Вы находитесь на странице: 1из 4

cost of land

Cost approval
Initial filling

Board of Directors
1 Engr. Olajide Dosunmu
2 Ejovwoke Dosunmu Ph.d
3 Mrs Jacqueline Ezekwelume Msc. LL.M, BL

Beneficial Ownership
1 Engr. Olajide Dosunmu
2 Ejovwoke Dosunmu Ph.D.

Relevant Project

Drainage design for 7km system 6c channel from Alamutu market


mushin to Apapa oshodi express way. Lagos Mainland.
1
Design of storm water drainage channel for system four channel, from
Yaba to Otto creek behind national theatre. Lagos Mainland-Yaba,
Surulere including route survey and mapping of 5km channel.
2
Design of downstream reach of system one primary storm water
channel in Ogudu which drains most part of Ikeja, maryland and
Ogudu. Also design of drainage masterplan of Nigerian police
mortgage bank/ FOKAS estate. Lagos mainland-Ogudu including Topo
3 survey of drainage route and 27 hectares of Land.
Design of Opebi reach of system one storm water drainage channel
Odo-iyalaro. Lagos mainland-Ikeja and Topographic survey of 52
4 hectares of Land and design of access road.

Drainage design and route survey for Osapa channel from Lekki Epe
expressway to Lagos Lagoon via Nicon town Lekki
5
Design and cathment topographic survey of of Down stream reach of
System 6 storm water drainage channel including lake assessment
6 from Festac Town to Badagry creek
Drainage master plan design for Ikorodu subregion, involving over 15
7 River channels
Vacuum drainage sewer and Topographical Survey of 85 hectares
8 Parkview estate.

Design of road and Drainage infrastructure for 8.5 hectares Jcil estate
Lekki Lagos including survey works
9
Design of Drainage, road, and full infrastructure for JCIL Estate
Lakowe Ibeju lekki Lagos
10

Design of road and drainage infrastructure for including survey for 10


hectares Palm spring residence in Lugbe Abuja FCT.
11
160,000,000.00

8,000,000.00
1,200.00 3000 3,600,000.00

Nature of Work Status


Design and
Design and Consruction Construction fully
Supervision completed

Design and
Design and Consruction Construction fully
Supervision completed

Design Completed,
Design and Consruction Construction on
Supervision going

Design and Consruction Design Completed,


Supervision Channel dredged
Design completed
Design and Consruction and Construction
Supervision partialy completed

Design Design complete

Design Design on-going

Design Design complete


Design complete,
Design and Consruction construction
Supervision ongoing
Design complete,
Design and Consruction construction
Supervision ongoing
Design complete,
Design and Consruction construction
Supervision ongoing

Вам также может понравиться