IT NO DESCRIPTION UNITE QUANTITY
1.5 Apply quartz paint of chosen type and color to fence m2 1552
Concrete capping for above HCB with thickness
1.6 100mm work ml 260
Reinforcemt steel bars according to structural
drawings Price shall include cutting, bending, placing
1.7 in position and tying wire.
a) the pile kg 1974.72
b) Beam kg 1219.68
c) Column kg 987.36
8.00 4,032.00
50.00 10,200.00
450.00 6,489.00
450.00 9,657.00
450.00 3,672.00
50.00 37,800.00
60.00 93,120.00
35.00 54,320.00
50.00 13,000.00
7.00 13,823.04
7.00 8,537.76
7.00 6,911.52
261,562.32
25.00 45,500.00
80.00 145,600.00
40.00 14,000.00
120.00 42,000.00
60.00 45,600.00
50.00 31,000.00
60.00 7,800.00
50.00 6,500.00
60.00 13,680.00
30.00 5,850.00
30.00 13,500.00
30.00 29,550.00
100.00 1,000.00
1,000.00 14,000.00
415,580.00
BILL OF QUANTITY FOR FENCE AND SITE WORK
Contrat Unit rate
IT NO DESCRIPTION UNITE QUANTITY
1.5 Apply quartz paint of chosen type and color to fence m2 1552 70.00
Concrete capping for above HCB with thickness
1.6 100mm work ml 260 100.00
Reinforcemt steel bars according to structural
drawings Price shall include cutting, bending, placing
1.7 in position and tying wire.
a) the pile kg 1974.72 35.00
b) Beam kg 1219.68 35.00
c) Column kg 987.36 35.00
2.12 with redash compacted properly for drive ways m2 985 130.00
Mount appropriate road furnitures and paints for
2.13 parkings and drive ways pcs 10 150.00
Construct manhole with 600x600x1200 concrete with
2.14 diam 8-300 rebar and 10cm thickness pcs 14 2,000.00
4,032.00
10,200.00
36,050.00
53,650.00
20,400.00
151,200.00
155,200.00
108,640.00
26,000.00
69,115.20
42,688.80
34,557.60
711,733.60
45,500.00
364,000.00
14,000.00
70,000.00
228,000.00
62,000.00
13,000.00
13,000.00
13,680.00
25,350.00
58,500.00
128,050.00
1,500.00
28,000.00
1,064,580.00
ABUNE GORGORIYOS SCHOOL AWARE BRANCH
FOR SANITERY WORK CONSTRUCTION FINANCIAL EVALUATION RESULT
Total amount with VAT
NAME OF THE CONTRACTOR Befor arthemetic After arthemetic
No. check check
1 Bahiru Eyasu BC 583,661.80 583,662.38
2 Hana and Abrham Construction 650,670.00 663,320.00
3 Festus Construction 1,261,653.50 1,706,703.50
ESULT
nt with VAT
Remark
1st Least Bider
2nd Least Bider
3rd Least Bider
Technical Qualifications, Competence, and Experience of the Tenderer
CRITERIA
Valid trade
NAME OF THE license or
CONTRACTOR Debarred by VAT Valid tax
Conflict of business
Grade Nationality
Interest
decision of the
organization
registration clearance
Employer certificate certificate
registration
certificate
Registered in
Ethiopia no no Valid Valid Valid
Bahiru Eyasu BC BC-5
Registered in
Ethiopia - - Valid Valid Valid
Hana and Abrham
Construction GC-8
Registered in
GC-6
Ethiopia - - Valid Valid Valid
Festus Construction
General experience of the Tenderer
Historical
Financial
No. of Project Experiance (for Average Annual
NAME OF THE Performance Profesinal
CONTRACTOR
(for the last 5 the last 5 Turnover(for the Equipments Staff
REMARK
(5 YEARS
YEARS) YEARS) last 3 years)
PERFORMA
NCE)
- - - - - -
Hana and Abrham
Construction
1,280.00
6,000.00
15,000.00
10,000.00
72,000.00
-
6,000.00
5,000.00
14,000.00
20,000.00
16,000.00
165,280.00
1,941,593.60
291,239.04
2,232,832.64
ABUNE GORGORIYOS SCHOOL AWARE BRANCH
BILL OF QUANTITY FOR SANITERY WORK
UNIT Contrat Unit rate Contrat
Item DESCRIPTION Quantity Amount
1.1 Demonshing 15cm reinforced concrete m2 200
Excavation for drainge structure on
backside of retaining wall with 2m width
1.2 and from reduced level to a depth not m3 300
exceeding 150cm.
Ditto Item No. 1:1 exceeding 150cm but
1.3 not 300cm depth. lm 708
Installing reinforced Ø1200mm pipe. price
1.4 include preparation of pipe bed. lm 100
Construct open U- Chanal ditch as shown
in the figure 500mmX300mmX1000mm to
1.5 protect the buliding from surface and lm 110
neighbouring flood.
Construct entance retaing wall with rack
1.6 Ø20 C/C 2cm kg 115
99
99
54
130.5
184.5
ABUNE GORGORIYOS SCHOOL AWARE BRANCH
BILL OF QUANTITY FOR SANITERY WORK
UNIT Contrat Unit rate Contrat
Item DESCRIPTION Quantity Amount
1.1 Demonshing 15cm reinforced concrete m2 270 160 43200
1.13 Construct brick wall above the membrane m2 246 150 36900
bedded in cement mortar ratio 1:3
1.14 Demolishing and construct after finshing
the drainage work, hand wash size
1mX6mX1m with concrete and cover with pcs 1 4080 4080
ceramic
1.15 Place 200x200mm Terazo for floor finshing
around hand wash area m2 20 150 3000
1.16 Cart away surplus excavated material
at adistance not exceeding 5km from the m3 700 120 84000
site.
Total summery 823,200.00
Vat (15%) 123,480.00
Grand Total 946,680.00
ABUNE GORGORIYOS SCHOOL LEBU BRANCH
BILL OF QUANTITY FOR ADDITIONAL WORK FOR FENCE AND SITE WORK
UNIT Contrat Unit rate Contrat
Item DESCRIPTION Quantity Amount
Demonshing the exsting and temporary
1.1 m2 1512 15 22680
fence.
1.2 Construct temporary fence. m3 780 30 23400
1.3 Demonshing 15cm reinforced concrete. m2 8 160 1280
Demonshing reinforced concrete Colunm
1.4 m2 2.88 600 1728
on the gate.
Cart away surplus excavated material at
1.5 adistance not exceeding 5km from the site. m3 1400 120 168000
Relocate steel water tank to approprate
1.6 place. pcs 1 5000 5000
Relocate roto water tank and after finsh the
1.7 fence work place to the orignal place. pcs 1 840 840
Relocate the guard house to aproprate
1.8 place. pcs 1 240 240
Relocate children play toys and after finsh
1.9 the site work place to the approprate place. pcs 6 80 480