Академический Документы
Профессиональный Документы
Культура Документы
igotanoffer.com
We have designed our tests to resemble the official BCG Potential Test as closely as possible. The
layout of this test follows exactly the one offered by BCG in most of its offices. Here are a few tips to use
this test as efficiently as possible:
Do the whole test under real time conditions: you have 45 minutes to complete it.
At the end of the 45 minutes, put your pen down, even if no one is there to ask you to. The reason this is
important is that you need to track your progress across different sample tests. If you do not stick to the
allocated time, you will have no way of knowing for sure whether you are progressing or not.
Finally, we are here to answer any of your questions, so if you get stuck trying to understand the
explanations in the answer key, just drop us a line at: support@igotanoffer.com. We’ll be happy to fill any
gaps!
Online case. During your recruiting process with BCG you will have to go through an online case. The
purpose of this exercise is to test your analytical and logic skills as well as your business sense.
Sample. This document is a sample of 23 questions put together by IGotAnOffer. Its purpose is to help
you prepare for the actual online exercise you will have to complete. We recommend that you take no
more than 45 minutes to solve this test.
No calculator. You should complete this sample test without using a calculator.
Scoring system. You should select one or more answers for each question. During the actual test you
will be able to move onwards and backwards and change your prior answers so you should feel free to
do the same here. For each right answer you will get +3 points, you will get 0 points for no answer and -1
point for a wrong answer.
1. £22 M
2. £32 M Number of farms Product specifications LPG NG Elec.
3. £42 M New farms in 2015 100 Heat in kWh produced
50 50 20
4. £52 M per hour (kWh / h)
New farms in 2019 250 Hours of operation per
500 500 500
year (h)
Existing farms as of 2014 10,000
Retail price (£) 1,100 1,000 500
Annual share of old farms replacing
Question x / 23
their heating system
1%
Area covered (m2) 500 500 200
1. 0.9%
2. 3.2% Number of farms Product specifications LPG NG Elec.
3. 5.2% New farms in 2015 100 Heat in kWh produced
50 50 20
4. 10.3% per hour (kWh / h)
New farms in 2019 250 Hours of operation per
500 500 500
year (h)
Existing farms as of 2014 10,000
Retail price (£) 1,100 1,000 500
Annual share of old farms replacing
Question x / 23
their heating system
1%
Area covered (m2) 500 500 200
4. North: coal
South: coal, LPG SOUTHERN PROVINCES
West: coal, LPG Coal: 1.0 CNY / kg
East: coal, LPG, electricity LPG: 6.0 CNY / kg
NG: 4.0 CNY / m3
Electricity: 0.8 CNY / kWh
4. North: coal
South: LPG SOUTHERN PROVINCES
West: NG Coal: 1.0 CNY / kg
East: LPG LPG: 6.0 CNY / kg
NG: 4.0 CNY / m3
Electricity: 0.8 CNY / kWh
SOUTHERN PROVINCES
Coal: 1.0 CNY / kg
LPG: 6.0 CNY / kg
NG: 4.0 CNY / m3
Electricity: 0.8 CNY / kWh
SOUTHERN PROVINCES
Coal: 1.0 CNY / kg
LPG: 6.0 CNY / kg
NG: 4.0 CNY / m3
Electricity: 0.8 CNY / kWh
£1 = 10 CNY
£1 = 10 CNY
assembly Transport
£60 £10 £10
cost / unit
3. Telyss works with two
Electricity heater
subcontractors Production
£300 £150 £100
simultaneously cost / unit
4. Telyss hedges itself Transport
£40 £5 £5
cost / unit
against exchange rates
£1 = 10 CNY
fluctuations
50%
90% 20% 500
400
40%
400
30% 300 250
200
20% 35% 200
100
50 50
10% 2020 100
0% target
2014 2020 target
0
Nuclear
Renewable
Nucleargas
Natural Renewable
Natural Gas
Hydropower Hydropower
Coal
Coal Electricity production Heat production
1. 438.5 g
2. 490.5 g CO2 emissions (g) / kWh
1% 1100
3. 665.5 g 100% 3% 1% 1000
4. 845.5 g 90% 5% 15% 1000
900
80%
2014 15%
800
70%
15% 700
60% 2014
Question x / 23 600
600
50%
90% 20% 500
400
40%
400
30% 300 250
200
20% 35% 200
100
50 50
10% 2020 100
0% target
2014 2020 target
0
Nuclear
Renewable
Nucleargas
Natural Renewable
Natural Gas
Hydropower Hydropower
Coal
Coal Electricity production Heat production
1. In some regions of China, Li Hu, head of the Chinese Energy Agency Additional natural gas supply in 2020
coal heating is not the
cheapest heating source “Our objective is to rely less on coal energy 50
and to reduce CO2 emissions. Regarding
(in CNY / kWh) agriculture, Chinese farming techniques Domestic Import from
2. In every region, natural are still behind those used in Europe, shale gas Russia
gas heating is expected to resulting in poor meat quality and frequent 40
be cheaper than coal outbreak of swine fever. Our target is to
1. Using gas heaters will Li Hu, head of the Chinese Energy Agency Additional natural gas supply in 2020
generate less pollution
than using coal or electric “Our objective is to rely less on coal energy 50
and to reduce CO2 emissions. Regarding
heaters. This will agriculture, Chinese farming techniques Domestic Import from
contribute to reducing are still behind those used in Europe, shale gas Russia
pollution and improving resulting in poor meat quality and frequent 40
the quality of the outbreak of swine fever. Our target is to
Subcontractor 1 2 3 4
CO2 emitted
100 NA 50 NA
(tonnes)
Turnover
45,000 56,000 230,000 67,000
(k CNY)
Ecotax
NA 280 NA 255
(k CNY)
Question 1 Question 2
Correct answer: 3 Correct answer: 3
The percentage contribution can be calculated as Answer 1 is not correct because the turnover for
follows: export market excluding China is increasing at less
than 50% per annum (£9M, £11M, £12M, £14M and
1. Calculate the growth of turnover from 2015 to 2019 £20M for each year from 2015 to 2019).
= (40 + 20 + 25) - (45 + 9 + 1) = £30M.
Answer 2 is not correct because the domestic market
2. Calculate the contribution of each segment as in 2019 is £40M, which is lower than the global export
(revenue increase between 2015 and 2019) / 30. market in 2019: 20 + 25 = £45M.
Then:
- Contribution of China = 24 / 30 For answer 3, notice that between 2016 and 2017:
- Contribution of Export market except China = 11 / 30 - The growth of the turnover in China is +£5M / year
- Contribution of Domestic market = -5 / 30 - The growth of the turnover in the rest of the export
market is +£1M / year
To avoid lengthy calculations, notice that answer 4 Therefore, the growth of turnover in China is equal to
cannot be correct because the Chinese contribution (5-1) / 1 = 400% more than the growth of turnover in
cannot be negative. the rest of export markets.
Then notice that answer 1, 2 and 3 only differ on the Therefore, in China between 2016 and 2017, the
export market except China segment, whose turnover grows 400% more than in the rest of the
contribution is 11 / 30. Since, 10 / 30 ≈ 33.3% and 1 / export market. Answer 3 is correct.
30 ≈ 3.3%, then 11 / 30 ≈ 36.6%.
Therefore, answer 3 is the right answer with
contribution of export market except China = 37%.
Question 3 Question 4
Correct answer: 2 Correct answer: 4
The size of the market in China in 2015 is given by: Answer 1 is not the right answer: the profit margin per
Market size = number of natural gas heaters sold x type of heater could help calculate if Telyss meets its
price. profit target. But it does not help us to know what the
revenue will be in 2015.
There are 100 new farms to be built in 2015.
There are 10,000 x 1% = 100 old farms that need to Answer 2 is also incorrect: knowing whether Telyss
change their heating system in 2015. breaks even does not help to calculate its revenue in
Thus, a total of 200 farms need new heaters. 2015.
The heat produced per heater per year is given by: The share of Chinese customers willing to purchase a
50 x 500 = 25,000 kWh = 25 MWh. heater in 2015 is insufficient to calculate the revenue
of Telyss in 2015. It does not indicate whether
Therefore, the number of heaters needed per farm is customers will purchase a heater from Telyss or
equal to: 4,000 MWh / 25 MWh = 160. another company. Answer 3 cannot be the right
answer.
The total number of heaters needed is given by:
Total number of heaters = farms x heaters =160 x 200 The market share of Telyss in China for 2015 does
= 32,000. help to calculate its turnover in China for 2015
(turnover = market share x size of the market).
Finally, the value of the heater market is given by:
number of heaters x price = 32,000 x 1,000 = £32M The correct answer is answer 4.
Question 5 Question 6
Correct answer: 2 Correct answer: 3
Telyss achieves its 2015 target if it revenues are £1M. The cost of 1 kWh of heat is equal to:
Therefore, the minimum market share that ensures (price of 1 unit of heating source) / (heat produced by
Telyss achieves its revenue target must solve: 1 unit of heating source)
(market share) x 32 = 1
For statement 1,
Therefore, Heating with LPG costs:
7 CNY / 14 kWh = 0.5 CNY / kWh
Market share = 1 / 32 ≈ 1 / 33 ≈ 3 / 100 ≈ 3% Heating with natural gas costs:
4 CNY / 10 kWh = 0.4 CNY / kWh < 0.5
Answer 2 is the closest answer. So statement 1 is false.
For statement 2:
Heating with electricity costs: 1 CNY / kWh > 0.5
Statement 2 is false.
Statement 3:
Heating with coal costs
1 CNY / 2 kWh = 0.5 CNY / kWh
Statement 3 is the right answer
Question 7 Question 8
Correct answer: 3 Correct answer: 3
The condition is met when the cost of heating (the The condition is met when the cost of heating
formula given in the previous answer key) is less than proposed in the answer is the lowest among all those
or equal to 0.5 CNY. available.
You can use some of the results obtained in question Here too, you can use some of the results obtained in
6 to reduce the number of calculations. question 6 to reduce the number of calculations.
• For coal: 1 CNY / kg implies 0.5 CNY / kWh
• For LPG: 7 CNY / kg implies 0.5 CNY / kWh In the west, coal costs 0.9 CNY / 2 kWh = 0.45 CNY /
• For NG: 4 CNY / m3 implies 0.4 CNY / kWh kWh. It remains more expensive than natural gas. So
answer 1 and 2 cannot be correct.
Answer 1 is false because, in the southern provinces,
the prices of coal and LPG are below 1 CNY / kg and Answer 3 differs from answer 4 only in the southern
7 CNY / kg respectively. So the answer for southern and eastern provinces.
provinces cannot be “none”. In the eastern provinces,
- Electricity costs 0.3 CNY / kWh,
Answer 2 is false because, in the northern provinces, - LPG costs 7 CNY / kg = 0.5 CNY / kWh,
the price of LPG is higher than 7 CNY / kg, so the - Coal costs 1 CNY / kg = 0.5 CNY / kWh
LPG cost cannot be lower than 0.5 CNY / kWh. - Natural gas costs 4 CNY / m3 = 0.4 CNY / kWh
Answer 4 does not list natural gas for any region. Therefore, electricity is the cheapest energy for
However, in all regions natural gas costs 4 CNY / m3 heating. So “East: LPG” in answer 4 is not correct and
= 0.4 CNY / kWh < 0.5 CNY. As a result answer 4 is answer 3 is the correct answer.
false and answer 3 is the correct answer.
Question 9 Question 10
Correct answer: 2 Correct answer: 3
The CEO’s objective is to sell the product most likely The cost proposed in the four answers should be
to be successful (see conditions of success in Doc 3) compared to the cost of the cheapest energy source
across all energy sources and all four regions of
The electric heater is more convenient than the China. Therefore, the cost should be less than 0.25
natural gas and the LPG heater which are themselves CNY / kWh, which is the cost of coal in the northern
more convenient than coal heaters (Doc 3). provinces (0.5 CNY / 2 kWh = 0.25 CNY / kWh).
Question 7 provides the list of the heaters that Answer 1, 2 and 3 are less than or equal to 0.25 /
guarantee a cost of fuel below 0.5 CNY / kWh. kWh, since 2.5 CNY / m3 = 2.5 CNY / 10 kWh = 0.25
Crossing the least convenient heaters from the list CNY / kWh. Therefore, the maximum of these costs is
gives: North: coal, NG. South: coal, NG, LPG. West: 2.50 CNY / m3.
coal, LPG, NG. East: coal, LPG, electricity, NG.
Answer 3 is the right answer.
Therefore, in the north, NG heaters are most likely to
be successful and in the east, electric heaters are
most likely to be successful.
Question 11 Question 12
Correct answer: 2 Correct answer: 1
The first step is to determine the quantity of heaters to The profit of Telyss will become positive when the
be sold in 2015. Given that Telyss plans to sell £1M of cumulated revenue become higher than the
heaters in 2015 and sells only natural gas heaters, at cumulated costs.
£1,000 per unit, Telyss should sell £1M / £1,000 =
1,000 units in 2015. In 2015:
Fixed cost for 2015 = £600,000
The second step is to calculate the cost of Variable costs = 1,000 x 210 = £210,000
manufacturing 1,000 heaters for each scenario. Revenue for 2015 = £1,000,000
Cost of exporting from the UK: Cumulated costs = Variable costs + fixed costs =
- Fixed cost per year = £10,000 x 12 = £120,000 £210,000 + £600,000 = £810,000
- Variable costs = £560 x 1,000 = £560,000 Cumulated revenue = £1,000,000
- Total cost = 120,000 + 560,000 = £680,000
Cost of subcontracting in China: The cumulated revenue of Telyss is higher than the
- Fixed cost = £5,000 x 12 = £60,000 cumulated expenses starting from 2015. The correct
- Variable cost = £260 x 1,000 = £260,000 answer is answer 1.
- Total cost = 60,000 + 260,000 = £320,000
Cost of producing in China:
- Fixed cost = £50,000 x 12 = £600,000
- Variable cost = £210 x 1,000 = £210,000
- Total cost = 600,000 + 210,000 = £810,000
Question 13 Question 14
Correct answer: 4 Correct answer: 2
All the statements have the form of a logical Answer 1: if the subcontractor does not deliver the
implication “if A then B”. goods to the final customer but to a warehouse
controlled by Telyss, it would be more difficult for them
Answer 1: If the subcontractor copies and sells to copy and sell the heaters, as they do not get a
Telyss’s products, then it becomes a competitor for direct access to customers. As a result, the
Telyss, so the competition is increased. competition risk is reduced.
Answer 2: If the subcontractor doesn’t meet the Answer 2: Checking the quality of the components
manufacturing standards, the quality of the end before the shipment to the subcontractor does not
product might decrease. reduce the risk that the subcontractor makes errors in
assembling the components. It only reduces the risk
Answer 3: If the subcontractor goes bankrupt, then of having components of bad quality. But this risk is
Telyss will not be able to assemble its products in not mentioned in question 13. This strategy does not
China until it finds a new subcontractor, which will address any risks mentioned in question 13.
result in business discontinuity.
Answer 3: working with two different subcontractors
Answer 4: the statement says that if the production is simultaneously would reduce the possibility that
made in China, there is no currency risk. This supply gets discontinued.
statement is not true because even if the assembly is
charged in CNY, components are purchased in USD. Answer 4: if Telyss takes an insurance against
So there is a possibility that the currency variation will currency variations, it reduces the currency risk.
impact Telyss in a negative way.
Therefore, answer 2 is the correct answer.
Question 15 Question 16
Correct answer: 2 Correct answer: 4
If x is the quantity of heaters above which natural gas From your answer to question 15, you know that if
installation cost is lower than LPG installation cost, there are more than 22 heaters to install, natural gas
then x needs to solve: installation costs are lower than LPG installation
costs.
NG installation cost = 100,000 + 10,000 x < LPG
installation cost = (3,600 + 11,000) x As a result, if customers always choose the solution
with the lowest installation costs, it is less suitable for
Notice that the piping costs have been removed from Telyss to sell in a market with a high proportion of
the above equation because the cost is the same for farms that need less than 22 heaters.
natural gas installation and LPG installation.
Recall from Doc 2 that one natural gas heater covers
Then, 500m2. Thus, farms with a heating surface of 0 to
100,000 + 10,000 x < (3,600 + 11,000) x 5,000m2 need from 0 to 10 heaters. Those with a
Is equivalent to: 100,000 < 4,600 x heating surface of 5,000 to 10,000m2 need from 10 to
Or, x > 100,000 / 4,600 20 heaters and those with a heating surface of more
Which gives: x > 21.7 than 10,000m2 need more than 20 heaters
Therefore, natural gas installation cost is lower than The graph shows that the west is the smallest market
LPG installation cost if and only if more than 22 for farms that need more than 20 heaters. As a result,
heaters are installed. it is on this market that it is least suitable to sell the
natural gas heater when customers want the lowest
Answer 2 is the right answer installation cost. It would be more suitable to sell LPG
heaters.
Question 17 Question 18
Correct answer: 1 Correct answer: 1
The amount of CO2 generated per kWh of electricity To calculate the total decrease in CO2 emissions
can be calculated by summing across all energy between 2014 and 2020, you can calculate the total
sources: % energy source in the mix x CO2(g) / kWh CO2 emitted in 2014 and in 2020 and subtract one
for energy source. result from the other.
In 2014 90% of 1 kWh of electricity came from coal However, to simplify calculations, you can also notice
and 1 kWh of electricity produced by coal emits 1,000 that the share of coal in the mix decreases from 90%
g of CO2. As a result, 1kWh of electricity produced at to 35% and that the share of all other energy sources
least 90% x 1000g = 900g of CO2. Therefore, (with lower emissions than coal) increases. Therefore
electricity heating was producing at least 900g / kWh emissions should decrease by at most:
in 2014. (35% x 1,000 g / kWh) - (90% x 1,000 g / kWh)
= 350 g / kWh – 900 g / kWh = -550 g / kWh
Natural gas heating produced 200g / kWh in 2014.
LPG heating produced 250g / kWh in 2014. The effect of a higher share of natural gas on total
Coal heating produced 400g / kWh in 2014. CO2 emissions is: (15% x 600 g / kWh) - (1% x 600
g / kWh) = 90 g / kWh – 6 g / kWh = 84 g / kWh
Therefore electricity emits more than any of the other
heating methods. The correct answer is answer 1. Therefore, since -550 + 84 = -466, the net decrease in
CO2 emissions must be less than 466g. The only
answer possible is therefore answer 1.
Question 19 Question 20
Correct answer: 2 Correct answer: 3
The price of natural gas in 2014 is 4.0 CNY and the Answer 4:
expected price in 2020 should be 39% lower. If you The correct answer to question 17 shows that this
use 40% as an approximation, you find that the statement is true.
expected NG price should be 4 x 0.6 = 2.4.
Question 21 Question 22
Correct answer: 3 Correct answer: 2
The right answer is the one that helps to: (1) Reduce Answer 1: this answer is not correct because the
the dependency on coal energy or reduce CO2 product of MU YIN FARM are sold to customers who
emissions or avoid disease or improve meat quality are not farms while Telyss’s products are sold to
by spreading farm management best practices (Doc farms.
8) AND (2) Increase the profits of Chinese farms.
Answer 2: this answer is correct. Like heaters,
Answer 1: reducing pollution is only in the interest of SODOC products are also sold to farms.
the Chinese government. It does not make the If a farm buys a ventilation system it will bring cold air
Chinese farms more profitable which require a heater to increase the temperature.
If a farm buys a heater, it needs a climate control
Answer 2: The reduction of Chinese farms cost of system to regulate it.
heating is only in the interest of the farms, not of the
government. Answer 3: the customers of these two companies are
the same. But using insulation material does not
Answer 3: A warm environment improves the health of generate more need for a heater. On the contrary, it
animals, thus the quality of the meat. It also prevents may not be necessary to heat if a farm is well
diseases. This is in the interest of the government. insulated.
Moreover, it also maximises the growth of animals
while reducing the cost of feed. This increases the Answer 4: the customers of these two companies are
profitability of farms which is in the interest of farms. the same, but purchasing animal feed does not
The correct answer is therefore answer 3. generate a need for heaters. On the contrary, the
farmer may need to heat less because the feeds
make his animals more resistant to cold conditions.
Question 23
Correct answer: 3