DAILY WELDING PARAMETER VERIFICATION RECORDS

Project: Lingshui
WBS Element: 10235-05MY

Length (mm)
Preheat (ºC)

kJ/mm(Max)
(Amp) (V)

Welder No.

Verification
Heat Input,
Time (sec)
Date/Time

Dia. (mm)

Temp(ºC)
(AF-XXX)

Electrode
Drawings

Interpass

Inspector
(Root) %
Joint No.

O2 Level

(Initial)
WPS
Max Max

Monitored by (ASM): Reviewed by (Client if applicable): Remarks


Frequency: Once per Shift monitoring according to
ITP

Name Name All monitored parameter are according to WPS.


Position Welding Inspector Date
Date Approved Not Approved

PDC10004234268