HSE Verification and Validation Check List

ENERGY
No
ISOLATION
Safeguard Verfication (requirement in place) Items Yes No N/A
Procedure

1 Has the Isolation certificate been in place and signed by all authorized
parties?

2 Have the drawing/marked up P&IDs with isolation certificate identification


number been available?

3 Have all other works related to the Isolation certificate been identified and
considered the SIMOPS?

4 Have all PTW related to the energy isolation work been in place and signed
by all authorized parties?

5 Has the breaking containment certificate been in place? (if needed)

6 Have all of the JSA related to the energy isolation work been reviewed and
approved by competent personnel?

7 Has the Pre-Job safety meeting been conducted prior commencing the work?

8 Have all of the changes on the isolation been recorded properly in the
isolation certificate?

9 Has the management of change procedure (MoC) been applied to any


deviation or changes of procedure and/or method of work?
HSE Verification and Validation Check List
ENERGY
People ISOLATION
1 Do the energy isolation designed and performed by competent personnel?
(Isolation Coordinator & Isolating Authority)

2 Do all of the Performing Authorities aware of his/her responsibility to


ensuring the integrity of the isolation prior commencing the work?

3 Do all of the workforces been informed and aware of the hazard related to
the isolation?
Tools & Equipment/Facility/Environment

1 Have all of the isolation equipment been applied/installed refer to the


isolation design?

2 Has the initial integrity testing been performed to all isolations?


For guideline refer to PRO-139 eni Indonesia r02 - Appendix E

3 Have all isolations been secured to prevent any unauthorized operation?

4 Has isolation integrity monitoring been performed at suitable intervals and


recorded as part of the shift handover?

5 Do the breaking containment process performed as per plan?


(if any breaking containment is needed)
HSE Verification and Validation Check List
ENERGY ISOLATION
6 Have cleaning and gas freeing step been performed as per plan/procedure?

7 Have barricade and safety sign been applied around the affected area during
breaking containment and gas cleaning/freeing activities?
HSE Verification and Validation Check List
ENERGY ISOLATION
Remarks
HSE Verification and Validation Check List
ENERGY ISOLATION
HSE Verification and Validation Check List
ENERGY ISOLATION
HSE Verification and Validation Check List
ENERGY ISOLATION
Validation (functioning) Status
HSE Verification and Validation Check List
ENERGY ISOLATION
HSE Verification and Validation Check List
ENERGY ISOLATION
HSE Verification and Validation Check List
ENERGY ISOLATION
Remarks
HSE Verification and Validation Check List