.1 Type 1. Fumagali Umberta E27 ceiling surface mounted Pcs 91
9.7.2 Type 2. thorn prisma C 2 x28 watt cl 184 Pcs 240
9.7.3 Type 3. fumagali francy with 1x40 watt incandescent lamp Pcs 20
Type 4 . DISANO 727 Comfort-frosted diffuser with FL 2x36
9.7.4 Watt lamps Pcs 309
9.7.5 Type 6. Philips Lineco TMS 022 1 x TL -d36watt Pcs 24
Type 8. PXF Trio II t5 2 x18w with Prm ptics IP 65 , high
9.7.6 frquency regulator Pcs 43
9.7.7 Type 10. Philips LED spot light PAR 18 watt Pcs 41
Type 11. chandlier crystal gallary Lucide robin
9.7.8 71336/05/415x40watt Pcs 2
Type 12. philips fit lamp chrome 28 watt surface bath room
9.7.9 mirror light Pcs 39
Type E1 DISANO 614 Safety-only Emergency 1h SE with FLC
9.7.10 11 watt lamp Pcs 58
STAIR Signage Modus Helios DS ( IP 42) with 1x11watt lamp
9.7.11 with STAIR sign Pcs 12
EXIT Signage Modus Helios DS ( IP 42) with 1x11watt lamp
9.7.12 with EXIT sign Pcs 2

Page 29 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


9.8 TV points
TV points fed through RG6 Coaxial 75ohm TV cable in rigid
conduit of minimum diameter 19mm of 25mm as shown on the
drawing including junction boxes with cover and all necessary
9.8.1 accessories PCs 79
9.8.2 Flush mounted TV outlets type Legrand Suno
(TV-R-SAT) PCs 79
Supply,install connect & test TV system with all necessary
accessaries complete with Multichannel amplifier, Spliter,tap,
9.8.3 Dishs and local radio ,Antenna etc. Ls 1
9.8.4 TV Splitter connection box of 150x100x70mm
with cover. PCs 21
9.9 CCTV SYSTEM

IP based Closed circuit television equipment, supplied,


installed,connected, tested and commissioned including CAT6A
UTP cables,complete all as specified (or equivalent).Factory test
report,2 years guarantee factory faults
CCTV POINTS
IP CCTV points in thermoplastic conduit of minimum diameter
21mm fed by CAT6A UTP cable as shown on drawings,
9.9.1 including junction boxes with covers, No 28
IP CCTV 5MP 360 deg. digital PTZ/Bi directional Audio
,Digital wide dynamic range Motion detection Audio detection
M12 & RJ-45 connector. Type SAMSUNG SNF-8010VM or
9.9.2 approved equivallent. No 28
Approved type 32" LCD high resolution color monitor,desplay No.
9.9.3 16/9 .maximum resolution:1680x1050 1
Purpose made control consol for four 32"monitors, No.
9.9.4 multiplexer,controller and keyboard 1
9.9.5 Approved type alarming switcher 220Vac/ 50Hz No 1
Fully programmable keyboard controller with touch screen LCD No.
9.9.6 as specified or approved equivalent. 1
CCTV Management Software licence for 30cameras,
documentation, instruction of owner's staff, power
9.9.7 supplies/transformers. LS 1

CCTV IP Network video recorder NVR 4/16 cameras,


Pentaplex: simultaneous live, record, playback,extraction and
remote access Video compression format: H264 , Number of
frames recorded: Up to 25 frames per second for 16 cameras in
D1 resolution Memory: 2 x 2 TB internal hard disks, i.e. a total
of 4TB and built-in DVD writer: and 19" rack mountable with all
9.9.8 necessary acessories to make the system complete. No 1

Page 30 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

CCTV system with above mentioned equipments including system


connectors,line and head end video amplifiers, digital control
system , cabinet of heavy duty and free standing for all electronic
equipments with complete analysis made on cable losses (both
signal and power) & signal level in dB at out camera and
monitor units ,with latest technology of each equipments, shop
drawing with complete analysis and all the necessary
accessories to be submitted prior to purchase and installtion.
9.9.9 see the drawing for the lay out ls 1
9.10 FIRE ALARM SYSTEM
Cabling
-As per IEC 331,IEC 332-1,IEC 332-3,IEC 1034,IEC 754-1
-With copper conductor
-Fire resistant and flame retardant
-Colour coded and suitable for addressable system
-Consisting of all the necessary accessories

Smoke / heat detector ,Manual call points , short circuit isolators


, alarm and visual indicating points fed through fire resistant
cable of 2-core 2.5sq.mm inside PVC conduit of 20mm diameter No.
9.10.1 including all necessary accessories. 100

Fire Alarm control panel with an integrated operating unit that


9.10.2 can process signals from devices of up to 150 addresses. No 1
9.10.3 Detector base with loop contact No. 100
9.10.4 Manual call point No 12
9.10.5 Sounder No 12
9.10.6 Heat detector No 4
9.10.7 smoke detector No 71
9.11 PUBLIC ADDRESS SYSTEM

Public address equipment, supplied, installed, connected, tested


and commissioned including control speaker cables, conduits
and all necessary accessories, complete as manufactured by
Bosch (or approved equivalent) and/or shown on drawings.
Network controller Bosch Praesideo LBB 4401/00 or approved
9.11.1 equivalent to be mounted in a 19" rack. no. 2
Power Amplifier Bosch Praesideo LBB 4421/00 (1x500W) or
9.11.2 approved equivalent to be mounted in a 19" rack. no. 2
Call station basic Bosch Praesideo LBB 4430/00 or approved
9.11.3 equivalent. no. 2
Configuration/diagnostic & logging software Bosch Praesideo
9.11.4 LBB 4470/00 or approved equivalent. no. 2
Plena back ground music source, type Bosch LBB 1961/00 or
9.11.5 approved equivalent to be mounted in a 19" rack. no. 2
9.11.6 6W ceiling mounted speaker no. 51
9.11.7 10W wall mounted column speaker no. 8

Page 31 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Sound system points fed through audio cable of PVC-insulated,


Al-screened, twisted pair, 16AWG stranded tinned copper wire,
type Belden or approved equivalent and in medium duty rigid
thermopastic conduit of minimum diameter of 16mm including
9.11.8 junction box and all other fixing accessories. no. 60
9.12 Power Cables(XLPE 0.6/KV or approved equ.)
9.12.1 3x70/35+1x35 mm2 ML 80
9.12.2 3x25/16+16mm2 " 30
9.12.3 5x16mm2 " 55
9.12.4 5x10 mm2 " 10
9.13 Cable way
9.13 CABLE TRAY
All cable tray shall run neatly and fixed in contact with the
horizontal and vertical corner of the wall with the necessary
drops and riser.

The cable tray must consisting of accessories like clamp


kit,coupling plate ,cable mounting bracket , grounding cable
drop out plate ,elbows and T-joints for
horizontal,bracket,mounting box support, suspension bracketend
cap,cable retainer,hinge connector for vertical change in
direction,wall and pendent bracket for wall support ,box for
cable junctions for all the necessary acessories
500mmx250mmx3000mm for PA/FA/CCTV/data cables ML 300
9.14 PVCpipes
dia 110mm ML 50
dia 50mm ML 50
9.15 Lightning Preventor system
Lightning Preventor Type SI60 to be installed as per the drawing
with all necessary fixing, Connecting and clamping accessaries
and 3m Almunium mast (Almunium mast should be supported at
9.15.1 three directions) LS 1
9.15.2 25x3mm copper tape ML 80
1x70mm2 bare copper down conductor run in PVC conduit of
9.15.3 diam 32mm Ml 20
Earthing rod of 16x2400mm to be driven in earthing pit of
9.15.4 400x400x500mm(resistance R < 5 ohm) Pcs 2

9.15.5 Lightening Event counter to be mounted at 1.8mt above NGL Pcs 2


9.16 Low Voltage Earthing system
Copper Earthing rod of 16x2400mm to be driven on earth in
9.16.1 Earthing pit of 600x600x600mm PCs 1
9.16.2 Copper conductor of (1x35mm2) for Earthing Ml 20
Equipotential bonding bar of 100x10mm copper bar to be
9.16.3 mounted inside generator room No 1
9.17 PASSANGER LIFT
Supply and install Passenger Lift as per the specification

Page 32 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


Technical Specifications
Standards
ISO 7465:2001,EN-81,BS ,ANSI,JIS,ISO 9001,

ES 3158:2006,ES 3159:2006 , latest editions of BS/EN or ES and


others quality certificate for design, manufacturing installation
and commissioning lifts and quality certificate for design,
manfucturing,commissioning lifts parts. and special standards
for hospital lifts
-Electromagnetic compatibility
- Electromagnetic immunity
-Electrical Safety
- Electronic equipment for use in power facilities:
Mechanical property and Finishing Material
Function :-Passenger Lift
Rated load : - 800kg, 13 person
Rated speed :- 1.6m/sec
Number of stops:-6 in one line
Floor - B+G + 4
Cabin door type:- Automatic center opening
Landing door type:- Automatic single door center opening
No entrance :- one(1) @ 0 degree
Floor - Vinyl composition tile/wear resistant rubber
Wall - Stainless steel
Interior face of doors - Stainless steel
Ceilings - Stainless steel panels/diffuser gird
Handrail -stainless steel, two sides
Mirror -Silver color, rear panel
Frame- Stainless steel
Exterior face of door - Stainless steel
Drive system and Elevator operation
-Gearless machine
- Simplex down Collective Selective control
-Electric traction type
-VVVF with encoder
Special operation and facilities
- Smoke Detectors
- Alarm buzzer

- Chime gong to sound present audioable indication control


- Toggle switch
- call registered light
- Inter phone to communicate with machine room
- Over load indicator both audiable and visual indicators
Car and Landing operation panel
- Car display for position and direction

Page 33 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


- Digital car position and direction control

Digital landing position & direction indicator on all floors


-Vandal proof Wait/stop push button
-Car display for position and direction
Control and safety features
-Dynamic braking for traction machine in event of power
failure
Power supply
- 380volts AC 50Hz 3phase
Disable
- Add braille tactile to all emergency buttons
Lighting Supply
- 220v, 50Hz, 1ph
- Indirect light in diffuser grid
Ventilation
-Car ventilation with fan built in the ceiling
-Temperature control Thermostat
Rescue device
-Automatic rescue device/ back up when power fails
- All power outputs are electronically protected
against short circuit
- Earth leak detection for traction machine during
emergency operation(short circuit, overload, loss of
connection of a phase to the motor, phase imbalance,
thermal protection, overspending, turning blockage)
Performs analysis of optimum motor turning direction
(minimim battery consumption during emeregency
operation) Conforms to EN81 regulation
Shaft Information
-Shall take and consider approprate standards
for the shaft,cabin,cabin doors,machine room size
and other parameters before manufacturing and
prepare working drawing referring to the
archtectrural and structural for submission
with the technical specification.
Submit for approval complete upto date lift
specification of the above items including guide
rails, reinforcement bar buffer,duty ,prewiring ,
conduiting/ trunking and other required and
necessary specification with working drawing
referring to archtectural and structural from at
least 3 lift suppliers having a minimum of 5 years
or equivalent grantee period in lift manufacturing

Page 34 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


,design, installation and maintenance. No 1

9.18 Automatic Transfer Switch (ATS)


Floor standing Automatic Transfer switch in metal enclosure and
lockable door , IP 54, Cable connection accessories (with
busway joint)Automatic mains and genertor sensing
units,Digital master controler
1 pcs ATS 200A /4P Motorised circuit breaker and all the
necessary accessories to make the system complete No 1
9.19 STAND-BY POWER SYSTEM

Stand-by diesel generator set Cummins, Caterpillar or approved


equivalent of 200KVA / 160KW after derating, 220/380V, 50Hz,
3-phase, 1500rpm, complete with engine and alternator direct
coupled turbocharger, engine control panel, including , all
indicating instruments, fuel base tank (8 hours), battery with
charger, with remote monitoring system and other accessories,
ready for operation. The generating set shall be capable of
operational at altitude of 1800m above sea level and ambient
temperature of 280C, price should be include complete exhaust
system. The Gen-Set should be sound proof during operation. no. 1

Total Carried To Summary

10. MECHANICAL WORKS

10.1 TOILET VENTILLATION


10.1.1 EXHAUST AIR FANS AND ACCESSORIES
10.1.1.1 Twin Toilet Extracting Air Fans

Supply, fix, test & Commission Twin toilet extraction fans


according to where shown on respective drawing, complete with
control facility, isolator switch flexible connection on suction
end, concrete pad with vibration isolator and all required
mechanical works for complete installation. Fans shall be of the
twin type with the option for alternate operation of one duty and
one stand by. Fan shall be rated for project spacifications.
A) TW-D 1
i) Fan Capacity
Type = DYNAIR or equivalent
Capacity: 1100 lit/sec.
Esp= 350pa No 1.00

B) TW-D 2
1. Fan Capacity

Page 35 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


Type = DYNAIR or equivalent
Capacity = 750 lit/sec
Esp = 300pa No 1.00
10.1.1.2 Wall Mounted Extracting Fans
1. Fan Capacity
Type = DYNAIR or equivalent
Capacity = 200 m/h
2. Esp = 25-40 pa No 2.00
10.1.1.3 Air Exhuast Inlets & Accessories
All exhuast air grills and door grills (doouble frame) shall be
approved quality and located to ensure the correct air
distribution with out stagnant regions or draughts occuring in
the room that they are serving.

Type = Air Master or Equivalent


Model = ECG
size = 150X150 no 75.00
Colour = As Per The Architect's Preference
Supply and install Door Grill As Shown On The Drawing

Type = Air Master or Equivalent


Model = DG-1
size = 450X200 no 20.00
10.1.1.4 Door Grills
Supply, fix, test and commission door grills with double frame.
All frame blades shall be high quality extruded aluminium
profiled construction with the advantages of of corrosion
resistance and high rigidity. Door Grill Coordinate color & size
of door grills with the architect's
Size
125x100mm no 75.00
10.1.1.5 Ventilation Ducts
Supply and install galvanized duct as shown on the in the
drawing complete with all fixing accessories
Size
125mmx100mm ml 45.00
150mmx125mm ml 27.00
200mmx125mm ml 18.00
200mmx150mm ml 6.00
200mmx175mm ml 13.00
225mmx200mm ml 30.00
250mmx225mm ml 16.00
300mmx250mm ml 7.00
300mmx275mm ml 13.00

Page 36 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


350mmx300mm ml 4.00
350mmx350mm ml 4.00
375mmx250mm ml 4.00
375mmx350mm ml 5.00
400mmx400mm ml 4.00
450mmx400mm ml 5.00
Supply and install flexible aluminum duct as shown on the
drawing
Size= dia 100mm ml 60.00
Duct-in mounted exhaust air fans and accessories

10.2 VAULT VENTILLATION


10.2.1 EXHAUST AIR FANS AND ACCESSORIES

Supply,install,test and commission IN-LINE exhaust air fan


according to where shown on respective drawings, to be mounted
on slab complete with electrical control facility, flexible
connecton on suction and delivery ends, isolater switch, support
with vibration isolator and all required mechanical works for
complete installation. Fan shall be rated for project spacific.
Price shall include all works required to install, test and
commission the system.
a) I-EF/1
i) Fan Capacity
Type = DYNAIR or equivalent
Capacity: 250Liter/second
External static head ... 150Pa No 1.00
ii) Supply and install noise attenuator of approved quality after
exahust air fan, all as shown on the respective drawing and
manufacturers instruction.
Q = 250Lit./sec.
No 1.00

iii) Supply, fix, test and commission exhaust air louver.The frame
and blades from high quality extruded aluminium profile.
Type = Air master or Equivalent
Size: 300x300mm No 1.00
b) I-EF/2
i) Fan Capacity
Type = DYNAIR or equivalent
Capacity: 384Liter/second
External static head ... 150Pa No 1.00

ii) Supply, fix, test and commission exhaust air louver.The frame
and blades from high quality extruded aluminium profile.
Type = Air master or Equivalent
Size: 400X400mm No 1.00

Page 37 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


10.2.2 EXHAUST AIR GRILLs /Ceiling mounted/
Supply, install, test and comission exhaust air grilles with
uninsulated factory made plenum box. The frame shall be made
from high quality extruded aluminium profile and standard
(30mm) flange width.
i - Capacity =100 &130liter/sec / Eg-1
Size: 300x300mmxmm
Type: air master or equivalent
Model: ARG-HA
Colour: As per the Architect's preference No 6.00
Exhaust air duct
a) Vault extract air duct
Size: 200 x 200 mmxmm ml 6.00
275x250 mmxmm ml 17.00
400x250 mmxmm ml 4.00
10.2.3 Volume Dampers

Supply, fix, test and commission volume control dampers.The


frame shall be constructed from galvanized steel sheet and
coated with aluminium spray.Price shall include all the
necessary accessories and connecting pieces.
For duct Size: 200x200 mmxmm/ VD No 6.00
10.3 MEETING HALL AIR CONDITIONING
10.3.1 FOUR WAY CEILING DIFFUSERS

All supply and return air ceiling diffusers shall be approved


quality and located to ensure the correct air distribution pattern
without stagnant regions or draughts occuring in the room that
they are serving. Price shall include sealing gaskets,all
necessary accessories and connecting pieces for the proper
functioning of the systems.

10.3.1.1 Supply air diffusers /Ceiling mounted/


Supply, install, test and comission supply air diffusers. The
frame shall be made from high quality extruded aluminium
profile and standard.
i - Capacity =380Liter/sec / 4SAD-1
N.Size: 450x450mmxmm
Type: air master or equivalent
Model: ACD4+D
Colour: As per the Architect's preference No 10.00
10.3.1.2 Return air diffusers /Ceiling mounted/
Supply, install, test and comission supply air diffusers. The
frame shall be made from high quality extruded aluminium
profile and standard.
i - Capacity =320liter/sec / 4RAD-1

Page 38 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


N.Size: 450X450mmxmm
Type: air master or equivalent
Model: ACD4
Colour: As per the Architect's preference No 10.00
DAMPERS AND ACCESSORIES
10.3.2 Volume Dampers

Supply, fix, test and commission pre insulated volume control


dampers with 20/30mm thicknes. Price shall include all the
necessary accessories and connecting pieces.
All dampers and accessories shall be manufactured as per
recognized codes and standard.
10.3.2.1 i - On supply air duct
Type: Air Master or equivalent
For duct Size : 300 x 300 mmxmm / VD No 8.00
For duct Size : 400X400 mmxmm / VD No 1.00
ii - On return air duct
Type: Air Master or equivalent
For duct Size : 300 x 300 mmxmm / VD No 10.00
iii - On return air duct
Type: Air Master or equivalent
For duct Size : 700X700 mmxmm / VD No 1.00
iV - On return air duct
Type: Air Master or equivalent
For duct Size : 300X225mmxmm / VD No 1.00
iV - On fresh air duct
Type: Air Master or equivalent
For duct Size : 200x125mmxmm / VD No 1.00
For duct Size : 200x100mmxmm / VD No 1.00
10.4 ROOF TOP PACKAGE
Supply, fix, test and commision Roof Top Pakage as per the
manufacturer's specification and instruction including but not
limited to the following accessories.
-Compresor ,evporatot,fillter ,Condenser,Fillter
- Concrete pedestal with vibration isolator
- RTP shall be rated for project specific
- RTP operating with environmental friendly gas
- RTP
i) F-RTP/01[FLOOR MOUNTED]
Brand:-Gree or Equivalent
Cooling capacity =50kw
External static pressure =200Pascal No 1.00
10.5 Out Door Condensing Unit

Page 39 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


Supply, fix and commission outdoor condensing units as per
manufacturer's instruction. The unit shall be:
. Designed and manufactured for outdoor installation
. Units and components shall work with ecological refrigerant
such as R-410A.
. Compressores shall be with built-in silencers and mounted on
vibration isolators.
. With electirical control system
. With access panels.
. With indoor unit conneciton ports.
Price shall also include all the necessary accessories.
10.5.1 a)Tri-split outdoor unit
Supply, install & commissions Tri split air conditioning
equipment consisting
of scroll compressor, condensing unit and Evaporating unit
complete
with all accessories including pelton pad
Cooling capacity - 12.8 kw
Brand:GREE or equivalent No 1.00
10.5.2 b)Indoor units
Supply, fix, test and commission cassette type indoor unit.
/ceiling mountd/ completed with:
. Washable filters.
. Control system
. Manual on-off switch with thermostat
. Remote control unit
. Thermostatic expansion valves
. Condensate drain pipe

. With all required accessories to make the system complete


a ) CFCU-1
Type: GREE or equivalent
Cooling capacity =3.6kw No 2.00
b)CFCU-2
Type: GREE or equivalent
Cooling capacity =5.6kw No 1.00
10.5.3 BU Module Manifold
Supply, fix, test and commision BU controller as per the
manufacturer's specification and instruction.
Brand: GREE or equivalent
Maximum conecting indoor unit=3 No 1.00
10.6 DUCT WORK
10.6.1 PRE INSULATED DUCT WORK

Page 40 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate

Fabricate, test and commission Polyisocyanurate Foam


Panel(PAL PIR Panel) with 45kg/m3 density, 20mm thicknes and
protected on both sides with 80microns aluminum facing
embossed with corrosion resistant polyser varnish for internal
installation.Duct works shall be in accordance with SMACNA
provisions.Provide flexible connction on duct crossing expansion
joint.Price shall include all the neccessary equipments/materials
for duct fabrication and installation. m2 210.00

Fabricate, test and commission Polyisocyanurate Foam


Panel(PAL PIR Panel) with 50kg/m3 density,30mm thicknes and
protected on both sides with 200microns aluminum facing
embossed with corrosion resistant polyser varnish for external
installation .Duct works shall be in accordance with technical
specification, book of standard and SMACNA provisions.
Price shall also include aluminium cover for external duct
installation.
Supply and install galvanized steel sheet for Supply and return
duct m2 50.00
10.6.2 Minimum thickness of rectangular duct construction
shall be as given below
Duct longer size (mm) sheet metal thickness (mm)
Up to 350 mm 0.6mm
400 to 600mm 0.7 mm
670 to 910 mm 0.9mm
920 to 1270 mm 1.0mm
1280 to 1520 mm 1.3 mm
1530 to 2130 mm 1.5 mm
10.6.3 Supply Air Duct
duct size(mmxmm) 800X700 ml 20.00
700X700 ml 8.00
700X550 ml 8.00
700X400 ml 7.00
400X400 ml 7.00
300X300 ml 15.00
10.6.4 Return Air Duct
duct size(mmxmm) 700x700 ml 20.00
550x500 ml 18.00
500x500 ml 12.00
500x375 ml 13.00
400x375 ml 15.00
300X300 ml 17.00
Supply and install flexible aluminum duct as shown on the
drawing
Size= dia 250mm ml 20.00

Page 41 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Item No Description Unit Qty Rate


10.6.5 Fresh Air Duct
duct size(mmxmm) 250x225 ml 4.00
200x125 ml 12.00
200x100 ml 6.00
10.7 SUPPLY FANS and Accessories
10.7.1 Duct In mounted supply fans
Supply, fix, test and commission In-Line centrifugal supply air
fans
i) SPF- 1
Type :…….Dynair or Equivalent
Model ….
Capacity : Extract air =200 l/sec
Exter. Static pressure =15mm H2O No 1.00
i) FL-1
Brand: Air master or Equivalent
size: 300x300 mmxmm No 1.00
10.7.2 REFRIGERANT PIPES AND ACCESSORIES
supply, tesr and install insulated copper pipes for split air
conditioner/ liquid &

suction pipes/ as where shown on the drawing, including fittings

branches,jointing hangers,brackets,support and all the necessary


accessories.

price shall include factory made insulation (minimum 20 mm)


with all accessories
Dia. 6.35 mm ml 11.00
Dia. 9.52 mm ml 18.00
Dia. 12.7 mm ml 11.00
Dia 15.9 mm ml 18.00
10.7.3 CONDENSATE PIPES for Split air conditioner
Supply and install uPVC condensate drain pipe with trap as
appropriate as where shown on the drawing, complete with all
necessary accessories & 25mm insulation.
Dia. 25mm ml 25.00
Dia. 20mm ml 10.00
Total Carried To Summary

Page 42 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

500,000.00

500,000.00

500,000.00

500,000.00

2,000,000.00

18,368.00

78,720.00

94,464.00

108,633.60

49,440.78

30,519.00

10,924.38

422,028.24
472,120.00

Page 43 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

1,381,371.50

282,702.00

2,949,291.49

316,085.00

316,085.00

25,454.59
12,297.34
7,453.65
76,222.36
2,377.90
11,086.86

623,327.08
143,976.81
43,982.80
268,301.90

224,745.00
447,007.50
464,730.00

Page 44 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
57,404.85
51,786.00

88,930.05
115,693.68
181,613.85
255,601.50
420,250.38
29,956.74
20,667.90
20,535.90

1,400,500.22
568,169.83
350,178.48
770,626.48
547,148.37

71,860.00

7,301,888.00

306,084.31
324,759.60
63,828.60

Page 45 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

954,955.65
302,940.00

8,704,575.00

1,483,020.00
123,681.53
174,058.50

335,552.07
494,352.25
1,268,662.50
84,649.25
174,615.00
148,566.25
33,540.50

1,009,079.66
1,180,940.37
3,064,235.15
233,819.69
983,319.65
1,990,043.22
989,317.06

24,428,595.80

Page 46 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

1,269,885.90
49,670.25
18,627.20

1,338,183.35

309,875.00

39,775.00

5,962.50

192,970.00

Page 47 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

1,398,250.00

41,947.50

279,650.00

2,268,430.00

372,000.00

Page 48 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

205,200.00

35,000.00

612,200.00

- 11350 x 2100 11350 x 2100


- 2800 x 2100 2800 x 2100

- 4900 x 2100 4900 x 2100

Page 49 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

- 13150 x 2100 13150 x 2100

- 6800 x 2100 6800 x 2100

- 9800 x 2100 9800 x 2100

- 27200 x 2100 27200 x 2100

- 11560 x 2100 11560 x 2100


- 2500 x 2100 2500 x 2100

- 25800 x 2100 25800 x 2100

- 12200 x 2100 12200 x 2100

- 14800 x 2100 14800 x 2100


= 4100 x
- = 4100 x 2800 2800
= 2800 x
- = 2800 x 1000 1000
= 6100 x
- = 6100 x 1000 1000
= 6300 x
- = 6300 x 1000 1000
= 4600 x
- = 4600 x 1000 1000
= 5600 x
- = 5600 x 1000 1000
= 6100 x
- = 6100 x 1000 1000
= 3750 x
- = 3750 x 1000 1000

-
-
-
-

Page 50 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-
-
-
-
-
-
-
-
-
-

Page 51 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-

-
-

Page 52 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

1,079,746.80

402,545.55
585,114.75
37,187.70

41,773.05

207,371.95

Page 53 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

327,196.00
177,307.50
12,658.50

-
-

-
-

Page 54 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 55 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

2,870,901.80

-
-
-

Page 56 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
-

Page 57 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 58 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-

Page 59 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 60 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
-
-
-
-
-

-
-
-

Page 61 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-

-
-

Page 62 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 63 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 64 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-

Page 65 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 66 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-

Page 67 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 68 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 69 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-

Page 70 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
-
-
-

-
-
-
-
-

-
-
-

-
-

-
-

Page 71 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-

Page 72 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-
-

-
-
-

Page 73 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-

-
-

-
-

-
-

Page 74 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 75 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 76 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
-

Page 77 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-
-
-
-
-

Page 78 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount
-
-
-
-
-
-

Page 79 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-

Page 80 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-

-
-

Page 81 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

Page 82 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-
-
-
-

-
-
-
-
-
-

Page 83 of 578
Awash Bank Bale Robe Branch Building Bill of Quantity

Amount

-
-
-

-
-
-
-

-
-
-

Page 84 of 578
AWASH BANK BALE - ROBE BRANCH

SUMMARY

1 DEMOLISHING WORK BIRR 2,000,000.00

SUB-STRUCTURE

1 EXCAVATION & EARTH WORK BIRR 2,949,291.49

2 MASONARY WORK BIRR 316,085.00

3 CONCRETE WORK BIRR 7,301,888.00

SUPER-STRUCTURE

1 CONCRETE WORK BIRR 24,428,595.80

2 BLOCK WORK BIRR 1,338,183.35

3 ROOFING & WATER PROOFING WORK BIRR 2,268,430.00

4 CARPENTARY AND JOINERY WORK BIRR 612,200.00

5 METAL AND ALMUNIUM WORK BIRR -

6 FINISHING WORK BIRR 2,870,901.80

7 PAINTING WORK BIRR -

8 SANITARY INSTALLATION BIRR -

9 ELECTRICAL INSTALLATION BIRR -

10 ELECTRO-MECHANICAL WORKS BIRR -


TOTAL BIRR 44,085,575.45

VAT (15 %) BIRR 6,612,836.32

CONTINGENCY BIRR 4,408,557.54

GRAND TOTAL BIRR 55,106,969.31


###
MTT CONSULTING, ARCHITECTS & ENGINEERS

Title: Awash Bank Issue No:


TAKE OFF SHEET FOIssue Date: 2019

Location: Bale Robe, Awash Bank


No LxWxH Qty

1 1,312.00
1,312.00

1 1,312.00
1.50
1,968.00

1 1,312.00
1.50
1,968.00

1 1,312.00
1.20
1,574.40

13 3.50
3.50
1.50
238.88

8 3.10
3.10
1.50
115.32

11 2.80
2.80
1.50
129.36

1 3.60
3.60
1.50
19.44

1 6.15
9.20
1.50
84.87

1 1.60
1.60
1.50
3.84

1 4.15
3.00
1.50
18.68
610.38

13 3.50
3.50
0.75
119.44

8 3.10
3.10
0.75
57.66
11 2.80
2.80
0.75
64.68

1 3.60
3.60
0.75
9.72

1 6.15
9.20
0.75
42.44

1 1.60
1.60
0.75
1.92

1 4.15
3.00
0.75
9.34
305.19

1 132.00
1.00
1.55
204.60

1 25.25
1.00
0.55
13.89
218.49

1 610.38 610.38
1 305.19 305.19
1 218.49 218.49
1 1.61 1.61
1 4.72 4.72
1 201.07 201.07
1 46.44 46.44
1 112.89 112.89
767.32

1 1,073.00
0.80
858.40

1 262.40 262.40
1 1,968.00 1,968.00
1 1,968.00 1,968.00
1 1,574.40 1,574.40
1 610.38 610.38
1 305.19 305.19
1 218.49 218.49
6,906.86

1 942.34
942.34
942.34

1 132.00
0.50
1.50
99.00
-
1 25.25 -
0.50 -
1.10 -
13.89
112.89
13 3.10
3.10
124.93

8 2.70
2.70
58.32

11 2.40
2.40
63.36

1 3.20
3.20
10.24

1 5.75
8.80
50.60

1 1.20
1.20
1.44

1 5.10
0.70
3.57

1 3.75
2.60
9.75
322.21

6 36.65
0.35
76.97
1 3.60
0.35
1.26

7 28.55
0.35
69.95

1 6.00
0.35
2.10

2 1.30
0.35
0.91

2 6.40
0.35
4.48

155.66

1 132.00
0.60
79.20

1 25.25
0.60
15.15
94.35

1 22.50
22.50
1 942.34
942.34
964.84
1 30.10
30.10
30.10

2 11.65
1.20
27.96
2 2.70
1.20
6.48

1 17.65
6.00
105.90
140.34

13 3.00
3.00
0.75
87.75

8 2.60
2.60
0.70
37.86

11 2.30
2.30
0.55
32.00

1 3.10
3.10
0.80
7.69

1 5.65
8.70
0.60
29.49

1 1.10
1.10
0.30
0.36

1 5.00
0.60
0.30
0.90

1 3.65
2.50
0.55
5.02
201.07

1 0.45
3.14
2.10
0.33

4 0.40
0.40
2.10
1.34

1 0.40
0.40
2.10
0.34

2 0.40
0.40
2.10
0.67

2 0.40
0.40
2.10
0.67

2 0.40
0.40
2.10
0.67

1 0.40
0.40
2.10
0.34

4 0.45
0.45
2.10
1.70

2 0.45
3.14
2.10
0.67

2 0.45
3.14
2.10
0.67

1 0.45
0.45
2.10
0.43

2 0.35
0.35
2.10
0.51

1 0.50
0.50
2.10
0.53

1 0.45
0.45
2.10
0.43
2 0.25
0.50
2.10
0.53

1 0.40
0.40
2.10
0.34

1 0.40
0.40
2.10
0.34

3 0.45
0.45
2.10
1.28

2 0.50
0.50
2.10
1.05

2 0.45
3.14
2.10
0.67

3 0.30
0.30
2.10
0.04

1 0.45
3.14
2.60
0.41

4 0.40
0.40
4.25
2.72
1 0.40
0.40
2.60
0.42

2 0.40
0.40
2.60
0.83

2 0.40
0.40
2.60
0.83

2 0.40
0.40
4.25
1.36

1 0.40
0.40
4.25
0.68

4 0.45
0.45
4.25
3.44

2 0.45
3.14
2.60
0.83

2 0.45
3.14
2.60
7.35

1 0.45
0.45
2.60
0.53
2 0.35
0.35
2.60
0.64

1 0.50
0.50
2.60
0.65

1 0.45
0.45
2.60
0.53

2 0.25
0.50
2.60
0.65

1 0.40
0.40
2.60
0.42

1 0.40
0.40
2.60
0.42

3 0.45
0.45
2.60
1.58

2 0.50
0.50
2.60
1.30

2 0.45
3.14
2.60
7.35

3 0.30
0.30
2.60
0.05

46.44

1 24.60
3.00
73.80

-1 1.30
2.20
(2.86)
70.94
14.19

1 113.40
3.00
340.20

1 6.10
1.80
10.98
70.24

1 2.35
2.70
6.35

-1 0.90
0.20
2.10
(0.38)

-1 0.70
0.20
0.70
(0.10)

1 2.60
4.20
10.92

-1 0.90
0.20
2.10
(0.38)

-1 0.70
0.20
0.70
(0.10)

16.31

6 36.65
0.25
0.40
21.99

1 3.60
0.25
0.40
0.36

7 28.55
0.25
0.40
19.99

1 6.00
0.25
0.40
0.60
2 1.30
0.25
0.40
0.26

2 6.40
0.25
0.40
1.28

3 2.70
0.25
0.40
0.81

1 13.25
0.25
0.40
1.33

1 15.60
0.25
0.40
1.56

1 28.15
0.25
0.40
2.82

1 36.65
0.25
0.40
3.67

1 36.65
0.25
0.40
3.67

1 3.60
0.25
0.40
0.36
1 22.55
0.25
0.40
2.26

1 19.50
0.25
0.40
1.95

1 4.55
0.25
0.40
0.46

2 28.55
0.25
0.40
5.71

1 6.00
0.25
0.40
0.60

1 28.55
0.25
0.40
2.86

1 6.50
0.25
0.40
0.65

1 12.55
0.25
0.40
1.26

1 3.10
0.25
0.40
0.31
1 2.00
0.25
0.40
0.20

74.92

1 17.80
17.80

5 27.65
138.25

2 25.15
50.30

10 39.05
390.50

1 19.10
19.10

5 29.70
148.50

1 22.90
22.90

5 36.70
183.50

1 22.50
22.50

149.00

1 9.85
9.85
4 26.65
106.60

1 3.60
3.60

1 23.65
23.65

9 36.45
328.05

2 24.20
48.40

1 18.35
18.35

5 29.15
145.75

2 35.65
71.30

1 4.05
4.05

1 14.95
14.95
774.55
154.91
303.91

1 6.40
1.70
0.20
2.18

20 1.70
0.15
0.15
0.77

1 6.40
1.70
0.20
2.18

20 1.70
0.15
0.15
0.77

1 2.35
4.40
0.20
2.07

8 4.40
0.15
5.28

2 2.35
0.25
1.18

1 90.95
0.20
0.15
2.73

1 7.33
1.10
0.15
1.21

16 0.15
1.10
0.15
0.40

1 1.20
1.10
0.30
0.40

19.13

2 11.65
1.20
27.96

1 17.65
6.00
105.90

1 32.30
1.20
38.76
172.62
17.26

13 3.00
3.00
0.75
117.00

8 2.60
2.60
0.70
58.24

11 2.30
2.30
0.55
55.66

1 3.10
3.10
0.80
9.92
1 5.65
8.70
0.60
17.22

1 1.10
1.10
0.30
1.32

1 5.00
0.60
0.30
3.36

1 3.65
2.50
0.55
6.77
269.49

1 0.45
3.14
2.10
2.97

4 0.40
0.40
2.10
13.44

1 0.40
0.40
2.10
3.36

2 0.40
0.40
2.10
6.72

2 0.40
0.40
2.10
6.72

2 0.40
0.40
2.10
6.72

1 0.40
0.40
2.10
3.36

4 0.45
0.45
2.10
15.12

2 0.45
3.14
2.10
5.93

2 0.45
3.14
2.10
5.93

1 0.45
0.45
2.10
3.78

2 0.35
0.35
2.10
5.88

1 0.50
0.50
2.10
4.20

1 0.45
0.45
2.10
3.78

2 0.25
0.50
2.10
6.30

1 0.40
0.40
2.10
3.36

1 0.40
0.40
2.10
3.36

3 0.45
0.45
2.10
11.34

2 0.50
0.50
2.10
8.40

2 0.45
3.14
2.10
30.16

3 0.30
0.30
2.10
7.56

1 0.45
3.14
2.60
3.67

4 0.40
0.40
4.25
27.20

1 0.40
0.40
2.60
4.16

2 0.40
0.40
2.60
8.32

2 0.40
0.40
2.60
8.32

2 0.40
0.40
4.25
13.60

1 0.40
0.40
4.25
6.80

4 0.45
0.45
4.25
30.60

2 0.45
3.14
2.60
7.35

2 0.45
0.45
2.60
1.05

1 0.45
0.45
2.60
4.68

2 0.35
0.35
2.60
7.28

1 0.50
0.50
2.60
5.20

1 0.45
0.45
2.60
4.68

2 0.25
0.50
2.60
7.80

1 0.40
0.40
2.60
4.16

1 0.40
0.40
2.60
4.16

3 0.45
0.45
2.60
14.04

2 0.50
0.50
2.60
10.40

2 0.45
0.45
2.60
9.36
3 0.30
0.30
2.60
9.36

350.59

6 36.65
0.40
175.92

1 3.60
0.40
2.88

7 28.55
0.40
159.88

1 6.00
0.40
4.80

2 1.30
0.40
2.08

2 6.40
0.40
10.24

3 2.70
0.25
0.20
5.27

1 13.25
0.25
0.20
8.61
1 15.60
0.25
0.20
10.14

1 28.15
0.25
0.20
18.30

1 36.65
0.25
0.20
23.82

1 36.65
0.25
0.20
23.82

1 3.60
0.25
0.20
2.34

1 22.55
0.25
0.20
14.66

1 19.50
0.25
0.20
12.68

1 4.55
0.25
0.20
2.96

2 28.55
0.25
0.20
37.12
1 6.00
0.25
0.20
3.90

1 28.55
0.25
0.20
18.56

1 6.50
0.25
0.20
4.23

1 12.55
0.25
0.20
8.16

550.35

1 774.55
774.55

2 113.40
3.00
680.40

2 120.60
1.80
434.16

1 23.90
2.70
64.53
1 0.90
0.20
2.10
1.02

1 0.70
0.20
0.70
0.42

-2 0.90
0.20
2.10
(0.76)

-2 0.70
0.20
0.70
(0.20)

1 34.60
2.70
93.42

1 0.90
0.20
2.10
1.02

1 0.70
0.20
0.70
0.42

-2 0.90
0.20
2.10
(0.76)

-2 0.70
0.20
0.70
(0.20)

1,273.49
1 6.40
1.70
10.88

2 6.40
0.35
4.48

20 1.70
0.15
5.10

1 6.40
1.70
10.88

2 6.40
0.35
4.48

20 1.70
0.15
5.10

1 2.35
5.85
13.75

2 2.35
0.35
1.65

8 4.40
0.15
5.28

2 2.35
0.25
1.18
1 90.95
0.15
13.64

1 7.33
1.10
8.06

2 7.33
0.25
3.67

16 1.10
0.15
2.64

90.78

1 21.45
3.00
64.35

1 1.30
0.20
2.20
1.14

-1 1.30
2.20
(2.86)
62.63

4 11.65
0.10
4.66

2 17.65
0.10
3.53
2 1.20
2.70
0.78

1 32.30
1.20
38.76

6 10.75
0.20
12.90

2 4.00
0.20
1.60

62.23
6.22

1 19,054.42 20,007.15
1 7,730.20 8,116.71
1 4,764.33 5,002.55
1 10,484.71 11,008.95
1 7,444.20 7,816.41
1 1,447.64 1,520.02

1 16.90
16.90

5 25.00
125.00

2 20.55
41.10

10 25.00
250.00
1 17.55
17.55

5 22.00
110.00

1 19.55
19.55

4 24.25
97.00
1 9.10
9.10
1 15.40
15.40
1 17.00
17.00

718.60

Super Structure

1 0.45
3.14
7.20
1.14

1 0.35
3.14
3.00
0.29

2 0.30
3.14
3.00
0.42

4 0.40
0.40
4.20
2.69

16 0.40
0.40
3.00
7.68

1 0.40
0.40
4.20
0.67

4 0.40
0.40
3.00
1.92

2 0.40
0.40
4.20
1.34

8 0.40
0.40
3.00
3.84

2 0.40
0.40
4.20
1.34

4 0.35
0.35
3.00
1.47

2 0.30
0.30
3.00
0.54

2 0.40
0.40
4.20
1.34

8 0.35
0.35
3.00
2.94

1 0.40
0.40
2.55
0.41

1 0.40
0.40
3.00
0.48

3 0.35
0.35
3.00
1.10

4 0.40
0.40
2.55
1.63

8 0.35
0.35
3.00
2.94

8 0.30
0.30
3.00
2.16

2 0.45
3.14
4.20
1.34

2 0.40
3.14
3.00
0.75
2 0.35
3.14
3.00
0.58

4 0.30
3.14
3.00
0.85

2 0.45
3.14
7.20
2.29

4 0.35
3.14
3.00
1.15

2 0.30
3.14
3.00
0.42

1 0.40
0.40
4.20
0.67

1 0.40
0.40
14.70
2.35

2 0.35
0.35
4.20
1.03

2 0.35
0.35
14.70
3.60
1 0.50
0.50
4.20
1.05

1 0.40
0.40
3.00
0.48

1 0.30
0.40
3.00
0.36

1 0.25
0.40
8.70
0.87

1 0.40
0.40
7.20
1.15

1 0.25
0.40
11.70
1.17

2 0.25
0.50
7.20
1.80

2 0.25
0.40
11.70
2.34

1 0.40
0.40
4.20
0.67

1 0.30
0.40
3.00
0.36

1 0.25
0.40
11.70
1.17

1 0.40
0.40
4.20
0.67

1 0.35
0.35
3.00
0.37

3 0.30
0.30
3.00
0.81

9 0.40
0.40
10.20
14.69

6 0.35
0.35
3.00
2.21

2 0.40
0.40
7.20
2.30

6 0.30
0.30
3.00
1.62

2 0.45
3.14
7.20
2.29

2 0.35
3.14
3.00
0.58

4 0.30
3.14
3.00
0.85

19 0.20
0.20
1.50
1.14

67 0.20
0.20
0.90
2.41

92.75

1 24.60
0.20
4.50
22.14

4 24.60
0.20
3.30
64.94

1 24.60
0.20
3.00
14.76
-6 1.30
0.20
2.20
(3.43)
98.41

1 34.60
2.85
98.61

-1 1.90
(1.90)
96.71
19.34

2 18.75
0.25
0.40
3.75

4 6.00
0.25
0.40
2.40

1 7.50
0.25
0.40
0.75

1 6.50
0.30
0.30
0.59

1 7.75
0.60
0.30
1.40

1 4.45
0.30
0.30
0.40

1 40.15
0.30
0.30
3.61

1 9.25
0.60
0.30
1.67

1 12.75
0.60
0.30
2.30

1 6.15
0.30
0.30
0.55

1 26.00
0.30
0.30
2.34

2 38.65
0.30
0.30
6.96

1 35.05
0.30
0.30
3.15

1 3.60
0.30
0.30
0.32
1 27.80
0.60
0.30
5.00

1 21.30
0.60
0.30
3.83

1 23.25
0.60
0.30
4.19

1 6.50
0.60
0.30
1.17

1 29.75
0.60
0.30
5.36

1 28.80
0.60
0.30
5.18

1 7.70
0.60
0.30
1.39

1 27.10
0.60
0.30
4.88

1 24.00
0.60
0.30
4.32
3 6.50
0.30
0.30
1.76

12 38.65
0.30
0.30
41.74

6 11.25
0.60
0.30
12.15

3 35.05
0.30
0.30
9.46

3 3.60
0.30
0.30
0.97

6 26.60
0.60
0.30
28.73

3 29.75
0.60
0.30
16.07

3 6.50
0.30
0.30
1.76

3 24.95
0.60
0.30
13.47
3 28.80
0.60
0.30
15.55

3 7.70
0.60
0.30
4.16

6 27.10
0.60
0.30
29.27

1 6.50
0.25
0.40
0.65

1 12.65
0.25
0.40
1.27

1 13.00
0.25
0.40
1.30

1 6.50
0.25
0.40
0.65

1 35.70
0.25
0.40
3.57

1 38.65
0.25
0.40
3.87
2 28.00
0.25
0.40
5.60

2 11.25
0.25
0.40
2.25

1 3.60
0.25
0.40
0.36

1 35.05
0.25
0.40
3.51

1 19.15
0.25
0.40
1.92

2 27.80
0.25
0.40
5.56

1 9.10
0.25
0.40
0.91

1 29.75
0.25
0.40
2.98

1 6.50
0.25
0.40
0.65

1 24.95
0.25
0.40
2.50

1 28.80
0.25
0.40
2.88

1 7.70
0.25
0.40
0.77

2 27.10
0.25
0.40
5.42

2 6.50
0.25
0.40
1.30

2 4.55
0.25
0.40
0.91

289.38

1 6.40
6.40

1 22.60
22.60

2 35.95
71.90
1 3.75
3.75

2 10.25
20.50

1 7.75
7.75

1 9.35
9.35

1 1.00
1.00

1 8.65
8.65

1 13.85
13.85

1 3.65
3.65

1 7.10
7.10

1 38.45
38.45

1 9.65
9.65

2 3.55
7.10

2 29.15
58.30

2 35.35
70.70
1 8.60
8.60

1 14.95
14.95

1 5.30
5.30

1 27.40
27.40

1 36.30
36.30

1 5.75
5.75
459.00
91.80

1 755.85
755.85

3 777.10
2,331.30
2,637.75

1 27.40
27.40

4 36.00
144.00
1 62.00
62.00

4 54.00
216.00

449.40

1 9.30
1.65
0.20
3.07

30 0.15
1.70
0.15
1.15

4 7.10
1.65
0.20
9.37

88 0.15
1.70
0.15
3.37

1 10.10
1.60
0.20
3.23

20 0.15
1.60
0.15
0.72
4 6.80
1.60
0.20
8.70

80 0.15
1.60
0.15
2.88

1 12.65
1.30
0.25
4.11

30 0.15
1.30
0.15
0.88

37.48

5 18.45
92.25

2 44.80
89.60

2 44.80
89.60

2 41.45
82.90

2 43.05
86.10
440.45
44.05
2 21.75
43.50
8.70
52.75

1 0.45
3.14
7.20
10.17

1 0.35
3.14
3.00
3.30

2 0.30
3.14
3.00
5.65

4 0.40
0.40
4.20
26.88

16 0.40
0.40
3.00
76.80

1 0.40
0.40
4.20
6.72

4 0.40
0.40
3.00
19.20

2 0.40
0.40
4.20
13.44

8 0.40
0.40
3.00
38.40

2 0.40
0.40
4.20
13.44

4 0.35
0.35
3.00
16.80

2 0.30
0.30
3.00
7.20

2 0.40
0.40
4.20
13.44

8 0.35
0.35
3.00
33.60

1 0.40
0.40
2.55
4.08

1 0.40
0.40
3.00
4.80

3 0.35
0.35
3.00
12.60

4 0.40
0.40
2.55
16.32

8 0.35
0.35
3.00
33.60

8 0.30
0.30
3.00
28.80

2 0.45
3.14
4.20
11.87

2 0.40
3.14
3.00
7.54

2 0.35
3.14
3.00
6.59

4 0.30
3.14
3.00
11.30

2 0.45
3.14
7.20
20.35

4 0.35
3.14
3.00
13.19

2 0.30
3.14
3.00
5.65

1 0.40
0.40
4.20
6.72

1 0.40
0.40
14.70
23.52

2 0.35
0.35
4.20
11.76

2 0.35
0.35
14.70
41.16

1 0.50
0.50
4.20
8.40

1 0.40
0.40
3.00
4.80

1 0.30
0.40
3.00
4.20

1 0.25
0.40
8.70
11.31
1 0.40
0.40
7.20
11.52

1 0.25
0.40
11.70
15.21

2 0.25
0.50
7.20
21.60

2 0.25
0.40
11.70
30.42

1 0.40
0.40
4.20
6.72

1 0.30
0.40
3.00
4.20

1 0.25
0.40
11.70
15.21

1 0.40
0.40
4.20
6.72

1 0.35
0.35
3.00
4.20
3 0.30
0.30
3.00
10.80

9 0.40
0.40
10.20
146.88

6 0.35
0.35
3.00
25.20

2 0.40
0.40
7.20
23.04

6 0.30
0.30
3.00
21.60

2 0.45
3.14
7.20
20.35

2 0.35
3.14
3.00
6.59

4 0.30
3.14
3.00
11.30

19 0.20
0.20
1.50
1.14

67 0.20
0.20
0.90
2.41

958.72

2 18.75
0.25
0.20
24.38
2 18.75
0.20
7.50

4 6.00
0.25
0.20
15.60

2 6.00
0.20
2.40

1 7.50
0.25
0.20
4.88

1 6.50
0.30
1.95

1 7.75
0.60
4.65

1 4.45
0.30
1.34
1 40.15
0.30
12.05

1 9.25
0.60
5.55

1 12.75
0.60
7.65

1 6.15
0.30
1.85

1 26.00
0.30
7.80

2 38.65
0.30
23.19

1 35.05
0.30
10.52

1 3.60
0.30
1.08

1 27.80
0.60
16.68

1 21.30
0.60
12.78

1 23.25
0.60
13.95

1 6.50
0.60
3.90

1 29.75
0.60
17.85

1 28.80
0.60
17.28

1 7.70
0.60
4.62

1 27.10
0.60
16.26

1 24.00
0.60
14.40

1 147.00
0.30
44.10

3 6.50
0.30
5.85

12 38.65
0.30
139.14

6 11.25
0.60
40.50

3 35.05
0.30
0.30
94.64

3 3.60
0.30
0.30
9.72

6 26.60
0.60
95.76

3 29.75
0.60
53.55

3 6.50
0.30
5.85

3 24.95
0.60
44.91

3 28.80
0.60
51.84

3 7.70
0.60
0.30
27.72

6 27.10
0.60
97.56

3 144.00
0.30
129.60

1 6.50
0.25
0.20
4.23

1 12.65
0.25
0.20
8.22
1 13.00
0.25
0.20
8.45

1 6.50
0.25
0.20
4.23

1 35.70
0.25
0.20
23.21

1 38.65
0.25
0.20
25.12

2 28.00
0.25
0.20
36.40

2 11.25
0.25
0.20
14.63

1 3.60
0.25
0.20
2.34

1 35.05
0.25
0.20
22.78

1 19.15
0.25
0.20
12.45
2 27.80
0.25
0.20
36.14

1 9.10
0.25
0.20
5.92

1 29.75
0.25
0.20
19.34

1 6.50
0.25
0.20
4.23

1 24.95
0.25
0.20
16.22

1 28.80
0.25
0.20
18.72

1 7.70
0.25
0.20
5.01

2 27.10
0.25
0.20
35.23

2 6.50
0.25
0.20
8.45
2 6.50
0.20
2.60

2 4.55
0.25
0.20
5.92

2 4.55
0.20
1.82

1,412.44

1 3,096.75
3,096.75
1 528.00
0.30 528.00
3,624.75

1 9.30
1.65
15.35

2 9.30
0.35
6.51

30 1.70
0.15
7.65

4 7.10
1.65
46.86

8 7.10
0.35
19.88

88 1.70
0.15
22.44

1 10.10
1.60
16.16

2 6.40
0.35
4.48

20 1.60
0.15
4.80

4 6.80
1.60
43.52

8 6.80
0.35
19.04

80 1.60
0.15
19.20

2 12.65
0.40
10.12

30 1.30
0.15
5.85

241.86
1 24.60
4.50
110.70

1 0.20
5.70
1.14

4 24.60
3.30
324.72

4 0.20
5.70
4.56

1 24.60
3.00
73.80

1 0.20
5.70
1.14

-6 1.30
2.20
(17.16)
498.90

2 44.80
89.60

1 59.65
0.10
5.97

2 44.80
89.60

1 59.65
0.10
5.97

2 41.45
82.90

1 60.55
0.10
6.06

2 43.05
86.10

1 59.80
0.10
5.98

2 21.75
43.50

1 44.05
0.20
8.81
424.48

1 34.60
2.85
98.61

1 5.10
0.20
1.02

-2 1.90
(3.80)
95.83

1 13,535.61 14,212.39
1 15,840.92 16,632.96
1 41,103.09 43,158.24
1 3,136.41 3,293.24
1 13,190.07 13,849.57
1 26,694.07 28,028.78
1 13,270.52 13,934.04

1 4.55
2.70
12.29

-1 1.80
2.10
(3.78)

1 5.50
2.70
14.85

1 1.50
2.70
4.05

-1 0.90
2.10
(1.89)

1 3.75
2.70
10.13

1 2.80
2.70
7.56

1 5.60
2.70
15.12
1 6.00
2.70
16.20

1 35.15
2.70
94.91

-2 1.80
2.10
(7.56)

-1 0.90
2.10
(1.89)

1 3.75
2.70
10.13

2 4.05
2.70
21.87

-2 0.90
2.10
(3.78)

1 10.05
2.70
27.14

1 12.20
2.70
32.94

-1 0.90
2.10
(1.89)

-1 1.80
2.10
(3.78)
1 2.35
4.20
9.87

1 5.60
4.20
23.52

-1 0.90
2.10
(1.89)

2 2.60
4.20
21.84

-1 0.90
2.10
(1.89)

1 1.75
4.20
7.35

1 2.45
4.20
10.29

1 4.35
4.20
18.27

-3 0.90
2.10
(5.67)

1 1.30
4.20
5.46

1 8.20
4.20
34.44
1 5.55
4.20
23.31

-1 1.00
2.10
(2.10)

1 6.05
4.20
25.41

1 2.80
4.20
11.76

1 2.70
4.20
11.34

1 8.40
4.20
35.28

1 8.80
4.20
36.96

1 9.10
4.20
38.22

1 4.60
4.20
19.32

1 6.10
4.20
25.62

1 1.15
4.20
4.83

1 13.00
4.20
54.60

1 15.15
4.20
63.63

-2 1.00
2.10
(4.20)

-1 1.00
2.10
(2.10)

1 6.50
4.20
27.30

1 9.05
4.20
38.01

-1 0.90
2.10
(1.89)

1 10.50
4.20
44.10

1 3.10
4.20
13.02

1 13.20
4.20
55.44

-1 0.90
2.10
(1.89)

-1 1.50
2.10
(3.15)

1 12.75
4.20
53.55

-1 1.00
2.10
(2.10)

1 2.25
4.20
9.45

-1 0.70
2.10
(1.47)

1 36.20
4.20
152.04

1 1.75
3.00
5.25

1 2.45
3.00
7.35

1 2.35
3.00
7.05

-1 0.90
2.10
(1.89)

1 1.30
3.00
3.90

1 3.65
3.00
10.95

1 8.25
3.00
24.75

1 1.00
3.00
3.00

1 3.60
3.00
10.80

2 1.55
3.00
9.30

2 2.35
3.00
14.10

1 3.35
3.00
10.05

1 5.25
3.00
15.75

1 5.65
3.00
16.95

1 1.50
3.00
4.50

1 6.40
3.00
19.20

1 1.50
3.00
4.50

1 7.00
3.00
21.00

1 20.30
0.90
18.27

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 6.30
3.00
18.90

1 13.50
3.00
40.50

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 1.20
3.00
3.60

1 2.15
3.00
6.45

1 6.10
3.00
18.30

1 9.80
3.00
29.40

1 11.30
3.00
33.90

1 48.60
0.90
43.74

1 1.75
3.00
5.25

1 2.45
3.00
7.35

1 1.00
3.00
3.00

1 1.50
3.00
4.50

-1 0.90
2.10
(1.89)

1 1.30
3.00
3.90

1 3.65
3.00
10.95

1 8.30
3.00
24.90

1 1.00
3.00
3.00

1 3.65
3.00
10.95

2 1.55
3.00
9.30

2 2.35
3.00
14.10

1 3.55
3.00
10.65

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 1.50
3.00
4.50

1 6.40
3.00
19.20

1 1.50
3.00
4.50

1 6.60
3.00
19.80

1 19.60
3.00
58.80

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 6.30
3.00
18.90

1 13.10
3.00
39.30

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.90
2.10
(1.89)

-1 0.90
2.10
(1.89)

1 16.70
3.00
50.10

1 9.80
3.00
29.40

1 48.05
0.90
43.25

1 4.15
3.00
12.45

1 1.00
3.00
3.00

1 1.50
3.00
4.50

-1 0.90
2.10
(1.89)

1 1.30
3.00
3.90

1 3.65
3.00
10.95

1 7.05
3.00
21.15

1 1.00
3.00
3.00

1 7.15
3.00
21.45

2 3.90
3.00
23.40

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 1.50
3.00
4.50

1 6.40
3.00
19.20

1 1.50
3.00
4.50

1 25.90
3.00
77.70

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 10.15
3.00
30.45

1 6.30
3.00
18.90

1 12.90
3.00
38.70

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 9.50
3.00
28.50

1 16.75
3.00
50.25

1 13.10
0.90
11.79

1 14.10
3.00
42.30

1 6.30
3.00
18.90

1 4.35
3.00
13.05

1 1.75
3.00
5.25

1 6.80
3.00
20.40

1 16.35
3.00
49.05

-2 1.50
2.10
(6.30)

1 1.00
3.00
3.00

1 1.50
3.00
4.50

-1 0.90
2.10
(1.89)

1 1.30
3.00
3.90

1 3.65
3.00
10.95

2 6.70
0.40
5.36

1 7.05
3.00
21.15

1 1.00
3.00
3.00

1 8.80
3.00
26.40

2 2.35
3.00
14.10

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 1.50
3.00
4.50

1 6.45
3.00
19.35

1 1.50
3.00
4.50

1 25.90
3.00
77.70

1 1.15
3.00
3.45

1 6.10
3.00
18.30

1 6.30
0.90
5.67

1 12.60
3.00
37.80

1 12.25
3.00
36.75

-2 1.50
2.10
(6.30)

1 6.50
3.00
19.50

-2 1.00
2.10
(4.20)

1 9.90
3.00
29.70

1 1.55
3.00
4.65

1 1.70
3.00
5.10

1 13.25
3.00
39.75

-1 0.90
2.10
(1.89)

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 11.65
3.00
34.95

1 16.70
3.00
50.10

1 9.30
3.00
27.90

1 17.65
0.90
15.89

1 23.90
3.00
71.70

1 1.50
3.00
4.50

1 26.20
3.00
78.60

1 1.50
3.00
4.50

1 162.95
1.50
244.43

-1 7.56
4.30

-1 5.80
4.20

-1 11.80
4.20

-1 0.60
2.25

-1 5.35
7.50

-1 0.90
7.25

-1 9.63
3.00

-1 3.63
4.20

-1 8.80
4.20

-1 11.40
4.20

-1 9.50
3.30

-1 1.05
20.40

-1 1.30
12.90

-1 0.90
12.90

-1 2.80
1.00
(2.80)

-1 6.10
1.00
(6.10)

-1 6.30
1.00
(6.30)

-1 4.60
1.00
(4.60)

-1 5.60
1.00
(5.60)

-1 6.10
1.00
(6.10)

-1 3.75
1.00
(3.75)

-1 11.35
2.10
(23.84)

-1 2.80
2.10
(5.88)

-1 4.90
2.10
(10.29)

-1 13.15
2.10
(27.62)

-1 6.85
2.10
(14.39)

-3 9.80
2.10
(61.74)

-1 2.75
2.10
(5.78)

-1 11.55
2.10
(24.26)
-1 2.50
2.10
(5.25)

-1 25.80
2.10
(54.18)

-1 12.20
2.10
(25.62)

-1 14.80
2.10
(31.08)

-1 4.10
2.80
(11.48)

3,341.81

2 1.45
4.20
12.18

-1 0.90
2.10
(1.89)

1 1.20
4.20
5.04

1 53.65
0.90
48.29
3 29.00
0.90
78.30

141.92

2 1.35
1.50
4.05

1 1.90
2.50
4.75

1 3.30
4.20
13.86

1 3.30
3.00
9.90

3 3.30
3.00
29.70
58.21

1 619.75
619.75

1 159.10
159.10
1 23.85
23.85

1 143.00
3.00 429.00

1 352.55
1.00 352.55
1 111.30
0.30 33.39
385.94

1 620.00
620.00

1 342.00
342.00

1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
3 1.00
3.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
5 1.00
5.00
1 1.00
1.00

100 1.00
100.00
50 1.00
50.00
37 1.00
37.00
10 1.00
10.00
4 1.00
4.00
5 1.00
5.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00
1 1.00
1.00

1 3.80
0.90
3.80
-
-
1 9.95 -
0.90 -
9.95
-
4 7.40 -
0.90 -
29.60
1 9.95
0.90 -
9.95
-
4 7.40 -
0.90 -
29.60
-
2 6.90
0.90 -
13.80
-
2 3.65
0.90 -
7.30
104.00

1 5.60
2.85
15.96

1 12.70
4.20
53.34

1 4.45
4.20
18.69

1 7.00
4.20
29.40

1 5.00
2.85
14.25

1 4.60
2.85
13.11

1 8.35
3.00
25.05

1 23.35
3.00
70.05

1 24.85
3.00
74.55

1 36.75
3.00
110.25

1 35.95
3.00
107.85

1 15.55
3.00
46.65

1 32.10
3.00
96.30

1 21.85
3.00
65.55

1 50.25
3.00
150.75

1 29.05
3.00
87.15
1 60.85
3.00
182.55

1 32.10
3.00
96.30

1 21.85
3.00
65.55

1 50.25
3.00
150.75

1 29.05
3.00
87.15

1 60.85
3.00
182.55

1 11.60
3.00
34.80
`
1 26.10
3.00
78.30

1 21.85
3.00
65.55

1 60.85
3.00
182.55

-74 0.90
2.10
(139.86)
1,965.09

65.00

4 6.80 27.20
4 3.50 14.00
1 6.70 6.70
4 13.70 54.80
4 6.10 24.40
2 4.90 9.80
1 3.70 3.70
4 13.40 53.60
1 8.10 8.10
202.30

2 25.25
4.43
223.72

2 54.90
4.43
486.41

1 21.60
4.43
95.69

1 41.90
4.43
185.62
2 25.25
4.43
223.72

2 54.10
4.43
479.33
1,694.48

2 37.35
3.49
260.70

1 26.20
3.49
91.44

2 37.35
3.49
260.70
612.84

50 17.75
2.94
2,609.25

28 31.00
2.94
2,551.92

2 16.16
2.94
95.02
11 1.30
2.94
42.04

5,298.23

4 6.00
24.00
1 5.00
5.00
58.00

2 4.00
8.00
16.00

1 11.00
11.00
11.00

1 102.00
102.00

1 102.00
102.00
4 24.00
96.00
4 5.00
20.00
116.00

4 4.00
16.00
16.00

1 102.00
102.00
102.00

1 387.00
387.00

1 4.55
2.70
12.29

-1 1.80
2.10
(3.78)

1 5.50
2.70
14.85

1 1.50
2.70
4.05

-1 0.90
2.10
(1.89)

1 3.75
2.70
10.13

1 2.80
2.70
7.56

1 5.60
2.70
15.12

1 6.00
2.70
16.20

1 35.15
2.70
94.91

-2 1.80
2.10
(7.56)

-1 0.90
2.10
(1.89)

1 3.75
2.70
10.13

2 4.05
2.70
21.87

-2 0.90
2.10
(3.78)

1 10.05
2.70
27.14

1 12.20
2.70
32.94

-1 0.90
2.10
(1.89)

-1 1.80
2.10
(3.78)

1 5.60
4.20
23.52

-1 0.90
2.10
(1.89)

2 2.60
4.20
21.84

-1 0.90
2.10
(1.89)

1 2.45
4.20
10.29

1 4.35
4.20
18.27

-3 0.90
2.10
(5.67)

1 8.20
4.20
34.44

1 5.55
4.20
23.31

-1 1.00
2.10
(2.10)

1 6.05
4.20
25.41

1 2.80
4.20
11.76

1 2.70
4.20
11.34

1 8.40
4.20
35.28

1 8.80
4.20
36.96

1 9.10
4.20
38.22

1 4.60
4.20
19.32

1 15.15
4.20
63.63

-2 1.00
2.10
(4.20)

-1 1.00
2.10
(2.10)

1 6.50
4.20
27.30

1 9.05
4.20
38.01

-1 0.90
2.10
(1.89)

1 10.50
4.20
44.10

1 3.10
4.20
13.02

1 13.20
4.20
55.44

-1 0.90
2.10
(1.89)

-1 1.50
2.10
(3.15)

1 12.75
4.20
53.55

-1 1.00
2.10
(2.10)

1 2.25
4.20
9.45

-1 0.70
2.10
(1.47)

1 2.45
3.00
7.35

1 2.35
3.00
7.05

-1 0.90
2.10
(1.89)

1 3.65
3.00
10.95

1 8.25
3.00
24.75

1 3.60
3.00
10.80

2 1.55
3.00
9.30

2 2.35
3.00
14.10

1 3.35
3.00
10.05

1 5.25
3.00
15.75

1 5.65
3.00
16.95

1 6.40
3.00
19.20

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 2.45
3.00
7.35

1 1.50
3.00
4.50

-1 0.90
2.10
(1.89)

1 3.65
3.00
10.95

1 8.30
3.00
24.90

1 3.65
3.00
10.95

2 1.55
3.00
9.30

2 2.35
3.00
14.10

1 3.55
3.00
10.65

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 6.40
3.00
19.20

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.90
2.10
(1.89)

-1 0.90
2.10
(1.89)

1 1.50
3.00
4.50
-1 0.90
2.10
(1.89)

1 3.65
3.00
10.95

1 7.05
3.00
21.15

1 7.15
3.00
21.45

2 3.90
3.00
23.40

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 6.40
3.00
19.20

1 6.70
3.00
20.10

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

1 6.75
3.00
20.25

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 6.30
3.00
18.90

1 4.35
3.00
13.05

1 6.80
3.00
20.40

1 16.35
3.00
49.05

-2 1.50
2.10
(6.30)

1 1.50
3.00
4.50
-1 0.90
2.10
(1.89)

1 3.65
3.00
10.95

2 6.70
0.40
5.36

1 7.05
3.00
21.15

1 8.80
3.00
26.40

2 2.35
3.00
14.10

1 5.25
3.00
15.75

1 5.60
3.00
16.80

1 6.45
3.00
19.35

1 12.25
3.00
36.75

-2 1.50
2.10
(6.30)

1 6.50
3.00
19.50

-2 1.00
2.10
(4.20)

1 9.90
3.00
29.70

1 1.70
3.00
5.10

1 13.25
3.00
39.75

-1 0.90
2.10
(1.89)

1 9.50
3.00
28.50

-2 1.00
2.10
(4.20)

-1 0.70
2.10
(1.47)

-1 0.90
2.10
(1.89)

1 1.50
3.00
4.50
1 1.50
3.00
4.50

2 1.45
4.20
12.18

-1 0.90
2.10
(1.89)

1 1.20
4.20
5.04

1 53.65
0.90
48.29

3 29.00
0.90
78.30

2 1.35
1.50
4.05

1 1.90
2.50
4.75

1 3.30
4.20
13.86

1 3.30
3.00
9.90

3 3.30
3.00
29.70
1,993.47

1 64.25
2.85
183.11

-2 1.90
(3.80)
2,172.78
4,345.57

25 0.90
2.10
127.50

14 0.70
2.10
68.60

19 1.00
2.10
98.80

5 1.50
2.10
28.50

4 1.80
2.10
24.00

6 0.90
2.10
30.60
378.00
0.25
94.50
21.63

1 8.70
0.25
2.18

1 8.40
0.25
2.10

1 8.40
0.25
2.10

1 5.10
0.25
1.28

1 15.00
0.25
3.75

1 14.50
0.25
3.63

1 6.00
0.25
1.50

1 8.40
0.25
2.10

1 8.40
0.25
2.10

1 8.40
0.25
2.10

1 6.60
0.25
1.65

1 40.84
0.25
10.21

1 25.80
0.25
6.45

1 25.80
0.25
6.45
47.59

1 8.10
4.20
34.02

4 8.10
3.00
97.20

1 8.10
2.70
21.87

-6 1.30
2.20
(17.16)
135.93
(2.88)
1,901.60
6,543.92

1 2.35
4.20
9.87

1 1.75
4.20
7.35

1 1.30
4.20
5.46

1 6.10
4.20
25.62

1 1.15
4.20
4.83

1 13.00
4.20
54.60

1 36.20
4.20
152.04

1 1.75
3.00
5.25

1 1.30
3.00
3.90
1 1.00
3.00
3.00

1 1.50
3.00
4.50

1 1.50
3.00
4.50

1 7.00
3.00
21.00

1 20.30
0.90
18.27

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 6.30
3.00
18.90

1 13.50
3.00
40.50

1 1.20
3.00
3.60

1 2.15
3.00
6.45
1 6.10
3.00
18.30

1 9.80
3.00
29.40

1 11.30
3.00
33.90

2 48.60
0.90
87.48

1 1.75
3.00
5.25

1 1.00
3.00
3.00

1 1.30
3.00
3.90

1 1.00
3.00
3.00

1 1.50
3.00
4.50

1 1.50
3.00
4.50

1 6.60
3.00
19.80
1 19.60
3.00
58.80

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 6.30
3.00
18.90

1 13.10
3.00
39.30

1 16.70
3.00
50.10

1 9.80
3.00
29.40

2 48.05
0.90
86.49

1 4.15
3.00
12.45

1 1.00
3.00
3.00

1 1.30
3.00
3.90

1 1.00
3.00
3.00

1 1.50
3.00
4.50

1 1.50
3.00
4.50

1 25.90
3.00
77.70

1 6.10
3.00
18.30

1 1.15
3.00
3.45

1 10.15
3.00
30.45

1 6.30
3.00
18.90

1 12.90
3.00
38.70

1 9.50
3.00
28.50

1 16.75
3.00
50.25

2 13.10
0.90
23.58

1 14.10
3.00
42.30

1 1.75
3.00
5.25

1 1.00
3.00
3.00

1 1.30
3.00
3.90

1 1.00
3.00
3.00

1 1.50
3.00
4.50

1 1.50
3.00
4.50

1 25.90
3.00
77.70

1 1.15
3.00
3.45

1 6.10
3.00
18.30

1 6.30
0.90
5.67

1 12.60
3.00
37.80

1 1.55
3.00
4.65

1 11.65
3.00
34.95

1 16.70
3.00
50.10

1 9.30
3.00
27.90

2 17.65
0.90
31.77

1 23.90
3.00
71.70

1 26.20
3.00
78.60

2 162.95
1.50
488.85
-1 7.56
4.30

-1 5.80
4.20

-1 11.80
4.20

-1 0.60
2.25

-1 5.35
7.50

-1 0.90
7.25

-1 9.63
3.00

-1 3.63
4.20

-1 8.80
4.20

-1 11.40
4.20

-1 9.50
3.30

-1 1.05
20.40

-1 1.30
12.90

-1 0.90
12.90

-1 2.80
1.00
(2.80)

-1 6.10
1.00
(6.10)

-1 6.30
1.00
(6.30)

-1 4.60
1.00
(4.60)

-1 5.60
1.00
(5.60)

-1 6.10
1.00
(6.10)

-1 3.75
1.00
(3.75)

-1 11.35
2.10
(23.84)

-1 2.80
2.10
(5.88)

-1 4.90
2.10
(10.29)

-1 13.15
2.10
(27.62)

-1 6.85
2.10
(14.39)

-3 9.80
2.10
(61.74)

-1 2.75
2.10
(5.78)

-1 11.55
2.10
(24.26)

-1 2.50
2.10
(5.25)

-1 25.80
2.10
(54.18)

-1 12.20
2.10
(25.62)

-1 14.80
2.10
(31.08)

-1 4.10
2.80
(11.48)
1,911.60

4 0.40
0.40
4.20
26.88

1 147.00
0.30
44.10

3 144.00
0.30
129.60

1 201.25
0.40
80.50

1 225.37
225.37
506.45
Window edge Plastering
1 11.35
2.10
15.55
1 2.80
2.10
7.00
1 4.90
2.10
9.10
2 2.10

4.20
4 2.10

8.40
1 2.10

2.10
1 2.10
2.10
1 2.80
1.00
4.80
5 6.10
1.00
40.50
5 6.30
1.00
41.50
1 4.60
1.00
6.60
1 5.60
1.00
7.60
1 6.10
1.00
8.10
1 3.75
1.00
5.75
1 4.10
2.80
9.70
173.00
0.13
21.63
2,439.67

1 3,546.15
3,546.15

1 225.38
225.38
1 53.65
0.90
48.29

3 29.00
0.90
78.30
253.17

6 9.85
59.10

20 1.73
34.50

30 1.73
51.75

88 1.73
151.80

20 1.63
32.50

30 1.63
48.75

88 1.63
143.00

9 4.43
39.83

11 1.33
14.58

23 1.23
28.18
544.88
59.10

20 1.70
34.00

30 1.70
51.00

88 1.70
149.60

20 1.60
32.00

30 1.60
48.00

88 1.60
140.80

9 4.40
39.60
23 1.20
27.60

6 9.85
59.10

581.70

5 5.20
26.00

1 9.70
9.70

5 5.25
26.25

1 28.20
28.20

1 1.45
1.45

91.60

314
0.30
94.20
5 3.80
19.00

1 8.40
8.40

5 6.50
32.50

1 21.60
21.60

1 2.40
2.40

1 150.00
150.00

1 16.70
16.70

1 28.60
28.60

279.20

100 0.95
95.00
50 0.75
37.50
37 1.05
38.85
10 1.55
15.50
4 1.85
7.40
5 0.95
4.75
199.00

1 11.40
11.40
1 2.85
2.85
1 4.95
4.95
1 13.20
13.20
1 6.85
6.85
3 9.85
29.55
1 27.25
27.25
1 11.61
11.61
1 2.55
2.55
1 25.85
25.85
1 12.25
12.25
1 14.85
14.85
1 4.15
4.15
1 2.85
2.85
1 6.15
6.15
1 6.35
6.35
1 4.65
4.65
1 5.65
5.65
5 6.15
30.75
1 3.80
3.80
227.51
1 7.66
7.66
1 5.90
5.90
1 11.90
11.90
1 6.10
6.10
1 5.44
5.44
1 1.00
1.00
1 9.73
9.73
1 3.73
3.73
1 8.87
8.87
1 11.50
11.50
1 9.60
9.60
1 1.15
1.15
1 1.40
1.40
1 1.00
1.00
84.98

1 48.60
48.60

1 48.05
48.05

1 13.10
13.10
1 17.65
17.65

1 162.95
162.95
290.35

1 53.65
53.65

3 29.00
87.00
140.65

1 107.00
107.00

1 17.76
17.76

1 35.80
35.80

1 305.30
305.30

1 119.01
119.01

1 31.75
31.75
1 47.00
47.00

1 85.45
85.45

1 15.40
15.40

1 2.80
2.80

1 17.68
17.68

1 3.00
3.00

1 22.29
22.29

1 19.83
19.83

1 21.85
21.85

1 20.79
20.79

1 141.47
141.47

1 64.72
64.72

1 80.13
80.13

1 37.11
37.11
1 356.00
356.00

1 4.60
4.60

1 16.32
16.32

1 11.00
11.00

1 300.10
300.10

1 54.80
54.80

1 144.25
144.25

1 90.95
90.95

1 65.10
65.10

1 141.75
141.75

1 286.00
286.00

1 61.05
61.05

1 145.45
145.45

1 64.55
64.55

1 28.80
28.80

1 198.65
198.65

1 249.50
249.50

1 29.55
29.55

1 41.45
41.45

1 212.05
212.05

1 51.95
51.95

1 25.55
25.55

1 199.25
199.25
3,867.81

1 30.95
30.95

1 14.95
14.95

1 9.60
9.60
1 35.90
35.90

1 43.53
43.53

1 10.60
10.60

1 31.90
31.90

1 28.40
28.40

1 9.95
9.95

1 6.00
6.00

1 4.51
4.51

1 6.22
6.22

1 9.65
9.65

1 3.83
3.83

1 3.82
3.82

1 19.00
19.00

1 18.00
18.00

1 19.20
19.20
1 4.13
4.13

1 3.56
3.56

1 115.70
115.70

1 8.00
8.00

1 11.63
11.63

1 6.40
6.40

1 102.85
102.85

1 23.80
23.80

1 75.90
75.90

1 45.15
45.15

1 41.20
41.20

1 102.00
102.00

1 68.35
68.35

1 24.20
24.20

1 75.90
75.90
1 44.85
44.85

1 11.00
11.00

1 133.30
133.30

1 89.75
89.75

1 22.75
22.75

1 24.45
24.45

1 71.25
71.25

1 29.25
29.25

1 20.95
20.95

1 110.70
110.70
1,117.60

1 17.00
17.00

4 27.40
109.60

4 2.90
11.60
1 30.90
30.90

5 32.40
162.00

5 3.35
16.75

330.85

1 16.20
16.20

4 6.15
24.60

5 4.45
22.25

46.85

1 652.81
652.81

1 21.00
21.00

1 55.30
55.30
729.11

1 65.00
65.00

1 4.40
4.40

1 118.90
118.90

1 15.00
15.00

1 75.60
75.60

1 4.40
4.40

1 15.00
15.00

1 6.90
6.90
305.20

1 31.70
31.70

1 7.10
7.10

1 49.40
49.40

1 13.75
13.75

1 21.75
21.75
1 7.10
7.10

1 14.50
14.50

1 53.80
53.80

1 10.00
10.00

1 210.00
210.00
419.10

2 4.25
2.10
17.85

1 4.70
2.10
9.87

2 1.50
2.10
6.30

2 6.25
2.10
26.25

6 6.60
2.10
83.16
6 6.55
2.10
82.53

2 5.95
2.10
24.99

2 6.55
2.10
27.51
278.46

1 8.15
3.00
24.45

1 5.10
3.00
15.30

1 4.70
3.00
14.10

1 6.45
3.00
19.35

1 6.05
3.00
18.15

1 11.30
3.00
33.90

1 4.55
3.00
13.65

2 7.90
3.00
47.40

2 7.50
3.00
45.00

1 7.95
3.00
23.85

1 6.45
3.00
19.35

1 15.20
3.00
45.60

2 4.75
3.00
28.50

1 14.85
3.00
44.55

1 5.80
3.00
17.40

1 5.40
3.00
16.20

2 8.75
3.00
52.50

1 6.10
3.00
18.30

1 6.10
3.00
18.30

1 6.45
3.00
19.35

5 6.80
3.00
102.00

2 4.75
3.00
28.50

1 14.85
3.00
44.55

1 5.40
3.00
16.20

2 8.75
3.00
52.50

1 6.10
3.00
18.30

1 6.10
3.00
18.30

1 6.45
3.00
19.35
4 6.80
3.00
81.60

1 4.75
3.00
14.25

1 5.40
3.00
16.20

1 6.10
3.00
18.30

4 6.80
3.00
81.60
1,046.85

4 32.70
1.80
235.44

1 30.70
1.80
55.26

5 38.60
1.80
347.40
638.10
1 3.30
2.70
8.91

1 3.30
4.20
13.86

3 3.30
3.00
29.70

52.47

1 138.00
138.00

1 132.40
132.40

2 11.65
1.40
32.62

2 19.15
1.40
53.62

6 35.90
0.20
43.08

2 34.10
0.20
13.64
142.96
MTT CONSULTING, ARCHITECTS & ENGINEERS PLC

No:
Date: 2019

cation: Bale Robe, Awash Bank


DESCRIPTION
1. Excavation & Earthwork
1.01. Site Clearance
CAD Area = 1,312 OFF SET (1.55+1.5)/2+0.25=1.65m FROM BOUNDARY
m2 Total

1.02. Bulk Excavation


0-1.5 m
All Area
CAD Area = 1,312 m2
D=1.50 m
m3 Total
1.03. Bulk Excavation
1.5-3.0 m
All Area
CAD Area = 1,312 m2
D=1.50 m
m3 Total
1.04 Bulk Excavation
3.0-4.50 m
All Area
CAD Area = 1,312 m2
D=0.80 m
m3 Total

1.05. Pit Excavation


A. 0-1.50 m
F1=3.0x3.0x0.75, 14 Pcs
L=3+2*0.25= 3.50 m
W=3+2*0.25= 3.50 m
D=1.50 m
m3
F2=2.6x2.6x0.70, 8 Pcs
L=2.6+2*0.25= 3.10 m
W=2.6+2*0.25= 3.10 m
D=1.50 m
m3
F3=2.3x2.3x0.55, 11 Pcs
L=2.3+2*0.25= 2.80 m
W=2.3+2*0.25= 2.80 m
D=1.50 m
m3
F4=3.1x3.1x0.80, 1 Pcs
L=3.1+2*0.25= 3.690 m
W=3.1+2*0.25= 3.690 m
D=1.50 m
m3
F5=5.65x8.7x0.60, 1 Pcs
L=5.65+2*0.25= 6.45 m
W=8.7+2*0.25= 9.20 m
D=1.50 m
m3
F6=1.10x1.10x0.30, 1 Pcs
L=1.1+2*0.25= 1.60 m
W=1.1+2*0.25= 1.60 m
D=1.50 m
m3
CF1=3.65x2.50x0.55, 1 Pcs
L=3.65+2*0.25= 4.15 m
W=2.5+2*0.25= 3.0 m
D=1.50 m
m3
m3 Total
1.06. Pit Excavation
B. 1.50-3.0 m
F1=3.0x3.0x0.75, 14 Pcs
L=3+2*0.25= 3.50 m
W=3+2*0.25= 3.50 m
D=0.7+0.05=0.75 m including lean concrete under pad
m3
F2=2.6x2.6x0.70, 8 Pcs
L=2.6+2*0.25= 3.10 m
W=2.6+2*0.25= 3.10 m
D=0.7+0.05=0.75 m
m3
F3=2.3x2.3x0.55, 11 Pcs
L=2.3+2*0.25= 2.80 m
W=2.3+2*0.25= 2.80 m
D=0.7+0.05=0.75 m
m3
F4=3.1x3.1x0.80, 1 Pcs
L=3.1+2*0.25= 3.690 m
W=3.1+2*0.25= 3.690 m
D=0.7+0.05=0.75 m
m3
F5=5.65x8.7x0.60, 1 Pcs
L=5.65+2*0.25= 6.45 m
W=8.7+2*0.25= 9.20 m
D=0.7+0.05=0.75 m
m3
F6=1.10x1.10x0.30, 1 Pcs
L=1.1+2*0.25= 1.60 m
W=1.1+2*0.25= 1.60 m
D=0.7+0.05=0.75 m
m3
CF1=3.65x2.50x0.55, 1 Pcs
L=3.65+2*0.25= 4.15 m
W=2.5+2*0.25= 3.0 m
D=0.7+0.05=0.75 m
m3
m3 Total

1.07.Trench Excavation
Peripheral Length
CAD Length= 132.0 m
W=0.5+2*0.25=1.0 m
D= 1.55 m including lean concrete under masonary
m3
Arround Ramp
CAD Length= 15+10.25= 25.25 m
W=0.5+2*0.25=1.0 m
D= 1.15 m
m3
m3 Total

1.08. A. Backfill Arround Foundation & Masonry


Total of Pit Excavation, 0-1.5 m
Total of Pit Excavation, 1.5-3.0 m
Total of Trench Excavation
lean under pad
lean under massonary
Total of Pad
Total of Foundation Column
Total of Masonry
m3 Total

1.08. B, Backfill Under Hardcore, 80 cm


Ground Floor Slab
All Area
CAD Area = 1,073 m2
m2 Total, D=0.80 m
m3 Total

1.09. Cartaway
Site Clearance x 0.2m
Bulk Excavation, 0-1.5
Bulk Excavation, 1.5-3.0
Bulk Excavation, 3.0-4.5
Pit Excavation, 0-1.5
Pit Excavation, 1.5-3.0
Trench Excavation
m3 Total

1.10. Hardcore, 25 cm
CAD Area = 1,332.20 m 2

m2
m2 Total

2.0. Masonry Work


Peripheral Length
CAD Length= 132.0 m
W=0.50 m
D= 1.55 m
m3
Arround Ramp
CAD Length= 15+10.25= 25.25 m
W=0.5+2*0.25=1.0 m
D= 1.15 m

m3 Total
3.0 Concrete Work
3.01 C-5 Lean Concrete
A. Under Footing Pad
F1=3.0x3.0x0.75, 14 Pcs
L=3+2*0.05= 3.10 m
W=3+2*0.05= 3.10 m
m2
F2=2.6x2.6x0.70, 8 Pcs
L=2.6+2*0.05= 2.70 m
W=2.6+2*0.05= 2.70 m
m2
F3=2.3x2.3x0.55, 11 Pcs
L=2.3+2*0.05= 2.40 m
W=2.3+2*0.05= 2.40 m
m2
F4=3.1x3.1x0.80, 1 Pcs
L=3.1+2*0.05= 3.20 m
W=3.1+2*0.05= 3.20 m
m2
F5=5.65x8.7x0.60, 1 Pcs
L=5.65+2*0.05= 5.75 m
W=8.7+2*0.05= 8.80 m
m2
F6=1.10x1.10x0.30, 1 Pcs
L=1.1+2*0.05= 1.20 m
W=1.1+2*0.05= 1.20 m
m2
F7=5.0x0.60x0.30, 1 Pcs
L=5+2*0.05= 5.10 m
W=0.6+2*0.05= 0.70 m
m2
CF1=3.65x2.50x0.55, 1 Pcs
L=3.65+2*0.05= 3.75 m
W=2.5+2*0.05= 2.60 m
m2
m2 Total

B. Under Grade Beams


Basement Floor Beams @ -3.00 m
Along Axis A, B, C, D, E & F, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25+2*0.05=0.35 m
m2
Along Axis E' , From 5-5'
L=3.60 m
W= 0.25+2*0.05=0.35 m
m2
Along Axis 1, 2, 3, 4, 5, 6 & 7, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25+2*0.05=0.35 m
m2
Along Axis 5' , From E-F
L=6.0 m
W= 0.25+2*0.05=0.35 m
m2
Starter Beam For Ramp @ -1.20 m
L= 1.30 m
W= 0.25+2*0.05=0.35 m
m2
Starter Beam For Ramp Car entrance
L= 6.4 m
W= 0.25+2*0.05=0.35 m
m2

m2 Total

C. Under Masonry
Peripheral CAD Length
Peripheral Length
CAD Length= 132.0 m
W=0.5+2*0.05=0.60 m
m2
Arround Ramp
CAD Length= 15+10.25= 25.25 m
W=0.5+2*0.05=0.60 m
m2
m2 Total

D. Under Basement & Ground Floor Slab


Ground Floor @ +0.00 m
CAD Area = 22.50 m2
m2
CAD Area = 1,332.20 m2
m2
m2 Total

E. Under Stair Case


Stair Case-4
CAD Area = 30.10 m2
m2
m2 Total

F. Under Ramps
Two Way Ramp
CAD Length = 11.65 m
W= 1.20 m
m2
CAD Length = 11.65 m
W= 1.20 m
m2
One Way Ramp, Car Entrance
CAD Length = 17.65 m
W= 6.0 m
m2
m2 Total, D= 100 m

3.02. C-30 Concrete Work


A. For Foundation Pad
F1=3.0x3.0x0.75, 14 Pcs
L=3.0 m
W=3.0 m
D=0.75 m
m3
F2=2.6x2.6x0.70, 8 Pcs
L=2.60 m
W=2.60 m
D=0.70 m
m3
F3=2.3x2.3x0.55, 11 Pcs
L=2.30 m
W=2.30 m
D=0.55 m
m3
F4=3.1x3.1x0.80, 1 Pcs
L=3.10 m
W=3.10 m
D=0.80 m
m3
F5=5.65x8.7x0.60, 1 Pcs
L=5.65 m
W=8.70 m
D=0.60 m
m3
F6=1.10x1.10x0.30, 1 Pcs
L=1.10 m
W=1.10 m
D=0.60 m
m3
F7=5.0x0.60x0.30, 1 Pcs
L=5.0 m
W=0.60 m
D=0.30 m
m3
CF1=3.65x2.50x0.55, 1 Pcs
L=3.65 m
W=2.50 m
D=0.55 m
m3
m3 Total

B. For Foundation Column


Starting @ -6.0 m
C1= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m3
C2= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C3= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C4= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C5= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C6= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C7= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C8= 0.45x0.45 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m3
C9= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m3
C10= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m3
C11= 0.45x0.45 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m3
C12= 0.35x0.35 m
L=0.35 m
W=0.35 m
D=3-0.5-0.4=2.10 m
m3
C13= 0.50x0.50 m
L=0.50 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m3
C14= 0.45x0.45 m,
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m3
C15= 0.25x0.50 m
L=0.25 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m3
C16= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C17= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m3
C18= 0.40x0.40 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m3
C19= 0.50x0.50 m
L=0.50 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m3
C20= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m3
C21= 0.30x0.30 m
L=0.30 m
W=0.30 m
D=3-0.5-0.4=2.10 m
m3
Basement Elevation Columns
C1= Φ 0.45 m, From -3.00 - +0.00 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m3
C2= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m3
C3= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m3
C4= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m3
C5= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m3
C6= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m3
C7= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m3
C8= 0.45x0.45 m, From -3.00 - +1.65 m
L=0.45 m
W=0.45 m
D=4.65-0.4=4.25 m
m3
C9= Φ 0.45 m, From -3.00 - +0.00 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m3
C10= Φ 0.45 m, From -3.00 - +0.00 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m3
C11= 0.45x0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m3
C12= 0.35x0.35 m, From -3.00 - +0.00 m
L=0.35 m
W=0.35 m
D=3-0.4=2.60 m
m3
C13= 0.50x0.50 m, From -3.00 - +0.00 m
L=0.50 m
W=0.50 m
D=3-0.4=2.60 m
m3
C14= 0.45x0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m3
C15= 0.25x0.50 m, From -3.00 - +0.00 m
L=0.25 m
W=0.50 m
D=3-0.4=2.60 m
m3
C16= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m3
C17= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m3
C18= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m3
C19= 0.50x0.50 m, From -3.00 - +0.00 m
L=0.50 m
W=0.50 m
D=3-0.4=2.60 m
m3
C20= Φ 0.45 m, From -3.00 - +0.00 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m3
C21= 0.30x0.30 m, From -3.00 - +0.00 m
L=0.30 m
W=0.30 m
D=3-0.4=2.60 m
m3

m3 Total

C. Lift Shaft
Peripheral
CAD Length =13.1+ 11.5= 24.60 m
D=3.0 m
m2
Door Opening
L = 1.30 m
D= 2.20 m
m2
m2 Total, D= 200 m
m3 Total

D. Basement Shear Wall and voult room


Basement Shear Wall
Peripheral
CAD Length = 125.2-4.6-(18*0.4) = 113.40 m
D=3.0 m
m2
Along Axis 7, B/n C-D
CAD Length = 6.5-0.4 = 6.1 m
D= 1.80 m
m2
m2 Total

Vault Shear Wall


Vault @ Basement Floor
Peripheral
CAD Area = 2.35 m2
D=3-0.3= 2.70 m
m3
Door Deduction, D1
L= 0.90 m
W= 0.20 m
D=2.1 m
m3
Window Deduction,
L= 0.70 m
W= 0.20 m
D=0.70 m
m3
Vault @ Ground Floor
Peripheral
CAD Area = 19.95-17.35=2.60 m2
D=4.5-0.3=4.20 m
m3
Door Deduction, D1
L= 0.90 m
W= 0.20 m
D=2.1 m
m3
Window Deduction,
L= 0.70 m
W= 0.20 m
D=0.70 m
m3

m3 Total

3.03. C-25 Concrete Work


C. Grade Beams
Basement Floor Beams @ -3.00 m
Along Axis A, B, C, D, E & F, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25 m
D= 0.40 m
m3
Along Axis E' , From 5-5'
L=3.60 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 1, 2, 3, 4, 5, 6 & 7, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 5' , From E-F
L=6.0 m
W= 0.25 m
D= 0.40 m
m3
Starter Beam For Ramp @ -1.20 m
L= 1.30 m
W= 0.25 m
D= 0.40 m
m3
Starter Beam For Ramp Car Entrance
L= 6.40 m
W= 0.25 m
D= 0.40 m
m3

Suspended Ground Floor Beams @ +0.00 m


Along Axis A', A" & C'
L=4.15+6.5+3.6 = 14.25 m
W= 0.25 m
D= 0.40 m
m3
Along Axis B, From 1-3--
L= 3.75+6.1+3.4=13.25 m
W= 0.25 m
D= 0.40 m
m3
Along Axis B, From 4-7
L= 6.1+6.1+3.4=15.6 m
W= 0.25 m
D= 0.40 m

Along Axis C, From 1-7


L= 6.1+6.1+6.1+6.1+3.75=28.15 m
W= 0.25 m
D= 0.40 m
m3
Along Axis D, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25 m
D= 0.40 m
m3
Along Axis E, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25 m
D= 0.40 m
m3
Along Axis E' , From 5-5'
L=3.60 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 2, From A-E
L=4.55+6.5*2+5 = 22.55 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 3, From A-E
L= 4.15+6.1+6.1+3.15=19.5m
W= 0.25 m
D= 0.40 m
m3
Along Axis 3" , From C-D
L= 4.55 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 4 & 5, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 5' , From C-D
L= 6.0 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 6, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 6' , From C-D
L= 6.50 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 6''
L= 12.55 m
W= 0.25 m
D= 0.40 m
m3
Ramp Beams
L= 3.10 m
W= 0.25 m
D= 0.40 m
m3
L= 2.0 m
W= 0.25 m
D= 0.40 m
m3

m3 Total

B. On Basement Floor Slab @ -3.00 m 15cm thick


All 4.15x4.55 m Grids
CAD Area = 17.80 m2
m2
All 6.5x4.55 m Grids
CAD Area = 27.65 m2
m2
All 4.15x6.5 m Grids
CAD Area = 25.15 m2
m2
All 6.5x6.5 m Grids
CAD Area = 39.05 m2
m2
All 4.15x5.0 m Grids
CAD Area = 19.10 m2
m2
All 6.5x5.0 m Grids
CAD Area = 29.70 m2
m2
All 4.15x6.0 m Grids
CAD Area = 22.90 m2
m2
All 6.5x6.0 m Grids
CAD Area = 36.70 m2
m2
Ground Floor @ +0.00 m
CAD Area = 22.50 m2
m2

m3 Total

Susspended Ground Floor Slab @ +0.00 m 20cm thick


B/n Axis 1-2 & A-B
CAD Area = 9.85 m2
m2
All 6.5x4.55 m Grid
CAD Area = 26.65 m2
m2
B/n Axis 3"-4 & A-B
CAD Area = 3.60 m2
m2
B/n Axis 1-2 & B-C
CAD Area = 23.65 m2
m2
All 6.5x6.5 m Grid
CAD Area = 36.45 m2
m2
B/n Axis 1-2/6-6' & C-D
CAD Area = 24.20 m2
m2
All 4.15x5.0 m Grid
CAD Area = 18.35 m2
m2
All 6.5x5.0 m Grid
CAD Area = 29.15 m2
m2
All 6.5x6.0 m Grid
CAD Area = 35.65 m2
m2
B/n Axis 5-5' & E-E'
CAD Area = 4.05 m2
m2
B/n Axis 5-6' & E-F
CAD Area = 14.95 m2
m2
m 2 Total
m3 Total, 20 cm
m3 Total

E. Stair Case
Stair Case-1
Stair Soffit =3.45+2.95= 6.40 m
W=1.70 m
D= 0.20 m
m3
Steps
L=1.70 m
W=0.30*0.5=0.15 m
D= 0.15 m
m3
Stair Case-2
Stair Soffit =3.45+2.95= 6.40 m
W=1.70 m
D= 0.20 m
m3
Steps
L=1.70 m
W=0.30*0.5=0.15 m
D= 0.15 m
m3
Stair Case-3
Stair Soffit =2.35 m
W=4.40 m
D= 0.20 m
m3
Steps
W=4.40 m
D= 0.15 m
m2
Stair Case-4
Stair Sides
L = 2.35 m
D= 0.1+0.15= 0.25 m
m2
Steps
Total length =11.3*2+11.35*2+11.4*3+11.45= 90.95 m
W=0.40*0.5=0.20 m
D= 0.15 m
m3
Stair Case-6
Stair Soffit
L= 2.7 m
W=1.10 m
D=0.15 m
m3
Steps
L= 0.3*0.5= 0.15m
W=1.10 m
D=.15m
m3
Landing
L= 1.2 m
W=1.10 m
D=0.30m
m3

m3 Total

G. Ramps
Two Way Ramp
CAD Length = 11.65 m
W= 1.20 m
m2
One Way Ramp, Car Entrance
CAD Length = 17.65 m
W= 6.0 m
m2
Three Flight Ramp, Back Side
CAD Length = 32.30 m
W= 1.20 m
m2
m2 Total, D= 100 m
m3 Total

3.04. Formwork
A. Foundation Pad
F1=3.0x3.0x0.75, 14 Pcs
L=3.0 m
W=3.0 m
D=0.75 m
m2
F2=2.6x2.6x0.70, 8 Pcs
L=2.60 m
W=2.60 m
D=0.70 m
m2
F3=2.3x2.3x0.55, 11 Pcs
L=2.30 m
W=2.30 m
D=0.55 m
m2
F4=3.1x3.1x0.80, 1 Pcs
L=3.10 m
W=3.10 m
D=0.80 m
m2
F5=5.65x8.7x0.60, 1 Pcs
L=5.65 m
W=8.70 m
D=0.60 m
m2
F6=1.10x1.10x0.30, 1 Pcs
L=1.10 m
W=1.10 m
D=0.60 m
m2
F7=5.0x0.60x0.30, 1 Pcs
L=5.0 m
W=0.60 m
D=0.30 m
m2
CF1=3.65x2.50x0.55, 1 Pcs
L=3.65 m
W=2.50 m
D=0.55 m
m2
m2 Total

B. Foundation & Basement Elevation Column


Foundation Columns
C1= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m2
C2= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C3= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C4= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C5= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C6= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C7= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C8= 0.45x0.45 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m2
C9= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m2
C10= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m2
C11= 0.45x0.45 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m2
C12= 0.35x0.35 m
L=0.35 m
W=0.35 m
D=3-0.5-0.4=2.10 m
m2
C13= 0.50x0.50 m
L=0.50 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m2
C14= 0.45x0.45 m,
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m2
C15= 0.25x0.50 m
L=0.25 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m2
C16= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C17= 0.40x0.40 m
L=0.40 m
W=0.40 m
D=3-0.5-0.4=2.10 m
m2
C18= 0.40x0.40 m
L=0.45 m
W=0.45 m
D=3-0.5-0.4=2.10 m
m2
C19= 0.50x0.50 m
L=0.50 m
W=0.50 m
D=3-0.5-0.4=2.10 m
m2
C20= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.5-0.4=2.10 m
m2
C21= 0.30x0.30 m, From -3.00 - +0.00 m
L=0.30 m
W=0.30 m
D=3-0.5-0.4=2.10 m
m2
Basement Elevation Columns
C1= Φ 0.45 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m2
C2= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m2
C3= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m2
C4= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m2
C5= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m2
C6= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m2
C7= 0.40x0.40 m, From -3.00 - +1.65 m
L=0.40 m
W=0.40 m
D=4.65-0.4=4.25 m
m2
C8= 0.45x0.45 m, From -3.00 - +1.65 m
L=0.45 m
W=0.45 m
D=4.65-0.4=4.25 m
m2
C9= Φ 0.45 m, From -3.00 - +0.00 m
Dim =0.45 m
Π= 3.14 m
D=3-0.4=2.60 m
m2
C10= Φ 0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m2
C11= 0.45x0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m2
C12= 0.35x0.35 m, From -3.00 - +0.00 m
L=0.35 m
W=0.35 m
D=3-0.4=2.60 m
m2
C13= 0.50x0.50 m, From -3.00 - +0.00 m
L=0.50 m
W=0.50 m
D=3-0.4=2.60 m
m2
C14= 0.45x0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m2
C15= 0.25x0.50 m, From -3.00 - +0.00 m
L=0.25 m
W=0.50 m
D=3-0.4=2.60 m
m2
C16= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m2
C17= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.40 m
W=0.40 m
D=3-0.4=2.60 m
m2
C18= 0.40x0.40 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m2
C19= 0.50x0.50 m, From -3.00 - +0.00 m
L=0.50 m
W=0.50 m
D=3-0.4=2.60 m
m2
C20= Φ 0.45 m, From -3.00 - +0.00 m
L=0.45 m
W=0.45 m
D=3-0.4=2.60 m
m2
C21= 0.30x0.30 m, From -3.00 - +0.00 m
L=0.30 m
W=0.30 m
D=3-0.4=2.60 m
m2

m2 Total

C. Grade Beams
Basement Floor Beams @ -3.00 m
Along Axis A, B, C, D, E & F, From 1-7
L=4.15+6.5*5 = 36.65 m
D= 0.40 m
m2
Along Axis E' , From 5-5'
L=3.60 m
D= 0.40 m
m2
Along Axis 1, 2, 3, 4, 5, 6 & 7, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
D= 0.40 m
m2
Along Axis 5' , From E-F
L=6.0 m
D= 0.40 m
m2
Starter Beam For Ramp @ -1.20 m
L= 1.30 m
D= 0.40 m
m2
Starter Beam For Ramp Car Entrance
L= 6.40 m
D= 0.40 m
m2
Suspended Ground Floor Beams @ +0.00 m
Along Axis A', A" & C'
L=4.15+6.5+3.6 = 14.25 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis B, From 1-3--
L= 3.75+6.1+3.4=13.25 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis B, From 4-7
L= 6.1+6.1+3.4=15.6 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis C, From 1-7
L= 6.1+6.1+6.1+6.1+3.75=28.15 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis D, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis E, From 1-7
L=4.15+6.5*5 = 36.65 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis E' , From 5-5'
L=3.60 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 2, From A-E
L=4.55+6.5*2+5 = 22.55 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 3, From A-E
L= 4.15+6.1+6.1+3.15=19.5m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 3" , From C-D
L= 4.55 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 4 & 5, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 5' , From C-D
L= 6.0 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 6, From A-F
L=4.55+6.5*2+5+6 = 28.55 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 6' , From C-D
L= 6.50 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 6''
L= 12.55 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2

m2 Total

D. Suspended Ground Floor Slab


Total of Suspended Ground Floor Slab
Area= 774.55 m2
m2 Total

E. Shear Wall Retaining Wall and voult room


Shear Wall
Peripheral
CAD Length = 125.2-4.6-(18*0.4) = 113.40 m
D=3.0 m
m2
Along Axis 7, B/n C-D
CAD Length = 125.2-4.6 = 120.60 m
D= 1.80 m
m2
Vault Shear Wall
Vault @ Basement Floor
Peripheral
CAD Length = 23.90 m
D=3-0.3= 2.70 m
m2
Door Opening Formwork
L= 0.90 m
W =0.20 m
D=2.10 m
m2
Windowr Opening Formwork
L= 0.70 m
W= 0.20 m
D=0.70 m
m2
Door Deduction, D1
L= 0.90 m
W= 0.20 m
D=2.1 m
m3
Window Deduction,
L= 0.70 m
W= 0.20 m
D=0.70 m
m3
Vault @ Ground Floor
Peripheral
CAD Length = 17.9+16.7= 34.60 m
D= 3-0.3= 2.70 m
m2
Door Opening Formwork
L= 0.90 m
W =0.20 m
D=2.10 m
m2
Windowr Opening Formwork
L= 0.70 m
W= 0.20 m
D=0.70 m
m2
Door Deduction, D1
L= 0.90 m
W= 0.20 m
D=2.1 m
m3
Window Deduction,
L= 0.70 m
W= 0.20 m
D=0.70 m
m3

m2 Total
F. Stair Case
Stair Case-1
Stair Soffit =3.45+2.95= 6.40 m
W=1.70 m
m2
Stair Sides
L = 3.45+2.95 = 6.40 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.70 m
D= 0.15 m
m2
Stair Case-2
Stair Soffit =3.45+2.95= 6.40 m
W=1.70 m
m2
Stair Sides
L = 3.45+2.95 = 6.40 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.70 m
D= 0.15 m
m2
Stair Case-3
Stair Soffit =2.35 m
W=5.85 m
m2
Stair Sides
L = 2.35 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=4.40 m
D= 0.15 m
m2
Stair Case-4
Stair Sides
L = 2.35 m
D= 0.1+0.15= 0.25 m
m2
Steps
Total length =11.3*2+11.35*2+11.4*3+11.45= 90.95 m
D=0.15 m
m2
Stair Case-6
Stair Soffit
L= 2.7 m
W=1.10 m
m2
Stair Sides
L= 2.7 m
D= 0.1+0.15= 0.25 m
m2
Steps
W=1.10 m
D=.15m
m2

m2 Total
G. Lift Shaft
Peripheral
CAD Length =11.5+9.95 = 21.45 m
D=3.0 m
m2
Door Opening
L = 1.30 m
W= 0.20 m
D= 2.20 m
m2
Door Opening
L = 1.30 m
D= 2.20 m
m2
m2 Total

H. Ramps
Two Way Ramp
CAD Length = 11.65 m
W= 1.20 m
m2
One Way Ramp, Car Entrance
CAD Length = 17.65 m
W= 6.0 m
m2
One Way Ramp, Car Entrance
CAD Length = 17.65 m
W= 6.0 m
m2
Three Flight Ramp
CAD Length = 32.30 m
W= 1.20 m
m2
Sides
L= 10.75 m
W= 0.20 m
m2
Three Flight Ramp
L= 4.0 m
W= 0.20 m
m2

m2 Total, D= 100 m
m3 Total

3.05. Rebar including 5% production


Dia. 8 mm
Dia. 10 mm
Dia. 12 mm
Dia. 14 mm
Dia. 16 mm
Dia. 20 mm
3.06. Styrofoam Expanssion Joint
Ground Floor Slab, D=0.10 m
Ground Floor Slab
All 4.15x4.55 m Grids
CAD Length=16.90 m, CAD Area = 17.80 m2
m
All 4.15x4.55 m Grids
CAD Length=21.35 m, CAD Area = 27.65 m2
m
All 4.15x6.5 m Grids
CAD Length=20.55 m, CAD Area = 25.15 m2
m
All 6.5x6.5 m Grids
CAD Length=25.0 m, CAD Area = 39.05 m2
m
All 4.15x5.0 m Grids
CAD Length=17.55 m, CAD Area = 19.10 m2
m
All 6.5x5.0 m Grids
CAD Length=22.0 m, CAD Area = 29.70 m2
m
All 4.15x6.0 m Grids
CAD Length=19.55 m, CAD Area = 22.90 m2
m
All 6.5x6.0 m Grids
CAD Length=24.25 m, CAD Area = 36.70 m2
m
CAD Length=24.25 m, CAD Area = 36.70 m2
m
CAD Length=24.25 m, CAD Area = 36.70 m2
m
CAD Length=24.25 m, CAD Area = 36.70 m2
m

m Total

Super Structure
1.0. Concrete Work
1.01. C-30 Concrete Work
A. Elevation Columns
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m3
C1= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C1= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C2= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C2= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C3= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C3= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C4= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C4= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C5= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C5= 0.35x0.35 m, From +4.50 - +11.10 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C5= 0.30x0.30 m, From +11.10 - +14.40 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m3
C6= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C6= 0.35x0.35 m, From +4.50 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C7= 0.40x0.40 m, From +1.65 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-1.65-0.3=2.55 m
m3
C7= 0.40x0.40 m, From +4.50 - +7.80 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C7= 0.35x0.35 m, From +7.80 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C8= 0.40x0.40 m, From +1.65 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-1.65-0.3=2.55 m
m3
C8= 0.35x0.35 m, From +4.50 - +11.10 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C8= 0.30x0.30 m, From +11.10 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m3
C9= Φ 0.45 m, From +0.00 - +4.50 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3=4.20 m
m3
C9= Φ 0.40 m, From +4.50 - +7.80 m
Dim =0.40 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C9= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C9= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C10= Φ 0.45 m, From +0.00 - +7.80 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m3
C10= Φ 0.35 m, From +7.80 - +14.40 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C10= Φ 0.30 m, From +14.40 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C11= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m3
C11= 0.40x0.40 m, From +4.50 - +20.70 m
L=0.40 m
W=0.40 m
D=((3.3-0.3)*4)+(3-0.3)=14.70 m
m3
C12= 0.35x0.35 m, From +0.00 - +4.50 m
L=0.35 m
W=0.35 m
D=4.5-0.3=4.20 m
m3
C12= 0.40x0.40 m, From +4.50 - +20.70 m
L=0.35 m
W=0.35 m
D=((3.3-0.3)*4)+(3-0.3)=14.70 m
m3
C13= 0.50x0.50 m, From +0.00 - +4.50 m
L=0.50 m
W=0.50 m
D=4.5-0.3=4.20 m
m3
C13= 0.40x0.40 m, From +4.50 - +7.80 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C13= 0.30x0.40 m, From +7.80 - +11.10 m
L=0.30 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C13= 0.25x0.40 m, From +11.10 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*2)+(3-0.3)= 8.70 m
m3
C14= 0.45x0.45 m, From +0.00 - +7.80 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+(3.3-0.3)=7.20 m
m3
C14= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m3
C15= 0.25x0.50 m, From +0.00 - +7.80 m
L=0.25 m
W=0.50 m
D=(4.5-0.3)+(3.3-0.3)=7.20 m
m3
C15= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m3
C16= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3= 4.20 m
m3
C16= 0.30x0.40 m, From +4.50 - +7.80 m
L=0.30 m
W=0.40 m
D=3.3-0.3=3.0 m
m3
C16= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m3
C17= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3= 4.20 m
m3
C17= 0.35x0.35 m, From +4.50 - +7.80 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C17= 0.30x0.30 m, From +7.80 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m3
C18= 0.40x0.40 m, From +0.00 - +11.10 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+((3.3-0.3)*2)= 10.20 m
m3
C18= 0.35x0.35 m, From +11.10 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m3
C19= 0.40x0.40 m, From +0.00 - +7.80 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+((3.3-0.3)*1)= 7.20 m
m3
C19= 0.30x0.30 m, From +7.80 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m3
C20= Φ 0.45 m, From +0.00 - +7.80 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m3
C20= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
C20= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m3
False Columns - 1= 0.20 x 0.20 m, From First - Roof Floor
L=0.20 m
W=0.20 m
D=1.50 m
m3
False Columns - 2= 0.20 x 0.20 m, From First - Roof Floor
L=0.20 m
W=0.20 m
D=0.90 m
m3

m3 Total

B. Lift Shaft
From Ground - First floor, +0.00 - +4.50 m
Peripheral
CAD Length =13.1+11.5 = 24.60 m
W=0.20 m
D= 4.50 m
m3
From First - Roof Floor, +4.50 - +17.70 m
Peripheral
CAD Length =13.1+11.5 = 24.60 m
W=0.20 m
D=3.30 m
m3
From Roof - Water Tanker Floor, +17.70 - +20.70 m
Peripheral
CAD Length =13.1+11.5 = 24.60 m
W=0.20 m
D=3.0 m
m3
Door Opening
L = 1.30 m
W= 0.20 m
D= 2.20 m
m3
m3 Total
C. Vault Shear Wall
Outter Perimeter
CAD Area = 17.9+16.7= 34.60 m
D= 2.85 m
m2
Dedduction, Door
CAD Area =1.90 m2
m2
m2 Total, D = 20 cm
m3 Total
C-25 Concrete
A. Floor Beams
Suspended Ground Floor Beam @ +1.65 m
Along Axis E & F, From --1-4
L=1.6+4.15+6.5*2= 18.75 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 1, 1', 3 & 4, From E-F
L= 6.0 m
W = 0.25 m
D = 0.40 m
m3
Along Axis 2, From --E-F
L= 1.5+6= 7.50 m
W = 0.25 m
D = 0.40 m
m3
First Floor Beam @ +4.50 m
Along Axis A, From 3-4
L=6.50 m
W= 0.30 m
D= 0.30 m
m3
Along Axis A', From 1-B'
L=7.75 m
W= 0.60 m
D= 0.30 m
m3
Along Axis A", From 1-B'
L=4.45 m
W= 0.30 m
D= 0.30 m
m3
Along Axis B, From --1-7
L=3.5+4.15+6.5*5= 40.15 m
W= 0.30 m
D= 0.30 m
m3
Along Axis B', From A'-3
L=9.25 m
W= 0.60 m
D= 0.30 m
m3
Along Axis B'', From A'-D
L=3.55+9.2= 12.75 m
W= 0.60 m
D= 0.30 m
m3
Along Axis C, From --1-2
L=2+4.15= 6.15 m
W= 0.30 m
D= 0.30 m
m3
Along Axis C, From 3-7
L=6.5*4= 26.0 m
W= 0.30 m
D= 0.30 m
m3
Along Axis D & E, From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.30 m
D= 0.30 m
m3
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.30 m
D= 0.30 m
m3
Along Axis E', From 5-5'
L=3.60 m
W= 0.30 m
D= 0.30 m
m3
Along Axis 1, From --B-F--
L=2.6+6.5*2+5+6+1.2= 27.80 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 2, From --B & C-F--
L=2.6+6.5+5+6+1.2= 21.30 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 3, From A-C & D-F--
L=4.55+6.5+5+6+1.2= 23.25 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 3", From C-D
L= 6.50 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 4, From A-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 6, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 7, From B-F
L=6.5*2+5+6= 24.0 m
W= 0.60 m
D= 0.30 m
m3
Second - Fourth Floor Beam @ +7.80 - +14.40 m
Along Axis A, From 3-4
L=6.50 m
W= 0.30 m
D= 0.30 m
m3
Along Axis B, C, D & E From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.30 m
D= 0.30 m
m3
Along Axis C' & D', From 3'-5
L=4.7+6.55 = 11.25 m
W= 0.60 m
D= 0.30 m
m3
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.30 m
D= 0.30 m
m3
Along Axis E', From 5-5'
L=3.60 m
W= 0.30 m
D= 0.30 m
m3
Along Axis 1 & 2, From --B-F
L=2.6+6.5*2+5+6= 26.60 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 3, From A-C & D-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 3', From C-D
L= 6.50 m
W= 0.30 m
D= 0.30 m
m3
Along Axis 4, From A-C-- & --D-F--
L=4.55+6.5+0.85*2+5+6+1.2= 24.95 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.60 m
D= 0.30 m
m3
Along Axis 6 & 7, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.60 m
D= 0.30 m
m3
Roof Floor Beam @ +17.70 m
Along Axis A, From 3-4
L=6.50 m
W= 0.25 m
D= 0.40 m
m3
Along Axis A', From 1-3
L=2+4.15+6.5= 12.65 m
W= 0.25 m
D= 0.40 m
m3
Along Axis A', From 5-7
L=6.5*2= 13.0 m
W= 0.25 m
D= 0.40 m
m3
Along Axis A", From 4-5
L= 6.50 m
W= 0.25 m
D= 0.40 m
m3
Along Axis B, From --1-3" & 4-7
L=2+4.15+6.5+3.55+6.5*3= 35.70 m
W= 0.25 m
D= 0.40 m
m3
Along Axis C, From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.25 m
D= 0.40 m
m3
Along Axis D & E, From ---1 & 3-7
L=2+6.5*4= 28.0 m
W= 0.25 m
D= 0.40 m
m3
Along Axis C' & D', From 3'-5
L=4.7+6.55= 11.25 m
W= 0.25 m
D= 0.40 m
m3
Along Axis E', From 5-5'
L=3.60 m
W= 0.25 m
D= 0.40 m
m3
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.25 m
D= 0.40 m
m3
Along Axis F', From --1-4
L=2+4.15+6.5*2= 19.15 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 1' & 1, From --B-F--
L=2.6+6.5*2+5+6+1.2= 27.80 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 2, From --B -C
L=2.6+6.5= 9.10 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 3, From A-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 3', From C-D
L= 6.50 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 4, From A-C-- & --D-F--
L=4.55+6.5+0.85*2+5+6+1.2= 24.75 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 6 & 7, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.25 m
D= 0.40 m
m3
Water Tanker Beam @ +20.70 m
Along Axis A & B, From 3-4
L=6.50 m
W= 0.25 m
D= 0.40 m
m3
Along Axis 3 & 4, From A-B
L=4.55 m
W= 0.25 m
D= 0.40 m
m3

m3 Total

B. In Floor Slab
Suspended Mezzanine Slab @ +1.65 m, 200 mm
B/n Axis 1'-1 & E-F
CAD Area= 6.40 m2
m2
B/n Axis 1-2 & E-F
CAD Area= 22.60 m2
m2
B/n Axis 2-3/3-4 & E-F
CAD Area= 35.95 m2
m2
Roof Floor Slab @ +17.70 m, 200 mm
B/n Axis 1'-1 & A-B
CAD Area= 3.75 m2
m2
B/n Axis 1'-1 & B-C/C-D
CAD Area= 10.25 m2
m2
B/n Axis 1'-1 & D-E
CAD Area= 7.75 m2
m2
B/n Axis 1'-1 & E-F
CAD Area= 9.35 m2
m2
B/n Axis 1'-1 & E-F
CAD Area= 1.0 m2
m2
B/n Axis 1-2 & A-B
CAD Area= 8.65 m2
m2
B/n Axis 2-3 & A-B
CAD Area= 13.85 m2
m2
B/n Axis 3"-4 & A-A'
CAD Area= 3.65 m2
m2
B/n Axis 4-5 & A"-B
CAD Area= 7.10 m2
m2
B/n Axis 3-4/4-5 & B-C
CAD Area= 38.45 m2
m2
B/n Axis 3-3' & C-D
CAD Area= 9.65 m2
m2
Arround Oval Opening
CAD Area= 3.05+0.5=3.55 m2
m2
B/n Axis 3-4/4-5 & D-E
CAD Area= 29.15 m2
m2
B/n Axis 3-4/4-5 & E-F
CAD Area= 35.35 m2
m2
B/n Axis 5-5' & E-E'
CAD Area= 8.60 m2
m2
B/n Axis 5'-6 & E-F
CAD Area= 14.95 m2
m2
B/n Axis 3-4 & F-F'
CAD Area= 5.30 m2
m2
Water Tank Floor Slab @ +20.70 m, 200 mm
B/n Axis 3-4 & A-B
CAD Area= 27.40 m2
m2
B/n Axis 5-6 & E-F
CAD Area= 36.30 m2
m2
B/n Axis 5-5' & F-F'
CAD Area= 5.75 m2
m2
m2 Total, D= 200 mm
m3 Total

Ribbed Slab
C. Normal Area 6cm top
First Floor Slab @ +4.50 m
Total Area
CAD Area= 755.85 m2
m2
Second - Fourth Floor Slab @ +7.80 - +14.30m
Total Area
CAD Area= 777.10 m2
m2
m2 Total of Ribbed Slab Area

D. Wet Area slab 12cm top


First - Fourth Floor Slab @ +4.50 - +14.40 m,
, Ground Floor
CAD Area= 13.7*2= 27.40 m2
m2
Toilet @ 3-4 & -B--, From Ground - Third Floor
CAD Area= 15.45*2= 30.90 m2 CAD Length = 30.70 m
m2
, Ground Floor
CAD Area= 13.7*2= 27.40 m2 CAD Length = 16.35*2= 32.70 m
m2
Toilet @ 4-5 & -B--, From Ground - Third Floor
CAD Area= 15.45*2= 30.90 m2 CAD Length = 30.70 m
m2

m2 Total of Wet Area

E. Stair Case
Stair Case-1
From Ground - First Floor
Stair Soffit =5.05+4.25= 9.30 m
W=1.65 m
D= 0.20 m
m3
Steps
L=0.30* 0.5= 0.15 m
W=1.70 m
D= 0.15 m
m3
From First - Roof Floor
Stair Soffit =3.75+3.35= 7.10 m
W=1.65 m
D= 0.20 m
m3
Steps
L=0.30* 0.5= 0.15 m
W=1.70 m
D= 0.15 m
m3
Stair Case-2
From Ground - First Floor
Stair Soffit =5.05*2= 10.10 m
W=1.60 m
D= 0.20 m
m3
Steps
L=0.30* 0.5= 0.15 m
W=1.60 m
D= 0.15 m
m3
From First - Roof Floor
Stair Soffit =3.45+3.35= 6.80 m
W=1.60 m
D= 0.20 m
m3
Steps
L=0.30* 0.5= 0.15 m
W=1.60 m
D= 0.15 m
m3
Stair Case - 5
From Ground - First Floor, +1.65 m
Stair Soffit = 12.65 m
W=1.30 m
D= 0.25 m
m3
Steps
L=0.30* 0.5= 0.15 m
W=1.30 m
D= 0.15 m
m3

m3 Total

F. Facaed
Typology - 1
CAD Area =18.45 m2
m2
Typology - 1
CAD Area =44.80 m2
m2
Typology - 2
CAD Area =44.80 m2
m2
Typology - 3
CAD Area =41.45 m2
m2
Typology - 4
CAD Area =43.05 m2
m2
m2 Total, D = 10 cm
m3 Total of 10 cm Faced
Typology - 5
CAD Area =21.75 m2
m2
m3 Total of 20 cm Faced
m3 Total of Faced Shear Wall

1.03. Formwork
A. Elevation Columns
C1= Φ 0.45 m, From +0.00 - +7.80 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m2
C1= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C1= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C2= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C2= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C3= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C3= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C4= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C4= 0.40x0.40 m, From +4.50 - +17.70 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C5= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C5= 0.35x0.35 m, From +4.50 - +11.10 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C5= 0.30x0.30 m, From +11.10 - +14.40 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m2
C6= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C6= 0.35x0.35 m, From +4.50 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C7= 0.40x0.40 m, From +1.65 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-1.65-0.3=2.55 m
m2
C7= 0.40x0.40 m, From +4.50 - +7.80 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C7= 0.35x0.35 m, From +7.80 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C8= 0.40x0.40 m, From +1.65 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-1.65-0.3=2.55 m
m2
C8= 0.35x0.35 m, From +4.50 - +11.10 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C8= 0.30x0.30 m, From +11.10 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m2
C9= Φ 0.45 m, From +0.00 - +4.50 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3=4.20 m
m2
C9= Φ 0.40 m, From +4.50 - +7.80 m
Dim =0.40 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C9= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C9= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C10= Φ 0.45 m, From +0.00 - +7.80 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m2
C10= Φ 0.35 m, From +7.80 - +14.40 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C10= Φ 0.30 m, From +14.40 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C11= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3=4.20 m
m2
C11= 0.40x0.40 m, From +4.50 - +20.70 m
L=0.40 m
W=0.40 m
D=((3.3-0.3)*4)+(3-0.3)=14.70 m
m2
C12= 0.35x0.35 m, From +0.00 - +4.50 m
L=0.35 m
W=0.35 m
D=4.5-0.3=4.20 m
m2
C12= 0.40x0.40 m, From +4.50 - +20.70 m
L=0.35 m
W=0.35 m
D=((3.3-0.3)*4)+(3-0.3)=14.70 m
m2
C13= 0.50x0.50 m, From +0.00 - +4.50 m
L=0.50 m
W=0.50 m
D=4.5-0.3=4.20 m
m2
C13= 0.40x0.40 m, From +4.50 - +7.80 m
L=0.40 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C13= 0.30x0.40 m, From +7.80 - +11.10 m
L=0.30 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C13= 0.25x0.40 m, From +11.10 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*2)+(3-0.3)= 8.70 m
m2
C14= 0.45x0.45 m, From +0.00 - +7.80 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+(3.3-0.3)=7.20 m
m2
C14= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m2
C15= 0.25x0.50 m, From +0.00 - +7.80 m
L=0.25 m
W=0.50 m
D=(4.5-0.3)+(3.3-0.3)=7.20 m
m2
C15= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m2
C16= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3= 4.20 m
m2
C16= 0.30x0.40 m, From +4.50 - +7.80 m
L=0.30 m
W=0.40 m
D=3.3-0.3=3.0 m
m2
C16= 0.25x0.40 m, From +7.80 - +20.70 m
L=0.25 m
W=0.40 m
D=((3.3-0.3)*3)+(3-0.3)= 11.70 m
m2
C17= 0.40x0.40 m, From +0.00 - +4.50 m
L=0.40 m
W=0.40 m
D=4.5-0.3= 4.20 m
m2
C17= 0.35x0.35 m, From +4.50 - +7.80 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C17= 0.30x0.30 m, From +7.80 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m2
C18= 0.40x0.40 m, From +0.00 - +11.10 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+((3.3-0.3)*2)= 10.20 m
m2
C18= 0.35x0.35 m, From +11.10 - +17.70 m
L=0.35 m
W=0.35 m
D=3.3-0.3=3.0 m
m2
C19= 0.40x0.40 m, From +0.00 - +7.80 m
L=0.40 m
W=0.40 m
D=(4.5-0.3)+((3.3-0.3)*1)= 7.20 m
m2
C19= 0.30x0.30 m, From +7.80 - +17.70 m
L=0.30 m
W=0.30 m
D=3.3-0.3=3.0 m
m2
C20= Φ 0.45 m, From +0.00 - +7.80 m
Dim =0.45 m
Π= 3.14 m
D=4.5-0.3+3.3-0.3 =7.20 m
m2
C20= Φ 0.35 m, From +7.80 - +11.10 m
Dim =0.35 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
C20= Φ 0.30 m, From +11.10 - +17.70 m
Dim =0.30 m
Π= 3.14 m
D=3.3-0.3=3.0 m
m2
False Columns - 1= 0.20 x 0.20 m, From First - Roof Floor
L=0.20 m
W=0.20 m
D=1.50 m
m2
False Columns - 2= 0.20 x 0.20 m, From First - Roof Floor
L=0.20 m
W=0.20 m
D=0.90 m
m2

m2 Total

B. Floor Beams
Suspended Ground Floor Beam @ +1.65 m
Along Axis E & F, From --1-4
L=1.6+4.15+6.5*2= 18.75 m
W= 0.25 m
D= 0.4-0.2=0.20 m
m2
L=1.6+4.15+6.5*2= 18.75 m
D= 0.4-0.2=0.20 m
m2
Along Axis 1, 1', 3 & 4, From E-F
L= 6.0 m
W = 0.25 m
D= 0.4-0.2=0.20 m
m2
Along Axis 1, 1', 3 & 4, From E-F
L= 6.0 m
D= 0.4-0.2=0.20 m
m2
Along Axis 2, From --E-F
L= 1.5+6= 7.50 m
W = 0.25 m
D= 0.4-0.2=0.20 m
m2
First Floor Beam @ +4.50 m
Along Axis A, From 3-4
L=6.50 m
W= 0.30 m
m2
Along Axis A', From 1-B'
L=7.75 m
W= 0.60 m
m2
Along Axis A", From 1-B'
L=4.45 m
W= 0.30 m
m2
Along Axis B, From --1-7
L=3.5+4.15+6.5*5= 40.15 m
W= 0.30 m
m2
Along Axis B', From A'-3
L=9.25 m
W= 0.60 m
m2
Along Axis B'', From A'-D
L=3.55+9.2= 12.75 m
W= 0.60 m
m2
Along Axis C, From --1-2
L=2+4.15= 6.15 m
W= 0.30 m
m2
Along Axis C, From 3-7
L=6.5*4= 26.0 m
W= 0.30 m
m2
Along Axis D & E, From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.30 m
m2
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.30 m
m2
Along Axis E', From 5-5'
L=3.60 m
W= 0.30 m
m2
Along Axis 1, From --B-F--
L=2.6+6.5*2+5+6+1.2= 27.80 m
W= 0.60 m
m2
Along Axis 2, From --B & C-F--
L=2.6+6.5+5+6+1.2= 21.30 m
W= 0.60 m
m2
Along Axis 3, From A-C & D-F--
L=4.55+6.5+5+6+1.2= 23.25 m
W= 0.60 m
m2
Along Axis 3", From C-D
L= 6.50 m
W= 0.60 m
m2
Along Axis 4, From A-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.60 m
m2
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.60 m
m2
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.60 m
m2
Along Axis 6, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.60 m
m2
Along Axis 7, From B-F
L=6.5*2+5+6= 24.0 m
W= 0.60 m
m2
Perimeter
CAD Length = 147.0 m
W= 0.30 m
m2
Second - Fourth Floor Beam @ +7.80 - +14.40 m
Along Axis A, From 3-4
L=6.50 m
W= 0.30 m
m2
Along Axis B, C, D & E From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.30 m
m2
Along Axis C' & D', From 3'-5
L=4.7+6.55 = 11.25 m
W= 0.60 m
m2
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.30 m
D= 0.30 m
m2
Along Axis E', From 5-5'
L=3.60 m
W= 0.30 m
D= 0.30 m
m2
Along Axis 1 & 2, From --B-F
L=2.6+6.5*2+5+6= 26.60 m
W= 0.60 m
m2
Along Axis 3, From A-C & D-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.60 m
m2
Along Axis 3', From C-D
L= 6.50 m
W= 0.30 m
m2
Along Axis 4, From A-C-- & --D-F--
L=4.55+6.5+0.85*2+5+6+1.2= 24.95 m
W= 0.60 m
m2
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.60 m
m2
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.60 m
D= 0.30 m
m2
Along Axis 6 & 7, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.60 m
m2
Perimeter
CAD Length = 144.0 m
W= 0.30 m
m2
Roof Floor Beam @ +17.70 m
Along Axis A, From 3-4
L=6.50 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis A', From 1-3
L=2+4.15+6.5= 12.65 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis A', From 5-7
L=6.5*2= 13.0 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis A", From 4-5
L= 6.50 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis B, From --1-3" & 4-7
L=2+4.15+6.5+3.55+6.5*3= 35.70 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis C, From --1-7
L=2+4.15+6.5*5= 38.65 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis D & E, From ---1 & 3-7
L=2+6.5*4= 28.0 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis C' & D', From 3'-5
L=4.7+6.55= 11.25 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis E', From 5-5'
L=3.60 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis F, From --1-5 & 5'-7
L=2+4.15+6.5*4+2.9= 35.05 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis F', From --1-4
L=2+4.15+6.5*2= 19.15 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 1' & 1, From --B-F--
L=2.6+6.5*2+5+6+1.2= 27.80 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 2, From --B -C
L=2.6+6.5= 9.10 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 3, From A-F--
L=4.55+6.5*2+5+6+1.2= 29.75 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 3', From C-D
L= 6.50 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 4, From A-C-- & --D-F--
L=4.55+6.5+0.85*2+5+6+1.2= 24.75 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 5, From --B-F--
L=3.1+6.5*2+5+6+1.7= 28.80 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 5', From E-F--
L= 6+1.7= 7.70 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 6 & 7, From --B-F
L=3.1+6.5*2+5+6= 27.10 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Water Tanker Beam @ +20.70 m
Along Axis A & B, From 3-4
L=6.50 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis A & B, From 3-4
L=6.50 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 3 & 4, From A-B
L=4.55 m
W= 0.25 m
D= 0.4-0.2= 0.20 m
m2
Along Axis 3 & 4, From A-B
L=4.55 m
D= 0.4-0.2= 0.20 m
m2

m2 Total

C. In Floor Slab
Total of Floor Slab Concret
Total Area = 3,546.15 m2
m2
Total length = =132*4 m2
m2
m2 Total

D. Stair Case
Stair Case-1
From Ground - First Floor
Stair Soffit =5.05+4.25= 9.30 m
W=1.65 m
m2
Stair Sides
L =5.05+4.25= 9.30 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.70 m
D= 0.15 m
m2
From First - Roof Floor
Stair Soffit =3.75+3.35= 7.10 m
W=1.65 m
m2
Stair Sides
Stair Soffit =3.75+3.35= 7.10 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.70 m
D= 0.15 m
m2
Stair Case-2
From Ground - First Floor
Stair Soffit =5.05*2= 10.10 m
W=1.60 m
m2
Stair Sides
L = 3.45+2.95 = 6.40 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.60 m
D= 0.15 m
m2
From First - Roof Floor
Stair Soffit =3.45+3.35= 6.80 m
W=1.60 m
m2
Stair Sides
Stair Soffit =3.45+3.35= 6.80 m
D= 0.2+0.15= 0.35 m
m2
Steps
W=1.60 m
D= 0.15 m
m2
Stair Case - 5
From Ground - First Floor, +1.65 m
Stair Soffit = 12.65 m
D=0.15+0.25= 0.40 m
m2
Steps
W=1.30 m
D= 0.15 m
m2

m2 Total

E. Lift Shaft
From Ground - First floor, +0.00 - +4.50 m
Peripheral & Internal
CAD Length =13.1+11.5 = 24.60 m
D= 4.50 m
m2
Door Opening
L = 0.20 m
W+2D= 2.2+1.3+2.2= 5.70 m
m2
From First - Roof Floor, +4.50 - +17.70 m
Peripheral
CAD Length =13.1+11.5 = 24.60 m
D=3.30 m
m2
Door Opening
L = 0.20 m
W+2D= 2.2+1.3+2.2= 5.70 m
m2
From Roof - Water Tanker Floor, +17.70 - +20.70 m
Peripheral
CAD Length =13.1+11.5 = 24.60 m
D=3.0 m
m2
Door Opening
L = 0.20 m
W+2D= 2.2+1.3+2.2= 5.70 m
m2
Deduction Door Opening
L = 1.30 m
D= 2.20 m
m2
m2 Total

F. Facaed
Typology - 1
CAD Area =44.80 m2
m2
Typology - 1
CAD Length = 59.65 m
W= 0.10 m
m2
Typology - 2
CAD Area =44.80 m2
m2
Typology - 2
CAD Length = 59.65 m
W= 0.10 m
m2
Typology - 3
CAD Area =41.45 m2
m2
Typology - 3
CAD Length = 60.55 m
W= 0.10 m
m2
Typology - 4
CAD Area =43.05 m2
m2
Typology - 4
CAD Length = 59.80 m
W= 0.10 m
m2
Typology - 5
CAD Area =21.75 m2
m2
Typology - 5
CAD Length = 44.05 m
W= 0.20 m
m2
m2 Total

G. Vault Shear Wall


Outter Perimeter + Inner Perimeter
CAD Area = 17.9+16.7= 34.60 m
D= 2.85 m
m2
Opening Side F.W
D+L+W= 2.1+0.9+2.1= 5.10 m
W= 0.20 m
m2
Deduction, Door
CAD Area =1.90 m2
m2
m2 Total, D = 20 cm

1.04. Rebar including 5% production


Dia. 6 mm
Dia. 8 mm
Dia. 10 mm
Dia. 12 mm
Dia. 14 mm
Dia. 16 mm
Dia. 20 mm

2.0. Block Work


A. 20 cm HCB
Basement Floor @ -3.00 m
Along Axis 2, From --C
L=4.55 m
H=3-0.3=2.70 m
m2
Door Deductions, D5
L= 1.80 m
W= 2.10 m
m2
Along Axis 3, From A-B--
L=5.90-0.4=5.50 m
H=3-0.3=2.70 m
m2
Along B/n Axis 3-4, B/n A-B
L=1.50 m
H=3-0.3=2.70 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 3, From D--
L=3.75 m
H=3-0.3=2.70 m
m2
Along Axis 4, From A-B--
L=1.5+1.3= 2.80 m
H=3-0.3=2.70 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3-0.3=2.70 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.0 m
H=3-0.3=2.70 m
m2
Along B/n Axis B & C, From 1-7
L=36.65-0.3*5= 35.15 m
H=3-0.3=2.70 m
m2
Door Deductions, D5
L= 1.80 m
W= 2.10 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis C, From 1-2
L=3.75 m
H=3-0.3=2.70 m
m2
Along Axis D & B/n D-E, From Vault Room-3
L=4.05 m
H=3-0.3=2.70 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis E, From --2-4
L=10.45-0.4= 10.05 m
H=3-0.3=2.70 m
m2
Along Axis E, From 5-7
L=12.6-0.4= 12.20 m
H=3-0.3=2.70 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D5
L= 1.8 m
W= 2.10 m
m2
Ground Floor @ +0.00 m
Along Axis 2, --B
L=2.35 m
H=4.5-0.3=4.20 m
m2
Along Axis 2, E-F
L=5.60 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along B/n Axis 2 & 3, B/n A-B
L=2.60 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 3, From A---
L=1.75 m
H=4.5-0.3=4.20 m
m2
Along Axis 3, From ---B
L=2.45 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 3-4, From D-E & E-vault
L=1.4+1.45+1.5= 4.35 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From A- Lift Shaft
L=1.30 m
H=4.5-0.3=4.20 m
m2
Along Axis 4, From --E-F
L=8.6-0.4=8.20 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 4 & 5, From ---E---
L=8.6-0.4=8.20 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis 4 & 5, Main Toilet Divider A/B & -E/F
L=2.7+3.35= 6.05 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 4 & 5, Main Toilet Handwash
L=2.80 m
H=4.5-0.3=4.20 m
m2
Along Axis 5, From ---B
L=2.70 m
H=4.5-0.3=4.20 m
m2
Along Axis 5, From ---E-F
L=8.8-0.4=8.40 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 5/6, From ---E-F
L=8.80 m
H=4.5-0.3=4.20 m
m2
Along Axis 6, From ---C
L=9.9-2*0.4=9.10 m
H=4.5-0.3=4.20 m
m2
Along Axis 6, From D-E
L=4.60 m
H=4.5-0.3=4.20 m
m2
Along Axis A, From 3-4
L=6.10 m
H=4.5-0.3=4.20 m
m2
Along Axis A---, From 1-3
L=1.15 m
H=4.5-0.3=4.20 m
m2
Along Axis ---A, From 4-6--
L=13.0 m
H=4.5-0.3=4.20 m
m2
Along Axis B, From --3 & 4-6
L=2.95+12.6-0.4=15.15 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D1
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis B/C, From 4-5
L=6.50 m
H=4.5-0.3=4.20 m
m2
Curve From Axis 3-7 B/n D-E
L=5.9+3.15=9.05 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along B/n Axis D & E, B/n 2-3--
L=10.50 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis D & E, B/n 4-5
L=3.10 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis D & E, From 5-7
L=13.20 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along Axis E, From --3-4-- & --5
L=11.6-0.4*2+1.95= 12.75 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis E-F & 4-5
L= 2.25 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along Axis F, From 1-7
L=39-7*0.4=36.20 m
H=4.5-0.3=4.20 m
m2
First Floor @ +4.50 m
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From ---B
L=2.45 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A--Shaft
L=2.35 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From A- Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From Lift Shaft---
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=8.65-0.4=8.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, From B---, Main Toilet Divider
L=3.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, From B---, Hand Wash Area
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Handwash for Landies & Gents, @ E/F
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Main Toilet Divider, @ E/F
L=3.35 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From -B--
L=5.6-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5-6, From E-F
L=1.30 m
H=3.3-0.3= 3.0 m
m2
Along b?n Axis 5-6, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From A-B--
L= 7.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --C-F, Guard Rail
L= 20.30 m
H=0.90 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 5-7
L=13.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L= 6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4=9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Along Axis F, From --1
L= 1.20 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From ---3
L= 2.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From 4-5
L= 6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --6-7
L= 9.80 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From -3-4 & 5---
L=7.6+3.7=11.30 m
H=3.3-0.3= 3.0 m
m2
Parapet Area
L=15.65+32.95= 48.60 m
H=0.90 m
m2
Second Floor @ +7.80 m
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From ---B
L=2.45 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From F--
L=1.0 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A-Lift Shaft
L= 1.50 m
H= 3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=8.7-0.4= 8.30 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5,/ A-B Main Toilet Partition
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, Hand Wash Area
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash Area
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5/ E-F, Main Toilet Partition
L=3.55 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From ---B---
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.40 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F--
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --B--
L= 6.9-0.3= 6.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From ---F
L=20.4-0.2*4= 19.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From 5-7
L=13.4-0.3= 13.10 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L=6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Along Axis F---, From 3-4, 4-5 & 5---
L=6.9+6.1+3.7=16.70 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --6-7
L=9.80 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=49.65-0.2*8 = 48.05 m
H=0.90 m
m2
Third Floor @ +11.10 m
Along Axis 3, From A-B
L=4.15 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From F--
L=1.0 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A-Lift Shaft
L= 1.50 m
H= 3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=7.45-0.4= 7.05 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5,/ A-B & E-F Main Toilet Partition
L=3.6+3.55 = 7.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash
L=1.55+2.35= 3.90 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From ---B---
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.40 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F--
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --B-F
L=27.4-0.3*5= 25.90 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 1-3
L=10.75-2*0.3= 10.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 5-7
L=13.2-0.3 = 12.90 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L=6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Along Axis F, From -5-6
L=9.80-0.3= 9.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From 3-4 & 4-5 & 5--
L=6.95+6.2+3.7 = 16.85 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=(1.55+25.2-12.25)-(7*0.2)=13.10 m
H=0.90 m
m2
Fourth Floor @ +14.40 m
Along Axis --1, From --D-F
L=15-0.3*3= 14.10 m
H=3.3-0.3=3.0 m
m2
Along Axis 2, From --B--
L=6.7-0.4= 6.30 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 2-3, From C--
L=2.7+1.65= 4.35 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From ---B--
L=7.2-0.4= 6.80 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From C-F
L=17.2-0.45-0.4 = 16.35 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along Axis 3, From F--
L=1.05 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A-Lift Shaft
L=1.50 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From B---, Leg Wash Area
L=3.35*2= 6.70 m
H=0.40 m
m2
Along Axis 4, From --E-F
L=7.45-0.4= 7.05 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Main Toilet Partition
L=5.25+3.55= 8.80 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From --B--
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.45 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From A-F
L=27.4-0.3*5=25.90 m
H=3.3-0.3=3.0 m
m2
Along Axis --A, From --3
L= 1.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 4-5
L=6.50 m
H=0.90 m
m2
Along Axis A, From 5-7
L=13.2-0.3*2= 12.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B & C, From 1-3
L=12.25 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along B/n Axis B & C, From 4-5
L=6.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along Axis C, From 1-3
L=11.15-0.4*2-0.45= 9.90 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis C/D, From --1
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis C/D, From --3
L=1.70 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis D & E, From 3-5
L= 13.25 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Along Axis F, From --1-3
L=12.25-0.3*2= 11.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From 3-4, 4-5 & 5---
L=6.9+6.1+3.7=16.70 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --5-6
L=9.9-2*0.3= 9.30 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=8.35+3.3+6 = 17.65 m
H=0.90 m
m2
Roof Floor @ +17.70 m
Staircase Room, B/n 3-4
L=27.1-0.4*8= 23.90 m
H=3.3-0.3=3.0 m
m2
Inside Staircase Room, B/2 3-4
L=1.55 m
H=3.3-0.3=3.0 m
m2
Staircase Room, B/n 5-6
L=28.6-6*0.4= 26.20 m
H=3.3-0.3=3.0 m
m2
Inside Staircase Room, B/n 5-6
L=1.55 m
H=3.3-0.3=3.0 m
m2
Parapet Wall
L=64.35+56.05+22.95+19.6= 162.95 m
H=1.50 m
m2
Deductions
Curtain Wall
CW1=7,560 x 4,300 m

m2
CW2=5,800 x 4,200 m

m2
CW3=11,800 x 4,200 m

m2
CW4=600 x 225 m

m2
CW5=5,350 x 7,500 m

m2
CW6=900 x 7,250 m

m2
CW7=9,630 x 3,000 m
m2
CW8=3,630 x 4,200 m

m2
CW9=8,800 x 4,200 m

m2
CW10=11,400 x 4,200 m

m2
CW11=9,500 x 3,300 m

m2
CW12=1,050 x 20,400 m

m2
CW13=1,300 x 12,900 m

m2
CW14=900 x 12,900 m

m2
Top-Windows
TW1=2,800 x 1,000 m

m2
TW2=6,100 x 1,000 m

m2
TW3=6,300 x 1,000 m

m2
TW4=4,600 x 1,000 m
m2
TW5=5,600 x 1,000 m

m2
TW6=6,100 x 1,000 m

m2
TW7=3,750 x 1,000 m

m2
Windows
W1=11,350 x 2,100 m

m2
W2=2,800 x 2,100 m

m2
W3=4,900 x 2,100 m

m2
W5=13,150 x 2,100 m

m2
W6=6,850 x 2,100 m

m2
W7=9,800 x 2,100 m

m2
W8=2,750 x 2,100 m

m2
W9=11,550 x 2,100 m

m2
W10=2,500 x 2,100 m

m2
W11=25,800 x 2,100 m

m2
W12=12,200 x 2,100 m

m2
W13=14,800 x 2,100 m

m2
W14=4,100 x 2,100 m

m2

m2 Total

B. 15 cm HCB
Ground Floor @ +0.00 m
Along B/n Axis 3 & 4, B/n E & F
L=1.45 m
H=4.5-0.3=4.20 m
m2
Door Deduction, D1
L=0.90 m
H=2.10 m
m2
Along B/n Axis E & F, B/n 4 & 5
L=1.20 m
H=4.5-0.3=4.20 m
m2
Hand Rails
First Floor
L=35.75+17.90= 53.65 m
H=0.90 m
m2
Second - Fourth Floor
L=29.0 m
H=0.90 m
m2

m2 Total

C. 10 cm HCB
Ground Floor @ +0.00 m
Along B/n Axis 2 & 3, From ---E
L=1.35 m
H=1.50 m
m2
Horizontal Toilet Partition B/n E & F
L=1.35 m
H=2.50 m
m2
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=4.5-0.3=4.20 m
m2
First Floor @ +4.50 m
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=3.3-0.3=3.0 m
m2
Second, Third & Fourth Floors @ +7.80, +11.10 & +14.40 m
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=3.3-0.3=3.0 m
m2
m2 Total
3. Roofing
3.01 EGA Roofing
CAD Area = 295+324.75=619.75 m2
m2 Total

3.02 Flashing Works


Truss 1+Truss 2+Truss 3= 27.7+21.1+28=76.80 m
ml Total
3.03 Copping Works
Truss 1+Truss 2+Truss 3= 10.65+13.2= 23.85 m
ml Total

3.04 Damp proofing


Shearwall
CAD length = 143
m2 Total

3.05 Roof water proofing


Roof water proofing
CAD area =320+50+45+55+20=490
m2 Total
CAD length =79+29+27+59+37=
m2 Total
m2 Total

4. Ceiling
4.01 Ceiling Works roof
CAD Area = Roof Area = 619.75
m2 Total
4.02 Ceiling wet area
CAD Area = Wet Area= 342
m2 Total
5. Aluminium
5.01 Window - Door Schedule
A. Window Schedule, All Windows are Aluminum Framed
W1,size(11,350*2,100)
Pcs
W2, size(2,800*2,100)
Pcs
W3, siez(4,900*2,100)
Pcs
W5, size(13,150*2,100)
Pcs
W6, size(6,800*2,100)
Pcs
W7, size(9,800*2,100)
Pcs
W8, size(27,200*2,100)
Pcs
W9, size(11,560*2,100)
Pcs
W10, size(2,500*2,100)
Pcs
W11, size(25,800*2,100)
Pcs
W12, size(12,200*2,100)
Pcs
W13, size(14,800*2,100)
Pcs
W14, size(4,100*2,800)
Pcs
TW1, size(2,800*1,000)
Pcs
TW2, size(6,100*1,000)
Pcs
TW3, size(6,300*1,000)
Pcs
Tw4, size(4,600*1,000)
Pcs
TW5, size(5,600*1,000)
Pcs
TW6, size(6,100*1,000)
Pcs
TW7, size(3,750*1,000)
Pcs

5.02. Door

D1, size(900*2100), One Side Hinge, Aluminum Frame


Pcs
D2, size(700*2100), One Side Hinge, Aluminum Frame
Pcs
D3, size(1000*2100), One Side Hinge, Aluminum Frame
Pcs
D4, size(1500*2100), Double Side Hinge, Aluminum Frame
Pcs
D5, size(1800*2100), Double Side Hinge, Metal Frame
Pcs
D6, size(900*2100), Fire Rated Door
Pcs

5.03 Curtain wall


CW1=7,560 x 7,350 mm
Pcs
CW2=5,800 x 4,200mm
Pcs
CW3=11,800 x 4,200mm
Pcs
CW4=6,000 x 2,550mm
Pcs
CW5=5,340 x 7,500mm
Pcs
CW6=7,250 x 900mm
Pcs
CW7=9,630 x 3,000mm
Pcs
CW8=3,630 x 4,200mm
Pcs
CW9=8,770 x 4,200mm
Pcs
CW10=11,400 x 4,200mm
Pcs
CW11=9,500 x 3,300mm
Pcs
CW12=1,050 x 20,420mm
Pcs
CW13=1,300 x 12,900mm
Pcs
CW14=900 x 12,900mm
Pcs

5.04 Detail Steel Hand rail

Ground to Basement Floor


L=3.80 m
H=0.90 m
m2

Detail Case -1
From Basement - Ground Floor -1St
L= 1.70 m
m
Detail Case -2
From Basement - Ground Floor
L= 1.60 m
m
Detail Case -3
On Ground Floor, No Definite Thread Width
Avg. Length= 9.85
m
Detail Case -4
From Basement - Ground Floor
L= 1.20 m
m2
Detail Case -5
From Basement - Ground Floor
L= 4.40 m
m
Detail Case -8
From Basement - Ground Floor
L= 4.40 m
m

5.05. Internal Aluminum Partition Wall


Ground Floor @ +0.00 m
Along Axis 2, From E-F
L=5.60 m
H=4.5-1.65=2.85 m
m2
Along B/n Axis 6&7, From B-C & C-D
L=6.8+5.9=12.70 m
H=4.5-0.3=4.20 m
m2
Along Axis C, From 6-7
L= 4.45 m
H= 4.5-0.3=4.20 m
m2
Along Axis D, From 6-7
L= 7.0 m
H= 4.5-0.3=4.20 m
m2
Along Axis E, From --1-2
L= 5.4-0.4= 5.0 m
H= 4.5-1.65=2.85 m
m2
Along Axis E, From ---3
L= 4.60 m
H= 4.5-1.65=2.85 m
m2
First Floor @ +4.50 m
Shop B/n Axis 2-3 & A
L=5.60 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 4-7 & A
L=3.65+19.7=23.35 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 1-2 & C-D
L=24.80 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 5-7 & C-F
L=37.15-0.4=36.75 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 1-3 & D-F
L=35.95 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 3-4 & D-F
L=15.55 m
H=3.3-0.3=3.0 m
m2
Second Floor @ +7.80 m
Shop B/n Axis 1-3 & B-C
L=32.10 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 4-5 & A-C
L=21.85 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 1-3 & C-F
L=50.25 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 3-4 & D-F
L=29.45-0.4= 29.05 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 6-7 & A-F
L=60.85 m
H=3.3-0.3=3.0 m
m2
Third Floor @ +11.10 m
Shop B/n Axis 1-3 & B-C
L=32.10 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 4-5 & A-C
L=21.85 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 1-3 & C-F
L=50.25 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 3-4 & D-F
L=29.45-0.4= 29.05 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 6-7 & A-F
L=60.85 m
H=3.3-0.3=3.0 m
m2
Fourth Floor @ +14.40 m
Along Axis 1, From A-C--
L=11.60 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 1-3 & A-B
L=10.85+15.25=26.10 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 4-5 & A-C
L=21.85 m
H=3.3-0.3=3.0 m
m2
Shop B/n Axis 6-7 & A-F
L=60.85 m
H=3.3-0.3=3.0 m
m2
Door deduction
D1 = 900 x 2100 mm
H=3.3-0.3=3.0 m
m2
m2 Total

5.06 Aluminium Sky light


Cad area

5.07 Aluminium Louver


left elevation

Rear elevation
right elevation

Front elevation

Total

5.09 Steel Structure


5.09.1. 50x50x3.0 mm
Truss-1, Vertical Members
L=25.25 m
Kg/m= 4.43
kg
Upper & Bottom Members
L=13.75*2+27.4=54.90 m
Kg/m= 4.43
kg

Truss-2, Vertical Members


L=21.60 m
Kg/m= 4.43
kg
Upper & Bottom Members
L=13.75+7.25+20.9=41.90 m
Kg/m= 4.43
kg

Truss-3, Vertical Members


L=25.25 m
Kg/m= 4.43
kg
Upper & Bottom Members
L=13.35+13.75+27=54.10 m
Kg/m= 4.43
kg
kg Total

5.09.1. 40x40x3.0 mm
Truss-1, Diagonal Members
L=37.35 m
Kg/m= 3.49
kg

Truss-2, Diagonal Members


L=26.20 m
Kg/m= 3.49
kg

Truss-3, Diagonal Members


L=37.35 m
Kg/m= 3.49
kg
kg Total

5.09.2 40x40x2.5 mm
Lattice Purlin-1
L=6+6.75+5= 17.75 m
Kg/m= 2.94
kg

Lattice Purlin-2
L=10.7+11.3+9= 31.0 m
Kg/m= 2.94
kg

Steel Stair
L=10.7+11.3+9= 31.0 m
Kg/m= 2.94
kg
L=10.7+11.3+9= 31.0 m
Kg/m= 2.94
kg

kg Total

5.09.3 Plates
Detail B, Sec C'-C'
2/500x250x3 mm, 4/16 Sloted Plates
Truss 1+Truss 3= 2+2=4 Pcs
Pcs
Truss 2= 1 Pcs
Pcs
Pcs Total

200x200x2.5 mm, 4/16 Sloted Plates


Stair Case
Pcs
Pcs Total

5.09 . 4 Chekerd Plate

Steel Stair CaseL= 1.30 m, W= 0.30 m & D= 0.04 m


Pcs
Pcs Total

5.09 . 5 Angle Iron


Detail C
40x25x25x4 mm
Total=(22*3+8)+28=102 Pcs
Pcs Total

Φ-12 Bolt, L= 100 mm


Detail C
Total of Angle Iron= 102 Pcs
Pcs Total

5.09.6 Bolt
M-16 J-Bolt, L=270 mm
Truss 1+Truss 3= 2+2=4 Pcs
Pcs
Truss 2= 1 Pcs
Pcs
Pcs Total

M-16 J-Bolt, L=300 mm


Steel Stair Case
Pcs
Pcs Total
M-12 J-Bolt, L=000 mm
Steel Stair Case
Pcs
Pcs Total

5.10 Corner Protection

Pcs Total

6.0 Finishing Works


6.01. Internal Plastering
A. 20 cm HCB
Basement Floor @ -3.00 m
Along Axis 2, From --C
L=4.55 m
H=3-0.3=2.70 m
m2
Door Deductions, D5
L= 1.80 m
W= 2.10 m
m2
Along Axis 3, From A-B--
L=5.90-0.4=5.50 m
H=3-0.3=2.70 m
m2
Along B/n Axis 3-4, B/n A-B
L=1.50 m
H=3-0.3=2.70 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 3, From D--
L=3.75 m
H=3-0.3=2.70 m
m2
Along Axis 4, From A-B--
L=1.5+1.3= 2.80 m
H=3-0.3=2.70 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3-0.3=2.70 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.0 m
H=3-0.3=2.70 m
m2
Along B/n Axis B & C, From 1-7
L=36.65-0.3*5= 35.15 m
H=3-0.3=2.70 m
m2
Door Deductions, D5
L= 1.80 m
W= 2.10 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis C, From 1-2
L=3.75 m
H=3-0.3=2.70 m
m2
Along Axis D & B/n D-E, From Vault Room-3
L=4.05 m
H=3-0.3=2.70 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis E, From --2-4
L=10.45-0.4= 10.05 m
H=3-0.3=2.70 m
m2
Along Axis E, From 5-7
L=12.6-0.4= 12.20 m
H=3-0.3=2.70 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D5
L= 1.8 m
W= 2.10 m
m2
Ground Floor @ +0.00 m
Along Axis 2, E-F
L=5.60 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along B/n Axis 2 & 3, B/n A-B
L=2.60 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 3, From ---B
L=2.45 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 3-4, From D-E & E-vault
L=1.4+1.45+1.5= 4.35 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From --E-F
L=8.6-0.4=8.20 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 4 & 5, From ---E---
L=8.6-0.4=8.20 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis 4 & 5, Main Toilet Divider A/B & -E/F
L=2.7+3.35= 6.05 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 4 & 5, Main Toilet Handwash
L=2.80 m
H=4.5-0.3=4.20 m
m2
Along Axis 5, From ---B
L=2.70 m
H=4.5-0.3=4.20 m
m2
Along Axis 5, From ---E-F
L=8.8-0.4=8.40 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis 5/6, From ---E-F
L=8.80 m
H=4.5-0.3=4.20 m
m2
Along Axis 6, From ---C
L=9.9-2*0.4=9.10 m
H=4.5-0.3=4.20 m
m2
Along Axis 6, From D-E
L=4.60 m
H=4.5-0.3=4.20 m
m2
Along Axis B, From --3 & 4-6
L=2.95+12.6-0.4=15.15 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D1
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis B/C, From 4-5
L=6.50 m
H=4.5-0.3=4.20 m
m2
Curve From Axis 3-7 B/n D-E
L=5.9+3.15=9.05 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along B/n Axis D & E, B/n 2-3--
L=10.50 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis D & E, B/n 4-5
L=3.10 m
H=4.5-0.3=4.20 m
m2
Along B/n Axis D & E, From 5-7
L=13.20 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along Axis E, From --3-4-- & --5
L=11.6-0.4*2+1.95= 12.75 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along B/n Axis E-F & 4-5
L= 2.25 m
H=4.5-0.3=4.20 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
First Floor @ +4.50 m
Along Axis 3, From ---B
L=2.45 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A--Shaft
L=2.35 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From Lift Shaft---
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=8.65-0.4=8.25 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, From B---, Main Toilet Divider
L=3.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, From B---, Hand Wash Area
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Handwash for Landies & Gents, @ E/F
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Main Toilet Divider, @ E/F
L=3.35 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From -B--
L=5.6-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.65 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5-6, From E-F
L=1.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L= 6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4=9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Second Floor @ +7.80 m
Along Axis 3, From ---B
L=2.45 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 3 & 4, From A-Lift Shaft
L= 1.50 m
H= 3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=8.7-0.4= 8.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5,/ A-B Main Toilet Partition
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4-5, Hand Wash Area
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash Area
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5/ E-F, Main Toilet Partition
L=3.55 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From ---B---
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.40 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L=6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.90 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Third Floor @ +11.10 m
Along B/n Axis 3 & 4, From A-Lift Shaft
L= 1.50 m
H= 3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From --E-F
L=7.45-0.4= 7.05 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5,/ A-B & E-F Main Toilet Partition
L=3.6+3.55 = 7.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash
L=1.55+2.35= 3.90 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From ---B---
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.40 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B-C, From 4-5
L= 6.70 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Along B/n Axis D & E, From 4-5
L=6.75 m
H=3.3-0.3= 3.0 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Fourth Floor @ +14.40 m
Along Axis 2, From --B--
L=6.7-0.4= 6.30 m
H=3.3-0.3=3.0 m
m2
Along B/n Axis 2-3, From C--
L=2.7+1.65= 4.35 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From ---B--
L=7.2-0.4= 6.80 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From C-F
L=17.2-0.45-0.4 = 16.35 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along B/n Axis 3 & 4, From A-Lift Shaft
L=1.50 m
H=3.3-0.3=3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis 4, From B---, Toilet
L=3.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis 4, From B---, Leg Wash Area
L=3.35*2= 6.70 m
H=0.40 m
m2
Along Axis 4, From --E-F
L=7.45-0.4= 7.05 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, Main Toilet Partition
L=5.25+3.55= 8.80 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 4 & 5, From E---, Hand Wash
L=2.35 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From --B--
L=5.65-0.4= 5.25 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From E-F
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From E-F
L=6.45 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis B & C, From 1-3
L=12.25 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D4
L= 1.50 m
W= 2.10 m
m2
Along B/n Axis B & C, From 4-5
L=6.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Along Axis C, From 1-3
L=11.15-0.4*2-0.45= 9.90 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis C/D, From --3
L=1.70 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis D & E, From 3-5
L= 13.25 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D1
L= 0.90 m
W= 2.10 m
m2
Along Axis E, From 4-5--
L=9.9-0.4= 9.50 m
H=3.3-0.3= 3.0 m
m2
Door Deductions, D3
L= 1.0 m
W= 2.10 m
m2
Door Deductions, D2
L= 0.70 m
W= 2.10 m
m2
Door Deductions, D6
L= 0.90 m
W= 2.10 m
m2
Roof Floor @ +17.70 m
Inside Staircase Room, B/2 3-4
L=1.55 m
H=3.3-0.3=3.0 m
m2
Inside Staircase Room, B/n 5-6
L=1.55 m
H=3.3-0.3=3.0 m
m2
B. 15 cm HCB
Ground Floor @ +0.00 m
Along B/n Axis 3 & 4, B/n E & F
L=1.45 m
H=4.5-0.3=4.20 m
m2
Door Deduction, D1
L=0.90 m
H=2.10 m
m2
Along B/n Axis E & F, B/n 4 & 5
L=1.20 m
H=4.5-0.3=4.20 m
m2
Hand Rails
First Floor
L=35.75+17.90= 53.65 m
H=0.90 m
m2
Second - Fourth Floor
L=29.0 m
H=0.90 m
m2
C. 10 cm HCB
Ground Floor @ +0.00 m
Along B/n Axis 2 & 3, From ---E
L=1.35 m
H=1.50 m
m2
Horizontal Toilet Partition B/n E & F
L=1.35 m
H=2.50 m
m2
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=4.5-0.3=4.20 m
m2
First Floor @ +4.50 m
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=3.3-0.3=3.0 m
m2
Second, Third & Fourth Floors @ +7.80, +11.10 & +14.40 m
Horizontal Toilet Partition B/n E & F & 4 & 5
L=1.35 m
H=3.3-0.3=3.0 m
m2
m2 Total
Vault Shear Wall
Outter Perimeter + Inner Perimeter
CAD Length =32.9+31.35= 64.25 m
D= 2.85 m
m2
Dedduction, Door
CAD Area =1.90 m2
m2
m2 Total of Internal Wall
m2 Total of Internal Wall Plastering
Door Side Plastering
D1, size(900*2100)

m
D2, size(700*2100)

m
D3, size(1000*2100)

m
D4, size(1500*2100)

m
D5, size(1800*2100)

m
D6, size(900*2100)
m
m Total
W= 0.25 m
m2 Total of Internal Door Side Plastering
m2 Total of Internal Window Side Plastering
Curtain wall, Plastering
CW1=7560x4350 mm
L=2*(4.35)=8.7m
W=0.25
m2
CW2=5800x4200mm
L=2*(4.20)=8.40m
W=0.25
m2
CW3=11800x4200mm
L=2*(4.20)=8.40m
W=0.25
m2
CW4=6000x2550mm
L=2*(2.55)=5.10m
W=0.25
m2
CW5=5340x7500mm
L=2*(7.50)=15.00m
W=0.25
m2
CW6=7250x900mm
L=2*(7.25)=14.50m
W=0.25
m2
CW7=9630x3000mm
L=2*(3.00)=6m
W=0.25
m2
CW8=3630x4200mm
L=2*(4.20)=8.4m
W=0.25
m2
CW9=8770x4200mm
L=2*(4.20)=8.4m
W=0.25
m2
CW10=11400x4200mm
L=2*(4.20)=8.40m
W=0.25
m2
CW11=9500x3300mm
L=2*(3.30)=6.6m
W=0.25
m2
CW12=1050x20420mm
L=2*(20.42)=40.84m
W=0.25
m2
CW13=1300x12900mm
L=2*(12.90)=25.8m
W=0.25
m2
CW14=900x12900mm
L=2*(12.90)=25.8m
W=0.25
m2
m2 Total
. Plastering of Lift Shaft
From Ground - First Floor
CAD Length = 8.10 m
H = 4.5-0.3= 4.20 m
m2
From First - Fourth Floor
CAD Length = 8.10 m
H=3.3-0.3= 3.0 m
m2
From First - Fourth Floor
CAD Length = 8.10 m
H=3-0.3= 2.70 m
m2
Door Deduction
L= 1.30
H=2.20 m
m2
m2 Total of lift Shaft Plastering
m2 Total of Internal Column Plastering F.M- External Plaster
m2 Total of External Wall Plastering
m 2
Total of Internal Wall Plastering

6.02. External Plastering


A. 20 cm HCB
Ground Floor @ +0.00 m
Along Axis 2, --B
L=2.35 m
H=4.5-0.3=4.20 m
m2
Along Axis 3, From A---
L=1.75 m
H=4.5-0.3=4.20 m
m2
Along Axis 4, From A- Lift Shaft
L=1.30 m
H=4.5-0.3=4.20 m
m2
Along Axis A, From 3-4
L=6.10 m
H=4.5-0.3=4.20 m
m2
Along Axis A---, From 1-3
L=1.15 m
H=4.5-0.3=4.20 m
m2
Along Axis ---A, From 4-6--
L=13.0 m
H=4.5-0.3=4.20 m
m2
Along Axis F, From 1-7
L=39-7*0.4=36.20 m
H=4.5-0.3=4.20 m
m2
First Floor @ +4.50 m
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From A- Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along b?n Axis 5-6, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From A-B--
L= 7.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --C-F, Guard Rail
L= 20.30 m
H=0.90 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 5-7
L=13.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --1
L= 1.20 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From ---3
L= 2.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From 4-5
L= 6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --6-7
L= 9.80 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From -3-4 & 5---
L=7.6+3.7=11.30 m
H=3.3-0.3= 3.0 m
m2
Parapet Area
L=15.65+32.95= 48.60 m
H=0.90 m
m2
Second Floor @ +7.80 m
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From F--
L=1.0 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=5.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F--
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --B--
L= 6.9-0.3= 6.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From ---F
L=20.4-0.2*4= 19.60 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along Axis A---, From 5-7
L=13.4-0.3= 13.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From 3-4, 4-5 & 5---
L=6.9+6.1+3.7=16.70 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --6-7
L=9.80 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=49.65-0.2*8 = 48.05 m
H=0.90 m
m2
Third Floor @ +11.10 m
Along Axis 3, From A-B
L=4.15 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From F--
L=1.0 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F--
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From --B-F
L=27.4-0.3*5= 25.90 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From --3
L=1.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 1-3
L=10.75-2*0.3= 10.15 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 4-5
L=6.30 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis A-B, From 5-7
L=13.2-0.3 = 12.90 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From -5-6
L=9.80-0.3= 9.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From 3-4 & 4-5 & 5--
L=6.95+6.2+3.7 = 16.85 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=(1.55+25.2-12.25)-(7*0.2)=13.10 m
H=0.90 m
m2
Fourth Floor @ +14.40 m
Along Axis --1, From --D-F
L=15-0.3*3= 14.10 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From A---
L=1.75 m
H=3.3-0.3=3.0 m
m2
Along Axis 3, From F--
L=1.05 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From A-Lift Shaft
L= 1.30 m
H=3.3-0.3=3.0 m
m2
Along Axis 4, From F---
L=1.0 m
H=3.3-0.3= 3.0 m
m2
Along Axis 5, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis 5 & 6, From F---
L=1.50 m
H=3.3-0.3= 3.0 m
m2
Along Axis 7, From A-F
L=27.4-0.3*5=25.90 m
H=3.3-0.3=3.0 m
m2
Along Axis --A, From --3
L= 1.15 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 3-4
L=6.10 m
H=3.3-0.3= 3.0 m
m2
Along Axis A, From 4-5
L=6.50 m
H=0.90 m
m2
Along Axis A, From 5-7
L=13.2-0.3*2= 12.60 m
H=3.3-0.3= 3.0 m
m2
Along B/n Axis C/D, From --1
L=1.55 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --1-3
L=12.25-0.3*2= 11.65 m
H=3.3-0.3= 3.0 m
m2
Along Axis F---, From 3-4, 4-5 & 5---
L=6.9+6.1+3.7=16.70 m
H=3.3-0.3= 3.0 m
m2
Along Axis F, From --5-6
L=9.9-2*0.3= 9.30 m
H=3.3-0.3= 3.0 m
m2
Corridor Area, Parapet Wall
L=8.35+3.3+6 = 17.65 m
H=0.90 m
m2
Roof Floor @ +17.70 m
Staircase Room, B/n 3-4
L=27.1-0.4*8= 23.90 m
H=3.3-0.3=3.0 m
m2
Staircase Room, B/n 5-6
L=28.6-6*0.4= 26.20 m
H=3.3-0.3=3.0 m
m2
Parapet Wall
L=64.35+56.05+22.95+19.6= 162.95 m
H=1.50 m
m2
Deductions
Curtain Wall
CW1=7,560 x 4,300 m

m2
CW2=5,800 x 4,200 m

m2
CW3=11,800 x 4,200 m

m2
CW4=600 x 225 m

m2
CW5=5,350 x 7,500 m

m2
CW6=900 x 7,250 m

m2
CW7=9,630 x 3,000 m

m2
CW8=3,630 x 4,200 m

m2
CW9=8,800 x 4,200 m

m2
CW10=11,400 x 4,200 m

m2
CW11=9,500 x 3,300 m

m2
CW12=1,050 x 20,400 m
m2
CW13=1,300 x 12,900 m

m2
CW14=900 x 12,900 m

m2
Top-Windows
TW1=2,800 x 1,000 m

m2
TW2=6,100 x 1,000 m

m2
TW3=6,300 x 1,000 m

m2
TW4=4,600 x 1,000 m

m2
TW5=5,600 x 1,000 m

m2
TW6=6,100 x 1,000 m

m2
TW7=3,750 x 1,000 m

m2
Windows
W1=11,350 x 2,100 m

m2
W2=2,800 x 2,100 m
m2
W3=4,900 x 2,100 m

m2
W5=13,150 x 2,100 m

m2
W6=6,850 x 2,100 m

m2
W7=9,800 x 2,100 m

m2
W8=2,750 x 2,100 m

m2
W9=11,550 x 2,100 m

m2
W10=2,500 x 2,100 m

m2
W11=25,800 x 2,100 m

m2
W12=12,200 x 2,100 m

m2
W13=14,800 x 2,100 m

m2
W14=4,100 x 2,100 m

m2
m2 Total of External Wall Plastering
External Column Plastering
L = 0.40 m
W = 0.40 m
H = 4.5-0.3=4.20 m
m2
External Beam Plastering
First Floor @ +4.50 m
CAD Length = 147.00 m
H = 0.30 m
m2
Second- - Fourth Floor @ +7.80 - +14.40 m
CAD Length = 144.00 m
H = 0.30 m
m2
Roof Floor @ +17.70 m
CAD Length =130.85+70.4= 201.25 m
H = 0.40 m
m2
Total of Faced Formwork
Total Area = 225.37 m2
m2
m2 Total of External beam & Column Plastering
Window edge Plastering
W1,size(11350*2100)

m
W2, size(2800*2100)

m
W3, siez(4900*2100)

m
W5, 2 faces only plastered, size(13150*2100)

m
W7, 4 faces plastered, size(9800*2100)

m
W8, only 1 face plastered, size(27200*2100)

m
W9, only 1 face plastered, size(11560*2100)
m
TW1, size(2800*1000)

m
TW2, size(6100*1000)

m
TW3, size(6300*1000)

m
Tw4, size(4600*1000)

m
TW5, size(5600*1000)

m
TW6, size(6100*1000)

m
TW7, size(3750*1000)

m
W14, size(4100*2800)

m
m
W= 0.25/2= 0.125 m
m2 Total of External Window Plastering
m2 Total of External Plastering

6.03. Plastering of Slab Soffit


Total of Floor Slab Formwork
CAD Area = 3,546.15 m2
m2 Total of Slab Soffit Plastering

6.04. Plastering of Staircase & Landing


Total of Staircase & Landing Formwork
CAD Area = 225.38 m2
m2 Total of Slab Soffit Plastering

6.05 Grooving
Hand Rails
First Floor
L=35.75+17.90= 53.65 m
H=0.90 m
m2
Second - Fourth Floor
L=29.0 m
H=0.90 m
m2
m2 Total of Grooved Plastering

6.09 Marble finishings

a. Marble Thread
40cm
Stair Case -4
On Ground Floor, No Definite Thread Width
Avg. Length= 9.85
m
ml of 40 cm Thread, (0.387+0.3+0.485)/3= 0.387 m

30cm
Stair Case -1
From Basement - Ground Floor
L= 1.70 m
m
From Ground - First Floor
L= 1.70 m
m
From First - Roof Floor
L= 1.70 m
m
Stair Case -2
From Basement - Ground Floor
L= 1.60 m
m
From Ground - First Floor
L= 1.60 m
m
From First - Roof Floor
L= 1.60 m
m
Stair Case -3
From Basement - Ground Floor
L= 4.40 m
m
Stair Case -5
From Ground - +1.65 m
L= 1.30 m
m2
Stair Case -6
From Basement - Ground Floor
L= 1.20 m
m2
ml of 30 cm Thread
m2 Total of 40 cm Marble Thread

b. Marble Risers
Stair Case -1
From Basement - Ground Floor
L= 1.70 m
m
From Ground - First Floor
L= 1.70 m
m
From First - Roof Floor
L= 1.70 m
m
Stair Case -2
From Basement - Ground Floor
L= 1.60 m
m
From Ground - First Floor
L= 1.60 m
m
From First - Roof Floor
L= 1.60 m
m
Stair Case -3
From Basement - Ground Floor
L= 4.40 m
m
Stair Case -6
From Basement - Ground Floor
L= 1.20 m
m2
Stair Case -4
On Ground Floor, No Definite Thread Width
Avg. Length= 9.85
m
ml of 40 cm Thread, (0.387+0.3+0.485)/3= 0.387 m

ml of 15 cm Riser

c. Marble on Staircase Landings


Stair Case -1
Landing
CAD Area=5.20 m2 CAD Length= 3.80 m
m2
Roof Floor
CAD Area=9.70 m2 CAD Length= 8.40 m
m2
Stair Case -2
Landing
CAD Area=5.25 m2 CAD Length= 6.50 m
m2
Roof Floor
CAD Area=28.20 m2 CAD Length= 21.60 m
m2
Stair Case -6
Landing
CAD Area=1.45 m2 CAD Length= 1.2*2= 2.40 m
m2

m2 Total of Marble Landing

d. Stair skirting

e. Marble Landing Skirtings


Stair Case -1
Landing
CAD Length= 3.80 m
m
Roof Floor
CAD Length= 8.40 m
m2
Stair Case -2
Landing
CAD Length= 6.50 m
m
Roof Floor
CAD Length= 21.60 m
m2
Stair Case -6
Landing
CAD Length= 1.2*2= 2.40 m
m
Basement Cement Screed Floor
parking
CAD Length = 150m
m2
Generetor
CAD Length = 16.70m
m2
RESERVOIR & PUMP ROOM
CAD Length = 28.60m
m2

m Total of Marble Landing Skirting

f. Door Treshold
D1, size(900*2100)

D2, size(700*2100)

D3, size(1000*2100)

D4, size(1500*2100)

D5, size(1800*2100)

D6, size(900*2100)
m Total

g. Window Cill
W1,size(11350*2100)

W2, size(2800*2100)

W3, siez(4900*2100)

W5, size(13150*2100)

W6, size(6800*2100)

W7, size(9800*2100)

W8, size(27200*2100)

W9, size(11560*2100)

W10, size(2500*2100)

W11, size(25800*2100)

W12, size(12200*2100)

W13, size(14800*2100)

W14, size(4100*2800)

TW1, size(2800*1000)

TW2, size(6100*1000)

TW3, size(6300*1000)

Tw4, size(4600*1000)

TW5, size(5600*1000)

TW6, size(6100*1000)

TW7, size(3750*1000)

m Total
Curtain Wall Cill
CW1=7560x4350 mm
m
CW2=5800x4200mm
m
CW3=11800x4200mm
m
CW4=6000x2550mm
m
CW5=5340x7500mm
m
CW6=7250x900mm
m
CW7=9630x3000mm
m
CW8=3630x4200mm
m
CW9=8770x4200mm
m
CW10=11400x4200mm
m
CW11=9500x3300mm
m
CW12=1050x20420mm
m
CW13=1300x12900mm
m
CW14=900x12900mm
m
m Total

h. Marble Copping Works 27 cm


First Floor @ +4.50 m
Parapet Area
L=15.65+32.95= 48.60 m
m
Second Floor @ +7.80 m
Corridor Area, Parapet Wall
L=49.65-0.2*8 = 48.05 m
m
Third Floor @ +11.10 m
Corridor Area, Parapet Wall
L=(1.55+25.2-12.25)-(7*0.2)=13.10 m
m
Fourth Floor @ +14.40 m
Corridor Area, Parapet Wall
L=8.35+3.3+6 = 17.65 m
m
Roof Floor @ +17.70 m
Parapet Wall
L=64.35+56.05+22.95+19.6= 162.95 m
m
m Total of Marble Copping of 20 cm HCB

i. Marble Copping Works 25cm


Hand Rails
First Floor
L=35.75+17.90= 53.65 m
m
Second - Fourth Floor
L=29.0 m
m
m Total of Internal Marble Copping, 15 cm HCB

6.1. Porcelain
Ground Floor @ +0.00 m
Cafeteria, NON-Slipery
CAD Area=107 m2 CAD Length =30.95m
m2
Security (Guard)& Locker
CAD Area=17.76 m2 CAD Length =14.95m
m2
Shop
CAD Area=35.80 m2 CAD Length =9.60m
m2
Seating area & Lobby
CAD Area=305.29 m2 CAD Length =35.90m
m2
Bank
CAD Area=119.01 m2 CAD Length =43.53m
m2
Branch manager
CAD Area=31.75 m2 CAD Length =10.60m
m2
Pool office
CAD Area=47 m2 CAD Length =31.90m
m2
Insurance
CAD Area=85.45 m2 CAD Length =28.40m
m2
Security
CAD Area=15.39 m2 CAD Length 9.95m
m2
shaft
CAD Area=2.8 m2 CAD Length 6.00m
m2
First Floor @ +4.50 m
shop, b/n 2-3 & A-B
CAD Area=17.68m2 CAD Length = 4.51 m
m2
shaft b/n 4-5 & B-C
CAD Area=3 m2 CAD Length = 6.22 m
m2
shop b/n 5-6 & A-B
CAD Area=22.29 m2 CAD Length = 9.65 m
m2
shop b/n 5-6 & A-B
CAD Area=20.46 m2 CAD Length = 3.83 m
m2
shop b/n 6-7 & A-B
CAD Area=21.85 m2 CAD Length = 3.82 m
m2
shop b/n 6-7 & A-B
CAD Area=20.79 m2 CAD Length = 19 m
m2
shops b/n 5-7 & C-F
CAD Area=141.47 m2 CAD Length = 18 m
m2
shops b/n 3-4 & D-F
CAD Area=64.72 m2 CAD Length = 19.2 m
m2
shops b/n 1-3 & D-F
CAD Area=80.13 m2 CAD Length = 4.13 m
m2
shops b/n 1-2 & B-D
CAD Area=37.11 m2 CAD Length = 3.56 m
m2
corridor
CAD Area=356 m2 CAD Length = 115.7 m
m2
utility b/n 4-5 & E-F
CAD Area=4.6 m2 CAD Length = 8 m
m2
Kiosk 1
CAD Area=16.32 m2 CAD Length = 11.63 m
m2
Kiosk 2
CAD Area=11 m2 CAD Length = 6.4 m
m2
Second Floor @ +7.80 m
Corridor
CAD Area= 300.10 m2 CAD Length = 102.85 m
m2
Shop @ 1-3 & --B--
CAD Area= 54.80 m2 CAD Length = 4.75*4+0.4*4*3=23.80 m
m2
Shop @ 1-3 & C-F
CAD Area= 144.25 m2 CAD Length = (15.65*2)+(8.75*4)+(6*0.4*4)= 75.90 m
m2
Shop @ 5-7 & -B--
CAD Area= 90.95 m2 CAD Length = 6.45*7=45.15 m
m2
Shop @ 3-4 & E-F
CAD Area= 65.10 m2 CAD Length = 6.1*4+16.8=81.20 m
m2
Shop @ 6-7 & C-F
CAD Area= 141.75 m2 CAD Length = 16.2+11.3*2+7.9*8= 102.0 m
m2
Third Floor @ +11.10 m
Corridor
CAD Area= 300.10 m2 CAD Length = 68.35 m
m2
Office @ 1-3 & --B--
CAD Area= 61.05 m2 CAD Length = 5.25*4+0.4*4*2=24.20 m
m2
Office @ 1-3 & C-F
CAD Area= 145.45 m2 CAD Length = (15.65*2)+(8.75*4)+(6*0.4*4)= 75.90 m
m2
Office @ 3-4 & E-F
CAD Area= 64.55 m2 CAD Length = 6.5*4+15.65+2*0.4*4= 44.85 m
m2
Shop @ 5-6 & -B--
CAD Area= 28.80 m2 CAD Length = 11.0 m
m2
Shop @ 6-7 & A-F
CAD Area= 198.65 m2 CAD Length = 47.3+7*10+10*4*0.4=133.30 m
m2
Fourth Floor @ +14.40 m
Corridor
CAD Area=15.5+234= 249.50 m2 CAD Length = 89.75 m
m2
Syndicate Room @ 1-2 & --B--
CAD Area= 29.55 m2 CAD Length = 22.75 m
m2
Syndicate Room @ 2-3 & --B--
CAD Area= 41.45 m2 CAD Length = 24.45 m
m2
Back Stage, Meeting Room & Store
CAD Area= 202.65+9.4= 212.05 m2 CAD Length = 60.1+11.15= 71.25 m
m2
Break Area @ 3-4 & E-F
CAD Area= 51.95 m2 CAD Length = 29.25 m
m2
Preyer Room @ 5-6 & -B--
CAD Area= 25.55 m2 CAD Length = 20.95 m
m2
Office @ 6-7 & A-F
CAD Area= 199.25 m2 CAD Length = 110.70 m
m2
m2 Total of Porcelain

6.11. Porcelain Skirting


Ground Floor @ +0.00 m
Cafeteria, NON-Slipery
CAD Length =30.95m
m2
Security (Guard)& Locker
CAD Length =14.95m
m
Shop
CAD Length =9.60m
m
Seating area & Lobby
CAD Length =35.90m
m
Bank
CAD Length =43.53m
m
Branch manager
CAD Length =10.60m
m
Pool office
CAD Length =31.90m
m
Insurance
CAD Length =28.40m
m
Security
CAD Length 9.95m
m
shaft
CAD Length 6.00m
m2
First Floor @ +4.50 m
shop, b/n 2-3 & A-B
CAD Length = 4.51 m
m
shaft b/n 4-5 & B-C
CAD Length = 6.22 m
m
shop b/n 5-6 & A-B
CAD Length = 9.65 m
m
shop b/n 5-6 & A-B
CAD Length = 3.83 m
m
shop b/n 6-7 & A-B
CAD Length = 3.82 m
m
shop b/n 6-7 & A-B
CAD Length = 19 m
m
shops b/n 5-7 & C-F
CAD Length = 18 m
m
shops b/n 3-4 & D-F
CAD Length = 19.2 m
m
shops b/n 1-3 & D-F
CAD Length = 4.13 m
m
shops b/n 1-2 & B-D
CAD Length = 3.56 m
m
corridor
CAD Length = 115.7 m
m
utility b/n 4-5 & E-F
CAD Length = 8 m
m
Kiosk 1
CAD Length = 11.63 m
m
Kiosk 2
CAD Length = 6.4 m
m
Second Floor @ +7.80 m
Corridor
CAD Length = 102.85 m
m
Shop @ 1-3 & --B--
CAD Length = 4.75*4+0.4*4*3=23.80 m
m
Shop @ 1-3 & C-F
CAD Length = (15.65*2)+(8.75*4)+(6*0.4*4)= 75.90 m
m
Shop @ 5-7 & -B--
CAD Length = 6.45*7=45.15 m
m
Shop @ 3-4 & E-F
CAD Length = 6.1*4+16.8=41.20 m
m
Shop @ 6-7 & C-F
CAD Length = 16.2+11.3*2+7.9*8= 102.0 m
m
Third Floor @ +11.10 m
Corridor
CAD Length = 68.35 m
m
Office @ 1-3 & --B--
CAD Length = 5.25*4+0.4*4*2=24.20 m
m
Office @ 1-3 & C-F
CAD Length = (15.65*2)+(8.75*4)+(6*0.4*4)= 75.90 m
m
Office @ 3-4 & E-F
CAD Length = 6.5*4+15.65+2*0.4*4= 44.85 m
m
Shop @ 5-6 & -B--
CAD Length = 11.0 m
m
Shop @ 6-7 & A-F
CAD Length = 47.3+7*10+10*4*0.4=133.30 m
m
Fourth Floor @ +14.40 m
Corridor
CAD Length = 89.75 m
m
Syndicate Room @ 1-2 & --B--
CAD Length = 22.75 m
m
Syndicate Room @ 2-3 & --B--
CAD Length = 24.45 m
m
Back Stage, Meeting Room & Store
CAD Length = 60.1+11.15= 71.25 m
m
Break Area @ 3-4 & E-F
CAD Length = 29.25 m
m
Preyer Room @ 5-6 & -B--
CAD Length = 20.95 m
m
Office @ 6-7 & A-F
CAD Length = 110.70 m
m
m Total of Porcelain Skirtings

6.12 Ceramic Floor Finish


Kitchen, Ground Floor
CAD Area=17.00m2 CAD Length 16.20m
m2
Toilet @ 4-5 & -B-, From Ground - Third Floor
CAD Area= 13.7*2= 27.40 m2 CAD Length = 16.35*2= 32.70 m
m2
Janitors Room, From Ground - Third
CAD Area= 2.90 m2 CAD Length = 6.15 m
m2
Toilet @ 4-5 & -B--, Fourth Floor
CAD Area= 15.45*2= 30.90 m2 CAD Length = 30.70 m
m2
Toilet @ 4-5 & E-F, From Ground - Fourth Floor
CAD Area= 16.2*2= 32.40 m2 CAD Length = 19.3*2= 38.60 m
m2
Shaft Room
CAD Area= 3.35 m2 CAD Length = 4.45 m
m2

m2 Total of Ceramic Floor Finish

6.13. Ceramic Skirting


Kitchen, Ground Floor
CAD Length 16.20m
m2
Janitors Room, From Ground - Third
CAD Length = 6.15 m
m2
Shaft Room, ,Ground - Fourth
CAD Length = 4.45 m
m2

6.14 Cement Screed


Basement Floor @ -3.00 m
parking
CAD Area=652.81 m2 CAD Length =150m
m2
Generetor
CAD Area=21 m2 CAD Length = 16.70m
m2
RESERVOIR & PUMP ROOM
CAD Area=55.3 m2 CAD Length = 28.60m
m2
m2 Total of Cement Screed

6.16 PVC Floor Finish


Basement Floor @ -3.00 m
store
CAD Area=65 m2 CAD Length = 31.70 m
m2
shaft
CAD Area=4.4 m2 CAD Length =7.10 m
m2
Archive
CAD Area=118.89m2 CAD Length = 49.40 m
m2
Counting & sorting
CAD Area=15.00 m2 CAD Length = 13.73 m
m2
Vault
CAD Area=32 m2 CAD Length = 21.75 m
m2
Ground Floor @ +0.00 m
shaft
CAD Area=4.4 m2 CAD Length = 7.10m
m2
Vault
CAD Area=15 m2 CAD Length = 14.50m
m2
First Floor @ +4.50 m
tech rm, b/n 3-4 left of A
CAD Area=6.9 m2 CAD Length = 10m
m2 9.1
m2 Total of PVC

6.17 PVC Skirting


Basement Floor @ -3.00 m
store
CAD Length = 31.70 m
m
shaft
CAD Length =7.10 m
m
Archive
CAD Length = 49.40 m
m
Counting & sorting
CAD Length = 13.73 m
m
Vault
CAD Length = 21.75 m
m
Ground Floor @ +0.00 m
shaft
CAD Length = 7.10m
m
Vault
CAD Length = 14.50m
m
Archive @ 4-7 & A-B--
CAD Length = 53.80 m
m
First Floor @ +4.50 m
tech rm, b/n 3-4 left of A
CAD Length = 10m
m 9.1
for gypsum bard
CAD Length = 210m
m
m Total of PVC Skirting

6.19 HPL partition wall


Ground Floor @ +0.00 m
B/n 4/5 & A/B
L=2.7+1.55=4.25 m
H=2.10 m
m2
B/n E & F
L=4.70 m
H=2.10 m
m2
B/n E & F, @ Vault
L=1.50 m
H=2.10 m
m2
B/n E & F, @Utility
L=3.35+1.45*2= 6.25 m
H=2.10 m
m2
First - Third Floor @ +4.50 - + 11.10 m
B/n Axis E & F, @Utility
L=3.6+1.5*2= 6.60 m
H=2.10 m
m2
B/n E & F, @Utility
L =3.55+1.5*2= 6.55 m
H=2.10 m
m2
Fourth Floor @ +14.40 m
B/n Axis A/B & 4/5, @Utility
L=3.6+1.5*2= 6.60 m
H=2.10 m
m2
B/n E & F, @Utility
L =3.55+1.5*2= 6.55 m
H=2.10 m
m2
m2 Total

6.20 Gypsum Board Partition Wall


First Floor @ +4.50 m
Along Axis 2, From -E-F
L=8.55-0.4=8.15 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis 4 & 5, From -B--
L=5.10 m
H=3.3-0.3=3.30 m
m2
Along Axis 5, From -B--
L=5.1-0.4=4.70 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis 5 & 6 & 6 & 7, From -B--
L=6.45 m
H=3.3-0.3=3.30 m
m2
Along Axis 6, From -B--
L=6.45-0.4=6.05 m
H=3.3-0.3=3.30 m
m2
Along Axis 6, From C-E
L=11.3005 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis C & D, From 1-2
L=4.55 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis C & D & E & F, From --6--
L=7.90 m
H=3.3-0.3=3.30 m
m2
Along Axis D & E, From --6--
L=7.9-0.4= 7.50 m
H=3.3-0.3=3.30 m
m2
Along Axis E, From 1-2--
L=8.35-0.4= 7.95 m
H=3.3-0.3=3.30 m
m2
Along Axis E, From 3-4
L=6.45 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis E & F, From 1-2-- & 3-4
L=8.75+6.45=15.20 m
H=3.3-0.3=3.30 m
m2
Second Floor @ +7.80 m
Along Axis 2 & B/n 2&3, From B---
L=8.55-0.4=8.15 m
H=3.3-0.3=3.30 m
m2
Along Axis 2, From C-E--
L=15.65-2*0.4= 14.85 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis 4&5, From -B--
L=5.80 m
H=3.3-0.3=3.30 m
m2
Along Axis 5, From -B--
L=5.8-0.4= 5.40 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis C-D & D-E, B/n 1-2--
L=8.75 m
H=3.3-0.3=3.30 m
m2
Along Axis D, B/n 6-7
L=6.10 m
H=3.3-0.3=3.30 m
m2
Along Axis E, B/n 3-4
L=6.10 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis E-F, B/n 3-4
L=6.45 m
H=3.3-0.3=3.30 m
m2
B/n Axis 6-7, All Horizontals
L=6.80 m
H=3.3-0.3=3.30 m
m2
Third Floor @ +11.10 m
Along Axis 2 & B/n 2&3, From B---
L=8.55-0.4=8.15 m
H=3.3-0.3=3.30 m
m2
Along Axis 2, From C-E--
L=15.65-2*0.4= 14.85 m
H=3.3-0.3=3.30 m
m2
Along Axis 5, From -B--
L=5.8-0.4= 5.40 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis C-D & D-E, B/n 1-2--
L=8.75 m
H=3.3-0.3=3.30 m
m2
Along Axis C, B/n 6-7
L=6.10 m
H=3.3-0.3=3.30 m
m2
Along Axis E, B/n 3-4
L=6.10 m
H=3.3-0.3=3.30 m
m2
Along B/n Axis E-F, B/n 3-4
L=6.45 m
H=3.3-0.3=3.30 m
m2
B/n Axis 6-7, All Horizontals
L=6.80 m
H=3.3-0.3=3.30 m
m2
Fourth Floor @ +14.40 m
Along Axis 2 & B/n 2&3, From B---
L=8.55-0.4=8.15 m
H=3.3-0.3=3.30 m
m2
Along Axis 5, From -B--
L=5.8-0.4= 5.40 m
H=3.3-0.3=3.30 m
m2
Along Axis C, B/n 6-7
L=6.10 m
H=3.3-0.3=3.30 m
m2
B/n Axis 6-7, All Horizontals
L=6.80 m
H=3.3-0.3=3.30 m
m2
m2 Total

6.21 Ceramic Wall Claddings


Ground Floor @ +0.00 m
Ground Floor Toilet B/n A-B
Toilet @ 4-5 & -B-, From Ground - Third Floor
CAD Length = 16.35*2= 32.70 m
D= 1.80 m
m2
Toilet @ 4-5 & -B--, Fourth Floor
CAD Length = 30.70 m
D= 1.80 m
m2
Toilet @ 4-5 & E-F, From Ground - Fourth Floor
CAD Length = 19.3*2= 38.60 m
D= 1.80 m
m2
m2 Total of Ceramic Wall Cladding

6.22 Lift Shaft granite Wall Claddings


Basement Floor @ -3.00 m
L = 3.30 m
D= 3-0.3=2.70 m
m2
Ground Floor @ +0.00 m
L = 3.30 m
D= 4.5-0.3=4.20 m
m2
First - Roof Floor @ +4.50 - +14.40 m
L = 3.30 m
D= 3.3-0.3=3.0 m
m2

m2 Total of lift Shaft Wall Cladding

6.23.1 Pavement Arround Building


CAD Area= 138.0 m2
m2 Total

6.23.2 Green area Arround Building


CAD Area= 132.4 m 2

m2 Total

7.04. Synthetic Enamel Paint


Ground Floor Toilet B/n A-B
CAD Length = 11.65 m
H = 4.5-0.3-1.8-1= 1.40 m
m2
Ground Floor Toilet B/n E-F
CAD Length =7.95+11.2= 19.15 m
H = 4.5-0.3-1.8-1= 1.40 m
m2
From First - Third Floor
CAD Length = 18.15+17.75= 35.90 m
H =3.3-0.3-1.8-1= 0.20 m
m2
Fourth Floor
CAD Length = 16.35+17.75= 34.10 m
H =3.3-0.3-1.8-1= 0.20 m
m2
m2 Total of Synthetic Enamel Paint
Remarks
Client:-

Location:- Bale

S
Axis Description Shape Ø Length Span Spacing

In Footing Pad C-30


F1=3.0x3.0x0.75 m X 14.00 4.35 3.00 0.12

Y 14.00 4.35 3.00 0.12

F2=2.60x2.60x0.70 m X 14.00 3.85 2.60 0.15

Y 14.00 3.85 2.60 0.15

F3=2.3x2.3x0.55 m X 12.00 3.25 2.30 0.12

Y 12.00 3.25 2.30 0.12

F4=3.1x3.1x0.80 m X 14.00 4.55 3.10 0.12

Y 14.00 4.55 3.10 0.12

F5=5.65x8.7x0.60 m 1 16.00 9.15 5.65 0.20

2 16.00 11.35 5.65 0.20

3 16.00 6.70 8.70 0.20

4 16.00 7.85 8.70 0.20

5 14.00 4.75 5.65 0.20

6 12.00 2.95 8.70 0.20

F6=1.10x1.10x0.30 m X 12.00 10.50 1.00 0.15

Y 12.00 10.50 1.00 0.15


CF1=3.65x2.50x0.55 m 1 14.00 4.60 2.40 0.15

2 14.00 4.60 2.40 0.11

3 14.00 3.45 3.55 0.11

4 12.00 3.75 3.55 0.15

5 12.00 1.30 2.40 0.15

6 12.00 2.50 2.40 0.15

In Foundation Column C-25


From -0.00 - +0.00 m
C1= Φ 0.45 m Sec. 15 20.00 4.30

St.15 8.00 1.70 2.10 0.15

C2= 40x40 Sec. 2 16.00 4.15

St.2 8.00 1.50 2.10 0.15

C3= 40x40 Sec. 3 16.00 4.15

St.3 8.00 1.50 2.10 0.15

C4= 40x40 Sec. 4 16.00 4.15

St.4 8.00 1.50 2.10 0.15

C5= 40x40 Sec. 2 16.00 4.15

St.2 8.00 1.50 2.10 0.15

C6= 40x40 Sec. 2 16.00 4.15

St.2 8.00 1.50 2.10 0.15

C7= 40x40 Sec. 2 16.00 4.15

St.2 8.00 1.50 2.10 0.15


C8= 45x45 Sec. 8 16.00 4.15

St.8 8.00 1.70 2.10 0.15

C9= Φ 0.45 m Sec. 18 16.00 4.15

St. 18 8.00 1.70 2.10 0.15

C10= Φ 0.45 m Sec. 18 16.00 4.15

St. 18 8.00 1.70 2.10 0.15

C11= 45x45 Sec. 8 16.00 4.15

St.8 8.00 1.70 2.10 0.15

C12= 35x35 Sec. 7 16.00 4.15

St.7 8.00 1.30 2.10 0.15

C13= 50x50 Sec. 1 16.00 4.15

St.1 8.00 1.90 2.10 0.15

C14= 45x45 Sec. 8 16.00 4.15

St.8 8.00 1.70 2.10 0.15

C15= 25x50 Sec. 12 16.00 4.15

St.12 8.00 1.20 2.10 0.15

C16= 40x40 Sec. 2 16.00 4.15

St.2 8.00 1.50 2.10 0.15

C17= 40x40 Sec. 3 16.00 4.15

St.3 8.00 1.50 2.10 0.15


C18= 45x45 Sec. 8 16.00 4.15

St.8 8.00 1.70 2.10 0.15

C19= 50x50 Sec. 14 20.00 4.15

St.14 8.00 1.90 2.10 0.15

C20= Φ 0.45 m Sec. 18 20.00 4.30

St. 18 8.00 1.70 2.10 0.15

C21= 30x305 m 16.00 4.15

8.00 1.10 2.10 0.15

Basement Elevation Column


C1= Φ 0.45, -3.00 - +0.00 m Sec. 15 20.00 3.80

St. 15 8.00 1.70 2.60 0.15

C2= 40x40, -3.00 - +1.65 m Sec. 2 16.00 5.30

St.2 8.00 1.50 4.25 0.15

C3= 40x40, -3.00 - +0.00 m Sec. 3 16.00 3.65

St.3 8.00 1.50 2.60 0.15

C4= 40x40, -3.00 - +0.00 m Sec. 4 16.00 3.65

St.4 8.00 1.50 2.60 0.15

C5= 40x40, -3.00 - +0.00 m Sec. 2 16.00 3.65

St.2 8.00 1.50 2.60 0.15

C6= 40x40, -3.00 - +1.65 m Sec. 2 16.00 5.30


St.2 8.00 1.50 4.25 0.15

C7= 40x40, -3.00 - +1.65 m Sec. 2 16.00 5.30

St.2 8.00 1.50 4.25 0.15

C8= 45x45, -3.00 - +0.00 m Sec. 8 16.00 3.65

St.8 8.00 1.70 2.60 0.15

C9= Φ 0.45, -3.00 - +0.00 m Sec. 18 16.00 3.65

St. 18 8.00 1.70 2.60 0.15

C10= Φ 0.45, -3.00 - +0.00 m Sec. 18 16.00 3.65

St. 18 8.00 1.70 2.60 0.15

C11= 45x45, -3.00 - +0.00 m Sec. 8 16.00 3.65

St.8 8.00 1.70 2.60 0.15

C12= 35x35, -3.00 - +0.00 m Sec. 7 16.00 3.65

St.7 8.00 1.30 2.60 0.15

C13= 50x50, -3.00 - +0.00 m Sec. 1 16.00 3.65

St.1 8.00 1.90 2.60 0.15

C14= 45x45, -3.00 - +0.00 m Sec. 8 16.00 3.65

St.8 8.00 1.70 2.60 0.15

C15= 25x50, -3.00 - +0.00 m Sec. 12 16.00 3.65

St.12 8.00 1.20 2.60 0.15

C16= 40x40, -3.00 - +0.00 m Sec. 2 16.00 3.65


St.2 8.00 1.50 2.60 0.15

C17= 40x40, -3.00 - +0.00 m Sec. 3 16.00 3.65

St.3 8.00 1.50 2.60 0.15

C18= 45x45, -3.00 - +0.00 m Sec. 8 16.00 3.65

St.8 8.00 1.70 2.60 0.15

C19= 50x50, -3.00 - +0.00 m Sec. 14 20.00 3.65

St.14 8.00 1.90 2.60 0.15

C20= Φ 0.45 m Sec. 15 20.00 3.80

St. 15 8.00 1.70 2.60 0.15

C21= 30x30 m 16.00 3.25

8.00 1.10 2.10 0.15

In Basement Floor Beam C-25, @ -3.00 m


A-F From 1-7 Sec. 1 12.00 8.20

12.00 7.05

12.00 10.55

12.00 4.60

12.00 7.00

12.00 6.95

st. 1 8.00 1.20 4.15 0.20

8.00 1.20 6.50 0.20

E' From 5-5' Sec. 1 12.00 4.65

12.00 3.95

st. 1 8.00 1.20 3.60 0.20


1&7 From A-F Sec. 1 12.00 6.45

12.00 7.05

12.00 9.30

12.00 11.50

12.00 7.00

12.00 5.55

12.00 6.45

st. 1 8.00 1.20 4.55 0.20

8.00 1.20 6.50 0.20

8.00 1.20 5.00 0.20

8.00 1.20 6.00 0.20

5' From E-F Sec. 1 12.00 7.05

12.00 6.35

st. 1 8.00 1.20 6.50 0.20


In Suspended Ground Floor Beam C-25, @ +0.00
A', A" & C' From 1-3-- Sec. 1 14.00 3.75

14.00 3.05

st. 1 8.00 1.20 2.70 0.15

B From 1-3 Sec. 1 14.00 8.20

14.00 7.45

14.00 4.60

14.00 10.35

st. 1 8.00 1.20 3.75 0.15

8.00 1.20 6.10 0.15

8.00 1.20 3.40 0.15

From 4-7 Sec. 1 14.00 7.05


14.00 7.85

14.00 4.25

14.00 7.05

14.00 6.95

st. 1 8.00 1.20 6.10 0.15

8.00 1.20 3.40 0.15

C, D & E From 1-7 Sec. 1 14.00 8.20

14.00 7.05

14.00 10.55

14.00 4.60

14.00 6.95

st. 1 8.00 1.20 4.15 0.15

8.00 1.20 6.50 0.15

E' From 5-5' Sec. 1 14.00 4.65

14.00 3.95

st. 1 8.00 1.20 3.60 0.15

2 From A-E Sec. 1 14.00 8.60

14.00 7.05

16.00 4.30

16.00 3.80

14.00 11.50

14.00 7.00

14.00 5.50

st. 1 8.00 1.20 4.55 0.15

8.00 1.20 6.50 0.15

8.00 1.20 5.00 0.15


3 From A-E Sec. 1 14.00 8.60

14.00 7.05

14.00 7.40

16.00 3.80

16.00 4.30

14.00 11.50

14.00 7.00

14.00 4.00

st. 1 8.00 1.20 4.15 0.15

8.00 1.20 6.10 0.15

8.00 1.20 3.15 0.15

3" From C-D Sec. 1 14.00 5.60

14.00 4.90

st. 1 8.00 1.20 4.55 0.15

4&5 From A-F Sec. 1 14.00 8.60

14.00 7.05

14.00 6.30

14.00 9.30

16.00 4.30

16.00 3.80

14.00 11.50

14.00 7.05

14.00 5.50

14.00 6.45

st. 1 8.00 1.20 4.55 0.15

8.00 1.20 6.50 0.15

8.00 1.20 5.00 0.15

8.00 1.20 6.00 0.15


5' From C-D Sec. 1 14.00 7.05

14.00 6.35

st. 1 8.00 1.20 6.00 0.15

6 From A-F Sec. 1 14.00 8.60

14.00 7.05

14.00 6.30

14.00 9.30

14.00 11.50

14.00 7.05

14.00 5.50

14.00 6.45

st. 1 8.00 1.20 4.55 0.15

8.00 1.20 6.50 0.15

8.00 1.20 5.00 0.15

8.00 1.20 6.00 0.15

6' From C-D Sec. 1 14.00 7.55

14.00 6.85

st. 1 8.00 1.20 6.50 0.15

6'' Sec. 1 14.00 9.35

14.00 5.00

14.00 8.45

st. 1 8.00 1.20 12.55 0.15


Total length(M

Unit Weight (Kg/M

Total Weight (Kg


10 cm Basement Floor Slab, C-25
All 4.15 x 4.55 m Grids X 8.00 4.12 4.55 0.25

Y 8.00 4.52 4.15 0.25

All 6.5 x 4.55 m Grids X 8.00 5.97 6.50 0.25

Y 8.00 6.47 6.00 0.25

All 4.15 x 6.5 m Grids X 8.00 4.12 6.50 0.25

Y 8.00 6.47 4.15 0.25

All 6.5 x 6.5 m Grids X 8.00 6.47 6.50 0.25

Y 8.00 6.47 6.50 0.25

All 4.15 x 5.0 m Grids X 8.00 4.12 5.00 0.25

Y 8.00 4.97 4.15 0.25

All 6.5 x 5.0 m Grids X 8.00 6.47 5.00 0.25

Y 8.00 4.97 6.50 0.25

All 4.15 x 6.0 m Grids X 8.00 4.12 6.00 0.25

Y 8.00 5.97 4.15 0.25

All 6.5 x 6.0 m Grids X 8.00 6.47 6.00 0.25

Y 8.00 5.97 6.50 0.25

Ground Floor X 8.00 1.37 17.10 0.25


Y 8.00 17.37 1.40 0.25

20 cm Suspended Ground Floor Slab, C-25


Along X
B/n Axis A-B
On Axis 2 10.00 5.00 4.55 0.15

From Axis 1-3 8.00 11.25 4.55 0.15

From Axis 3"-4 8.00 5.30 1.45 0.12

From Axis 4-5 & 6-7 8.00 9.00 4.55 0.12

From Axis 5-6 8.00 7.15 4.55 0.12

On Axis 5 & 6 8.00 4.30 4.55 0.15

B/n Axis B-C & C-D


On Axis 2 10.00 3.55 6.50 0.15

From Axis 1-3 8.00 6.05 6.50 0.12

From Axis 2-3, 3-4, 4-5 & 5-6 8.00 7.15 6.50 0.12

From Axis 6-7, B-C 8.00 9.00 6.50 0.12

From Axis 6-6', C-D 8.00 6.00 6.50 0.12

On Axis 3, 4 & 5 10.00 4.30 6.50 0.15

On Axis 6, B-C 8.00 4.30 6.50 0.15

On Axis 6, C-D 10.00 3.20 6.50 0.15

B/n Axis D-E


On Axis 2 10.00 3.55 5.00 0.15

From Axis 1-2 8.00 6.05 5.00 0.15

From Axis 2-3, 3-4, 4-5 & 5-6 8.00 7.15 5.00 0.15

From Axis 6-7 8.00 9.00 5.00 0.12

On Axis 3, 4, 5 & 6 10.00 4.30 5.00 0.15

B/n Axis E-F


From Axis 4-5 8.00 10.40 6.00 0.12

From Axis 5-5' 8.00 7.15 1.50 0.12

From Axis 5'-6 8.00 4.30 6.00 0.12

From Axis 6-7 8.00 9.00 6.00 0.15

On Axis 5, E-E' 10.00 4.30 1.50 0.15

On Axis 6 10.00 3.10 6.00 0.12

Along Y
B/n Axis 1-2
From Axis A-B 8.00 6.60 2.70 0.12

From Axis B-C & C-D 8.00 7.15 4.15 0.12

From Axis D-E 8.00 7.00 4.15 0.12

On Axis B 10.00 3.30 2.70 0.15

On Axis C 10.00 4.30 4.15 0.15

On Axis D 10.00 3.80 4.15 0.15

B/n Axis 2-3, 3-4, 4-5, 5-6 & 6-7


From Axis A-B, Not on 3-4 8.00 6.60 4.55 0.12

From Axis A-B, 3"-4 8.00 2.20 1.45 0.12

On Axis B 10.00 3.30 6.50 0.15

From Axis B-C & C-D 8.00 7.15 6.50 0.12

From Axis B-C, From 3-4 8.00 8.55 6.50 0.12

From Axis C-D, From 6-6' 8.00 7.15 4.20 0.12

From Axis D-E, From 2-3, 3-4 & 6-7 8.00 7.00 6.50 0.12

From Axis D-E, From 4-5 8.00 5.65 6.50 0.12

From Axis D-E, From 5-5' 8.00 7.65 3.60 0.12

From Axis D-E, From 5'-6 8.00 7.00 2.90 0.12

From Axis E-F, From 4-5 & 6-7 8.00 8.35 6.50 0.12

From Axis E-F, From 5'-6 8.00 8.35 2.90 0.12

On Axis C, From 1-2 10.00 4.30 4.15 0.15


On Axis C, From 2-3, 3-4, 4-5, 5-6 & 6-7 10.00 4.30 6.50 0.15

On Axis D 10.00 3.80 4.15 0.15

On Axis D, From 2-3, 3-4, 4-5, 5-6 & 6-7 10.00 3.80 6.50 0.15

On Axis E, From 4-5, 5-6 & 6-7 10.00 3.65 6.50 0.15

Stair Case & Landing


Staircase - 1
From -3.00 - -1.50 m 10.00 2.00 1.70 0.10

14.00 5.55 1.70 0.10

10.00 1.15 1.70 0.10

10.00 2.75 1.70 0.10

Along the Soffit 10.00 1.70 3.45 0.20

Per Step 8.00 1.70

Per Step 8.00 1.05 1.70 0.20

From -1.50 - +0.00 m 14.00 5.25 1.70 0.10

10.00 3.10 1.70 0.10

10.00 1.20 1.70 0.10

Along the Soffit 10.00 1.70 3.00 0.20

Per Step 8.00 1.70

Per Step 8.00 1.05 1.70 0.20

Staircase - 2
From -3.00 - -1.50 m 10.00 1.65 1.70 0.10

14.00 5.25 1.70 0.10

10.00 1.15 1.70 0.10

10.00 2.40 1.70 0.10

Along the Soffit 10.00 1.70 3.45 0.20

Per Step 8.00 1.70

Per Step 8.00 1.05 1.70 0.20


From -1.50 - +0.00 m 14.00 4.90 1.70 0.10

10.00 2.75 1.70 0.10

10.00 1.20 1.70 0.10

Along the Soffit 10.00 1.70 3.00 0.20

Per Step 8.00 1.70

Per Step 8.00 1.05 1.70 0.20

Staircase - 3
From -1.20 - +0.00 m 14.00 3.20 5.90 0.11

8.00 5.90 5.90 0.20

12.00 0.80 5.90 0.15

12.00 0.85 5.90 0.15

Along the Soffit 8.00 5.90 2.35 0.20

Per Step 10.00 5.90

Per Step 8.00 0.70 5.90 0.20

Staircase - 4
From -1.20 - +0.00 m 14.00 3.20 11.10 0.11

12.00 0.80 11.10 0.15

12.00 0.85 1.70 0.15

Along the Soffit 8.00 11.40 2.35 0.20

Per Step 8.00 11.40

Per Step 8.00 1.20 11.40 0.20

Stair Case - 6
From Basement - Ground Floor

14.00 7.85 1.10 0.15

12.00 1.85 1.10 0.15

Step 8.00 0.93 1.10 0.20


Step 12.00 1.25 1.10 0.15

14.00 2.70 1.10 0.15

Step 14.00 1.20 1.10 0.15

20 cm Lift Shaft, C-30


Along X
Front Side 3 8.00 1.25 2.20 0.15

Front Side, Above Door Opening 2 10.00 3.55 0.80 0.20

Diagonals 5 12.00 0.80

Rear Side 8.00 6.90 3.00 0.15

Left & Right Side 8.00 6.85 3.00 0.15


Along Y
Front Side 10.00 3.40 1.00 0.15

Front Side, Above Door Opening 6' 10.00 1.05 1.30 0.15

Rear Side 10.00 3.40 3.30 0.15

Left & Right Side 10.00 3.40 3.30 0.15

20 cm Retaining Shear Wall, C-30


Along X
Along Axis A
From 1-3 8.00 10.80 3.00 0.20

From 3-4, 4-5, 5-6 & 6-7 8.00 6.60 3.00 0.20

Along Axis F
From 1-2 8.00 4.65 3.00 0.20

From 2-3, 3-4, 4-5 & 6-7 8.00 6.60 3.00 0.20

From 5-5' & 5'-6 8.00 4.55 3.00 0.20

Along Axis 1
From A-B 8.00 4.65 3.00 0.20
From C-D 8.00 6.60 3.00 0.20

From D-F 8.00 5.10 3.00 0.20

Along Axis 7
From A-C 8.00 11.20 3.00 0.20

From C-D 8.00 6.60 1.80 0.20

From D-E 8.00 11.10 3.00 0.20

Along Y
Peripheral Length
CAD Length, Deducting C-D 1 8.00 3.70 ### 0.15

2 10.00 3.70 ### 0.11

From C-D 1 8.00 2.50 6.50 0.15

2 10.00 2.50 6.50 0.11

20 cm Vault Shear Wall, C-30


Basement Floor
Sec 2-2 @ level -3(basment to ground floor) 8.00 7.15 3.20 0.15
8.00 7.15 3.20 0.15
3 8.00 4.40 3.20 0.15
10.00 3.45 3.65 0.15
7 12.00 1.15 1.60 0.15
8 10.00 1.85 0.70 0.15
10.00 3.45 6.90 0.15
5 12.00 0.80
2 10.00 5.50 0.90 0.15
sec A-A,pad for shaer wall 8.00 5.41 0.60 0.15
10.00 1.01 5.00 0.15

15 cm Ramp, C-25
Two Way Rams

X 8.00 1.20 12.00 0.25


Y 8.00 12.00 1.20 0.25

One Way Ramp

X 8.00 6.00 18.00 0.25

Y 8.00 18.00 6.00 0.25

Sec C-C 12.00 4.45 1.20 0.15

12.00 4.25 1.20 0.15

14.00 11.05 1.20 0.12

10.00 1.20 10.75 0.15


Sec B-B 12.00 4.25 1.20 0.15

12.00 4.25 1.20 0.15

14.00 11.10 1.20 0.15

10.00 1.20 10.75 0.15


Sec A-A 12.00 4.80 1.20 0.15

12.00 3.70 1.20 0.15

12.00 11.30 1.20 0.12

10.00 1.20 11.00 0.15

Ramp Beams

GB-1, For Two Way Ramp 14.00 2.25

14.00 1.55

St. 8.00 1.20 1.20 0.15

GB-1, For Two Way Ramp 14.00 2.25

14.00 1.55

St. 8.00 1.20 1.20 0.15

RB-2, For Three Flight Ramp

16.00 3.75

14.00 3.05

8.00 1.20 2.30 0.15

RB-2, For Three Flight Ramp

16.00 3.45
14.00 2.75

8.00 1.20 2.35 0.15


GB-1, For Three Flight Ramp

12.00 2.65

12.00 1.95

8.00 1.20 1.20 0.20

Total length(M

Unit Weight (Kg/M

Total Weight (Kg

Summ

Total length(M

Unit Weight (Kg/M

Total Weight (Kg


ኤም ቲ ቲ አማካሪ አርክቴክቶችና መሃንዲሶች ኃ.የተ.የግ.ማህበር

MTT Consulting Architects & Engineers Plc

Project :- Awash Bank

Contructor :-

SUB STRUCTURE
No of No of
6mm 8mm 10mm 12mm
bars elem

26.00 13.00

26.00 13.00

18.33 8.00

18.33 8.00

20.17 11.00 720.96

20.17 11.00 720.96

26.83 1.00

26.83 1.00

29.25 1.00

29.25 1.00

44.50 1.00

44.50 1.00

29.25 1.00

44.50 1.00 131.28

7.67 1.00 80.50

7.67 1.00 80.50


17.00 1.00

22.82 1.00

33.27 1.00

24.67 1.00 92.50

17.00 1.00 22.10

17.00 1.00 42.50

12.00 1.00

30.00 1.00 51.00

12.00 4.00

30.00 4.00 180.00

16.00 1.00

30.00 1.00 45.00

10.00 2.00

30.00 2.00 90.00

12.00 2.00

30.00 2.00 90.00

12.00 2.00

30.00 2.00 90.00

12.00 1.00

30.00 1.00 45.00


12.00 4.00

30.00 4.00 204.00

12.00 2.00

30.00 2.00 102.00

12.00 2.00

30.00 2.00 102.00

12.00 1.00

30.00 1.00 51.00

12.00 2.00

30.00 2.00 78.00

16.00 1.00

30.00 1.00 57.00

12.00 1.00

30.00 1.00 51.00

12.00 2.00

30.00 2.00 72.00

12.00 1.00

30.00 1.00 45.00

16.00 1.00

30.00 1.00 45.00


12.00 3.00

30.00 3.00 153.00

16.00 2.00

30.00 2.00 114.00

12.00 2.00

30.00 2.00 102.00

8.00 3.00

15.00 3.00 49.50

12.00 2.00

36.67 2.00 124.67

12.00 4.00

58.67 4.00 352.00

16.00 1.00

36.67 1.00 55.00

10.00 2.00

36.67 2.00 110.00

12.00 2.00

36.67 2.00 110.00

12.00 2.00
58.67 2.00 176.00

12.00 1.00

58.67 1.00 88.00

12.00 4.00

36.67 4.00 249.33

12.00 2.00

36.67 2.00 124.67

12.00 2.00

36.67 2.00 124.67

12.00 1.00

36.67 1.00 62.33

12.00 2.00

36.67 2.00 95.33

16.00 1.00

36.67 1.00 69.67

12.00 1.00

36.67 1.00 62.33

12.00 2.00

36.67 2.00 88.00

12.00 1.00
36.67 1.00 55.00

16.00 1.00

36.67 1.00 55.00

12.00 3.00

36.67 3.00 187.00

16.00 2.00

36.67 2.00 139.33

12.00 2.00

36.67 2.00 124.67

8.00 3.00

15.00 3.00 49.50

-3.00 m
3.00 6.00 147.60

9.00 6.00 380.70

3.00 6.00 189.90

3.00 6.00 82.80

12.00 6.00 504.00

6.00 6.00 250.20

21.75 6.00 156.60

167.50 6.00 1,206.00

3.00 1.00 13.95

3.00 1.00 11.85

19.00 1.00 22.80


3.00 7.00 135.45

6.00 7.00 296.10

3.00 7.00 195.30

3.00 7.00 241.50

3.00 7.00 147.00

3.00 7.00 116.55

3.00 7.00 135.45

23.75 7.00 199.50

67.00 7.00 562.80

26.00 7.00 218.40

31.00 7.00 260.40

3.00 1.00 21.15

3.00 1.00 19.05

33.50 1.00 40.20


5, @ +0.00 m
3.00 3.00

3.00 3.00

19.00 3.00 68.40

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

26.00 1.00 31.20

41.67 1.00 50.00

23.67 1.00 28.40

4.00 1.00
4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

83.33 1.00 100.00

23.67 1.00 28.40

4.00 3.00

28.00 3.00

4.00 3.00

4.00 3.00

4.00 3.00

28.67 3.00 103.20

221.67 3.00 798.00

4.00 1.00

4.00 1.00

25.00 1.00 30.00

4.00 1.00

8.00 1.00

2.00 1.00

2.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

31.33 1.00 37.60

88.67 1.00 106.40

34.33 1.00 41.20


4.00 1.00

4.00 1.00

4.00 1.00

2.00 1.00

2.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

57.33 1.00 68.80

83.33 1.00 100.00

44.00 1.00 52.80

4.00 1.00

4.00 1.00

31.33 1.00 37.60

4.00 2.00

4.00 2.00

4.00 2.00

4.00 2.00

2.00 2.00

2.00 2.00

4.00 2.00

4.00 2.00

4.00 2.00

4.00 2.00

31.33 2.00 75.20

88.67 2.00 212.80

34.33 2.00 82.40

41.00 2.00 98.40


4.00 1.00

4.00 1.00

41.00 1.00 49.20

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

4.00 1.00

31.33 1.00 37.60

88.67 1.00 106.40

34.33 1.00 41.20

41.00 1.00 49.20

4.00 1.00

4.00 1.00

44.33 1.00 53.20

4.00 1.00

4.00 1.00

4.00 1.00

84.67 1.00 101.60


Total length(M) - 9,574.90 - 4,779.84

nit Weight (Kg/M) 0.22 0.40 0.62 0.89

Total Weight (Kg) - 3,782.09 - 4,244.50


C-25
19.20 1.00 79.10

17.60 1.00 79.55

27.00 5.00 805.95

25.00 5.00 808.75

27.00 2.00 222.48

17.60 2.00 227.74

27.00 10.00 1,746.90

27.00 10.00 1,746.90

21.00 1.00 86.52

17.60 1.00 87.47

21.00 5.00 679.35

27.00 5.00 670.95

25.00 1.00 103.00

17.60 1.00 105.07

25.00 5.00 808.75

27.00 5.00 805.95

69.40 1.00 95.08


6.60 1.00 114.64

ab, C-25

31.33 1.00 156.67

31.33 1.00 352.50

13.08 1.00 69.34

77.83 1.00 700.50

38.92 1.00 278.25

62.67 1.00 269.47

44.33 2.00 314.77

55.17 2.00 667.52

220.67 2.00 3,155.53

55.17 1.00 496.50

55.17 1.00 331.00

133.00 2.00 1,143.80

44.33 1.00 190.63

44.33 1.00 141.87

34.33 1.00 121.88

34.33 1.00 207.72

137.33 1.00 981.93

42.67 1.00 384.00

137.33 1.00 590.53


51.00 1.00 530.40

13.50 1.00 96.53

51.00 1.00 219.30

41.00 1.00 369.00

11.00 1.00 47.30

51.00 1.00 158.10

23.50 1.00 155.10

71.17 1.00 508.84

35.58 1.00 249.08

19.00 1.00 62.70

28.67 1.00 123.27

28.67 1.00 108.93

38.92 4.00 1,027.40

13.08 1.00 28.78

44.33 4.00 585.20

110.33 4.00 3,155.53

55.17 1.00 471.68

36.00 1.00 257.40

55.17 3.00 1,158.50

55.17 1.00 311.69

31.00 1.00 237.15

25.17 1.00 176.17

55.17 2.00 921.28

25.17 1.00 210.14

28.67 1.00 123.27


44.33 5.00 953.17

28.67 1.00 108.93

44.33 5.00 842.33

44.33 3.00 485.45

18.00 1.00 36.00

18.00 1.00

18.00 1.00 20.70

18.00 1.00 49.50

18.25 1.00 31.03

10.00 1.00 17.00

95.00 1.00 99.75

18.00 1.00

18.00 1.00 55.80

18.00 1.00 21.60

16.00 1.00 27.20

10.00 1.00 17.00

95.00 1.00 99.75

18.00 1.00 29.70

18.00 1.00

18.00 1.00 20.70

18.00 1.00 43.20

18.25 1.00 31.03

10.00 1.00 17.00

95.00 1.00 99.75


18.00 1.00

18.00 1.00 49.50

18.00 1.00 21.60

16.00 1.00 27.20

10.00 1.00 17.00

95.00 1.00 99.75

54.64 1.00

30.50 1.00 179.95

40.33 1.00 32.27

40.33 1.00 34.28

12.75 1.00 75.23

8.00 1.00 47.20

244.00 1.00 170.80

101.91 1.00

75.00 1.00 60.00

12.33 1.00 10.48

12.75 1.00 145.35

8.00 1.00 91.20

464.00 1.00 556.80

8.33 1.00

8.33 1.00 15.42

6.50 1.00 6.05


8.33 1.00 10.42

8.33 1.00

8.33 1.00

15.67 4.00 78.33

5.00 2.00 35.50

6.00 2.00 9.60

21.00 1.00 144.90

21.00 2.00 287.70

7.67 4.00 104.27

9.67 2.00 20.30

23.00 2.00 156.40

23.00 4.00 312.80

C-30

16.00 2.00 345.60

16.00 10.00 1,056.00

16.00 3.00 223.20

16.00 10.00 1,056.00

16.00 2.00 145.60

16.00 2.00 148.80


16.00 2.00 211.20

16.00 2.00 163.20

16.00 2.00 358.40

10.00 2.00 132.00

16.00 2.00 355.20

792.33 1.00 2,931.63

1,080.09 1.00 3,996.34

44.33 1.00 110.83

60.09 1.00 150.23

22.33 1.00 159.68


22.33 1.00 159.68
22.33 2.00 196.53
27.33 2.00 188.60
12.67 2.00 29.13
5.67 2.00 20.97
47.00 2.00 324.30
18.00 1.00 14.40
7.00 2.00 77.00
5.00 1.00 27.05
34.33 1.00 34.68

49.00 2.00 117.60


5.80 2.00 139.20

73.00 1.00 438.00

25.00 1.00 450.00

9.00 1.00 40.05

9.00 1.00 38.25

11.00 1.00

72.67 2.00 174.40


9.00 1.00 38.25

9.00 1.00 38.25

9.00 1.00

72.67 2.00 174.40


9.00 1.00 43.20

9.00 1.00 33.30

11.00 1.00 124.30

74.33 2.00 178.40

3.00 2.00

3.00 2.00

9.00 2.00 21.60

3.00 2.00

3.00 2.00

9.00 2.00 21.60

4.00 1.00

3.00 1.00

16.33 1.00 19.60

4.00 1.00
3.00 1.00

17.67 1.00 21.20

3.00 1.00 7.95

3.00 1.00 5.85

7.00 1.00 8.40

Total length(M) - 38,664.15 12,528.69 585.40

nit Weight (Kg/M) 0.22 0.40 0.62 0.89

Total Weight (Kg) - 15,272.34 7,730.20 519.84

Summary for Sub Structure


6mm 8mm 10mm 12mm

Total length(M) - 48,239.05 12,528.69 5,365.24

nit Weight (Kg/M) 0.22 0.40 0.62 0.89

Total Weight (Kg) - 19,054.42 7,730.20 4,764.33

- 19,054.42 7,730.20 4,764.33

- - - -
.ማህበር

rs Plc

Bank

14mm 16mm 20mm 24mm

1,470.30

1,470.30

564.67

564.67

122.09

122.09

267.64

331.99

298.15

349.33

138.94
78.20

104.96

114.79

51.60

199.20

66.40

83.00

99.60

99.60

49.80
199.20

99.60

99.60

49.80

99.60

66.40

49.80

99.60

49.80

66.40
149.40

132.80

103.20

99.60

91.20

254.40

58.40

73.00

87.60

127.20
63.60

175.20

87.60

87.60

43.80

87.60

58.40

43.80

87.60

43.80
58.40

131.40

116.80

91.20

78.00
33.75

27.45

32.80

29.80

18.40

41.40

28.20
31.40

17.00

28.20

27.80

98.40

592.20

126.60

55.20

83.40

18.60

15.80

34.40

56.40

8.60

7.60

46.00

28.00

22.00
34.40

28.20

29.60

7.60

8.60

46.00

28.00

16.00

22.40

19.60

68.80

56.40

50.40

74.40

17.20

15.20

92.00

56.40

44.00

51.60
28.20

25.40

34.40

28.20

25.20

37.20

46.00

28.20

22.00

25.80

30.20

27.40

37.40

20.00

33.80
7,411.81 4,685.70 586.80 -

1.21 1.58 - 3.55


8,960.88 7,398.72 - -
99.90

94.50

94.50
88.20

174.84

326.11

65.42
22.50

10.00
121.55

99.90

13.50

9.30

13.50

9.30

15.00

9.15

13.80
8.25

1,260.41 28.80 - -

1.21 1.58 2.47 3.55


1,523.84 45.48 - -

14mm 16mm 20mm 24mm

8,672.22 4,714.50 586.80 -

1.21 1.58 2.47 3.55


10,484.71 7,444.20 1,447.64 -

10,484.71 7,444.20 - -

- - 1,447.64 -
Client:-
Location:- Bale

Axis Description Shape Ø Length

Elevation Columns C-30


C1= Φ 0.45 From +0.00 - +4.50 m Sec. 15 20.00 5.30
St. 15 8.00 1.70

From +4.50 - +7.80 m Sec. 15 20.00 4.10


St. 15 8.00 1.70

From +7.80 - +14.40 m Sec. 2 16.00 3.95


St .2 8.00 1.50

From +14.40 - +17.70 m Sec. 2 16.00 3.65


St .2 8.00 1.50

C2= 40x40 From +1.65 - +4.50 m Sec. 2 16.00 3.50


St. 2 8.00 1.50

From +4.50 - +14.40 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

From +14.40 - +17.70 m Sec. 2 16.00 3.65


St. 2 8.00 1.50

C3= 40x40 From +0.00 - +4.50 m Sec. 3 16.00 5.15


St. 3 8.00 1.50

From +4.50 - +14.40 m Sec. 3 16.00 3.95


St. 3 8.00 1.50

From +14.40 - +17.70 m Sec. 3 16.00 3.65


St. 3 8.00 1.50

C4= 40x40 From +0.00 - +4.50 m Sec. 4 16.00 5.15


St.4 8.00 1.50

From +4.50 - +14.40 m Sec. 4 16.00 3.95


St. 4 8.00 1.50

From +14.40 - +17.70 m Sec. 4 16.00 3.65


St. 4 8.00 1.50

C5= 40x40 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 2 8.00 1.50

35x35 From +4.50 - +11.10 m Sec. 5 16.00 3.95


St. 5 8.00 1.30

30x30 From +11.10 - +14.40 m Sec. 5 16.00 3.55


St. 5 8.00 1.10

C6= 40x40 From +1.65 - +4.50 m Sec. 2 16.00 3.50


St. 2 8.00 1.50

35x35 From +4.50 - +14.40 m Sec. 7 16.00 3.95


St. 7 8.00 1.30

From +14.40 - +17.70 m Sec. 5 16.00 3.65


St. 5 8.00 1.30

C7= 40x40 From +1.65 - +4.50 m Sec. 2 16.00 3.50


St. 2 8.00 1.50

From +4.50 - +7.80 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

35x35 From +7.80 - +14.40 m Sec. 7 16.00 3.95


St. 7 8.00 1.30

From +14.40 - +17.70 m Sec. 5 16.00 3.65


St. 5 8.00 1.30
C8= 45x45 From +0.00 - +4.50 m Sec. 8 16.00 5.15
St. 8 8.00 1.70

35x35 From +4.50 - +11.10 m Sec. 7 16.00 3.95


St. 7 8.00 1.30

30x30 From +11.10 - +14.40 m Sec. 6 16.00 7.60


St. 6 8.00 1.10

C9= Φ 0.45 From +0.00 - +4.50 m Sec. 15 16.00 5.15


St. 15 8.00 1.70

From +4.50 - +14.40 m Sec. 15 16.00 3.95


St. 15 8.00 1.70

From +14.40 - +17.70 m Sec. 2 16.00 3.65


St .2 8.00 1.70

C10= Φ 0.45 From +0.00 - +4.50 m Sec. 15 16.00 5.15


St. 15 8.00 1.70

From +4.50 - +14.40 m Sec. 15 16.00 3.95


St. 15 8.00 1.70

From +14.40 - +17.70 m Sec. 2 16.00 3.65


St .2 8.00 1.70

C11= 40x40 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 2 8.00 1.50

From +4.50 - +14.40 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

From +14.40 - +20.70 m Sec. 4 16.00 3.95


St. 4 8.00 1.50

C12= 35x35 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 7 8.00 1.50
From +4.50 - +17.70 m Sec. 5 16.00 3.95
St. 5 8.00 1.50

From +17.70 - +20.70 m Sec. 5 16.00 3.95


St. 5 8.00 1.50

C13= 50x50 From +0.00 - +4.50 m Sec. 1 16.00 5.15


St. 1 8.00 1.90

40x40 From +4.50 - +7.80 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

30x40 From +4.50 - +7.80 m Sec. 9 16.00 3.95


St. 9 8.00 1.30

25x40 From +11.10 - +20.70 m Sec. 10 16.00 3.95


St. 10 8.00 1.20

C14= 40x40 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 2 8.00 1.50

From +4.50 - +7.80 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

25x40 From +7.80 - +20.70 m Sec. 10/11 16.00 3.95


St. 10/11 8.00 1.20

C15= 25x50 From +0.00 - +4.50 m Sec. 12 16.00 5.15


St. 12 8.00 1.40

From +4.50 - +7.80 m Sec. 12 16.00 3.95


St. 12 8.00 1.40

25x40 From +7.80 - +20.70 m Sec. 10/11 16.00 3.95


St. 10/11 8.00 1.20

C16= 40x40 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 2 8.00 1.50

30x40 From +4.50 - +7.80 m Sec. 9 16.00 3.95


St. 9 8.00 1.30

25x40 From +7.80 - +20.70 m Sec. 10/11 16.00 3.95


St. 10/11 8.00 1.20

C17= 40x40 From +0.00 - +4.50 m Sec. 3 16.00 5.15


St. 3 8.00 1.50

35x35 From +4.50 - +7.80 m Sec. 5 16.00 3.95


St. 5 8.00 1.30

30x30 From +7.80 - +17.70 m Sec. 6 16.00 3.95


St. 6 8.00 1.10

C18= 40x40 From +0.00 - +4.50 m Sec. 2 16.00 5.15


St. 2 8.00 1.50

From +4.50 - +11.10 m Sec. 4 16.00 3.95


St. 4 8.00 1.50

From +11.10 - +17.70 m Sec. 13 16.00 3.95


St. 13 8.00 1.10

C19= 40x40 From +0.00 - +4.50 m Sec. 3 16.00 5.15


St. 3 8.00 1.50

From +4.50 - +7.80 m Sec. 2 16.00 3.95


St. 2 8.00 1.50

30x30 From +7.80 - +17.70 m Sec. 6 16.00 3.95


St. 6 8.00 1.10

C20= Φ 0.45 From +0.00 - +4.50 m Sec. 15 20.00 5.30


St. 15 8.00 1.70

From +4.50 - +7.80 m Sec. 15 20.00 4.10


St. 15 8.00 1.70

From +7.80 - +14.40 m Sec. 2 16.00 3.95


St .2 8.00 1.50
From +14.40 - +17.70 m Sec. 2 16.00 3.65
St .2 8.00 1.50

False Columns From First - Roof Floor T-1 12.00 1.75


T-1 8.00 0.60

From First - Roof Floor T-2 12.00 1.15


T-2 8.00 0.60

In Suspended Ground Floor Beam C-25, @ +1.


E From ---1-4 Sec. 1 14.00 9.65
14.00 10.55
14.00 3.65
14.00 4.30
16.00 6.40
16.00 7.05
16.00 6.95
st. 1 8.00 1.20
8.00 1.20
8.00 1.20

F From ---1-4 Sec. 1 14.00 9.65


14.00 10.55
14.00 3.65
14.00 4.30
16.00 6.40
16.00 7.05
16.00 6.95
st. 1 8.00 1.20
8.00 1.20
8.00 1.20

1, 1' & 4 From E-F Sec. 1 14.00 7.05


16.00 6.35
st. 1 8.00 1.20
2 From --E-F Sec. 1 14.00 8.35
16.00 7.65
st. 1 8.00 1.20
8.00 1.20

3 From E-F Sec. 2 14.00 7.05


16.00 2.55
14.00 2.55
20.00 6.35
16.00 6.35
st. 1 8.00 1.20

In First Floor Beam C-25, @ +4.50 m


A From 3-4, 300x300 mm Sec. 1 14.00 7.35
14.00 6.85
st. 1 8.00 1.10

A' From 1-B', 250x400 mm Sec. 2 16.00 8.55


16.00 8.05
st. 2 10.00 1.30

A" From 1-B', 300x300 mm Sec. 8 16.00 5.30


16.00 4.80
st. 8 10.00 1.70

B From --1-7 Sec. 1 14.00 11.35


14.00 7.05
14.00 10.45
14.00 7.90
14.00 6.95
st. 1 8.00 1.10
8.00 1.10
8.00 1.10

B' From 2B-3C, 250x400 mm Sec. 2 14.00 10.10


14.00 9.60
st. 2 10.00 1.30
B" From A'1/2-3D, 600x300 mm Sec. 2 16.00 2.50
16.00 11.70
20.00 4.25
20.00 2.60
16.00 4.05
16.00 9.70
st. 2 10.00 1.70
10.00 1.70

C From --1-2 Sec. 1 14.00 6.80


14.00 6.30
st. 1 8.00 1.10
8.00 1.10

From 3-7 Sec. 1 14.00 10.45


14.00 7.05
14.00 6.95
st. 1 8.00 1.10

D&E From --1-7 Sec. 1 14.00 9.90


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
st. 1 8.00 1.10
8.00 1.10
8.00 1.10

E' From 5-5' Sec. 1 14.00 4.65


14.00 3.95
st. 1 8.00 1.10

F From --1-5 Sec. 1 14.00 9.90


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
st. 1 8.00 1.10
8.00 1.10
8.00 1.10
From 5'-7 Sec. 1 14.00 10.25
14.00 9.75
st. 1 8.00 1.10
8.00 1.10

1 From --B-F--, 300x600 mm Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.30
20.00 5.00
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.45
16.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
16.00 7.50
20.00 7.50
st. 2 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

2 From ---B Sec. 2 16.00 3.25


16.00 2.70
st. 2 10.00 1.70

From C-F--, 300x600 mm Sec. 3 16.00 9.70


16.00 10.35
20.00 3.80
20.00 3.65
20.00 3.45
16.00 7.00
20.00 7.00
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
st.3 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3 From A-C Sec. 5 16.00 3.05


16.00 9.55
20.00 2.10
20.00 3.80
20.00 2.60
16.00 5.50
20.00 5.50
16.00 7.00
20.00 7.00
st. 5 10.00 1.70
10.00 1.70

From D--- Sec. 4 20.00 4.15


16.00 3.65
st. 4 10.00 1.70

From E-F-- Sec. 4 16.00 7.85


20.00 2.50
20.00 3.45
16.00 7.35
20.00 7.35
st. 4 10.00 1.70
10.00 1.70

3" From A-C Sec. 2 16.00 7.35


16.00 6.85
st. 2 10.00 1.70

4 From A-F--, 300x600 mm Sec. 6 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.30
20.00 3.65
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.45
16.00 11.55
20.00 11.55
20.00 7.15
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
st. 6 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5 From --B-F--, 300x600 mm Sec. 7 16.00 6.90


16.00 7.05
16.00 6.40
16.00 10.80
20.00 5.50
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.95
16.00 9.90
20.00 9.90
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 8.00
20.00 8.00
st. 7 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
5' From E-F-- Sec. 2 16.00 8.35
16.00 7.85
st. 2 10.00 1.70
10.00 1.70

6 From --B-F, 300x600 mm Sec. 7 16.00 6.90


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.50
20.00 4.30
16.00 3.80
20.00 3.65
20.00 2.45
16.00 9.90
20.00 9.90
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
st. 7 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

7 From --B-F, 300x600 mm Sec. 7 16.00 6.90


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.50
20.00 4.30
16.00 3.80
20.00 3.65
20.00 2.45
16.00 9.90
20.00 9.90
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
st. 7 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

BM1 From 3-4 Sec. 9 14.00 7.30


14.00 6.85
st. 9 8.00 0.90

BM2 From 3-4 Sec. 9 14.00 1.45


14.00 0.95
st. 9 8.00 0.90

BM3 From 2'-3' Sec. 9 16.00 7.35


20.00 2.90
20.00 2.90
16.00 7.85
st. 9 8.00 1.10

BM4 From D-E Sec. 9 16.00 5.55


16.00 5.35
st. 9 8.00 1.10

In Second Floor Beam C-25, @ +7.80 m


A From 3-4, 300x300 mm Sec. 1 14.00 7.35
14.00 6.85
St. 1 8.00 1.10

B, C, D & E From --1-7 Sec. 1 14.00 10.00


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

C' & D' From 3'-5 Sec. 7 16.00 12.00


16.00 11.60
St. 7 10.00 1.10
10.00 1.10

E' From 5-5' Sec. 1 14.00 4.65


14.00 3.95
St. 1 8.00 1.10

F From --1-5 Sec. 1 14.00 9.90


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

From 5'-7 Sec. 1 14.00 10.25


14.00 9.75
St. 1 8.00 1.10
8.00 1.10

1 From --B-F, 300x600 mm Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
16.00 6.50
20.00 6.50
St. 1 10.00 1.70
St. 2 10.00 1.70
10.00 1.70
10.00 1.70

2 From ---B-F Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
St.2 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3 From A-F-- Sec. 3 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.30
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St.3 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3' From C-D Sec. 7 16.00 7.35


16.00 6.85
st. 7 10.00 1.10

4 From A-C--, 300x600 mm Sec. 3 16.00 8.55


16.00 7.05
20.00 3.65
20.00 4.30
16.00 6.05
20.00 6.05
16.00 7.65
20.00 7.65
St. 3 10.00 1.70
10.00 1.70

From --D-F-, 300x600 mm Sec. 4 16.00 6.40


16.00 10.30
20.00 3.80
20.00 3.65
16.00 3.45
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
5 From --B-F--, 300x600 mm Sec. 5 16.00 8.55
16.00 7.05
16.00 6.40
16.00 10.80
20.00 3.65
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.95
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 8.00
20.00 8.00
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5' From E-F-- Sec. 2 16.00 8.35


16.00 7.85
st. 2 10.00 1.70
10.00 1.70

6 From --B-F, 300x600 mm Sec. 5 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

7 From --B-F, 300x600 mm Sec. 4 16.00 6.90


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.50
20.00 4.30
20.00 2.45
16.00 11.55
20.00 11.55
16.00 7.15
16.00 5.65
16.00 6.50
st. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
BM1 From 3-4 Sec. 9 14.00 7.30
14.00 6.85
st. 9 8.00 0.90

BM2 From 3-4 Sec. 9 14.00 1.45


14.00 0.95
st. 9 8.00 0.90

In Third Floor Beam C-25, @ +11.10 m


A From 3-4, 300x300 mm Sec. 1 14.00 7.35
14.00 6.85
St. 1 8.00 1.10

B, C, D & E From --1-7 Sec. 1 14.00 10.00


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

C' & D' From 3'-5 Sec. 7 16.00 12.00


16.00 11.60
St. 7 10.00 1.10
10.00 1.10

E' From 5-5' Sec. 1 14.00 4.65


14.00 3.95
St. 1 8.00 1.10

F From --1-5 Sec. 1 14.00 9.90


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

From 5'-7 Sec. 1 14.00 10.25


14.00 9.75
St. 1 8.00 1.10
8.00 1.10

1 From --B-F, 300x600 mm Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
16.00 6.50
20.00 6.50
St. 1 10.00 1.70
St. 2 10.00 1.70
10.00 1.70
10.00 1.70

2 From ---B-F Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
St.2 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3 From A-F-- Sec. 3 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.30
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.65
20.00 3.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St.3 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3' From C-D Sec. 7 16.00 7.35


16.00 6.85
st. 7 10.00 1.10

4 From A-C--, 300x600 mm Sec. 3 16.00 8.55


16.00 7.05
20.00 3.65
20.00 4.30
16.00 6.05
20.00 6.05
16.00 7.65
20.00 7.65
St. 3 10.00 1.70
10.00 1.70

From --D-F-, 300x600 mm Sec. 4 16.00 6.40


16.00 10.30
20.00 3.80
20.00 3.65
16.00 3.45
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5 From --B-F--, 300x600 mm Sec. 5 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.80
20.00 3.65
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.95
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 8.00
20.00 8.00
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5' From E-F-- Sec. 2 16.00 8.35


16.00 7.85
st. 2 10.00 1.70
10.00 1.70

6 From --B-F, 300x600 mm Sec. 5 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

7 From --B-F, 300x600 mm Sec. 4 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 3.65
20.00 4.30
20.00 3.80
16.00 11.55
20.00 11.55
16.00 7.15
16.00 5.65
16.00 6.50
st. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

BM1 From 3-4 Sec. 9 14.00 7.30


14.00 6.85
st. 9 8.00 0.90
BM2 From 3-4 Sec. 9 14.00 1.45
14.00 0.95
st. 9 8.00 0.90

In Fourth Floor Beam C-25, @ +14.40 m


A From 3-4, 300x300 mm Sec. 1 14.00 7.35
14.00 6.85
St. 1 8.00 1.10

B, C, D & E From --1-7 Sec. 1 14.00 10.00


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

C' & D' From 3'-5 Sec. 7 16.00 12.00


16.00 11.60
St. 7 10.00 1.10
10.00 1.10

E' From 5-5' Sec. 1 14.00 4.65


14.00 3.95
St. 1 8.00 1.10

F From --1-5 Sec. 1 14.00 9.90


14.00 7.05
14.00 10.45
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10
From 5'-7 Sec. 1 14.00 10.25
14.00 9.75
St. 1 8.00 1.10
8.00 1.10

1 From --B-F, 300x600 mm Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
16.00 6.50
20.00 6.50
St. 1 10.00 1.70
St. 2 10.00 1.70
10.00 1.70
10.00 1.70

2 From ---B-F Sec. 2 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 5.00
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 9.40
20.00 9.40
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
St.2 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3 From A-F-- Sec. 3 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.30
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.65
20.00 3.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St.3 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

3' From C-D Sec. 7 16.00 7.35


16.00 6.85
st. 7 10.00 1.10

4 From A-C--, 300x600 mm Sec. 3 16.00 8.55


16.00 7.05
20.00 3.65
20.00 4.30
16.00 6.05
20.00 6.05
16.00 7.65
20.00 7.65
St. 3 10.00 1.70
10.00 1.70

From --D-F-, 300x600 mm Sec. 4 16.00 6.40


16.00 10.30
20.00 3.80
20.00 3.65
16.00 3.45
16.00 5.65
20.00 5.65
16.00 7.50
20.00 7.50
St. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5 From --B-F--, 300x600 mm Sec. 5 16.00 8.55


16.00 7.05
16.00 6.40
16.00 10.80
20.00 3.65
20.00 4.30
16.00 3.80
20.00 3.65
20.00 3.95
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 8.00
20.00 8.00
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

5' From E-F-- Sec. 2 16.00 8.35


16.00 7.85
st. 2 10.00 1.70
10.00 1.70

6 From --B-F, 300x600 mm Sec. 5 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 3.65
20.00 4.30
20.00 3.80
20.00 3.65
20.00 2.45
16.00 11.55
20.00 11.55
16.00 7.15
20.00 7.15
16.00 5.65
20.00 5.65
16.00 6.50
20.00 6.50
st. 5 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

7 From --B-F, 300x600 mm Sec. 4 16.00 8.55


16.00 7.05
16.00 6.40
16.00 9.25
20.00 3.65
20.00 4.30
20.00 3.80
16.00 11.55
20.00 11.55
16.00 7.15
16.00 5.65
16.00 6.50
st. 4 10.00 1.70
10.00 1.70
10.00 1.70
10.00 1.70

In Roof Floor Beam C-25, @ +17.70 m


A From 3-4, 250x400 mm Sec. 1 14.00 7.55
14.00 6.85
St. 1 8.00 1.20

A' From --1-3, 250x400 mm Sec. 1 14.00 4.70


14.00 9.40
14.00 6.40
14.00 6.95
St. 1 8.00 1.20
8.00 1.20
8.00 1.20

A' From 5-7, 250x400 mm Sec. 1 14.00 4.05


14.00 10.55
14.00 2.70
14.00 6.95
St. 1 8.00 1.20

A" From 4-5, 250x400 mm Sec. 1 14.00 7.55


14.00 6.85
St. 1 8.00 1.20

B From --1-3" Sec. 1 14.00 10.05


14.00 7.60
14.00 3.85
14.00 6.40
14.00 10.50
St. 1 8.00 1.10
8.00 1.10
8.00 1.10
8.00 1.10

From 4-7 Sec. 1 14.00 10.55


14.00 2.70
14.00 6.95
14.00 7.05
St. 1 8.00 1.10

C From --1-7 Sec. 1 14.00 9.65


14.00 7.05
14.00 10.55
14.00 3.85
14.00 4.30
14.00 6.40
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

D&E From ---1 Sec. 16.00 2.85


16.00 2.15
St. 8.00 1.10

From 3-7 Sec. 1 14.00 10.55


14.00 7.05
14.00 4.30
14.00 6.95
St. 1 8.00 1.10

C' & D' From 3'-5 Sec. 1 14.00 8.75


14.00 4.10
14.00 11.60
St. 1 8.00 1.20
8.00 1.20

E' From 5-5' Sec. 1 14.00 4.65


14.00 3.95
St. 1 8.00 1.10
F From --1-5 Sec. 1 14.00 9.90
14.00 7.05
14.00 10.55
14.00 3.85
14.00 4.30
14.00 6.40
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

From 5'-7 Sec. 1 14.00 10.45


14.00 9.75
St. 1 8.00 1.10
8.00 1.10

F' From --1-4 Sec. 1 14.00 9.65


14.00 10.55
14.00 6.40
14.00 7.05
14.00 6.95
St. 1 8.00 1.10
8.00 1.10
8.00 1.10

1' From --B-F--, 300x600 mm Sec. 1 14.00 6.45


14.00 7.05
14.00 10.30
14.00 9.35
14.00 7.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

1 From --B-F--, 300x600 mm Sec. 1 14.00 6.45


14.00 7.05
14.00 10.30
14.00 5.10
14.00 9.35
14.00 7.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

2 From ---B-C Sec. 1 14.00 6.45


14.00 4.05
14.00 5.10
14.00 9.25
St. 1 8.00 1.20
8.00 1.20

3 From A-F-- Sec. 1 14.00 6.45


14.00 7.05
14.00 10.30
14.00 3.65
14.00 4.30
14.00 9.35
14.00 7.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

3' From C-D Sec. 1 16.00 7.35


16.00 6.85
st. 1 8.00 1.20

4 From A-C--, 300x600 mm Sec. 1 14.00 6.45


14.00 4.70
14.00 3.65
14.00 12.00
St. 1 8.00 1.20
8.00 1.20
8.00 1.20

From --D-F-, 300x600 mm Sec. 1 14.00 3.95


14.00 10.30
14.00 6.10
14.00 7.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

5 From --B-F--, 300x600 mm Sec. 1 14.00 6.95


14.00 7.05
14.00 10.80
14.00 5.60
14.00 9.85
14.00 7.95
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

5' From E-F-- Sec. 1 14.00 8.55


14.00 7.85
St. 1 8.00 1.70
8.00 1.70

6 From --B-F, 300x600 mm Sec. 1 14.00 6.95


14.00 7.05
14.00 9.30
20.00 5.60
14.00 9.85
14.00 6.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

6 From --B-F, 300x600 mm Sec. 1 14.00 6.95


14.00 7.05
14.00 9.30
14.00 9.85
14.00 6.45
St. 1 8.00 1.20
8.00 1.20
8.00 1.20
8.00 1.20

Water Tank Beam C-25, @ +20.70 m


A&B From 3-4, 250x400 mm Sec. 1 14.00 7.55
14.00 6.85
St. 1 8.00 1.20

3&4 From A-B, 250x400 mm Sec. 1 14.00 5.60


14.00 4.90
St. 1 8.00 1.20

E&F From 5-6, 250x400 mm Sec. 1 14.00 7.55


14.00 6.85
St. 1 8.00 1.20
8.00 1.20
8.00 1.20

5 From E-F--, 250x400 mm Sec. 1 14.00 8.55


14.00 7.85
St. 1 8.00 1.20
8.00 1.20

6 From E-F, 250x400 mm Sec. 1 14.00 7.05


14.00 6.35
St. 1 8.00 1.20

30 cm First Floor Ribbed Slab @ +4.50 m, C


Along X
B/n Axis ---B
From ---2 10.00 7.95
From 2-3 10.00 9.00
From 4-5 10.00 7.15
From 5-6 & 6-7 10.00 9.00
On Axis 1 & 2 20.00 5.15
On Axis 6 10.00 4.30
B/n Axis B-C
From ---2 10.00 6.65
From 2-4 10.00 11.50
From 4-5 & 5-6 10.00 7.15
From 6-7 10.00 9.00
On Axis 1 10.00 5.15
On Axis 2 10.00 3.55
On Axis 3, 4, 5 & 6 10.00 4.30
B/n Axis C-D
From ---2 10.00 6.45
From 2--- 10.00 5.25
From 3"-4 10.00 4.55
From 5-6 & 6-7 10.00 9.00
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 6 10.00 4.30
B/n Axis D-E
From ---2 10.00 6.45
From 2-3, 3-4, 4-5 & 5-6 10.00 7.15
From 6-7 10.00 9.00
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 6 10.00 4.30
B/n Axis E-F
From ---2 10.00 6.45
From 2-3 & 3-4 10.00 7.15
From 4-5 & 6-7 10.00 9.00
From 5-6 10.00 7.15
From 5'-6 10.00 4.80
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 3 & 4 10.00 4.30
On Axis 5 10.00 4.30
On Axis 6 10.00 4.30
30 cm Second - Fourth Floor Ribbed Sla
Along X
B/n Axis ---B
From ---2 10.00 6.45
From 2-3 10.00 9.00
From 4-5 10.00 7.15
From 5-6 & 6-7 10.00 9.00
On Axis 1 & 2 10.00 3.55
On Axis 6 10.00 4.30
B/n Axis B-C
From ---2 10.00 6.65
From 2-3, 3-4, 4-5 & 5-6 10.00 7.15
From 6-7 10.00 9.00
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 3, 4, 5 & 6 10.00 4.30
B/n Axis C-D
From ---2 10.00 6.45
From 2-3-- 10.00 8.80
From 5-6 & 6-7 10.00 9.00
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 3 & 6 10.00 4.30
B/n Axis D-E
From ---2 10.00 6.45
From 2-3, 3-4, 4-5 & 5-6 10.00 7.15
From 6-7 10.00 9.00
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 6 10.00 4.30
B/n Axis E-F
From ---2 10.00 6.45
From 2-3 & 3-4 10.00 7.15
From 4-5 & 6-7 10.00 9.00
From 5-6 10.00 7.15
From 5'-6 10.00 4.80
On Axis 1 10.00 3.65
On Axis 2 10.00 3.55
On Axis 3 & 4 10.00 4.30
On Axis 5 10.00 4.30
On Axis 6 10.00 4.30

Stair Case & Landing


Staircase - 1
From +0.00 - +2.25 m 14.00 1.65
14.00 6.85
10.00 2.90
10.00 1.75
Along the Soffit 10.00 1.65
Per Step 8.00 1.65
Per Step 8.00 1.05

From +2.25 - +4.50 m 14.00 7.20


14.00 3.25
14.00 1.75
Along the Soffit 10.00 1.65
Per Step 8.00 1.65
Per Step 8.00 1.05

From +4.50/7.80/11.10/14.40 m 12.00 1.95


- +6.15/9.45/12.75/16.05 m 12.00 5.85
12.00 2.85
12.00 1.25
Along the Soffit 10.00 1.60
Per Step 8.00 1.60
Per Step 8.00 1.05

From +6.15/9.45/12.75/16.05 m - 12.00 5.25


- +7.80/11.10/14.40/17.70 m 12.00 3.20
12.00 1.70
Along the Soffit 10.00 1.60
Per Step 8.00 1.60
Per Step 8.00 1.05

Staircase - 2
From +0.00 - +2.25 m 14.00 1.65
14.00 7.20
14.00 2.90
14.00 2.40
Along the Soffit 10.00 1.55
Per Step 8.00 1.55
Per Step 8.00 1.05

From +2.25 - +4.50 m 14.00 7.20


14.00 3.25
14.00 2.35
Along the Soffit 10.00 1.55
Per Step 8.00 1.55
Per Step 8.00 1.05

From +4.50/7.80/11.10/14.40 m 12.00 2.05


- +6.15/9.45/12.75/16.05 m 12.00 5.80
12.00 2.55
12.00 1.25
Along the Soffit 10.00 1.55
Per Step 8.00 1.55
Per Step 8.00 1.05

From +6.15/9.45/12.75/16.05 m - 14.00 5.35


- +7.80/11.10/14.40/17.70 m 12.00 2.95
14.00 1.30
Along the Soffit 10.00 1.55
Per Step 8.00 1.55
Per Step 8.00 1.05

Staircase - 5
12.00 1.90
12.00 1.35
14.00 6.60
14.00 7.70
12.00 1.75
16.00 3.60
12.00 2.75
16.00 1.55
Along the Soffit 10.00 1.30
Per Step 8.00 1.30
Per Step 8.00 1.20

20 cm Lift Shaft, C-30


From Ground - First Floor
Along X
Front Side 3 8.00 1.25
Front Side, Above Door Opening 2 10.00 3.55
Diagonals 5 12.00 0.80
Rear Side 8.00 6.90
Left & Right Side 8.00 6.90
Along Y
Front Side 10.00 4.90
Front Side, Above Door Opening 7 10.00 2.65
Rear Side 10.00 4.90
Left & Right Side 10.00 4.90
From First - Roof Floor
Along X
Front Side 3 8.00 1.25
Front Side, Above Door Opening 2 10.00 3.55
Diagonals 5 12.00 0.80
Rear Side 8.00 6.90
Left & Right Side 8.00 6.90
Along Y
Front Side 10.00 3.70
Front Side, Above Door Opening 6 12.00 1.55
Rear Side 10.00 3.70
Left & Right Side 10.00 3.70
From Roof - Water Tank Floor
Along X
Front Side 3 8.00 1.25
Front Side, Above Door Opening 2 10.00 3.55
Diagonals 5 12.00 0.80
Rear Side 8.00 6.90
Left & Right Side 8.00 6.90
Along Y
Front Side 10.00 3.15
Front Side, Above Door Opening 6' 10.00 1.05
Rear Side 10.00 3.15
Left & Right Side 10.00 3.15

20 cm Vault Shear Wall, C-30


From Ground - First Floor
Along X
Front Side 3 8.00 3.55
3 8.00 0.85
Front Side, Above Door Opening 2 10.00 5.05
Diagonals 5 12.00 0.80
Rear Side 2 10.00 10.00
Left & Right Side 8.00 11.90
Along Y
Front Side 10.00 3.30
10.00 3.30
Front Side, Above Door Opening 7 12.00 1.00
Rear Side 10.00 3.30
Left & Right Side 10.00 3.30

20 cm Suspended Ground Floor Slab, C-25 @ +1


Along X
B/n Axis E-F
On Axis 1 10.00 3.15
From Axis 1'-2 8.00 6.05
From Axis 2-3 8.00 7.15
From Axis 3-4 8.00 9.00
On Axis 2 10.00 3.55
On Axis 3 10.00 4.30

Along Y
From Axis 1'-2 10.00 10.05
From Axis 2-3 & 3-4 10.00 10.05
20 cm First - Fourth Floor Slab, C-25
Along X

Behind Lift Shaft 8.00 2.80

Along Y
Behind Lift Shaft 8.00 2.20

20 cm Roof Floor Slab, C-25 @ +17.70 m


Along X
B/n Axis A-A'
From 3-4 8.00 5.30
Along Y
B/n Axis A-A'
From 3-4 8.00 2.20

Along X
B/n Axis A'-B
On Axis 1 8.00 3.65
From Axis 1'-2 8.00 6.45
On Axis 2 8.00 3.55
From Axis 2-3 8.00 8.75
From Axis 4-5, A"-B 8.00 10.05
On Axis 3 10.00 4.30

B/n Axis B-C & C-D


From Axis 1'-1 8.00 3.45
From Axis 3-4 & 4-5, B-C 8.00 8.90
From Axis 3-3', C-D 8.00 3.45
On Axis 4, B-C 10.00 4.30

B/n Axis D-E


From Axis 1'-1 8.00 3.45
From Axis 3-4 & 4-5, B-C 8.00 8.90
On Axis 4, B-C 10.00 4.30

B/n Axis D-F'


From Axis 1'-1 8.00 3.45
From Axis 3-4 & 4-5, B-C 8.00 8.90
On Axis 4, B-C 10.00 4.30
From Axis 5-6, E-E' 8.00 5.25
On Axis 5', E-E' 10.00 2.15
From Axis 5'-6, E-E' 8.00 5.25
From Axis 3-4, F-F' 8.00 8.90

Along Y
B/n Axis 1'-1
From Axis A'-C 8.00 9.40
From Axis C-D 8.00 7.15
From Axis D-E 8.00 5.65
From Axis E-F' 8.00 7.40
On Axis B 10.00 4.90
On Axis C 10.00 4.30
On Axis D 10.00 3.80
On Axis E 10.00 3.65
On Axis F 10.00 3.35

B/n Axis 1-2


From Axis A-B 8.00 4.35
B/n Axis 2-3
From Axis A-B 8.00 4.35
B/n Axis 3"-4
From Axis A-A' 8.00 2.20
B/n Axis 3-4 & 4-5
From Axis B-C 8.00 8.90
On Axis B 8.00 3.90
From Axis C-D, 3-3' 8.00 7.15
On Axis C 8.00 4.30
On Axis D 8.00 3.80
From Axis D-E 8.00 8.90
On Axis E 8.00 3.65
From Axis E-F', 3-4 8.00 7.50
From Axis E-F, 4-5 8.00 7.15
From Axis E-F, 5-5' 8.00 5.25
From Axis E-F', 5'-6 8.00 9.90

20 cm Water Tank Slab, C-25 @ +20.70 m


Along X
B/n Axis A-B,From 3-4 10.00 10.85
B/n Axis E-F,From 5-6 10.00 10.85
B/n Axis F-F',From 5-5' 10.00 4.00

Along Y
B/n Axis A-B,From 3-4 10.00 8.90
B/n Axis E-F',From 5-5' 12.00 9.55
B/n Axis F-F',From 5'-6 12.00 9.70
On Axis F',From 5-5' 12.00 3.85

Total le
Unit Weigh
Total Wei

Summ
Total le
Unit Weigh
Total Wei

For 1.0 x 1.0 m Grid, Shrinkage & Temprature


X 6.00 1.00
Y 6.00 1.00
Stirup in 1.0 x 1.0 m Grid
6.00 0.65
Total le
Unit Weigh
Total Wei
Descriptipn Area
First Floor 755.85
Second-fourth 2331.3
Total Area 3087.15
Total Kg/m2 4.38

Total Kg 13,535.61

10 cm Faced, C-30
Typology - 1
Along X
Front Side X 8.00 1.00
10 cm Stirup Y 8.00 2.10
20 cm Stirup Y 8.00 2.30

Total le
Unit Weigh
Total Wei

Area Pcs
Type-1 44.8 1 44.8
Type-2 44.8 1 44.8
Type-3 41.45 1 41.45
Type-4 43.05 1 43.05
Total Area 174.1
10 cm 10.62
Total Kg 1,848.37
Type-5 21.75 1 21.75
10 cm 11.13
Total Kg 242.18
Total Faced Kg ###
ኤም ቲ ቲ አማካሪ አርክቴክቶችና መሃንዲሶች ኃ.የተ.የግ.ማህበር

MTT Consulting Architects & Engineers Plc


Project :- Awash Bank
Contructor :-

SUPER STRUCTURE
No of No of
Span Spacing 6mm 8mm 10mm
bars elem

C-30
12.00 1.00
4.20 0.15 58.00 1.00 98.60

12.00 1.00
3.00 0.15 42.00 1.00 71.40

12.00 2.00
3.00 0.15 42.00 2.00 126.00

12.00 1.00
3.00 0.15 42.00 1.00 63.00

12.00 4.00
2.55 0.15 36.00 4.00 216.00

12.00 12.00
3.00 0.15 42.00 12.00 756.00

12.00 4.00
3.00 0.15 42.00 4.00 252.00

16.00 1.00
4.20 0.15 58.00 1.00 87.00

16.00 3.00
3.00 0.15 42.00 3.00 189.00

16.00 1.00
3.00 0.15 42.00 1.00 63.00

10.00 2.00
4.20 0.15 58.00 2.00 174.00

10.00 6.00
3.00 0.15 42.00 6.00 378.00

10.00 2.00
3.00 0.15 42.00 2.00 126.00

12.00 2.00
4.20 0.15 58.00 2.00 174.00

8.00 4.00
3.00 0.15 42.00 4.00 218.40

8.00 2.00
3.00 0.15 42.00 2.00 92.40

12.00 2.00
2.55 0.15 36.00 2.00 108.00

32.00 2.00
3.00 0.15 42.00 6.00 327.60

8.00 2.00
3.00 0.15 42.00 2.00 109.20

12.00 1.00
2.55 0.15 36.00 1.00 54.00

12.00 1.00
3.00 0.15 42.00 1.00 63.00

20.00 1.00
3.00 0.15 42.00 2.00 109.20

8.00 1.00
3.00 0.15 42.00 1.00 54.60
12.00 4.00
4.20 0.15 58.00 4.00 394.40

12.00 8.00
3.00 0.15 42.00 8.00 436.80

8.00 4.00
3.00 0.15 42.00 8.00 369.60

12.00 2.00
4.20 0.15 58.00 2.00 197.20

12.00 6.00
3.00 0.15 42.00 6.00 428.40

12.00 2.00
3.00 0.15 42.00 2.00 142.80

12.00 2.00
4.20 0.15 58.00 2.00 197.20

12.00 6.00
3.00 0.15 42.00 6.00 428.40

12.00 2.00
3.00 0.15 42.00 2.00 142.80

12.00 1.00
4.20 0.15 58.00 1.00 87.00

12.00 3.00
3.00 0.15 42.00 3.00 189.00

10.00 1.00
3.00 0.15 42.00 1.00 63.00

12.00 2.00
4.20 0.15 58.00 2.00 174.00
8.00 8.00
3.00 0.15 42.00 8.00 504.00

8.00 2.00
2.70 0.15 38.00 2.00 114.00

16.00 1.00
4.20 0.15 58.00 1.00 110.20

12.00 1.00
3.00 0.15 42.00 1.00 63.00

12.00 1.00
3.00 0.15 42.00 1.00 54.60

12.00 3.00
3.00 0.15 42.00 3.00 151.20

12.00 1.00
4.20 0.15 58.00 1.00 87.00

12.00 1.00
3.00 0.15 42.00 1.00 63.00

42.00 1.00
3.00 0.15 42.00 4.00 201.60

12.00 2.00
4.20 0.15 58.00 2.00 162.40

12.00 2.00
3.00 0.15 42.00 2.00 117.60

12.00 8.00
3.00 0.15 42.00 8.00 403.20

12.00 1.00
4.20 0.15 58.00 1.00 87.00

12.00 1.00
3.00 0.15 42.00 1.00 54.60

42.00 1.00
3.00 0.15 42.00 4.00 201.60

16.00 1.00
4.20 0.15 58.00 1.00 87.00

8.00 1.00
3.00 0.15 42.00 1.00 54.60

8.00 3.00
3.00 0.15 21.00 3.00 69.30

16.00 3.00
4.20 0.15 58.00 3.00 261.00

10.00 6.00
3.00 0.15 42.00 6.00 378.00

10.00 3.00
3.00 0.15 42.00 3.00 138.60

16.00 2.00
4.20 0.15 58.00 2.00 174.00

12.00 2.00
3.00 0.15 42.00 2.00 126.00

8.00 6.00
3.00 0.15 42.00 6.00 277.20

12.00 2.00
4.20 0.15 58.00 2.00 197.20

12.00 2.00
3.00 0.15 42.00 2.00 142.80

12.00 4.00
3.00 0.15 42.00 4.00 252.00
12.00 2.00
3.00 0.15 42.00 2.00 126.00

4.00 19.00
1.50 0.15 11.00 19.00 125.40

4.00 67.00
0.90 0.15 7.00 67.00 281.40

C-25, @ +1.65 m
3.00 1.00
3.00 1.00
1.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
1.60 0.15 11.67 1.00 14.00
4.15 0.15 28.67 1.00 34.40
6.50 0.15 88.67 1.00 106.40

3.00 1.00
3.00 1.00
2.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
1.60 0.15 11.67 1.00 14.00
4.15 0.15 28.67 1.00 34.40
6.50 0.15 88.67 1.00 106.40

3.00 3.00
3.00 3.00
6.00 0.15 41.00 3.00 147.60
3.00 1.00
3.00 1.00
1.50 0.15 11.00 1.00 13.20
6.00 0.15 41.00 1.00 49.20

3.00 1.00
2.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
6.00 0.15 41.00 1.00 49.20

@ +4.50 m
3.00 1.00
3.00 1.00
6.50 0.20 33.50 1.00 36.85

4.00 1.00
4.00 1.00
7.75 0.16 98.88 1.00 128.54

4.00 1.00
4.00 1.00
4.45 0.16 57.63 1.00 97.96

3.00 1.00
21.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.45 0.20 18.25 1.00 20.08
4.15 0.20 21.75 1.00 23.93
6.50 0.20 167.50 1.00 184.25

4.00 1.00
4.00 1.00
9.25 0.16 117.63 1.00 152.91
4.00 1.00
4.00 1.00
3.00 1.00
3.00 1.00
4.00 1.00
4.00 1.00
3.45 0.16 45.13 1.00 76.71
9.20 0.16 117.00 1.00 198.90

3.00 1.00
21.00 1.00
2.00 0.20 11.00 1.00 12.10
4.15 0.20 21.75 1.00 23.93

6.00 1.00
9.00 1.00
6.00 1.00
6.50 0.20 134.00 1.00 147.40

3.00 2.00
21.00 2.00
3.00 2.00
3.00 2.00
3.00 2.00
2.00 0.20 11.00 2.00 24.20
4.15 0.20 21.75 2.00 47.85
6.50 0.20 167.50 2.00 368.50

3.00 1.00
3.00 1.00
3.60 0.20 19.00 1.00 20.90

3.00 1.00
9.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.20 11.00 1.00 12.10
4.15 0.20 21.75 1.00 23.93
6.50 0.20 100.50 1.00 110.55
3.00 1.00
3.00 1.00
2.90 0.20 15.50 1.00 17.05
6.50 0.20 33.50 1.00 36.85

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
12.00 1.00
5.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
2.60 0.16 34.50 1.00 58.65
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90
1.20 0.16 17.00 1.00 28.90

4.00 1.00
4.00 1.00
2.60 0.16 34.50 1.00 58.65

4.00 1.00
4.00 1.00
5.00 1.00
3.00 1.00
3.00 1.00
4.00 1.00
3.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
6.50 0.16 83.25 1.00 141.53
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90
1.20 0.16 17.00 1.00 28.90

4.00 1.00
4.00 1.00
2.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
5.00 1.00
4.55 0.16 58.88 1.00 100.09
6.50 0.16 83.25 1.00 141.53

5.00 1.00
3.00 1.00
3.50 0.16 45.75 1.00 77.78

4.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
6.00 0.16 77.00 1.00 130.90
1.20 0.16 17.00 1.00 28.90

4.00 1.00
4.00 1.00
6.50 0.16 83.25 1.00 141.53

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
11.00 1.00
7.00 1.00
3.00 1.00
5.00 1.00
5.00 1.00
4.00 1.00
6.00 1.00
4.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
3.00 1.00
4.55 0.16 58.88 1.00 100.09
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90
1.20 0.16 17.00 1.00 28.90

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
10.00 1.00
6.00 1.00
3.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90
1.70 0.16 23.25 1.00 39.53
4.00 1.00
4.00 1.00
1.70 0.16 23.25 1.00 39.53
6.50 0.16 83.25 1.00 141.53

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
13.00 1.00
8.00 1.00
4.00 1.00
6.00 1.00
3.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
3.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
13.00 1.00
8.00 1.00
4.00 1.00
6.00 1.00
3.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
3.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90

3.00 2.00
3.00 2.00
6.50 0.15 44.33 2.00 79.80

3.00 2.00
3.00 2.00
1.00 0.15 7.67 2.00 13.80

3.00 1.00
2.00 1.00
2.00 1.00
4.00 1.00
6.50 0.15 44.33 1.00 48.77

3.00 2.00
4.00 2.00
5.00 0.15 34.33 2.00 75.53

@ +7.80 m
3.00 1.00
3.00 1.00
6.50 0.20 33.50 1.00 36.85

3.00 4.00
21.00 4.00
3.00 4.00
3.00 4.00
3.00 4.00
2.00 0.20 11.00 4.00 48.40
4.15 0.20 21.75 4.00 95.70
6.50 0.20 167.50 4.00 737.00

4.00 2.00
4.00 2.00
4.70 0.20 49.00 2.00 107.80
6.55 0.20 67.50 2.00 148.50

3.00 1.00
3.00 1.00
3.60 0.20 19.00 1.00 20.90

3.00 1.00
9.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.20 11.00 1.00 12.10
4.15 0.20 21.75 1.00 23.93
6.50 0.20 100.50 1.00 110.55

3.00 1.00
9.00 1.00
2.90 0.20 15.50 1.00 17.05
6.50 0.20 33.50 1.00 36.85

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
14.00 1.00
8.00 1.00
6.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 73.70

4.00 1.00
4.00 1.00
7.00 1.00
8.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 67.00 1.00 113.90

4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
0.85 0.20 10.50 1.00 17.85
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
6.00 1.00
4.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 113.90
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
9.00 1.00
7.00 1.00
5.00 1.00
2.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
2.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90
3.00 2.00
3.00 2.00
6.50 0.15 44.33 2.00 79.80

3.00 2.00
3.00 2.00
1.00 0.15 7.67 2.00 13.80

@ +11.10 m
3.00 1.00
3.00 1.00
6.50 0.20 33.50 1.00 36.85

3.00 4.00
21.00 4.00
3.00 4.00
3.00 4.00
3.00 4.00
2.00 0.20 11.00 4.00 48.40
4.15 0.20 21.75 4.00 95.70
6.50 0.20 167.50 4.00 737.00

4.00 2.00
4.00 2.00
4.70 0.20 49.00 2.00 107.80
6.55 0.20 67.50 2.00 148.50

3.00 1.00
3.00 1.00
3.60 0.20 19.00 1.00 20.90

3.00 1.00
9.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.20 11.00 1.00 12.10
4.15 0.20 21.75 1.00 23.93
6.50 0.20 100.50 1.00 110.55

3.00 1.00
9.00 1.00
2.90 0.20 15.50 1.00 17.05
6.50 0.20 33.50 1.00 36.85

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
14.00 1.00
8.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 73.70

4.00 1.00
4.00 1.00
7.00 1.00
8.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 67.00 1.00 113.90

4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
0.85 0.20 10.50 1.00 17.85
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
6.00 1.00
4.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 113.90
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
9.00 1.00
7.00 1.00
5.00 1.00
2.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
2.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90

3.00 2.00
3.00 2.00
6.50 0.15 44.33 2.00 79.80
3.00 2.00
3.00 2.00
1.00 0.15 7.67 2.00 13.80

@ +14.40 m
3.00 1.00
3.00 1.00
6.50 0.20 33.50 1.00 36.85

3.00 4.00
21.00 4.00
3.00 4.00
3.00 4.00
3.00 4.00
2.00 0.20 11.00 4.00 48.40
4.15 0.20 21.75 4.00 95.70
6.50 0.20 167.50 4.00 737.00

4.00 2.00
4.00 2.00
4.70 0.20 49.00 2.00 107.80
6.55 0.20 67.50 2.00 148.50

3.00 1.00
3.00 1.00
3.60 0.20 19.00 1.00 20.90

3.00 1.00
9.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.20 11.00 1.00 12.10
4.15 0.20 21.75 1.00 23.93
6.50 0.20 100.50 1.00 110.55
3.00 1.00
3.00 1.00
2.90 0.20 15.50 1.00 17.05
6.50 0.20 33.50 1.00 36.85

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
3.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
2.60 0.20 28.00 1.00 47.60
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
14.00 1.00
8.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 73.70

4.00 1.00
4.00 1.00
7.00 1.00
8.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
4.55 0.20 47.50 1.00 80.75
6.50 0.20 67.00 1.00 113.90

4.00 1.00
4.00 1.00
6.00 1.00
7.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
0.85 0.20 10.50 1.00 17.85
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.20 0.20 14.00 1.00 23.80

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
6.00 1.00
4.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
6.50 0.20 67.00 1.00 113.90
1.70 0.20 19.00 1.00 32.30

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
9.00 1.00
7.00 1.00
5.00 1.00
2.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
5.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
2.00 1.00
3.10 0.20 33.00 1.00 56.10
6.50 0.20 134.00 1.00 227.80
5.00 0.20 52.00 1.00 88.40
6.00 0.20 62.00 1.00 105.40

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
7.00 1.00
2.00 1.00
1.00 1.00
4.00 1.00
1.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
3.10 0.16 40.75 1.00 69.28
6.50 0.16 166.50 1.00 283.05
5.00 0.16 64.50 1.00 109.65
6.00 0.16 77.00 1.00 130.90

@ +17.70 m
3.00 1.00
3.00 1.00
6.50 0.15 44.33 1.00 53.20

3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.15 14.33 1.00 17.20
4.15 0.15 28.67 1.00 34.40
6.50 0.15 44.33 1.00 53.20

3.00 1.00
3.00 1.00
3.00 1.00
6.00 1.00
6.50 0.15 88.67 1.00 106.40

3.00 1.00
3.00 1.00
6.50 0.15 44.33 1.00 53.20

3.00 1.00
3.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
2.00 0.15 14.33 1.00 15.77
4.15 0.15 28.67 1.00 31.53
6.50 0.15 44.33 1.00 48.77
3.55 0.15 24.67 1.00 27.13

6.00 1.00
4.00 1.00
6.00 1.00
3.00 1.00
6.50 0.15 133.00 1.00 146.30

3.00 1.00
21.00 1.00
3.00 1.00
1.00 1.00
2.00 1.00
3.00 1.00
3.00 1.00
2.00 0.15 14.33 1.00 15.77
4.15 0.15 28.67 1.00 31.53
6.50 0.15 221.67 1.00 243.83

4.00 2.00
4.00 2.00
2.00 0.15 14.33 2.00 31.53

6.00 2.00
9.00 2.00
3.00 2.00
6.00 2.00
6.50 0.15 177.33 2.00 390.13

3.00 2.00
3.00 2.00
3.00 2.00
4.70 0.15 32.33 2.00 77.60
6.55 0.15 44.67 2.00 107.20

3.00 1.00
3.00 1.00
3.60 0.15 25.00 1.00 27.50
3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
1.00 1.00
3.00 1.00
2.00 0.15 14.33 1.00 15.77
4.15 0.15 28.67 1.00 31.53
6.50 0.15 133.00 1.00 146.30

3.00 1.00
3.00 1.00
2.90 0.15 20.33 1.00 22.37
6.50 0.15 44.33 1.00 48.77

3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.00 0.15 14.33 1.00 15.77
4.15 0.15 28.67 1.00 31.53
6.50 0.15 88.67 1.00 97.53

3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.60 0.15 36.67 1.00 44.00
6.50 0.15 88.67 1.00 106.40
5.00 0.15 68.67 1.00 82.40
6.00 0.15 82.00 1.00 98.40
1.20 0.15 18.00 1.00 21.60

3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
2.60 0.15 18.33 1.00 22.00
6.50 0.15 88.67 1.00 106.40
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20
1.20 0.15 9.00 1.00 10.80

4.00 1.00
4.00 1.00
4.00 1.00
4.00 1.00
2.60 0.15 18.33 1.00 22.00
6.50 0.15 44.33 1.00 53.20

3.00 1.00
12.00 1.00
3.00 1.00
1.00 1.00
1.00 1.00
3.00 1.00
3.00 1.00
4.55 0.15 31.33 1.00 37.60
6.50 0.15 88.67 1.00 106.40
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20
1.20 0.15 9.00 1.00 10.80

4.00 1.00
4.00 1.00
6.50 0.15 44.33 1.00 53.20

3.00 1.00
3.00 1.00
1.00 1.00
3.00 1.00
4.55 0.15 31.33 1.00 37.60
6.50 0.15 44.33 1.00 53.20
0.85 0.15 6.67 1.00 8.00

3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
0.85 0.15 6.67 1.00 8.00
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20
1.20 0.15 9.00 1.00 10.80

3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.10 0.15 21.67 1.00 26.00
6.50 0.15 88.67 1.00 106.40
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20
1.70 0.15 12.33 1.00 14.80

3.00 1.00
3.00 1.00
6.50 0.15 44.33 1.00 75.37
1.70 0.15 12.33 1.00 20.97

3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.10 0.15 21.67 1.00 26.00
6.50 0.15 88.67 1.00 106.40
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20

3.00 1.00
12.00 1.00
3.00 1.00
3.00 1.00
3.00 1.00
3.10 0.15 21.67 1.00 26.00
6.50 0.15 88.67 1.00 106.40
5.00 0.15 34.33 1.00 41.20
6.00 0.15 41.00 1.00 49.20

+20.70 m
3.00 2.00
3.00 2.00
6.50 0.15 44.33 2.00 106.40

3.00 2.00
3.00 2.00
4.55 0.15 31.33 2.00 75.20

3.00 2.00
3.00 2.00
6.50 0.15 44.33 1.00 53.20
3.60 0.15 25.00 1.00 30.00
2.90 0.15 20.33 1.00 24.40

3.00 1.00
3.00 1.00
6.00 0.15 41.00 1.00 49.20
1.70 0.15 12.33 1.00 14.80

3.00 1.00
3.00 1.00
6.00 0.15 41.00 1.00 49.20

@ +4.50 m, C-25

2.25 0.40 6.63 2.00 105.34


2.25 0.40 6.63 2.00 119.25
1.15 0.40 3.88 2.00 55.41
2.75 0.40 7.88 4.00 283.50
2.25 0.40 6.63 6.00
2.75 0.40 7.88 3.00 101.59

6.20 0.40 16.50 2.00 219.45


6.20 0.40 16.50 2.00 379.50
6.20 0.40 16.50 4.00 471.90
6.20 0.40 16.50 2.00 297.00
6.20 0.40 16.50 3.00 254.93
2.25 0.40 6.63 3.00 70.56
6.20 0.40 16.50 12.00 851.40

6.20 0.40 16.50 2.00 212.85


6.20 0.40 16.50 2.00 173.25
6.20 0.40 16.50 2.00 150.15
6.20 0.40 16.50 4.00 594.00
6.20 0.40 16.50 3.00 180.68
2.25 0.40 6.63 3.00 70.56
6.20 0.40 16.50 3.00 212.85

4.70 0.40 12.75 2.00 164.48


4.70 0.40 12.75 8.00 729.30
4.70 0.40 12.75 2.00 229.50
4.70 0.40 12.75 3.00 139.61
4.70 0.40 12.75 3.00 135.79
4.70 0.40 12.75 12.00 657.90

6.55 0.40 17.38 2.00 224.14


6.55 0.40 17.38 4.00 496.93
5.75 0.40 15.38 4.00 553.50
2.60 0.40 7.50 2.00 107.25
3.15 0.40 8.88 2.00 85.20
6.55 0.40 17.38 3.00 190.26
6.55 0.40 17.38 3.00 185.04
6.55 0.40 17.38 6.00 448.28
2.60 0.40 7.50 3.00 96.75
5.75 0.40 15.38 3.00 198.34
r Ribbed Slab @ +7.80 - +14.40 m, C-25

2.25 0.40 6.63 6.00 256.39


2.25 0.40 6.63 6.00 357.75
1.15 0.40 3.88 6.00 166.24
2.75 0.40 7.88 12.00 850.50
2.25 0.40 6.63 18.00 423.34
2.75 0.40 7.88 9.00 304.76

6.20 0.40 16.50 6.00 658.35


6.20 0.40 16.50 24.00 2,831.40
6.20 0.40 16.50 6.00 891.00
6.20 0.40 16.50 9.00 542.03
2.25 0.40 6.63 9.00 211.67
6.20 0.40 16.50 36.00 2,554.20

6.20 0.40 16.50 6.00 638.55


6.20 0.40 16.50 6.00 871.20
6.20 0.40 16.50 12.00 1,782.00
6.20 0.40 16.50 9.00 542.03
2.25 0.40 6.63 9.00 211.67
6.20 0.40 16.50 18.00 1,277.10

4.70 0.40 12.75 6.00 493.43


4.70 0.40 12.75 24.00 2,187.90
4.70 0.40 12.75 6.00 688.50
4.70 0.40 12.75 9.00 418.84
4.70 0.40 12.75 9.00 407.36
4.70 0.40 12.75 36.00 1,973.70

5.75 0.40 15.38 6.00 595.01


5.75 0.40 15.38 12.00 1,319.18
5.75 0.40 15.38 12.00 1,660.50
2.60 0.40 7.50 6.00 321.75
3.15 0.40 8.88 6.00 255.60
5.75 0.40 15.38 9.00 505.07
5.75 0.40 15.38 9.00 491.23
5.75 0.40 15.38 18.00 1,190.03
2.60 0.40 7.50 9.00 290.25
5.75 0.40 15.38 9.00 595.01

ng

1.65 0.10 17.50 1.00


1.65 0.10 17.50 1.00
1.65 0.10 17.50 1.00 50.75
1.65 0.10 17.50 1.00 30.63
5.05 0.20 26.25 1.00 43.31
15.00 1.00 24.75
1.65 0.20 138.75 1.00 145.69

1.65 0.10 17.50 1.00


1.65 0.10 17.50 1.00
1.65 0.10 17.50 1.00
4.25 0.20 22.25 1.00 36.71
15.00 1.00 24.75
1.65 0.20 120.25 1.00 126.26

1.65 0.13 13.69 4.00


1.65 0.13 13.69 4.00
1.65 0.13 13.69 4.00
1.65 0.13 13.69 4.00
3.75 0.20 19.75 4.00 126.40
11.00 4.00 70.40
1.65 0.20 101.75 4.00 427.35

1.65 0.13 13.69 4.00


1.65 0.13 13.69 4.00
1.65 0.13 13.69 4.00
4.25 0.20 22.25 4.00 142.40
13.00 4.00 83.20
1.65 0.20 120.25 4.00 505.05
1.60 0.10 17.00 1.00
1.60 0.10 17.00 1.00
1.60 0.10 17.00 1.00
1.60 0.10 17.00 1.00
5.05 0.20 26.25 1.00 40.69
15.00 1.00 23.25
1.60 0.20 135.00 1.00 141.75

1.60 0.10 17.00 1.00


1.60 0.10 17.00 1.00
1.60 0.10 17.00 1.00
4.25 0.20 22.25 1.00 34.49
15.00 1.00 23.25
1.60 0.20 135.00 1.00 141.75

1.60 0.10 17.00 4.00


1.60 0.10 17.00 4.00
1.60 0.10 17.00 4.00
1.60 0.10 17.00 4.00
3.45 0.20 18.25 4.00 113.15
11.00 4.00 68.20
1.60 0.20 99.00 4.00 415.80

1.60 0.10 17.00 4.00


1.60 0.10 17.00 4.00
1.60 0.10 17.00 4.00
3.35 0.20 17.75 4.00 110.05
13.00 4.00 80.60
1.60 0.20 117.00 4.00 491.40

1.30 0.15 9.67 1.00


1.30 0.15 9.67 1.00
1.30 0.10 14.00 1.00
1.30 0.10 14.00 1.00
1.30 0.12 11.83 1.00
1.30 0.15 9.67 1.00
1.30 0.15 9.67 1.00
1.30 0.15 9.67 1.00
12.65 0.20 64.25 1.00 83.53
30.00 1.00 39.00
1.30 0.20 225.00 1.00 270.00

30

2.20 0.15 15.67 4.00 78.33


2.30 0.20 12.50 2.00 88.75
6.00 2.00
4.50 0.15 31.00 1.00 213.90
4.50 0.15 31.00 2.00 427.80

1.00 0.15 7.67 4.00 150.27


1.30 0.15 9.67 2.00 51.23
3.30 0.15 23.00 2.00 225.40
3.30 0.15 23.00 4.00 450.80

2.20 0.15 15.67 16.00 313.33


1.10 0.20 6.50 8.00 184.60
6.00 8.00
3.30 0.15 23.00 4.00 634.80
3.30 0.15 23.00 8.00 1,269.60

1.00 0.15 7.67 16.00 453.87


1.30 0.15 9.67 8.00
3.30 0.15 23.00 8.00 680.80
3.30 0.15 23.00 16.00 1,361.60

2.20 0.15 15.67 4.00 78.33


0.80 0.20 5.00 2.00 35.50
6.00 2.00
3.00 0.15 21.00 1.00 144.90
3.00 0.15 21.00 2.00 289.80
1.00 0.15 7.67 4.00 96.60
1.30 0.15 9.67 2.00 20.30
3.30 0.15 23.00 2.00 144.90
3.30 0.15 23.00 4.00 289.80

l, C-30

2.10 0.15 15.00 2.00 106.50


2.10 0.15 15.00 2.00 25.50
0.75 0.15 6.00 2.00 60.60
6.00 2.00
2.85 0.15 20.00 1.00 200.00
2.85 0.15 20.00 4.00 952.00

3.30 0.15 23.00 2.00 151.80


0.60 0.15 5.00 2.00 33.00
0.90 0.15 7.00 2.00
4.80 0.15 33.00 2.00 217.80
11.25 0.15 76.00 4.00 1,003.20

b, C-25 @ +1.65 m

6.00 0.10 61.00 1.00 192.15


6.00 0.15 41.00 1.00 248.05
6.00 0.15 41.00 1.00 293.15
6.00 0.15 41.00 1.00 369.00
6.00 0.15 41.00 1.00 145.55
6.00 0.15 41.00 1.00 176.30

5.75 0.11 53.27 1.00 535.39


6.50 0.11 60.09 2.00 1,207.83
Slab, C-25

1.50 0.12 13.50 4.00 151.20

3.10 0.12 26.83 4.00 236.13

@ +17.70 m

1.45 0.12 13.08 1.00 69.34

2.95 0.12 25.58 1.00 56.28

2.60 0.15 18.33 1.00 66.92


2.60 0.15 18.33 1.00 118.25
2.60 0.15 18.33 1.00 65.08
2.60 0.15 18.33 1.00 160.42
1.45 0.15 10.67 1.00 107.20
6.00 0.15 41.00 1.00 176.30

6.50 0.15 44.33 2.00 305.90


6.50 0.15 44.33 2.00 789.13
6.50 0.15 44.33 1.00 152.95
6.50 0.15 44.33 1.00 190.63

5.00 0.15 34.33 1.00 118.45


5.00 0.12 42.67 2.00 759.47
5.00 0.15 34.33 1.00 147.63

7.20 0.15 49.00 1.00 169.05


6.00 0.12 51.00 2.00 907.80
6.00 0.15 41.00 1.00 176.30
2.90 0.12 25.17 1.00 132.13
2.90 0.15 20.33 1.00 43.72
3.10 0.12 26.83 1.00 140.88
1.20 0.12 11.00 1.00 97.90

2.00 0.15 14.33 1.00 134.73


2.00 0.15 14.33 1.00 102.48
2.00 0.15 14.33 1.00 80.98
2.00 0.15 14.33 1.00 106.07
2.00 0.15 14.33 1.00 70.23
2.00 0.15 14.33 1.00 61.63
2.00 0.15 14.33 1.00 54.47
2.00 0.15 14.33 1.00 52.32
2.00 0.15 14.33 1.00 48.02

4.15 0.15 28.67 1.00 124.70

6.50 0.15 44.33 1.00 192.85

2.95 0.12 25.58 1.00 56.28

6.50 0.12 55.17 2.00 981.97


6.50 0.15 44.33 1.00 172.90
1.85 0.12 16.42 1.00 117.38
6.50 0.15 44.33 1.00 190.63
6.50 0.15 44.33 1.00 168.47
6.50 0.12 55.17 2.00 981.97
6.50 0.15 44.33 2.00 323.63
6.50 0.12 55.17 1.00 413.75
6.50 0.12 55.17 1.00 394.44
3.60 0.12 31.00 1.00 162.75
2.90 0.12 25.17 1.00 249.15

@ +20.70 m

4.55 0.18 26.28 1.00 285.11


6.00 0.10 61.00 1.00 661.85
1.70 0.10 18.00 1.00 72.00

6.50 0.11 60.09 1.00 534.81


3.60 0.13 28.69 1.00
2.90 0.13 23.31 1.00
3.60 0.13 28.69 1.00

Total length(M) - 40,103.59 66,617.65


Unit Weight (Kg/M) 0.22 0.40 0.62
Total Weight (Kg) - 15,840.92 41,103.09
Summary for Super Structure
6mm 8mm 10mm
Total length(M) - 40,103.59 66,617.65
Unit Weight (Kg/M) 0.22 0.40 0.62
Total Weight (Kg) - 15,840.92 41,103.09
- 15,840.92 41,103.09
- - -

1.00 0.25 5.00 1.00 5.00


1.00 0.25 5.00 1.00 5.00

1.00 0.25 5.00 3.00 9.75


Total length(M) 19.75 - -
Unit Weight (Kg/M) 0.22 0.40 0.62
Total Weight (Kg) 4.38 - -
0

1.00 0.18 6.56 2.00 13.11


1.00 0.18 6.56 1.00 13.77
1.00 0.18 6.56 1.00 15.08

Total length(M) - 41.96 -


Unit Weight (Kg/M) 0.22 0.40 0.62
Total Weight (Kg) - 16.57 -
ዲሶች ኃ.የተ.የግ.ማህበር

& Engineers Plc


ct :- Awash Bank
uctor :-

12mm 14mm 16mm 20mm 24mm

63.60

49.20

94.80

43.80

168.00

568.80

175.20

82.40

189.60

58.40
103.00

237.00

73.00

123.60

126.40

56.80

84.00

252.80

58.40

42.00

47.40

79.00

29.20
247.20

379.20

243.20

123.60

284.40

87.60

123.60

284.40

87.60

61.80

142.20

39.50

123.60
252.80

63.20

82.40

47.40

47.40

142.20

61.80

47.40

165.90

123.60

94.80

379.20

61.80

47.40
165.90

82.40

31.60

94.80

247.20

237.00

118.50

164.80

94.80

189.60

127.20

98.40

189.60
87.60

133.00

308.20

28.95
31.65
3.65
4.30
19.20
21.15
20.85

28.95
31.65
7.30
4.30
19.20
21.15
20.85

63.45
57.15
25.05
22.95

21.15
5.10
2.55
19.05
19.05

22.05
20.55

34.20
32.20

21.20
19.20

34.05
148.05
31.35
23.70
20.85

40.40
38.40
10.00
46.80
12.75
7.80
16.20
38.80

20.40
132.30

62.70
63.45
41.70

59.40
296.10
62.70
38.40
41.70

13.95
11.85

29.70
63.45
31.35
19.20
20.85
30.75
29.25

34.20
28.20
25.60
41.20
60.00
21.50
3.80
10.95
10.35
37.60
28.60
7.15
22.60
30.00
7.50

13.00
10.80

38.80
41.40
19.00
10.95
10.35
28.00
21.00
22.60
5.65
30.00
7.50

12.20
38.20
4.20
19.00
10.40
22.00
11.00
28.00
35.00

20.75
10.95

31.40
12.50
13.80
29.40
7.35

29.40
27.40

34.20
28.20
25.60
41.20
40.15
30.10
11.40
18.25
17.25
46.20
69.30
28.60
22.60
11.30
30.00
22.50

27.60
28.20
25.60
43.20
55.00
25.80
11.40
14.60
19.75
39.60
39.60
28.60
7.15
22.60
5.65
32.00
16.00
33.40
31.40

27.60
28.20
25.60
37.00
71.50
34.40
15.20
21.90
7.35
39.60
39.60
28.60
35.75
22.60
5.65
26.00
19.50

27.60
28.20
25.60
37.00
71.50
34.40
15.20
21.90
7.35
39.60
39.60
28.60
35.75
22.60
5.65
26.00
19.50

43.80
41.10

8.70
5.70

22.05
5.80
5.80
31.40

33.30
42.80

22.05
20.55

120.00
592.20
125.40
76.80
83.40
96.00
92.80

13.95
11.85

29.70
63.45
31.35
19.20
20.85

30.75
87.75

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
28.60
22.60
26.00
6.50

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
14.30
22.60
5.65
26.00
13.00

34.20
28.20
25.60
41.20
51.10
34.40
22.80
17.25
46.20
46.20
28.60
7.15
22.60
5.65
30.00
30.00

29.40
27.40

34.20
28.20
25.55
34.40
24.20
24.20
30.60
30.60

25.60
41.20
22.80
25.55
17.25
22.60
5.65
30.00
30.00
34.20
28.20
25.60
43.20
25.55
25.80
15.20
14.60
19.75
46.20
57.75
28.60
7.15
22.60
11.30
32.00
16.00

33.40
31.40

34.20
28.20
25.60
37.00
25.55
38.70
26.60
18.25
4.90
46.20
57.75
28.60
35.75
22.60
5.65
26.00
13.00

27.60
28.20
25.60
37.00
38.50
8.60
2.45
46.20
11.55
28.60
22.60
26.00

43.80
41.10

8.70
5.70

22.05
20.55

120.00
592.20
125.40
76.80
83.40

96.00
92.80

13.95
11.85

29.70
63.45
31.35
19.20
20.85

30.75
87.75

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
28.60
22.60
26.00
6.50

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
14.30
22.60
5.65
26.00
13.00

34.20
28.20
25.60
41.20
51.10
34.40
22.80
25.55
17.25
46.20
46.20
28.60
7.15
22.60
5.65
30.00
30.00

29.40
27.40

34.20
28.20
25.55
34.40
24.20
24.20
30.60
30.60

25.60
41.20
22.80
25.55
17.25
22.60
5.65
30.00
30.00

34.20
28.20
25.60
43.20
25.55
25.80
15.20
14.60
19.75
46.20
57.75
28.60
7.15
22.60
11.30
32.00
16.00

33.40
31.40

34.20
28.20
25.60
37.00
25.55
38.70
26.60
18.25
4.90
46.20
57.75
28.60
35.75
22.60
5.65
26.00
13.00

34.20
28.20
25.60
37.00
25.55
8.60
3.80
46.20
11.55
28.60
22.60
26.00

43.80
41.10
8.70
5.70

22.05
20.55

120.00
592.20
125.40
76.80
83.40

96.00
92.80

13.95
11.85

29.70
63.45
31.35
19.20
20.85
30.75
29.25

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
28.60
22.60
26.00
6.50

34.20
28.20
25.60
37.00
30.00
30.10
19.00
10.95
4.90
37.60
18.80
28.60
14.30
22.60
5.65
26.00
13.00

34.20
28.20
25.60
41.20
51.10
34.40
22.80
25.55
17.25
46.20
46.20
28.60
7.15
22.60
5.65
30.00
30.00

29.40
27.40

34.20
28.20
25.55
34.40
24.20
24.20
30.60
30.60

25.60
41.20
22.80
25.55
17.25
22.60
5.65
30.00
30.00

34.20
28.20
25.60
43.20
25.55
25.80
15.20
14.60
19.75
46.20
57.75
28.60
7.15
22.60
11.30
32.00
16.00
33.40
31.40

34.20
28.20
25.60
37.00
25.55
38.70
26.60
18.25
4.90
46.20
57.75
28.60
35.75
22.60
5.65
26.00
13.00

34.20
28.20
25.60
37.00
25.55
8.60
3.80
46.20
11.55
28.60
22.60
26.00

22.65
20.55

14.10
28.20
19.20
20.85

12.15
31.65
8.10
41.70

22.65
20.55

30.15
22.80
3.85
19.20
31.50
63.30
10.80
41.70
21.15

28.95
148.05
31.65
3.85
8.60
19.20
20.85

22.80
17.20

126.60
126.90
25.80
83.40

52.50
24.60
69.60

13.95
11.85
29.70
84.60
31.65
11.55
4.30
19.20

31.35
29.25

28.95
31.65
19.20
21.15
20.85

19.35
84.60
30.90
28.05
22.35

19.35
84.60
30.90
15.30
28.05
22.35

25.80
16.20
20.40
37.00

19.35
84.60
30.90
3.65
4.30
28.05
22.35

29.40
27.40

19.35
14.10
3.65
36.00

11.85
30.90
18.30
22.35

20.85
84.60
32.40
16.80
29.55
23.85

25.65
23.55

20.85
84.60
27.90
16.80
29.55
19.35

20.85
84.60
27.90
29.55
19.35

45.30
41.10

33.60
29.40

45.30
41.10

25.65
23.55

21.15
19.05
204.71
5
28.88
119.88

126.00
56.88
30.63

106.80
320.40
156.09
68.46

287.54
175.26
93.11
28.05
122.40
49.30
40.80

122.40
55.25
39.95

139.40
394.40
173.40
85.00

363.80
200.60
88.40

18.37
13.05
92.40
107.80
20.71
34.80
26.58
14.98
9.60

38.40

119.87

9.60
9.60

14.00
274.01
226.08
110.47

3,532.00 10,909.90 16,905.68 5,379.21 -


0.89 1.21 1.58 2.47 3.55
3,136.41 13,190.07 26,694.07 ### -

12mm 14mm 16mm 20mm 24mm


3,532.00 10,909.90 16,905.68 5,379.21 -
0.89 1.21 1.58 2.47 3.55
3,136.41 13,190.07 26,694.07 ### -
3,136.41 13,190.07 26,694.07 13,270.52 -
- - - - -

- - - - -
0.89 1.21 1.58 2.47 3.55
- - - - -
- - - - -
0.89 1.21 1.58 2.47 3.55
- - - - -

Вам также может понравиться